World Bank Aided MAHARASHTRA AGRICULTURAL COMPETITIVENESS PROJECT 1 ST MID TERM REVIEW (22 nd April – 03 rd May 2013) AURANGABAD DISTRICT PROGRESS REPORT PREPARED BY PROJECT IMPLEMENTATION UNIT (AGRICULTURAL MARKETING) F/E/78, 1st Floor, LDB Training Centre Bldg, Market Yard, Gultekdi, Pune-411037, Tel: 020-24270315/16, Fax: 020-24270322 E-mail:[email protected]. Website: http://macp.gov.in
39
Embed
AURANGABAD DISTRICT - MACPmacp.gov.in/sites/default/files/user_doc/Aurangabad...AURANGABAD STDIST. REPORT-1 MTR 2013 4 1. Executive Summary: Aurangabad District is located mainly in
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
World Bank Aided
MAHARASHTRA AGRICULTURAL COMPETITIVENESS PROJECT
1ST MID TERM REVIEW (22nd April – 03rd May 2013)
AURANGABAD DISTRICT PROGRESS REPORT
PREPARED BY
PROJECT IMPLEMENTATION UNIT (AGRICULTURAL MARKETING)
F/E/78, 1st Floor, LDB Training Centre Bldg, Market Yard, Gultekdi, Pune-411037,
• Major Crop Arrivals: Major commodities marketed in the APMC are Cotton, Maize, Gram.
• Existing Market Infrastructure:
Sr. No. Name of Infrastructure Capacity 1 Sale hall 20 A 32 R 2 Godown 950 MT 3 Road 1 KM 4 Wall compound All yard 5 Hamal Bhawan 1200 sq.ft. 6 Farmer house 1200 sq.ft. 7 Toilet block 400 sq.ft 8 Lady workers rest house 200 sq.ft 9 Office building 100*50 10 Grain cleaning machine 10 MT per hours 11 Weigh Bridge 30 MT 12 Shopping center 43 shops
• Full Project Proposal (FPP) Details:
o Project cost FPP/ Sanction tender cost- Rs. 186.06Lakhs
o Basic Infrastructure Cost- Rs. 89.92 Lakhs
AURANGABAD DIST. REPORT-1ST MTR 2013 10
o Productive Infrastructure Cost- Rs. 96.13 Lakhs
• Name of SP- M/s. Precision Precast Services PL, Pune
• Name of Contractor- M/s C B Bikkad
• Name of MFE- Mr. Ranjit Anchalkar
• Date of work order- 29/02/2012
• Date of Commencement of Work: 29/02/2012
• Date of Completion: 28-02-2013 (Actual Expected July 2013)
• Extension Date – 31/07/2013.
• Amt. of Expenditure till date- Rs. 85.98 Lakh (46.21 %)
o Basic Expenditure- Rs. 58.55 Lakh (65.11 %)
o Productive Expenditure- Rs. 27.43 Lakh (28.53 %)
o Project Expenditure- Rs. 36.13 lakh
• Present Status of MMIP Civil Works:
o 90% work of Cement Concrete Road is complete.
o 31% of RCC gutter work complete.
o Concrete road around godown work completed.
o 10% work of godown completed, work upto plinth level in progress.
• Capacity Building under MMIP: o Training at NIPHT completed, Persons attended: 03 Nos. o Exposure visit to Karnataka State from 23 to 27 Aug 2011, Persons attended: 10
Nos.
AURANGABAD DIST. REPORT-1ST MTR 2013 11
• Photograph
• Reforms:
o APMC Reforms
• Practices- Recording at gate, electronic weighing of commodities, Open Auction practices, Payment within 24 hrs are being practiced in the APMC as per the Model Byelaws prescribed by Director of Marketing, M.S.
• Information Dissemination- The APMC is disclosing regularly financial statements for the benefit of the stakeholders in the form of Annual Reports, as well as information regarding tenders awarded is available.
• Market Information- The APMC has installed electronic boards, as well as manual display boards for providing price information to the farmers & traders.
• Standard Accounting System: The APMC has adopted the Standard Accounting System prescribed by Director of Marketing, M.S. which is being recorded manually at present. The MACP has provided hardware & Tally software. Computerised Standard Accounting System will be commenced by 30th Sept. 2013.
AURANGABAD DIST. REPORT-1ST MTR 2013 12
Lasur Station Status upto 31st March 2013
Sr. No. Name of Work Tender
Amount
Work done upto end of
March
% Achieved upto End of
March Balance Work Physical progress
Basic Infrastructure
1 Cement Concrete Road 52,33,085 47,77,938 91.30 4,55,147 Work completed
2 RCC Gutter 33,27,394 10,47,760 31.49 22,79,634 Work in progress
3 Toilet block 2,76,962 29,577 10.68 2,47,385 Work in progress
4 Water Supply line 1,55,000 - 0.00 1,55,000 Yet to start
Basic Total 89,92,441 58,55,274 65.11 31,37,167
Productive Infrastructure
1 Godown 69,52,433 6,29,876 9.06 63,22,557 Work upto plinth level in progress.
2 Concrete Road around Godown 14,31,022 15,94,948 111.46 -1,63,926 Work completed
3 RCC gutter around Godown 7,76,085 5,18,390 66.80 2,57,695 Work in progress
4 Food Grain Pulse cleaning unit 4,54,265 - 0.00 4,54,265 Yet to start
Productive Total 96,13,805 27,43,214 28.53 68,70,591
TOTAL AMOUNT OF WORK DONE 1,86,06,246 85,98,488 46.21 1,00,07,758
AURANGABAD DIST. REPORT-1ST MTR 2013 13
2. Sillod APMC:
A/P- Sillod, Tal- Sillod Dist- Aurangabad.
• Name of Chairman: Mr. S.A.Salve
• Name of Secretary: Mr. V.M.Kapse
• Area of Main market with subyards:
o Area in Ha Total - 24.71 ha
Sr. No. Name of Yard Area
Ha. 1 Sillod APMC Main Yard 5.72
2 Sub yard Bharadi 3.09
3 Sub yard Ajantha 2.08
4 Sub yard Andhari 3.01
5 Sub yard Ambhai 3.41
6 Sub yard Shivana 2.4
• Commodities Arrivals – last 3 years:
Year Total Arrival MT
Cess In Rs. Lakh
Surplus In Rs. Lakh
2009-10 94940 310.06 183.01
2010-11 92089 426.85 209.11
2011-12 56887 -- --
• Major Crop Arrivals: Major commodities marketed in the APMC are Jowar, Wheat, Cotton,
Wheat
AURANGABAD DIST. REPORT-1ST MTR 2013 14
• Existing Market Infrastructure:
Sr. No.
Name of Infrastructure
Capacity
1 Shekari Niwas 2 hall 2 Office Building 1 3 Water Supply - 4 Wire Fencing partly 5 Godown
o Project cost FPP/ Sanction tender cost- Rs. 208.30 Lakhs
o Basic Infrastructure Cost- Rs. 85.93 Lakhs
o Productive Infrastructure Cost- Rs. 122.36 Lakhs
• Name of SP- M/s. Precision Precast Services PL, Pune
• Name of Contractor- M/s Chandram Ashanna
• Name of MFE- Mr. Ranjit Anchalkar
• Date of work order- 01/02/2013
• Date of Commencement of Work: 01/02/2013
• Date of Completion: 31-01-2014 (Actual Expected Aug 2013)
• Extension Date – NA.
• Amt. of Expenditure till date- Rs. 92.99 Lakh (44.68 %)
o Basic Expenditure- Rs. 61.18 Lakh (71.21 %)
o Productive Expenditure- Rs. 31.80 Lakh (44.68 %)
o Project Expenditure- Rs. 38.54 lakh
• Present Status of MMIP Civil Works:
o Cement Concrete Road & Compound wall work completed.
o Godown works at various levels in progress.
o Weigh bridge works at various levels in progress.
• Capacity Building under MMIP:
o Training at NIPHT- 19 to 22 March 2012 completed, Persons attended: 09 Nos. o Exposure visit to Karnataka State from 4 to 8 Dec 2012, Persons attended: 10 Nos.
AURANGABAD DIST. REPORT-1ST MTR 2013 16
• Photograph
AURANGABAD DIST. REPORT-1ST MTR 2013 17
Sillod APMC Status upto 31st March 2013
Sr. No. Name of Work Tender Amount Work done upto
end of March % Achieved upto
End of March Balance Work Physical progress
Basic Infrastructure
1 Water Tank at Main yard Sillod 14,02,967
- 0.00
14,02,967 Excavation for footing in
progress 2 Cement Concrete Road
a At Sub Yard Shivana 4,06,715
2,70,085 66.41
1,36,629 Work completed
b At Sub Yard Ajintha 3,43,728
3,67,271 106.85
-23,543 Work completed
3 Compound Wall
a At Sub Yard Ambhai 21,68,604
20,52,089 94.63
1,16,515 Work completed
b At Sub Yard Andhari 19,19,168
19,47,170 101.46
-28,001 Work completed
4 Plinth Protection and SW Drain
a At Sub Yard Shivana 23,52,287
14,82,375 63.02
8,69,912 Work in progress
Basic Total 85,93,468 61,18,989 71.21 24,74,479
AURANGABAD DIST. REPORT-1ST MTR 2013 18
Sr. No. Name of Work Tender Amount Work done upto
end of March % Achieved upto
End of March Balance Work Physical progress
Productive Infrastructure
1 Godown 1000 MT
a Sillod Civil 52,29,725
5,68,854 10.88%
46,60,871 Work at truss level
b Sillod Electrical 1,38,463
-
1,38,463 Yet to srart
c Bharadi Civil 52,25,704
23,99,733
28,25,971 Work at truss level
d Bharadi Electrical 1,38,620
-
1,38,620 Yet to start
2 Weigh Bridge
a Andhari Civil 5,35,582
1,04,505 19.51%
4,31,077 Work in progress
b Andhari Electrical 19,334
-
19,334 Yet to start
c Shivna Civil 5,49,308
1,07,892 19.64%
4,41,415 Work in progress
d Shivna Electrical 19,014
-
19,014 Yet to start
3 Godown Repair
a At Ajintha 3,67,116
-
3,67,116
Productive Total 1,22,22,866 31,80,985 26.02% 90,41,880
TOTAL AMOUNT OF WORK DONE 2,08,16,334 92,99,974 44.68% 1,15,16,360 69% completed
AURANGABAD DIST. REPORT-1ST MTR 2013 19
3. Progress of Rural Haats
AURANGABAD DIST. REPORT-1ST MTR 2013 20
SAVANGI RH 1) Name Of Grampanchayat: Savangi * Taluka: Gangapur 2) Population : 25,000 3) Grampanchayat Body: Yes Period from : Land: 2.0 ha. 4) Details of last 3 years Arrivals and Turnover:
1 Lease (Rs.Lakhs) 1.21 1.33 1.45 6) Major Crops in the Area :Maize, Tur, Soyabean
7) No demos conducted by PIU (Agri) :NIL
8) Name of Service Provider : Inhouse
9) Project Cost : Proposed Infrastructure :
Sr.No Item Amount (Rs. Lakhs) 1 RCC work for open space 7.83 2 WBM for open space 4.19 3 New open platform 5.24 4 Drinking water facility 0.36 5 Toilet Block 1.87 6 Vegetable washing tank 0.40 7 RCC Pipe Drain 0.07 8 Compost Pit 0.07 Total 20.03
(Tender Cost: Rs.---------- lakhs) 10) Name of Contractor: Mr.Narendra V Tambat
11) Date of work order : 28.2.2011
12) Period of Completion: Six Month
13) Extension, if any: No
14) Present Status: 100% work completed
15) Final Bill Dated:
16) Handing over of RH to GP: Yes (Date: )
17) RH Management Committee Established: Yes
18) No of Women’s ---00
19) SC/ST--02
20) Nos. of Meetings conducted:
21) Training at NIPHT availed: No
22) No of Person attended: 00
23) Environment related: RH doesn’t fall under ES 1 criteria hence addition measures were not suggested. Provision of compost pit, toilet blocks provided for waste management, cleanliness and hygiene.
AURANGABAD DIST. REPORT-1ST MTR 2013 21
SHIVUR RH 1) Name Of Grampanchayat: Shivur Taluka:Vaijapur
2) Population : 15,600
3) Grampanchayat Body: Yes Period from :Sept. 2010 to sept.2015 Land : 2.35 ha.
5) Lease for last 3 years : S. No. Particular 2009-10 2010-11 2011-12
1 Lease (Rs. Lakhs) 1.43 1.70 2.00
6) Major Crops in the Area:Maize, Tur, Soyabean 7) No demos conducted by PIU (Agri):Nil 8) Name of Services Provider: M/s PankajAgarwal
9) Project Cost : Proposed Infrastructure :
S. No. Item Amount (Rs.) 1 Open auction Platforms 10220.00 2 Drinking Water Facility 954.00 3 Toilet block with septic tank 4139.00 4 Compost Pit 94.00 5 WBM Road 4277.00 6 Site levelling &Misc. Work 267.00 Total 19951.00
(Tender Cost- Rs. 19.99 lakhs) 10) Name of Contractor: Tushmaan Constructions Pvt. Ltd.
11) Date of work order: 4.11.2012
12) Period Of Completion: Six Month
13)Extension, if any :
14)Present Status: 55 % work completed
15) Final Bill Dated: ---
16) Handing over of RH to GP: No
17) RH Management Committee Established: Yes
18) No of Women’s : 02
19) SC/ST - 00
20) Nos. of Meeting conducted:
21) Training at NIPHT availed: Yes
AURANGABAD DIST. REPORT-1ST MTR 2013 24
22) No of Persons attended: ----
23) Environment related: RH fall under ES 1 criteria. EMAP has been prepared and EMAP
compliance is in progress.
24) Photographs:
PLATFORM
DRINKING WATER FACILITY
AURANGABAD DIST. REPORT-1ST MTR 2013 25
GALLE BORGAON RH
1) Name Of Grampanchayat: Galle Borgaon Taluka:Khultabdad
2) Population : 7896
3) Grampanchayat Body: Yes Period from:Sept. 2010 To Sept 2015 Land: 1.25 ha.
4) Details of last 3 years Arrivals and Turnover :
1 Repairing open auction Platforms 372000.00 2 open auction Platforms 1087200.00 3 Drinking Water facilities 96500.00 4 Toilet Block with septic tank 421200.00 5 Compost Pit 9600.00 6 Site leveling and Misc work 9300.00 Total 1995800.00
(Tender Cost- Rs. 19.99 lakhs) 10) Name of Contractor: Shri. Randhe Ashok Nanaji
11) Date of work order: 4.11.2012
12) Period of Completion: Six Month
13) Extension, if any:
14) Present Status: 55 % work completed
15) Final Bill Dated: ---
16) Handing over of RH to GP: No
17) RH Management Committee Established: Yes
18) No of Women’s: 03
19) SC/ST - 01
20) Nos. of Meeting conducted:
21) Training at NIPHT availed: Yes
22) No of Persons attended: ----
AURANGABAD DIST. REPORT-1ST MTR 2013 26
23) Environment related: RH fall under ES 1 criteria. EMAP has been prepared and EMAP
compliance is in progress.
25) Photographs:
PLATFORMS
TOILET BLOCK
AURANGABAD DIST. REPORT-1ST MTR 2013 27
BHARADI RH
1) Name Of Grampanchayat : Bharadi Taluka : Sillod
2) Population : 9000
3) Grampanchayat Body: Yes Period from :Aug 2010 to Aug 2015 Land : 2.98 ha.
4) Details of last 3 years Arrivals and Turnover :
5) Lease for last 3 years : S. No. Particular 2009-10 2010-11 2011-12
1 Lease (Rs. Lakhs) 4.37 6.00 6.25
6) Major Crops in the Area :Maize, Tur, Soyabean
7) No demos conducted by PIU (Agri) :57 Nos.(Maize)
8) Name of Services Provider: M/s Pankaj Agarwal
9) Project Cost : Proposed Infrastructure : S.
No. Item Amount(Rs.)
1 Open auction Platforms 11533.00 2 Drinking Water facilities 941.00 3 Toilet Block with septic tank 4101.00 4 Compost Pit 88.00 5 WBN Road 3138.00 6 Site levelling and Misc work 198.00 Total 19999.00
(Tender Cost- Rs. 19.89 lakhs) 10) Name of Contractor: Shri. Randhe A Nanaji
11) Date of work order: 4.11.2012
12) Period Of Completion: Six Month
13)Extension, if any :
14)Present Status: 55 % work completed (03 tranches given)
15) Final Bill Dated:---
16) Handing over of RH to GP: No
17) RH Management Committee Established: Yes
18) No of Women’s : 02
19) SC/ST - 00
20) Nos. of Meeting conducted:
21) Training at NIPHT availed: Yes
AURANGABAD DIST. REPORT-1ST MTR 2013 28
22) No of Persons attended: 02
23) Environment related: RH doesn’t fall under ES 1 criteria hence addition measures were not
suggested. Provision of compost pit, toilet blocks provided for waste management, cleanliness and
hygiene.
24) Photographs:
PLATFORMS
TOILET BLOCKS
AURANGABAD DIST. REPORT-1ST MTR 2013 29
PACHOD BK. RH
1) Name Of Grampanchayat: Pachod (bk), Taluka : Paithan
2) Population: 10,500
3) Grampanchayat Body : Yes Period from :Aug 2010 to Aug 2015 Land : 0.94
4) Details of last 3 years Arrivals and Turnover :
5) Lease for last 3 years : S. No. Particular 2009-10 2010-11 2011-12
1 Lease (Rs. Lakhs) 1.25 13.00 13.50
6) Major Crops in the Area :Maize, Tur, Soyabean
7) No of demos conducted by PIU (Agri):100 Nos. (Tur Crop)
8) Name of Services Provider: M/s Pankaj Agarwal 9) Project Cost : Proposed Infrastructure :
S. No. Item Amount (Rs.) 1 Open auction Platforms (otta) 10311.00 2 Drinking Water facilities 96900.00 3 Toilet Block with septic tank 418300.00 4 Compost Pit 9100.00 5 WBN Road 379100.00 6 Site leveling and Misc work 65100.00 1999600.00
(Tender Cost- Rs. 19.95 lakhs) 10) Name of Contractor: Shri. Randhe Ashok Nanaji
11) Date of work order: 17.4.2012
12) Period Of Completion: Six Month
13) Extension, if any :
14) Present Status: 40 % work completed (02 tranches given)
15) Final Bill Dated:---
17) RH Management Committee Established: Yes
18) No of Women’s : 01
19) SC/ST - 01
20) Nos. of Meeting conducted:
21) Training at NIPHT availed: Yes
22) No of Persons attended: 09
AURANGABAD DIST. REPORT-1ST MTR 2013 30
23) Environment related: RH doesn’t fall under ES 1 criteria hence addition measures were not
suggested. Provision of compost pit, toilet blocks provided for waste management, cleanliness and
hygiene.
24) Photographs:
PLATFORMS
AURANGABAD DIST. REPORT-1ST MTR 2013 31
BIDKIN RH
1) Name Of Grampanchayat : Bidkin Taluka : Paithan
2) Population : 9000
3) Grampanchayat Body: Yes Period from: Dec 2007 to Dec 2015 Land: 2.11 ha.
4) Details of last 3 years Arrivals and Turnover :
5) Lease for last 3 years : S. No. Particular 2009-10 2010-11 2011-12
1 Lease (Rs. Lakhs) 32.00 35.00 38.00 6) Major Crops in the Area :Maize, Tur, Soyabean
7) No demos conducted by PIU (Agri) :Nil
8) Name of Services Provider: M/s Pankaj Agarwal
9) Project Cost : Proposed Infrastructure :
S. No. Item Amount (Rs. Lakhs) 1 Platforms Repairs 12.82 2 Drinking water 0.94 3 Toilet 4.13 4 Site levelling 2.02 5 Compost Pit 0.09 Total 19.99
(Tender Cost Rs. 19.95 lakhs) 10) Name of Contractor: Shri. Randhe Ashok Nanaji
11) Date of work order: 17.4.2012
12) Period of Completion: Six Month
13) Extension, if any:
14) Present Status: 20 % work completed (01 tranche given)
15) Final Bill Dated: ---Handing
16) Handing over of RH to GP: No
17) RH Management Committee Established: Yes
18) No of Women’s: 02
19) SC/ST - 01
20) Nos. of Meeting conducted:
21) Training at NIPHT availed: Yes
22) No of Persons attended: 02
AURANGABAD DIST. REPORT-1ST MTR 2013 32
23) Environment related: RH doesn’t fall under ES 1 criteria hence addition measures were not
suggested. Provision of compost pit, toilet blocks provided for waste management, cleanliness and
hygiene.
24) Photographs:
PLATFORMS
AURANGABAD DIST. REPORT-1ST MTR 2013 33
4. Progress of FCSCs
AURANGABAD DIST. REPORT-1ST MTR 2013 34
Introduction:
The Component B of the project envisages strengthening of existing markets as well as introduction of alternating marketing systems. Aggregation of agricultural produce through Producer Associations is one of the major project interventions towards piloting alternative marketing systems. The PIU (AM) has hired the services of SPs for 06 Phase-I districts viz., Aurangabad, Ahmednagar, Parbhani, Jalna, Yavatmal & Hingoli. The SPs have commenced the task of awareness creating and group formation. The SPs also have focussed on adopting existing farmer groups (affiliated to ATMA/ NABARD) and mobilizing them towards formation of Producer Associations to established FCSC. Over the tenure of its services the SP will provide handholding to the PG members to establish process and business standards for opertionalisation of FCSC. This will be achieved mainly through supporting the PGs and PAs to design and implement at agricultural marketing business plan. The FCSC will mainly deliver some basic value added activities, in grain and horticulture, and carry out input marketing and output marketing. This would involve supply of inputs like seeds, fertilizers, manures, pesticides, cattle feed to the members & farmers, and also aggregation of produce, its cleaning, grading and marketing.
Sr. No. Name of District Name of SP Remark
1. Aurangabad & A’nagar Wipro Limited Expected Nos. of PAs (FCSCs) 14 per
district. 2. Yavatmal & Hingoli Wipro Limited
3. Parbhani & Jalna, MART
4. Amaravati, Akola,
Buldhana & Washim
SPs appointed by
PIU (Agri)
Amaravati & Buldhana: Expected Nos. of PGs. 367 per district. Akola & Washim: Expected Nos. of PGs. 332 per district.
FCSC Activities in Aurangabad District:
Name of the firm: Wipro Limited
Package No: 3
Districts covered: Aurangabad & Ahmednagar
Agreement signed on the date: 25-09-2012
Details on groups formed/adopted so far:
Total No. of groups formed/adopted across
Cereals & Pulses category
Fruits & vegetables category
Aurangabad district 60 33
Total No. of groups formed/adopted across the package: 164
AURANGABAD DIST. REPORT-1ST MTR 2013 35
Details on meeting on awareness creation:
Awareness meetings conducted cluster wise across No. of meetings conducted
Aurangabad district 9
Total of Package 3 22
Details on meeting on group formation:
Meetings conducted on associating members for group formation across
No. of meetings conducted
Aurangabad district 122
Total of Package 3 180
Details on meeting on capacity building:
Sessions conducted on capacity building across
No. of meetings conducted
Aurangabad district 12
Total of Package 3 25
Details on farmers in the groups formed/adopted:
Total No. of farmers in the groups formed/adopted across
Cereals & Pulses category
Fruits & vegetables category
Aurangabad district 993 574 Entire package 3 1598 1310
Total No. of farmers in the groups formed/adopted across the Package 3: 2908
AURANGABAD DIST. REPORT-1ST MTR 2013 36
AURANGABAD DIST. REPORT-1ST MTR 2013 37
5. Project Management
AURANGABAD DIST. REPORT-1ST MTR 2013 38
IMPLEMENTATION OF GOVERNANCE AND ACCOUNTABILITY ACTION PLAN:
At the district level offices of the DDRCS, designated one senior officer, in each district office, as
the Grievance Redressal Officer, who will receive any complaint relating to any matter relating to
the project. The District Deputy Registrar is designated as the Appellate Authority relating to the
grievance redressal.
Grievance Redressal Mechanism:
Complaint/s through Complaint Boxes: The aggrieved parties (stakeholders or SPs) can
forward the complaints to the respective District Grievance Redressal Officer by writing to the
authority. There are Complaint Boxes in each of the offices of the DDRCS. The Complaint
Boxes are opened by the MACP Accountant on a specific day in a week. The District Head of
the Office will take note of the complaints in the complaints register, gives reply to the
complainant. The details of the arrangement regarding Complaints Boxes is as follows:
Sr. No. Office where the
Complaint Boxes are provided
Persons responsible for opening the Complaint Boxes
1 District Deputy Registrar Coop. Societies
MACP Accountant /District Grievance Redressal Officer in O/o DDRCS
District Grievance Redressal Officers: All the DDRCS offices have one designated
Grievance Redressal officer and the DDRCS is designated as appellate authority for this
purpose. The details of designated officers are as follows.
Department District Level Office
District Grievance Redressal Officer Appellate Authority
Department of Co-operation & Marketing
District Deputy Registrar Coop. Societies (DDRCS)
Asst. Registrar Coop. Societies (ARCS) in the office of DDRCS
District Deputy Registrar Coop. Societies (DDRCS)
1. Date of Complaint Box Installation : 01/06/2012 2. Day & Time of Opening the Complaint Box : Tuesday, 11:00am 3. Complaints received in Complaint Box till March 2013 : - Nil - 4. Name Of MACP Accountant : Mr. N.S. Motinge
AURANGABAD DIST. REPORT-1ST MTR 2013 39
Project Management:
• Computer & Furniture procured at DDRCS office. (Procurement undertaken at PIU(AM) level).
Register for Cheque, EFT & Bank draft Received Cash Book Register for Cheque & Bank draft Issue Payment Voucher Bill Register for Pending & Paid Receipt Voucher Grants Sanction release and Expenditure Register Complaint Register Fixed asset & Dead Stock register (DDR office) Interest register Contractor Payment Register Security deposit register
• Trainings/Workshops/Exposure Visits given to DDRCS officers/staff.
Sr. No.
Trainings/Workshops /Exposure Visits
No. of Participants
1 District Level Workshop 2 2 NIPHT Training 3 APMC Training 2 4 RH Workshop 2 5 ABPF Workshop 1 6 Training / Workshops by ATMA 7 Exposure Visit 1 8 Other MACP Training 2