i AUDIT REPORT ON THE ACCOUNTS OF ASSISTANT DIRECTOR LOCAL GOVERNMENT, ELECTION & RURAL DEVELOPMENT DEPARTMENT AND SELECTED UNION COUNCILS DISTRICT HARIPUR KHYBER PAKHTUNKHWA AUDIT YEAR 2015-16 AUDITOR GENERAL OF PAKISTAN
i
AUDIT REPORT
ON THE ACCOUNTS OF
ASSISTANT DIRECTOR LOCAL
GOVERNMENT, ELECTION & RURAL
DEVELOPMENT DEPARTMENT AND
SELECTED UNION COUNCILS
DISTRICT HARIPUR
KHYBER PAKHTUNKHWA
AUDIT YEAR 2015-16
AUDITOR GENERAL OF PAKISTAN
ii
TABLE OF CONTENTS
1 ABBREVIATION AND ACRONYMS i
2 PREFACE ii
3 EXECUTIVE SUMMARY iii
4 SUMMARY TABLES AND CHARTS vi
Table 1: Audit Works Statistics vi
Table 2: Audit Observations Classified by Categories vi
Table 3: Outcome Statistics vii
Table 4: Irregularities Pointed Out viii
Table 5: Cost Benefit viii
5 CHAPTER 1 1
1.1 AD LGE & RDD and selected Union Councils 1
1.1.1 Introduction 1
1.1.2 Comments on Budget and Accounts (Variance Analysis) 1
1.1.3 Brief Comments on the Status of Compliance 2
1.2 Audit Paras 3
iv
ABBREVIATIONS AND ACRONYMS
AP Advance Para
AD Assistant Director
BOQ Bill of Quantity
CPWD Centeral Public Works Department
CSR Composite Schedule Rates
DAC Departmental Accounts Committee
DC Deputy Commissioner
DDO Drawing and Disbursing Officer
GFR General Financial Rules
KTS Kalabat Twon Ship
LGA Local Government Act
LGE&RDD Local Government Election & Rural Development
Department
MFDAC Memorandum for Departmental Accounts Committee
PAC Public Accounts Committee
PAO Principal Accounting Officer
PCC Plain Cement Concrete
POL Petrolium Oil Lucricants
RDA Regional Directorate of Audit
UC Union Council
WSS Water Supply & Sanitation
v
Preface
Articles 169 and 170 of the Constitution of the Islamic Republic of
Pakistan, 1973 read with Sections 8 and 12 of the Auditor-General (Functions,
Powers and Terms and Conditions of Service) Ordinance, 2001 and Section 168
of Local Government Act 2012 require the Auditor-General of Pakistan to
conduct audit of the receipts and expenditure of Local Fund of Union Councils
and Assistant Director Local Government.
The report is based on audit of the accounts of Assistant Director Local
Government & Rural Development Department Haripur and 15 Union Councils
District Haripur for the Financial Year 2014-15. The Directorate General of Audit,
District Governments, Khyber Pakhtunkhwa, Peshawar conducted audit on test
check basis during 2015-16 with a view to reporting significant findings to the
relevant stakeholders. The main body of the Audit Report includes only the
systemic issues and significant audit findings. Relatively less significant issues are
listed in the Annexure-1 of the Audit Report. The Audit Observations listed in
Annexure-1 shall be pursued with the Principal Accounting Officer at the DAC
level and in all cases where the PAO does not initiate appropriate action, the Audit
observations will be brought to the notice of Public Accounts Committee through
the next year’s Audit Report.
Audit findings indicate the need for adherence to the regularity
framework besides instituting and strengthening internal controls to avoid
recurrence of similar violations and irregularities.
The observations included in this Report have been finalized in the light
of written replies of the Department. DAC meetings could not be convened
despite repeated requests.
The Audit Report is submitted to the Governor of Khyber Pakhtunkhwa in
pursuance of Article 171 of the Constitution of the Islamic Republic of Pakistan,
1973 read with Khyber Pakhtunkhwa Local Government Act 2012, to be laid
before appropriate legislative forum.
Islamabad (Rana Assad Amin)
Dated: Auditor General of Pakistan
vi
EXECUTIVE SUMMARY
The Directorate General Audit, District Governments, Khyber
Pakhtunkhwa, Peshawar, is responsible to conduct the audit of all Assistant
Directors Local Government & Rural Development Department and Union
Councils. Its Regional Directorate of Audit Abbottabad has audit jurisdiction of
Assistant Director Local Government & Rural Development Department and
UCs of six Districts i.e. Abbottabad, Haripur, Mansehra, Battagram, Kohistan
and Tor Ghar.
The Regional Directorate has a human resource of 12 officers and staff,
constituting 3,012 man days and a budget of about Rs15.840 million was
allocated to the Directorate during Financial Year 2015-16. It has the mandate to
conduct financial attest audit, audit of sanctions, audit of compliance with
authority and audit of receipts as well as the performance audit of entities,
projects and programs. Accordingly, Regional Director Audit Abbottabad carried
out audit of the accounts of Assistant Director Local Government & Rural
Development Department and 15 UCs and audit findings included in the Audit
Report.
Assistant Director Local Government & Rural Development Department
and UCs District Haripur perform their operations under Khyber Pakhtunkhwa
Local Government Act 2012. Administrative Secretary i.e. Secretary Local
Government and Rural Development Department, Khyber Pakhtunkhwa is the
Principal Accounting Officer for these local bodies. According to financial
provisions of the Act the Secretary Local Government and Rural Development
Department, Khyber Pakhtunkhwa authorizes the Annual Budget Statement for
these local bodies in the form of budgetary grants.
a. Scope of audit
There are 45 Union Councils in two Tehsils of District Haripur out of
which the accounts of 15 Councils were examined in detail. These Union
vii
Councils were selected for detail audit by excluding the last year audited
entities, on the basis of random sample keeping in view the available man days.
Out of the total expenditure of the Assistant Director Local Government
& Rural Development Department and 15 UCs, District Haripur for the Financial
Year 2014-15, the auditable expenditure under the jurisdiction of RDA was Rs
35.381 million. Out of this, RDA Abbottabad audited an expenditure of Rs
24.766 million which, in terms of percentage, is 70% of auditable expenditure.
The receipts of 15 Union Councils District Haripur for the Financial Year
2014-15 were Rs 16.831 million. Out of this, RDA Abbottabad audited receipts
of Rs 11.781 million which, in terms of percentage, was 70 % of auditable
receipts.
The total expenditure and receipts of Assistant Director Local
Government & Rural Development Department and 15 UCs, District Haripur, for
the Financial Year 2014-15 were Rs 52.212 million. Out of this, RDA
Abbottabad audited the expenditure of Rs 36.548 million.
b. Recoveries at the instant of Audit
Recovery of Rs 4.545 million was pointed out during the audit. However,
no recovery was affected till finalization of this report.
c. Audit Methodology
Audit was conducted after understanding the business processes of
Assistant Director Local Government Office Haripur and Union Councils, with
respect to their functions, control structure, prioritization of risk areas by
determining their significance and identification of key controls. This helped
auditors in understanding the systems, procedures, environment, and the audited
entity before starting audit. Audit used desk audit techniques for analysis of
compiled data and review of actual vouchers with other supporting documents
and records called for scrutiny and substantive testing in the Regional Directorate
of Audit Abbottabad.
d. Audit Impact
viii
Audit pointed out various irregularities of serious nature to the
management. However, no impact was visible as the management failed to reply
and the irregularities could not come to the light in the proper forum i.e DAC.
e. Comments on Internal Control and Internal Audit department
The purpose of internal control system is to ensure effective operation of
an organization. It consists of measures employed by the management to achieve
objectives, safeguard assets, ensure accuracy, timeliness and reliability of
financial and accounting information for decision making.
One of the basic component of Internal Control System, as envisaged
under Para 13 of GFR Volume-I, is Internal Audit which was not prevalent in
Assistant Director Local Government & Rural Development Department
Department.
f. Key Audit Findings of the report;
i. Irregularity &Non compliance was noticed in two cases involving Rs
17.274 million.1
ii. Internal Control Weaknesses was noted in four cases involving Rs
5.874 million.2
g. Recommendations
i. Disciplinary action needs to be taken for violation of the rules and
regulations in spending the public money.
ii. All sectors of AD LGE&RDD and Union Councils need to strengthen
internal controls i.e. financial, managerial, operational, administrative and
accounting controls etc to ensure that reported lapses are preempted and
fair value for money is obtained from public spending.
iii. Transfer of Taxes deducted from the bills of the contractors need to be
ensured.
iv. Inquiries need to be held to fix responsibility for losses, irregular
payments and wasteful expenditure
1 Para 1.2.1.1 & 1.2.1.2
2 Para 1.2.2.1, 1.2.2.2, 1.2.2.3 & 1.2.2.4
ix
SUMMARY TABLES AND CHARTS
Table 1: Audit Work Statistics
(Rs in million)
Table 2: Audit observations classified by categories
(Rs in million)
S.No. Description Amount Placed under
Audit Observation
1 Unsound asset management -
2 Weak financial management -
3 Weak Internal controls 5.874
4 Others 17.274
Total 23.148
S.No Description No. Budget
1 Total Entities (PAOs) in Audit Jurisdiction 01 135.293
2 Total formations in audit jurisdiction 45 135.293
3 Total Entities(PAO) Audited 01 91.038
4 Total formations Audited 16 91.038
5 Audit and Inspection Reports 01 91.038
6 Special Audit Reports - -
7 Performance Audit Reports - -
8 Other Reports - -
x
Table 3: Outcome Statistics
(Rs in million)
S.No. Description
Expenditure
on Acquiring
Physical
Assets
(Procurement)
Civil
Works Receipts Others
Total
For the
year
2014-15
Total
For the
year 2013-
14
1 Outlays
Audited - 41.235 16.831 32.972 91.038 60.806
2
Amount
Placed under
Audit
Observation
/Irregularities
of Audit
- 21.364 - 1.784 23.148 14.65
3
Recoveries
Pointed Out
at the
instance of
Audit
- 4.545 - - 4.545 2.465
4
Recoveries
Accepted
/Established
at the
instance of
Audit
- - - - - -
5
Recoveries
Realized at
the instance
of Audit
- - - - - -
Note: The outcome figures reported for the year 2013-14 pertains to the Ten (10)
Union Councils audited last year. Since the PAO is the same therefore, these
amounts have been included here to show cumulative effect against the PAO.
xi
Table 4: Table of Irregularities pointed out
(Rs in million)
S.No. Description
Amount Placed
under Audit
Observation
1 Violation of Rules and regulations, principle of propriety and
probity in public operation 0
2 Report cases of fraud, embezzlement, thefts and misuse of
public resources. 0
3
Accounting Errors (accounting policy departure from NAM,
misclassification, over or understatement of account balances)
that are significant but are not material enough to result in the
qualification of audit opinions on the financial statements.
0
4 Quantification of weaknesses of internal control systems. 17.274
5
Recoveries and overpayment, representing cases of
establishment overpayment or misappropriations of public
monies
0
6 Non-production of record 0
7 Others, including cases of accidents, negligence etc. 5.874
Total 23.148
Table 5: Cost-Benefit
(Rs in million) S.No Description Amount
1 Outlays Audited 91.038
2 Expenditure on Audit 0.743
3 Recoveries realized at the instance of Audit -
Cost-Benefit Ratio 1:0
1
CHAPTER-1
1.1 Assistant Director LGE&RDD and Union Councils Haripur.
1.1.1 Introduction
District Haripur has two Tehsils i.e. Haripur & Ghazi. There is an
Assistant Director Local Government & Rural Development Department and 45
Union Councils. Each Union Council has a Secretary. Assistant Director Local
Government & Rural Development Department is Drawing and Disbursing
Officer (DDO) for his office and union councils of the District Haripur.
According to 1998 population census, the population of District Haripur is
692,228.
1.1.2 Comments on Budget and Accounts (Variance Analysis)
An amount of Rs 118.462 million was allocated as budget by the
Provincial Government to Assistant Director Local Government & Rural
Development Department and 15 Union Councils of District Haripur. Receipts of
Rs 16.831 were realized during Financial Year 2014-15. Thus making a total of
Rs 135.293 at the disposal of local councils, against which expenditure of Rs
74.207 million was incurred by Assistant Director Local Government Department
and 15 Union Councils of District Haripur, with a saving of Rs 44.255 million
during the Financial Year 2014-15. Detail is given below:
Detail of budget & expenditure during Financial Year 2014-15
(Rs in million)
2014-15 Budget Expenditure Excess/ (Saving) %age
Salary 70.572 26.042 44.530 35%
Non-salary 6.655 6.930 -0.275 10%
Developmental 41.235 41.235 0 55%
Total 118.462 74.207 (44.255) 100%
Receipts 16.831 16.831
0
G.Total 135.293 91.038 (44.255)
2
The huge savings of Rs 44.255 million in all heads of accounts indicates
weakness in the capacity of these local institutions to utilize the amount allocated.
Expenditure 2014-15
Rs in million)
1.1.3 Brief comments on the status of Compliance with PAC/ZAC
Directives
The audit reports on the accounts of Assistant Director Local Government
& Rural Development Department and Union Councils Haripur under the LGA
2012, have not yet been discussed in PAC.
S a l a r y R s
2 6 .0 4 2 m i l l io n
(3 5 % )
N o n S a l a r y
R s 6 .9 3 0 m i l l io n
(1 0 % )
D ev e l o p m en t
R s 4 1 .2 3 5
m i l l i o n
( 5 5 % )
S ala ry
N o n Sa la ry
D e ve lo p m e n t
3
1.2 AUDIT PARAS AD LG&RDD AND UCs Haripur
1.2.1 Irregularity & Non compliance
1.2.1.1 Irregular expenditure on account of pay & Allowances of
employees on detailment – Rs 1.784 million
According to Para VIII of notification of Government of Khyber
Pakhtunkhwa Establishment Department issued vide No SOR-
VI/E&AD/Misc/Updation/09 dated 13-01-2009, No posting/transfer shall be
made on detailment basis.
Assistant Director LGE&RDD Haripur during 2014-15 incurred
expenditure of Rs 1,783,872 on account of pay & Allowances of the following
employees on detailment basis in violation of Govt instructions.
S.No Name of Official Working
with
Pay &
Allowances
Total pay &
allowances for the
year 2014-15
1 Khurram Shehzad V/S BPS-7 DC Haripur 18,514 222,168
2 Jamil Khan V/S BPS-7 AC Ghazi 24,996 299,952
3 Aslam Khan N/Q BS-2 AC Haripur 19,201 230,412
4 Muhammad Riasat N/Q BS-2 DC Haripur 14,430 p/m 173,160
5 Imran Khan N/Q BS-2 DC Haripur 12,795 153,540
6 Wasim khan N/Q BS-2 DC Haripur 15,430 185,160
7 Nisar Ahmed N/Q BS-2 DC Haripur 14,430 173,160
8 Sajjad Ahmed N/Q BS-2 DC Haripur 14,430 173,160
9 Muhammad Ibrar N/Q BS-2 AC Haripur 14,430 173,160
Total 1,783,872
Posting on detailment occurred due to weak internal controls, which
resulted in wastage of public money.
When pointed out in March 2016, management stated that the staff
mentioned above have since been discharging their duties in the office of
competent authority after issuance of their posting orders. The posting was made
4
in larger public interest. Reply was not convincing as government instructions
were violated.
Request for convening of DAC meeting was made in April 2016, which
was not convened till finalization of this report.
Audit recommends investigation, fixing responsibility and disciplinary
action besides corrective measures under intimation to audit.
AP No.76 (2014-15)
1.2.1.2 Unauthorized splitting of schemes to avoid sanction- Rs 15.490
million
According to Para 59 of CPWD code “A group of works which form one
project shall be considered as one work, and the necessity for obtaining the
approval or sanction of higher authority to a project which consists of such a
group works is not avoided by the fact that the cost of particular work in the
project is within the powers of approval or sanction of the minor local
Government or other concerned.
Administrator/Secretary Union Councils Haripur during 2010-14 splitted
developmental schemes in phases in order to avoid sanction of the higher
authority. Detail is given at annexure-6
The schemes were splitted due to weak internal control.
When pointed out in March 2016, management stated that no phasing was
allowed, the work was splitted as per site requirement to extent maximum facility
to the local community. Reply was not cogent the schemes were splitted to avoid
sanction of the competent authority.
Request for convening of DAC meeting was made in April 2016, which
was not convened till finalization of this report.
5
AuditThe matter is reported for investigation and action against
person(s) at fault.
AP No.80 (2014-15)
6
1.2.2 Internal Control Weaknesses
1.2.2.1 Non Surrender of Savings – Rs 1.329 million
According to S No III of the minutes of meeting of Finance Department
issued vide Government of Khyber Pakhtunkhwa LGE&RD Department No
SOB/LG/1-4/2003/Vol-II dated 19-11-2013, unspent balances out of allocated
funds during the year should be surrendered to Provincial Account I well in time,
so that same could be re-appropriated to other developmental schemes by P&D
Department Khyber Pakhtunkhwa.
Assistant Director LGE&RDD Haripur during 2014-15 advertized
developmental schemes worth Rs 10,950,000 detail is given at annexure-2. It was
observed that the schemes were awarded for an amount of Rs 9,621,418, however
savings amounting to Rs 1,328,582 were not surrendered to government.
Savings were not surrendered in violation of Government instructions,
which resulted in unauthorized retention of public funds.
When pointed out in February 2016, management stated that the funds
pertain to Union councils and was lying in the UCs bank accounts. After
devolution and establishment of village/Neighbourhood councils the unspent
balance was transferred into the VC/NC bank accounts as per instructions of the
Government. Reply was not convincing as the funds were utilized on
developmental schemes by AD office as executing agency and the unspent
balances were required to be surrendered to provincial Account I as per above
instructions.
Request for convening of DAC meeting was made in April 2016, which
was not convened till finalization of this report.
7
Audit recommends that the funds should be surrendered to
Provincial Government as per instructions.
AP No.77 (2014-15)
1.2.2.2 Non deposit of Income tax and stamp duty – Rs 3.936 million
Para 8 and 26 of the General Financial Rules Volume I requires that each
administrative department to see that the dues of the government are correctly
and promptly assessed, collected and paid into Government Treasury.
Administrator/Secretary Union Councils, deducted Rs 3,386,930 and Rs
549,225 on account of income tax and stamp duty respectively during 2009-15
from various contractors detail is given at annexure-3. The amount was retained
in the union fund instead of depositing into Government treasury.
Non deposit of taxes and stamp duty occurred due to weak internal
control, which resulted into loss to Government.
When pointed out in March 2016, management stated that the concerned
village secretaries have been directed to immediately deposit the amount
deducted on account of income tax and stamp duty and challan shall be shown to
audit. Reply was not convincing as no recovery was made.
Request for convening of DAC meeting was made in April 2016, which
was not convened till finalization of this report.
Audit recommends recovery.
AP No.78 (2014-15)
1.2.2.3 Overpayment due to allowing higher rates- Rs 0.135 million
According to item No 16-22 of CSR 2012 and CSR 2009 rate for supply
and spreading 1’ to 1.5’ guage shingle on road surface including compaction is
Rs 561.90/m/3 and 368.00/m3 respectively
Administrator/Secretary Union Councils Haripur during 2010-13 overpaid
Rs 134,695 to the contractors in the schemes by allowing higher rates then
approved rates as per detail given in annexure-4
8
Overpayment was made to contractors due to weak internal control,
which resulted in loss to Government
When pointed out in March 2016, management stated that the rates were
allowed as per BOQ as per exact compaction. No overpayment was allowed,
furthermore scheme wise analysis report will be prepared and will be shown to
audit. Reply was not convincing as higher rates were allowed other then CSR.
Request for convening of DAC meeting was made in April 2016, which
was not convened till finalization of this report.
The matter is reported for recovery under intimation to audit.
AP No.79 (2014-15)
1.2.2.4 Non Deduction of Sales Tax –Rs 0.474 million
According to Government of Pakistan Collectorate of Sales Tax &
Federal Excise letter No.ST(Tech)Misc.Purchase.06/6097 dated 10/10/2006 there
is no sales tax on services of Repair and Fixation of Pipes etc, however the
material used in such services are chargeable to Sales Tax as per Sales Tax Act
1990.
Administrator/Secretary Union Councils Haripur during 2010-14, it was
observed that sales tax amounting to Rs 474,228 was not deducted from the firms
on account of Supplies. Detail is given at annexure-5
Audit observed that non deduction of Sales Tax occurred due to non
observance of rules, which resulted in loss to Government.
When pointed out in March 2016, management stated that observation
would be refer to concerned Secretary of Union council for proper reply to audit
observation.
Request for convening of DAC meeting was made in April 2016, which
was not convened till finalization of this report.
Audit recommends recovery of sales tax.
AP No.81(2014-15)
9
ANNEXURE
Annexure-1
Detail of MFDAC Paras
(Rs in million) S.
No
AP
No. Entity Caption Amount
1 82 AD & UCs Non conducting of physical stock taking of assets -
Total -
10
Annexure-2
Para No.1.2.2.1
Detail of savings
S.# Name of scheme E/cost
expenditur
e savings
1 const of P/wall Bareela 150,000 147,139 2,861
2 const of P/wall Padni Uc Bareela 300,000 292,130 7,870
3 const of P/wall Chappra Bajeeda Uc Mankaria 300,000 292,014 7,986
4 pavment of street Moh Rehmanabad Uc Dhenda 300,000 258,537 41,463
5 const of P/wall, path Pind khankhel Uc Dingi 500,000 490,334 9,666
6 const of path Rarra Uc Pind kamal khan 700,000 685,074 14,926
7 pavment of street/p/wall pind Munim Uc Bareela 300,000 289,188 10,812
8 pavement of street/sanittion pop KTS 200,000 196,013 3,987
9 pavement of street/sanittion Panian 400,000 296,502 103,498
10 const of path Badi Guloo Uc Sirya 600,000 587,307 12,693
11 pavement of street Sakhiabad-ii Uc Kotnajeebullah 300,000 293,490 6,510
12 const of path Moh Kawasaki KTS 200,000 195,944 4,056
13 pavement of street Sakhiabad-i Uc Kotnajeebullah 500,000 431,087 68,913
14 const of path Dhenda Uc Dhenda 700,000 507,638 192,362
15 const of path Bora bandi Basu mera uc Dhenda 600,000 587,208 12,792
16 pavement of street Darul uloom KTS 400,000 348,825 51,175
17 Repair and pavement of street Moh Darband 200,000 173,145 26,855
18 pavement of street adjscent pop Sector 4 uc kalabat 300,000 191,673 108,327
19 pavement of street kangra uc panian 500,000 435,925 64,075
20 const of P/wall Jatti pind 200,000 154,959 45,041
21
pavement of PCC path Lada chowk to Mohri Maliya uc
Dingi 500,000 436,806 63,194
22 Sanitation scheme at Abdullah pur Panian 200,000 166,916 33,084
23 pavement of street P/wall Panian Moh Pull walla 300,000 217,862 82,138
24 pavement of street new abadi Sirya 200,000 160,805 39,195
25 pavement of street Kali tarar ii sharqi Uc Sirya 300,000 249,986 50,014
26 pavement of street Kali tarar i sharqi Uc Sirya 200,000 149,886 50,114
27 pavement of street Chechian Uc pind kamal khan 400,000 307,736 92,264
28 const of path Todo Uc Panian 600,000 490,011 109,989
29 const of path Bara Bandi Bassu mera Uc Dhenda 600,000 587,278 12,722
10,950,000 9,621,418 1,328,582
11
Annexure-3
Para No. 1.2.2.2
S.No Name of UC Income tax Stamp duty Total
1 UC Kalinger 239,400 41,250 280,650
2 Bareela 162,000 25,000 187,000
3 Sikandar pur 366,000 76,250 442,250
4 Bandi Sher Khan 373,800 51,250 425,050
5 Darwaish 217,980 30,850 248,830
6 Panian 215,810 33,000 248,810
7 Bagra 262,800 35,500 298,300
8 Ladarmang 248,220 33,375 281,595
9 Sara e Salih 278,520 50,250 328,770
10 Shah maqsood 162,000 33,750 195,750
11 jitti pind 312,000 50,750 362,750
12 North 224,400 29,250 253,650
13 Barkot 324,000 58,750 382,750
Total 3,386,930 549,225 3,936,155
12
Detail of Income Tax & Stamp duty Uc Kalinger
Name of scheme E/cost Stamp duty Income Tax Year
const of open well ring dara kalinger 80,000 250 4,800 2009-10
pavment of street Banda basant pur 90,000 250 5400
const of path moh kartian kalinger 150000 1250 9000
const of well Mari 80000 250 4800
const of well ring moh Mulla Tandan 110000 1250 6600
const of path new karkot 80000 250 4800
const of well sawabi mera 80000 250 4800
pavment of street moh meran kalinger 100000 1250 6000
pavment of street kalinger south 80000 250 4800
pavment of street moh Mulla tandan 150000 1250 9000
extension open well Malik Irshad gam 60000 250 3600
PCC road kheri 80000 250 4800
Pavment of street Gandaf phase i 100,000 1250 6,000 2010-11
Pavment of street Gandaf phase ii 50000 250 3000
Pavment of street Gandaf phase iii 100000 1250 6,000
const of link road bala mari phase iii 100000 1250 6,000
const of community center Kalinger iv 100000 1250 6,000
WSS gam phase i 100000 1250 6,000
const of community center Kalinger i 100000 1250 6,000
WSS chajka phase i 100000 1250 6,000
const of link road bala mari phase i 100000 1250 6,000
const of link road bala mari phase iii 100000 1250 6,000
const of community center Kalinger phase ii 100000 1250 6,000
WSS gam phase ii 100000 1250 6,000
const of community center Kalinger phase iii 100000 1250 6,000
Const of well kalinger phase i 100,000 1250 6,000 2011-12
pavement of street Moh Kholian Kalinger 100000 1250 6000
WSS Murad Pur 100000 1250 6000
WSS Murad Pur phase ii 50000 250 3000
const of road moh Awan lassan Kalinger phase i 100000 1250 6000
const of road moh Awan lassan Kalinger phase ii 100000 1250 6000
13
WSS Village Gam phase ii 100000 1250 6000
const of open well moh Ibrahim phase i 100000 1250 6000
const of open well moh Ibrahim phase ii 100000 1250 6000
const of open well moh Ibrahim phase iii 100000 1250 6000
const of protection wall moh Yousaf kalinger 100000 1250 6000
WSS Village Gam phase i 100000 1250 6000
const of path Moh Dara Kalinger 100000 1250 6000
Pavment of street moh dara kalinger 100000 1250 6000
const of protection wall Qabristan karkot 100000 1250 6000
const of path moh saidan kalinger 150000 1250 9000
41250 239,400
Detail of Income Tax & Stamp duty Uc Bareela
Name of scheme E/cost Stamp duty Income Tax year
Pavement of street Chak naim 100,000 1250 6,000 2010-11
pavement of street near h/o Akhtar 100,000 1250 6,000
pavement of street at pind saeeran 100,000 1250 6,000
pavement of street at Bareela 100,000 1250 6,000
pavement of street Padani phase i 100,000 1250 6,000 2011-12
pavement of street Padani phase ii 100,000 1250 6,000
pavement of street Takia Bareela phase i 100,000 1250 6,000
pavement of street Takia Bareela phase ii 100,000 1250 6,000
pavement of street/R/wall pind Munaim phase ii 100,000 1250 6,000
pavement of street/R/wall pind Munaim phase iii 100,000 1250 6,000
pavement of street Bandi Munaim phase i 100,000 1250 6,000
pavement of street Bandi Munaim phase ii 100,000 1250 6,000
const of Nalla Bandi Munaim 100,000 1250 6,000
const of B/wall Qabristan Bandi Munaim 100,000 1250 6,000
pavement of street Khoi Nara 100,000 1250 6,000
Pavement of street pind munaim 100,000 1250 6,000
Sanitation scheme uc Bareela 100,000 1250 6,000
WSS Chack Munaim Tanawal Mohra 700,000 1250 42,000 2012-13
pavement of street uc Bareela 200,000 1250 12,000
pavement of street Khoi Nara 100,000 1250 6,000
25000 162,000
14
Detail of Income Tax & Stamp duty Uc sikandar pur
Name of scheme E/cost Stamp duty Income Tax year
pavement of street h/o manzoor ahmed Mkhan coloney –i 100,000 1250 6000
pavement of street malik Abdul Ghafoor Dheri phase –i 100,000 1250 6000
pavement of street h/o manzoor ahmed Mkhan coloney –ii 100,000 1250 6000
const of culvert Sikandar pur phase-I 100,000 1250 6000
const of culvert Sikandar pur phase-Ii 100,000 1250 6000
const of culvert Sikandar pur phase-Iii 100,000 1250 6000
WSS/sanitation scheme Makhan coloney phase i 100,000 1250 6000
WSS/sanitation scheme Makhan coloney phase ii 100,000 1250 6000
WSS/sanitation scheme Makhan coloney phase iii 100,000 1250 6000
pavement of street malik Abdul Ghafoor Dheri phase –ii 100,000 1250 6000
pavement of street malik Abdul Ghafoor Dheri phase –iii 100,000 1250 6000
pavement of street malik Abdul Ghafoor Dheri phase –iv 100,000 1250 6000
pavement of street malik Abdul Ghafoor Dheri phase –v 100,000 1250 6000
pavement of street Moh Akbar din 100,000 1250 6000
pavement of street Moh Akbar din phase ii 100,000 1250 6000
pavement of street Muzafar abad 100,000 1250 6000
pavement of street Moh Hasrat abad 100,000 1250 6000
pavement of street h/o Saddique 100,000 1250 6000
pavement of street Awan coloney phase i 100,000 1250 6000
pavement of street Awan coloney phase ii 100,000 1250 6000
pavement of street Awan coloney phase iii 50,000 1250 3000
pavement of street mkahan coloney chapper road 100,000 1250 6000
pavement of street Gujar mohra 100,000 1250 6000
pavement of street/street light sikandar pur 100,000 1250 6000
pavement of street Fazal shah Sikandar pur 150,000 1250 9000
pavement of street h/o Qamar to h/o Riaz 100,000 1250 6000
pavement of street khalil ur rehman to h/o Qamar 100,000 1250 6000
pavement of street h/o Aslam 100,000 1250 6000
pavement ostreet to h/o sadiq to h/o nawaz 100,000 1250 6000
pavement of street h/o Akram to h/p Fareed 100,000 1250 6000
pavement of street malik Ibrahim 100,000 1250 6000
15
pavement of street Masjid street moh Bagh dheri 100,000 1250 6000
pavement of street moh talab wali masjid 100,000 1250 6000
pavement of street h/o Gul Khan 100,000 1250 6000
pavement of street near h/o malik zar gul khan 100,000 1250 6000
const of road/t well to Chowa sharif 100,000 1250 6000
pavement of main street sikandar pur phase ii 100,000 1250 6000
pavement of main street sikandar pur phase i 100,000 1250 6000
pavement of street malikyar Ahmed khan 100,000 1250 6000
const of nalla Gujar Mora 100,000 1250 6000
Pavement of street Moh Tarbela Makhan coloney 100,000 1250 6000
pavement of street Makhan coloney 100,000 1250 6000
pavement of street h/o Asif 100,000 1250 6000
Pavement of street h/o nawaz makhan coloney 100,000 1250 6000
pavement of street chapper road Makhan coloney 100,000 1250 6000
pavement of street makhan coloney h/o Arif 100,000 1250 6000
pavement of street Pind Munaim Moh Bala 100,000 1250 6000
pavement of street pind munaim moh zareen 100,000 1250 6000
pavement of street khoi moh north 100,000 1250 6000
pavement of street khoi moh south 100,000 1250 6000
pavement of street Naar moh centeral 100,000 1250 6000
pavement of street Naar moh south 100,000 1250 6000
WSS Pind munaim No 1 100,000 1250 6000
WSS Pind munaim No 2 100,000 1250 6000
pavement of street at padni 100,000 1250 6000
pavement of steet bandi munaim 100,000 1250 6000
pavement of steet bandi munaim street 2 100,000 1250 6000
pavement of steet bandi munaim street 3 100,000 1250 6000
pavement of steet bandi munaim street 4 100,000 1250 6000
pavement of street Katba Dhak street 1 100,000 1250 6000
pavement of street Katba Dhak street 2 100,000 1250 6000
6,100,000 76250 366000
16
Detail of Income Tax & Stamp duty Uc Bandi sher khan
Name of scheme E/cost Stamp
duty
Income
Tax
year
const of path Serian Mera 145,000 1250 8700
2009-
10
Boring 1No. Garhi Serian 90,000 250 5400
const of path moh Haji Qayum Garhi serian 40,000 250 2400
Boring 1No. Bajwala 85,000 250 5100
pavement of street Darshkhel village 200,000 1250 12000
Ring well moh Irshad Garhi serian 50,000 250 3000
1No boring near safdar khan moh gandian 80,000 250 4800
Kacha path Moh kangar Gandian 80,000 250 4800
WSS office UC/pavemnet GPS Darshkhel 80,000 250 4800
WSS moh Dakhan Gandian 30,000 250 1800
well moh chakdai motor main serian mera 40,000 250 2400
1No. Boring malik Ashraf Ghawa 70,000 250 4200
water tank village ketta near Ahmed din 40,000 250 2400
well with motor main road serian mera 40,000 250 2400
protection wall langarial road Gandian 30,000 250 1800
pavement of street moh Nasir Abad phase i 200,000 1250 12000 2012-
13
pavement of street moh Nasir Abad phase ii 100,000 1250 6000
pavement of street bandi sher khan 200,000 1250 12000
boring hand pump village serian Bajwala 200,000 1250 12000
Boring hand pump village Thedi near ghar Hashim
khan 100,000 1250 6000
const of path Rajadhani 200,000 1250 12000
purchase of hand pumpbandi sher khan 100,000 1250 6000
Boring hand pumpvillage serian 100,000 1250 6000
const of open well moh Saif ur rehman 200,000 1250 12000
pavement of street near house Ahmed Nawaz Thedi 60,000 250 3600
Boring of well near house Sarfaraz thedi 90,000 250 5400
PCC Habib rehman serian mera Phase i 100,000 1250 6000
2011-
12
PCC Habib rehman serian mera Phase ii 100,000 1250 6000
PCC Habib rehman serian mera Phase iii 100,000 1250 6000
17
1No. Bore village Gandian 100,000 1250 6000
1No. Bore Haji Gulab phase i 100,000 1250 6000
1No. Bore Haji Gulab phase ii 100,000 1250 6000
1No. Bore Haji Gulab phase iii 100,000 1250 6000
1No. Bore village Parthal Hafiz Arshad 100,000 1250 6000
WSS Mehmood(ASI) phase i 100,000 1250 6000
WSS Mehmood(ASI) phase ii 30,000 250 1800
PCC main street Bajwala phase i 100,000 1250 6000
PCC main street Bajwala phase ii 100,000 1250 6000
WSS village Ahmed din Kattian 100,000 1250 6000
1No. Bore village chitto phula street Kala khan 100,000 1250 6000
1No. Bore Saleem Gandian 100,000 1250 6000
PCC road master Asghar phase i 100,000 1250 6000
PCC road master Asghar phase ii 100,000 1250 6000
1No Bore moh Gohar rehman Darshekhel phase i 100,000 1250 6000
1No Bore moh Gohar rehman Darshekhel phase ii 50,000 250 3000
WSS master Tariq Gandian 50,000 250 3000
const of room Uc Bandi sher khan phase i 100,000 1250 6000
const of room Uc Bandi sher khan phase ii 100,000 1250 6000
1 No. bore Darshkhel 100,000 1250 6000
2010-
11
const of path Qabristan Darshkhel 70,000 250 4200
causeway pcc moh eidgah to Beera 80,000 250 4800
pavement of street moh Shamim Akhtar Darshkhel 40,000 250 2400
pavement of street pcc main path Bandi sher khan 80,000 250 4800
1No boring near h/o Gul zeb 90,000 250 5400
const of path serian near haji Zamarud khan 80,000 250 4800
const of path khanwaiz khan to Arshad serian 70,000 250 4200
1No. Bore serian haji Zamarud khan 90,000 250 5400
PCC Anwar khan market to moh basti pir khan
Gandian 70,000 250 4200
1No. Bore moh lohar Barain Gandian 70,000 250 4200
PCC basti Gul zaman to road Gandian 60,000 250 3600
protection wall moh Kangar Gandian 40,000 250 2400
WSS Moh Talli Kehyan Gumawa 90,000 250 5400
18
1No bore moh hokran near h/o malik Yunas counciler 70,000 250 4200
Main kacha road Phula Galli 100,000 1250 6000
1No. Bore moh Haryala ketian gumawa 80,000 250 4800
repair & maintenance UC office bandi sher khan 50,000 250 3000
1No. Bore village bartall 100,000 1250 6000
5No motors/handpump 100,000 1250 6000
1No motor 20,000 250 1200
6,230,00
0 51250 373800
*
Detail of Income Tax & Stamp duty Uc Darwaish
Name of scheme E/cost
Stamp
duty
Income
Tax year
Pavement of street uc Darwaish 183,000 1250 10980 2013-14
protection wall Talla Markaz darwaish 500,000 1250 30000
const of road Naseem town 600,000 1850 36000
WSS Scheme UC Darwaish 200,000 1250 12000
Pavement of street Kachi Moh Kajur wala Darwaish
phase i 200,000 1250 12000
WSS Scheme UC Darwaish 100,000 1250 6000 2011-12
Pavement of street Alam 100,000 1250 6000 2010-11
pavement of streets Doian Phase ii 100,000 1250 6000
pavement of streets at village Darwaish 100,000 1250 6000
boring of well at village Meelam Jora pind 100,000 1250 6000 2012-13
pavement of street/retaining wall phase ii Darwaish 50,000 250 3000
pavement of street Naseem Town Hattar road phase i 100,000 1250 6000
pavement of street Naseem Town Hattar road phase ii 100,000 1250 6000
Sanitation scheme Darwaish 100,000 1250 6000
Pavement of streett/drian at village Darwaish 100,000 1250 6000
Pavement of streett/drian at village Darwaish 100,000 1250 6000
WSS Scheme UC Darwaish 100,000 1250 6000
pavement of streets at village Darwaish 100,000 1250 6000
pavement of streets at village Darwaish 100,000 1250 6000
pavement of streets at village Darwaish 100,000 1250 6000
WSS Scheme UC Darwaish 100,000 1250 6000
19
Sanitation scheme Darwaish 100,000 1250 6000
pavement of streets at village Darwaish 100,000 1250 6000
WSS Scheme UC Darwaish 100,000 1250 6000
Sanitation scheme Darwaish 100,000 1250 6000
30850 217980
Detail of Income Tax & Stamp duty Uc Panian
Name of scheme E/cost Stamp duty Income Tax year
Stor room UC Panian 57,833 250 3469.98 2010-11
protection wall Kangra coloney 39,000 250 2340
pavement of streets Panian 400,000 1250 24000 2012-13
pavement of streets Kangra coloney 200,000 1250 12000
const of path todu 300,000 1250 18000
pavement of street Abdullah pur 100,000 1250 6000
pavement of street ganian 100,000 1250 6000
pavement of streets Kangra coloeny 200,000 1250 12000
pavement of streets Panian 200,000 1250 12000
1No Bore Todu 200,000 1250 12000
pavement of street Patri par coloney 100,000 1250 6000
Pavement of street moh Aziz abad 100,000 1250 6000
Pavement of street moh Eidgah 100,000 1250 6000
Pavement of street moh School 100,000 1250 6000
Pavement of street moh new Eidgah 100,000 1250 6000
Pavement of street moh community center 100,000 1250 6000
Pavement of street moh Toot wala 100,000 1250 6000
Pavement of street moh pul wal samasabad 100,000 1250 6000
Pavement of street moh Abdullah 100,000 1250 6000
Pavement of street moh khandaq wala 100,000 1250 6000
Pavement of street phase 1 Panian 100,000 1250 6000
Pavement of street phase ii Panian 100,000 1250 6000
Pavement of street Abdullah pur No.1 100,000 1250 6000
Pavement of street Abdullah pur No.2 100,000 1250 6000
Pavement of street Abdullah pur No.3 100,000 1250 6000
20
Pavement of street Abdullah pur No.4 100,000 1250 6000
Pavement of street Kangra coloney 100,000 1250 6000
Pavement of street Kangra coloney sector 1 100,000 1250 6000
3,596,833 33000 215810
Detail of Income Tax & Stamp duty Uc Bagra
Name of scheme E/cost Stamp duty Income Tax year
PCC street village Karwala 150,000 1250 9000 2012-13
protection wall Malikabad Karwla 200,000 1250 12000
const of Pulli road 200,000 1250 12000
const of well Karwala 200,000 1250 12000
const of well Moh Ch Naseer 200,000 1250 12000
pavement of street moh Abdul Khaliq 200,000 1250 12000
PCC Street Akram Khan Phase i 100,000 1250 6000
PCC Street Akram Khan Phase ii 100,000 1250 6000
Pcc street Babu Tanoli 100,000 1250 6000
PCC steet haji Habib urehman phase iv 50,000
3000
PCC steet haji Habib urehman phase iii 100,000 1250 6000
Pcc street Babu Tanoli phase iii 100,000 1250 6000
Pcc street Babu Tanoli phase iv 100,000 1250 6000
PCC Street ch naseer Phase i 100,000 1250 6000
PCC Haji Habib urehman ohase ii 100,000 1250 6000
PCC Street ch naseer Phase iii 100,000 1250 6000
PCC Street ch naseer Phase iv 100,000 1250 6000
PCC Street Babur Tanoli Phase i 100,000 1250 6000
PCC Street ch naseer Phase iii 100,000 1250 6000
PCC Haji Habib urehman ohase i 100,000 1250 6000
boring of well Khliq dad 100,000 1250 6000
boring of well Karwala phase ii 100,000 1250 6000
const of Nalla near H/o Mehmood 100,000 1250 6000
Boring of well near h/o Zahid khan 100,000 1250 6000
boring of well h/o muhammad akbar 100,000 1250 6000
PCC street Akram Khan phase iii 50,000 250 3000
21
boring of well Karwala phase i 100,000 1250 6000
widwninig of road Mohri 100,000 1250 6000 2010-11
Boring Karwala No 1 100,000 1250 6000
Boring 1No Karwala No 1 100,000 1250 6000
open well Karwala No 2 100,000 1250 6000
Pcc Street Othla Karwala 100,000 1250 6000
WSS Sekra No 2 30,000 250 1800
PCCC Street Karwala No 1 100,000 1250 6000
3No Bore Motor/handpump 100,000 1250 6000
open well Karwala No 2 100,000 1250 6000
1No bore Karwala No 1 100,000 1250 6000
widwninig of road Mohri Awan 100,000 1250 6000
open well and repairing of ring Bagra 100,000 1250 6000
open well and repairing of ring bagra 100,000 1250 6000
4,380,000 35500 262800
*
Detail of Income Tax & Stamp duty Uc Ladarmang
Name of scheme E/cost Stamp duty Income Tax year
const of path parhora pain 50,000 250 3000 2009-10
protection wall Parhora pain 50,000 250 3000
const/widening of path merkhor 50,000 250 3000
const of open well Gojra dalri phase ii 50,000 250 3000
removal of road sliding at mando road 20,000 250 1200
protection wall of well Chaintry 35,000 250 2100
const of well Beesnsala 30,000 250 1800
const of well Hassan bai bala Moh 50,000 25 3000
const of wall off shop Ajab khan 30,000 250 1800
const of office building UC Ladarmang 885,000 1850 53100
const of well Sarad Naisy Ban 50,000 250 3000
pcc road hall jadal near h/o Aurengzeb 100,000 1250 6000
const of path near H/o Gulistan 50,000 250 3000
const of link road saij pur bala phase i 100,000 1250 6000 2010-11
const of link road saij pur bala phase ii 100,000 1250 6000
22
const of link road saij pur bala phase iii 100,000 1250 6000
const of link road saij pur bala phase iv 100,000 1250 6000
const of link road Milyara phase i 100,000 1250 6000
const of link road Milyara phase ii 100,000 1250 6000
const of link road Milyara phase iv 100,000 1250 6000
const of link road Latif abad phase i 100,000 1250 6000
const of link road Latif abad phase ii 100,000 1250 6000
const of link road Latif abad phase iv 100,000 1250 6000
const of link road Latif abad phase iii 100,000 1250 6000
const of well Hanif Basala banda 100,000 1250 6000
const of well uc Ladarmang 87,000 250 5220
const of road dara dahri 150,000 1250 9000 2012-13
const of open well moh Daud khan phase i 100,000 1250 6000
pavement of street at moh dehri hassan bai phase i 100,000 1250 6000
pavement of street at moh dehri hassan bai phase ii 100,000 1250 6000
const of well at graveyard latif abad 200,000 1250 12000
remainng work of office UC Ladarmang 200,000 1250 12000
pavement of street at Maloo Doga 150,000 1250 9000
pavemnet of street at Kharan 150,000 1250 9000
const of link road Kundiyala 150,000 1250 9000
const of open well moh Daud khan phase ii 100,000 1250 6000
33375 248220
23
Detail of Income Tax & Stamp duty Uc Sara e salih
Name of scheme E/cost Stamp duty Income Tax year
Boring of well Tatreela Sara e salih 100,000 1250 6000 2012-13
Boring of well Qayum Khan moh Rahmatabad 100,000 1250 6000
pavement of street M Arif to railway line 100,000 1250 6000
remaining work WSS sara e salih 100,000 1250 6000
boring of well moh mera 100,000 1250 6000
boring of well moh Khan Bahadur 100,000 1250 6000
instalation of motor pump sara e salih 100,000 1250 6000
boring of well moh feroz khan 100,000 1250 6000
boring of well moh Jadeed sara e salih 100,000 1250 6000
boring of well Nabi abad 100,000 1250 6000
boring of well moh dada 100,000 1250 6000
boring of well moh Abdullah 100,000 1250 6000
Pavement of street M Ayaz darmiana changi bandi 100,000 1250 6000
pavement of street Qazi fazal Al hussain 100,000 1250 6000
Pavement of street Ismail khan moh Zareen 100,000 1250 6000
pavement of street haji M Yousaf 100,000 1250 6000
const of path for new tube well 100,000 1250 6000
pavement of streets sara e salih 400,000 1250 24000
pavement of street Gaar Sara e salih 200,000 1250 12000
pavement of streets changi bandi 300,000 1250 18000
hand pump near masjid Ameer Hamza 100,000 1250 6000
installation of motor and hand pumps 42,000 250 2520
pavement of street M Khalid to Nazakat Gulbahar coloney 100,000 1250 6000
Pavement of street near H/o M Arif to Moh Ashraf Gulbahar 100,000 1250 6000
Pavement of street Moh M Ramazan to Azeemia 100,000 1250 6000
pavement of street masjid new abadi 100,000 1250 6000
pavement of street Tariq councler to h/o M Imtiaz 100,000 1250 6000
pavement of street M Sabir Pehalwan to M Aslam 100,000 1250 6000
pcc street irrigation road to M Ishfaq 100,000 1250 6000
pavement of street Rehana road near h/o ali Mardan 100,000 1250 6000
pavement of street Gulzeb to h/o noor zaman 100,000 1250 6000
24
pavement of street Yousaf to h/o Chanan din 100,000 1250 6000
wss moh M Ajmal kahan 100,000 1250 6000
wss bore Abdul hafiz Moh Noor 100,000 1250 6000
wss Khalil urehman 100,000 1250 6000
wss M Ashraf Kala khan Moh masjid 100,000 1250 6000
wss Mehboob urehman 100,000 1250 6000
1No bore mera sara e salih 100,000 1250 6000
pavement of street h/o Zakir Hussain to Miskeen moh 100,000 1250 6000
pavement of street haji Asraf to Haji Mir Afzal 100,000 1250 6000
wss moh uc sara e salih 100,000 1250 6000
4,642,000 50250 278520
Detail of Income Tax & Stamp duty Uc Shah maqsood
Name of scheme E/cost Stamp duty Income Tax Year
Installation ofmotor and hand pump Akhwan bandi 100,000 1250 6000 2012-13
RCC ring chak mohri 100,000 1250 6000
pavement of street Akhoon bandi 100,000 1250 6000
pavement of street Thanda Chowa 100,000 1250 6000
pavement of street sajid khan/Abid khan 100,000 1250 6000
Bore/water tank mohri No 1 jan Muhammad 100,000 1250 6000
water bore mohra 100,000 1250 6000
pavement of street nokaa pa phase ii 100,000 1250 6000
water bore mera shah maqsood 100,000 1250 6000
pavement of street masjid wali ghupa 100,000 1250 6000
pavement of street Mohra kalanawan 100,000 1250 6000
pavement of street Mohra kalanawan phase i 100,000 1250 6000
boring of well Mera ghupa 100,000 1250 6000
pavement of street khan nawaz khan 100,000 1250 6000
pavement of streets Shah maqsood 100,000 1250 6000
1No bore mera shah maqsood 100,000 1250 6000
bore moh Dheri tanda chowa 100,000 1250 6000
pavement of street Akhtar khan 100,000 1250 6000
pavement of street nokaa pa phase ii 100,000 1250 6000
const of RCC ring for tank tnada chowa Chanzeb 100,000 1250 6000
25
water bore shah maqsood 100,000 1250 6000
pavement of street moh Khaliq dad 100,000 1250 6000
pavement of street mohri h/o M Iqbal 100,000 1250 6000
pavement of street mohri h/o Baba Saleem 100,000 1250 6000
pavement of street shah maqsood Hakeem khan 100,000 1250 6000
pavement of street Moh Bara shah maqsood 100,000 1250 6000
pavement of street Nikka Pa kala khan 100,000 1250 6000
33750 162000
Detail of Income Tax & Stamp duty Uc Jitti Pind
Name of scheme E/cost Stamp
duty
Income
Tax
Year
pavement of street/sanitation UC Jitti pind 100,000 1250 6000 2012-
13
WSS/sanitation scheme uc jitti pind 100,000 1250 6000
wss/pavement of streets uc jitti pind 100,000 1250 6000
WSS/sanitation scheme uc jitti pind 100,000 1250 6000
pavement of street Alwali phase iv 100,000 1250 6000
pavement of street Alwali phase iii 100,000 1250 6000
pavement of street Alwali phase ii 100,000 1250 6000
pavement of street Alwali phase i 100,000 1250 6000
pavement of street kag phase ii 100,000 1250 6000
pavement of street kag phase i 100,000 1250 6000
pavement of street simla nagar phase iii 100,000 1250 6000
pavement of street simla nagar phase ii 100,000 1250 6000
pavement of street uc jitti pind phase v 100,000 1250 6000
pavement of street simla nagar phase i 100,000 1250 6000
pavement of street uc jitti pind phase iv 100,000 1250 6000
pavement of street uc jitti pind phase iii 100,000 1250 6000
pavement of street uc jitti pind phase ii 100,000 1250 6000
pavement of street uc jitti pind phase i 100,000 1250 6000
pavement of street Kag centeral 100,000 1250 6000
pavement of street Kag North 100,000 1250 6000
pavement of street Kag Moh No.1 100,000 1250 6000
pavement of street Kag Moh No.2 100,000 1250 6000
Pavement of street Aloli No 1 100,000 1250 6000
Pavement of street Aloli No 2 100,000 1250 6000
Pavement of street Aloli No 4 50,000 250 3000
26
pavement of street Aloli Ghurki maira 100,000 1250 6000
WSS Aloli No 1 100,000 1250 6000
WSS Aloli No 2 100,000 1250 6000
pavement of street No 1 Jitti pind 60,000 250 3600
pavement of street No 2 Jitti pind 60,000 250 3600
pavement of street/culvert Jitti pind phase i 100,000 1250 6000
pavement of street/culvert Jitti pind phase ii 100,000 1250 6000
const of path/retianing wall Jitti pind phase i 100,000 1250 6000
const of path/retianing wall Jitti pind phase ii 100,000 1250 6000
pavement of street simla nagar phase i 200,000 1250 12000
pavement of street Alwali 300,000 1250 18000
WSS Alawali 500,000 1250 30000
pavement of street village Jitti pind phase i 200,000 1250 12000
pavement of street village Simla Nagar phase
ii
200,000 1250 12000
pavement of street village Jitti pind phase ii 200,000 1250 12000
pavement of street village Jitti pind phase iii 130,000 1250 7800
WSS Chapri maira Alwali 100,000 1250 6000
WSS Alwali 100,000 1250 6000
5,200,00
0
50750 312000
Detail of Income Tax & Stamp duty Uc North
Name of scheme E/cost Stamp
duty
Income
Tax
Year
Sanitation scheme moh Sheran wala gate 100,000 1250 6000 2012-
13
Pavement of street moh Ramzani 100,000 1250 6000
Pavement of street moh subedaran tarbeela road 100,000 1250 6000
Pavement of street Fort road 100,000 1250 6000
Pavement of street moh Swatian 100,000 1250 6000
Pavement of street moh Babu 100,000 1250 6000
Pavement of street moh Asif abad 100,000 1250 6000
Pavement of street at moh Khoo 100,000 1250 6000
Pavement of street moh police station near aman
plaza
100,000 1250 6000
Pavement of street jama masjid farooqia shera
wala gate
100,000 1250 6000
Pavement of street babu Rashid to Dr plaza shera
wala gate
100,000 1250 6000
Pavement of street moh Tawheed abad 100,000 1250 6000
supply & fixing of street lights moh asif abad 90,000 250 5400
Pavement of street moh feroz pura 100,000 1250 6000
27
WSS moh Taheed abad 100,000 1250 6000
WWS Fort road 50,000 250 3000
Pavement of street moh Asif abad 100,000 1250 6000
WSS moh Babu 100,000 1250 6000
Remaining work community center moh Khoo 650,000 1250 39000
Boring of pump community center 200,000 1250 12000
Pavement of street moh Tawheed abad 200,000 1250 12000
Bore masjid moh khoo 200,000 1250 12000
Bore community center moh Khoo 200,000 1250 12000
Remaining work community center Ayatha 450,000 1250 27000
WSS moh upper ramazani near h/o Akhtar &
Arshad
100,000 1250 6000
3,740,0
00
29250 224400
Detail of Income Tax & Stamp duty UC Barkot
Name of scheme E/cost
Stamp
duty
Income
Tax Year
1No Bore Nazim Latif Uc Barkot 100,000 1250 6000
2012-
13
1No Bore Nazim Latif Uc Barkot 100,000 1250 6000
1No Bore Kharianf Uc Barkot 100,000 1250 6000
1No Bore Kharianf Uc Barkot 100,000 1250 6000
1No Bore Kharianf Uc Barkot 100,000 1250 6000
1No Bore Kekot 100,000 1250 6000
1No Bore Kekot 100,000 1250 6000
5No bore and hand pump phase i 100,000 1250 6000
3No bore and hand pump uc Barkot 100,000 1250 6000
PCC road Kharian to GGHS Kharian phase i 100,000 1250 6000
PCC road Kharian to GGHS Kharian phase iii 100,000 1250 6000
PCC road Kharian to GGHS Kharian phase iv 100,000 1250 6000
Const of road Poocher uc barkot 100,000 1250 6000
1No bore Desra moh Bani 100,000 1250 6000
1No bore Desra moh Bani 100,000 1250 6000
1No bore village Desra 100,000 1250 6000
1No bore village Desra 100,000 1250 6000
4No bore and hand pump Desra 100,000 1250 6000
1No bore Halli 100,000 1250 6000
1No bore Halli 100,000 1250 6000
1No bore Halli 100,000 1250 6000
3No bore and hand pump Halli uc Barkot 100,000 1250 6000
Boring Neelam Bhoto phase i 100,000 1250 6000
Boring Neelam Bhoto phase ii 100,000 1250 6000
28
const of protection wall Malat Mehboob phase i 100,000 1250 6000
const of protection wall Malat Mehboob phase
ii 100,000 1250 6000
1No bore tamri haryala 100,000 1250 6000
const of wall haryala 100,000 1250 6000
1No bore masjid Kharian 100,000 1250 6000
widening of road ch faqir Muhammad sari
phase i 100,000 1250 6000
widening of road ch faqir Muhammad sari
phase ii 100,000 1250 6000
1No bore Saif ullah Halli 100,000 1250 6000
1No bore Sabir Ali Halli 100,000 1250 6000
PCC road moh Sangra phase i 100,000 1250 6000
PCC road Sangar phase ii 100,000 1250 6000
PCC road Sangar phase iii 100,000 1250 6000
widening of road moh Qayum sangar phase i 100,000 1250 6000
widening of road moh Qayum sangar phase ii 100,000 1250 6000
1No bore Latif abad Nazim Barkot 100,000 1250 6000
PCC and path Khurshid Raja 100,000 1250 6000
repair of well and mootr pump moh Bani Desra 100,000 1250 6000
Installation of motor & hand pump uc Barkot 100,000 1250 6000
widening of road 1Km Sanjal jandi 800,000 1250 48000
boring of well Kohela Gali 100,000 1250 6000
1No bore Nubahar sari 100,000 1250 6000
pavement of street Halli darbar 100,000 1250 6000
boring of well village Desra moh Bani 100,000 1250 6000
5,400,00
0 58750 324000
29
Annexure-4
Para No. 1.2.2.3
Detail of overpayment due to allowing higher rates
S. No Name of Union Council Overpayment
1 Dhenda 16,082
2 Darwaish 7,934
3 bandi sher khan 9,566
4 Panian 10,210
5 Bagra 1,812
6 Sirya 44,942
7 Sara e salih 9,002
8 shah Maqsood 10,766
9 Jitti pind 14,203
10 North 8,709
11 Barkot 1469
Total 134,695
30
UC Dhenda
S.N
o
Name of
scheme
Item of
work
Rate
paid
Rate
admissi
ble
Diff Qty overpaym
ent
Add
20%
prmium
total
overpaym
ent
1 Pavement
of street
Chohar
sharif
Providing
& laying
of shingle
gravel
590.34 561.9 28.44 42.00m 1194.48
0 1194.48 2 Pavement
of street
new
Kalass
Providing
& laying
of shingle
gravel
590.34 561.9 28.44 85.00m 2417.4
0 2417.4 3 Pavement
of street
new
Mamia
Providing
& laying
of shingle
gravel
590.34 561.9 28.44 41.22 1172.3
0 1172.3 4 PDhenda
phase v
Providing
& laying
of shingle
gravel
396.26 368 28.26 12.76 360.59
72.118 432.708 5 Pavement
ofsterret
/sanitation
uc dhenda
phase 2
Providing
& laying
of shingle
gravel
396.26 368 28.26 107.05 3025.23
605.046 3630.276 6 Pavement
of street
Baso Mera
phase 3
Providing
& laying
of shingle
gravel
396.26 368 28.26 16.42 464.02
92.804 556.824 7 Pavement
of street
Baso Mera
phase 2
Providing
& laying
of shingle
gravel
396.26 368 28.26 13.08 369.64
73.928 443.568 8 Pavement
of street
nara phase
1
Providing
& laying
of shingle
gravel
396.26 368 28.26 14.01 395.92
79.184 475.104 9 Pavement
of street
jagal phase
2
Providing
& laying
of shingle
gravel
396.26 368 28.26 18.49 522.53
104.506 627.036 10 Pavement
of street
Providing
& laying
396.26 368 28.26 16.62 469.68
93.936 563.616
31
jagal phase
1
of shingle
gravel
11 Pavement
of street
Baso Mera
phase 3
Providing
& laying
of shingle
gravel
396.26 368 28.26 18.38 519.42
103.884 623.304 12 Pavement
of street
nara phase
2
Providing
& laying
of shingle
gravel
396.26 368 28.26 16.38 462.89
92.578 555.468 13 PDhenda
phase vii
Providing
& laying
of shingle
gravel
396.26 368 28.26 52.02 1470.08
294.016 1764.096 14 PDhenda
phase vi
Providing
& laying
of shingle
gravel
396.26 368 28.26 24.95 705.08
141.016 846.096 15 Pavement
of street
dhenda No
1
Providing
& laying
of shingle
gravel
396.26 368 28.26 22.99 649.7
129.94 779.64 Total 14198.96
16081.916
32
UC Bandi Sher Khan
S.No Name of scheme Item of work Rate
paid
Rate
admissible
Difference Qty overpayment Add 20%
premium
total
overpayment
1 pavement of street
Nasir abad phase i
Providing &
laying of
shingle gravel
590.34 561.9 28.44 32.92 936.24
0 936.24
2 pavement of street
Nasir abad phase ii
Providing &
laying of
shingle gravel
590.34 561.9 28.44 14.01 398.44
0 398.44
3 pavement of street
Bandi sher khan
Providing &
laying of
shingle gravel
590.34 561.9 28.44 25.22 717.26
0 717.26
4 pavement of street
near house of
Ahmend Nawaz
Providing &
laying of
shingle gravel
590.34 561.9 28.44 8.94 254.25
0 254.25
5 PCC main street
Bajwala
Providing &
laying of
shingle gravel
396.26 368 28.26 20.8 587.81
117.5616 705.37
6 PCC main street
Bajwala phase ii
Providing &
laying of
shingle gravel
396.26 368 28.26 21.23 599.96
119.992 719.95
7 const of path
qabristan Darshkhel
Providing &
laying of
shingle gravel
396.26 368 28.26 31.88 900.93
180.1858 1081.11
8 pavement of street
moh Shamim Akhtar
Darshkhel
Providing &
laying of
shingle gravel
396.26 368 28.26 12.09 341.66
68.33268 410.00
9 pavement of street
pcc main path Bandi
sher khan
Providing &
laying of
shingle gravel
396.26 368 28.26 46.16 1304.48
260.8963 1565.38
10 const of path serian
near haji Zamarud
khan
Providing &
laying of
shingle gravel
396.26 368 28.26 11.75 332.06
66.411 398.47
11 const of path
khanwaiz khan to
Arshad serian
Providing &
laying of
shingle gravel
396.26 368 28.26 20.98 592.89
118.579 711.47
12 PCC Anwar khan
market to moh basti
pir khan Gandian
Providing &
laying of
shingle gravel
396.26 368 28.26 18.23 515.18
103.036 618.22
13 PCC basti Gul
zaman to road
Gandian
Providing &
laying of
shingle gravel
396.26 368 28.26 23.1 652.81
130.5612 783.37
14 const of path moh
Haji Qayum Garhi
serian
Providing &
laying of
shingle gravel
396.26 368 28.26 7.87 222.41
44.48124 266.89
Total 8356.38 9566.42
33
UC Panian
S.No Name of scheme Item of work Rate
paid
Rate
admissible
Differenc
e
Qty overpayment Add 20%
premium
total
overpayment
1 Pavement of street
Moh School Panian
Providing & laying
of shingle gravel
396.26 368 28.26 18.48 522.24 104.44896 626.69
2 Pavement of street
Moh Eidgah
Providing & laying
of shingle gravel
396.26 368 28.26 14.83 419.10 83.81916 502.91
3 Pavement of street
Moh new Eidgah
Providing & laying
of shingle gravel
396.26 368 28.26 15.99 451.88 90.37548 542.25
4 Pavement of street
Moh community
center
Providing & laying
of shingle gravel
396.26 368 28.26 25.25 713.57 142.713 856.28
5 Pavement of street
Moh toty wala
Providing & laying
of shingle gravel
396.26 368 28.26 25.39 717.52 143.50428 861.03
6 Pavement of street
Moh shamas abad
Providing & laying
of shingle gravel
396.26 368 28.26 16.98 479.85 95.97096 575.83
7 Pavement of street
Moh Abdullah
Providing & laying
of shingle gravel
396.26 368 28.26 49.17 1389.54 277.90884 1667.45
8 Pavement of street
Moh Abdullah pu
No.1
Providing & laying
of shingle gravel
396.26 368 28.26 21.88 618.33 123.66576 741.99
9 Pavement of street
Moh Abdullah pu
No.2
Providing & laying
of shingle gravel
396.26 368 28.26 10.53 297.58 59.51556 357.09
10 Pavement of street
Moh Abdullah pu
No.3
Providing & laying
of shingle gravel
396.26 368 28.26 5.66 159.95 31.99032 191.94
11 Pavement of street
Moh Abdullah pu
No.4
Providing & laying
of shingle gravel
396.26 368 28.26 10.9 308.03 61.6068 369.64
12 Pavement of street
Kangra coloney
Providing & laying
of shingle gravel
396.26 368 28.26 9.39 265.36 53.07228 318.43
13 Pavement of street
Kangra Coloney
Sector 1
Providing & laying
of shingle gravel
396.26 368 28.26 42.17 1191.72 238.34484 1430.07
14 Pavement of street
at panian phase i
Providing & laying
of shingle gravel
396.26 368 28.26 15.88 448.77 89.75376 538.52
15 Pavement of street
at panian phase ii
Providing & laying
of shingle gravel
396.26 368 28.26 18.57 524.79 104.95764 629.75
Total 8508.24 10209.89
34
UC Bagra
S.No Name of scheme Item of work Rate
paid
Rate
admissible
Difference Qty overpayment Add 20%
premium
total
overpayment
1
PCC Street
Akram Khan
Phase i
Providing &
laying of shingle
gravel
396.26 368 28.26 12.85 363.14
72.6282 435.77
2
Pcc street Babu
Tanoli phase iv
Providing &
laying of shingle
gravel
396.26 368 28.26
10.84
306.34
61.26768 367.61
3
widwninig of road
Mohri
Providing &
laying of shingle
gravel
396.26 368 28.26
14.83
419.10
83.81916 502.91
4
widwninig of road
Mohri Awan
Providing &
laying of shingle
gravel
396.26 368 28.26
14.92
421.64
84.32784 505.97
Total
1812.26
35
UC Sirya
S.
N
o
Name of scheme Item of work Rate
paid
Rate
admi
ssible
Diffe
rence
Qty overpa
yment
Add 20%
premium
total
overpaym
ent
1
pavement of street
village Sirya
Providing &
laying of
shingle gravel
396.26 368 28.26 14.26 402.99
80.59752 483.59
2
pavement of street
/protection wall Moh
sultan
Providing &
laying of
shingle gravel
396.26 368 28.26
26.39
745.78
149.1563 894.94
3
pavement of street kali
Tarar
Providing &
laying of
shingle gravel
396.26 368 28.26
31.08
878.32
175.6642 1053.98
4
pavement of street
village Sirya phase ii
Providing &
laying of
shingle gravel
396.26 368 28.26
17.24
487.20
97.44048 584.64
5
pavement of street
village Sirya phase i
Providing &
laying of
shingle gravel
396.26 368 28.26
19.26
544.29
108.8575 653.15
6
pavement of street
village Batrasi
Providing &
laying of
shingle gravel
396.26 368 28.26
14.38
406.38
81.27576 487.65
7
pavement of street
khadu moh rafiq
Providing &
laying of
shingle gravel
396.26 368 28.26
21.57
609.57
121.9136 731.48
8
pavement of street
khadu moh wasti
Providing &
laying of
shingle gravel
396.26 368 28.26
20.89
590.35
118.0703 708.42
9
pavement of street kali
tarar Gharbi
Providing &
laying of
shingle gravel
396.26 368 28.26
19.45
549.66
109.9314 659.59
10
pavement of streeet
village Panjo
Providing &
laying of
shingle gravel
396.26 368 28.26
21.85
617.48
123.4962 740.98
11
pavement of street
khado near h/o mehboob
Providing &
laying of
shingle gravel
396.26 368 28.26
22.93
648.00
129.6004 777.60
12
pavement of street sirya
phase i
Providing &
laying of
shingle gravel
396.26 368 28.26
22.67
640.65
128.1308 768.79
13
pavement of street sirya
phase ii
Providing &
laying of
shingle gravel
396.26 368 28.26
20.07
567.18
113.4356 680.61
14
pavement of street sirya
phase iii
Providing &
laying of
shingle gravel
396.26 368 28.26
18.96
535.81
107.1619 642.97
15 pavement of street kali Providing & 396.26 368 28.26
18.51 523.09
104.6185 627.71
36
tarar Gharbi phase i laying of
shingle gravel
16
pavement of street kali
Tarar phase i
Providing &
laying of
shingle gravel
396.26 368 28.26
18.45
521.40
104.2794 625.68
17
pavement of street kali
tarar Gharbi phase ii
Providing &
laying of
shingle gravel
396.26 368 28.26
18.51
523.09
104.6185 627.71
18
pavement of street/water
bore Sirya
Providing &
laying of
shingle gravel
396.26 368 28.26
19.25
544.01
108.801 652.81
19
pavement of street
Batrasi
Providing &
laying of
shingle gravel
396.26 368 28.26
13.47
380.66
76.13244 456.79
20
const of path kand Gulo
bandi
Providing &
laying of
shingle gravel
396.26 368 28.26
9.06
256.04
51.20712 307.24
21
pavement of street
village Mang
Providing &
laying of
shingle gravel
396.26 368 28.26
19.3
545.42
109.0836 654.50
22
const of path village
Sirya
Providing &
laying of
shingle gravel 590.34
561.9 28.44
68.57
1950.1
3
0 1950.13
23
const of path village
Khadu
PCC 1:2:4 as
for street/road
6469.0
9
5900.
79 568.3 51.33
29170.
84 0 29170.84
Total
44941.81
37
UC Sara e Salih
S.
N
o
Name of scheme Item of work Rate
paid
Rate
admi
ssible
Diffe
rence
Qty overpaym
ent
Add 20%
premium
total
overpaym
ent
1
const of path for new
tube well sara salih
Providing &
laying of shingle
gravel
396.26 368 28.26 23.49 663.83
132.7655 796.59
2
pavement of streets
sara e salih
Providing &
laying of shingle
gravel
396.26 368 28.26 40.96 1157.53
231.5059 1389.04
3
pavement of street M
Khalid to Nazakat
Gulbahar coloney
Providing &
laying of shingle
gravel
396.26 368 28.26
56.73
1603.19
320.638 1923.83
4
Pavement of street
near H/o M Arif to
Moh Ashraf
Gulbahar
Providing &
laying of shingle
gravel
396.26 368 28.26 41.59 1175.33
235.0667 1410.40
5
Pavement of street
Moh M Ramazan to
Azeemia
Providing &
laying of shingle
gravel
396.26 368 28.26 28.89 816.43
163.2863 979.72
6
pavement of street
masjid new abadi
Providing &
laying of shingle
gravel
396.26 368 28.26 12.2 344.77
68.9544 413.73
7
pavement of street M
Sabir Pehalwan to M
Aslam
Providing &
laying of shingle
gravel
396.26 368 28.26 15.57 440.01
88.00164 528.01
8
pcc street irrigation
road to M Ishfaq
Providing &
laying of shingle
gravel
396.26 368 28.26 17.4 491.72
98.3448 590.07
9
pavement of street
Rehana road near h/o
ali Mardan
Providing &
laying of shingle
gravel
396.26 368 28.26 18.91 534.40
106.8793 641.28
10
pavement of street
Yousaf to h/o
Chanan din
Providing &
laying of shingle
gravel
396.26 368 28.26 9.71 274.40
54.88092 329.29
Total
9001.94
38
UC Shah Maqsood
S.
No
Name of scheme Item of work Rate
paid
Rate
admis
sible
Differ
ence
Qty overpay
ment
Add
20%
premiu
m
total
overpay
ment
1
pavement of street
Akhoon bandi
Providing &
laying of
shingle gravel
396.26 368 28.26 20.84 588.94
117.7877 706.73
2
pavement of street
Thanda Chowa
Providing &
laying of
shingle gravel
396.26 368 28.26 29.08 821.80
164.3602 986.16
3
pavement of street
sajid khan/Abid
khan
Providing &
laying of
shingle gravel
396.26 368 28.26
18.12
512.07
102.4142 614.49
4
pavement of street
nokaa pa phase ii
Providing &
laying of
shingle gravel
396.26 368 28.26 16.7 471.94
94.3884 566.33
5
pavement of street
Mohra kalanawan
Providing &
laying of
shingle gravel
396.26 368 28.26 58.39 1650.10
330.0203 1980.12
6
pavement of street
Mohra kalanawan
phase i
Providing &
laying of
shingle gravel
396.26 368 28.26 40.75 1151.60
230.319 1381.91
7
pavement of street
Akhtar khan
Providing &
laying of
shingle gravel
396.26 368 28.26 36.39 1028.38
205.6763 1234.06
8
pavement of street
nokaa pa phase ii
Providing &
laying of
shingle gravel
396.26 368 28.26 14.67 414.57
82.91484 497.49
9
pavement of street
mohri h/o M Iqbal
Providing &
laying of
shingle gravel
396.26 368 28.26 17.87 505.01
101.0012 606.01
10
pavement of street
mohri h/o Baba
Saleeml
Providing &
laying of
shingle gravel
396.26 368 28.26 5.53 156.28
31.25556 187.53
11
pavement of street
Moh Bara shah
maqsood
Providing &
laying of
shingle gravel
396.26 368 28.26 19.5 551.07
110.214 661.28
12
pavement of street
Nikka Pa kala khan
Providing &
laying of
shingle gravel
396.26 368 28.26 39.63 1119.94
223.9888 1343.93
Total
10766.0
4
39
UC Jitti Pind
S.
No
Name of scheme Item of
work
Rate
paid
Rate
admis
sible
Differ
ence
Qty overpaym
ent
Add 20%
premium
total
overpa
yment
1
wss/pavement of
streets uc jitti pind
Providing
& laying of
shingle
gravel
396.26 368 28.26 11.63 328.66
65.73276 394.40
2
pavement of street
Alwali phase iv
Providing
& laying of
shingle
gravel
396.26 368 28.26
12.77
360.88
72.17604 433.06
3
pavement of street
Alwali phase iii
Providing
& laying of
shingle
gravel
396.26 368 28.26
11.69
330.36
66.07188 396.43
4
pavement of street
Alwali phase ii
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.9
279.77
55.9548 335.73
5
pavement of street
kag phase ii
Providing
& laying of
shingle
gravel
396.26 368 28.26
4.92
139.04
27.80784 166.85
6
pavement of street
kag phase i
Providing
& laying of
shingle
gravel
396.26 368 28.26
3.22
91.00
18.19944 109.20
7
pavement of street
simla nagar phase iii
Providing
& laying of
shingle
gravel
396.26 368 28.26
12.99
367.10
73.41948 440.52
8
pavement of street
simla nagar phase ii
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.65
272.71
54.5418 327.25
9
pavement of street uc
jitti pind phase v
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.68
273.56
54.71136 328.27
10
pavement of street
simla nagar phase i
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.71
274.40
54.88092 329.29
11
pavement of street uc
jitti pind phase iv
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.65
272.71
54.5418 327.25
40
12
pavement of street uc
jitti pind phase iii
Providing
& laying of
shingle
gravel
396.26 368 28.26
8.55
241.62
48.3246 289.95
13
pavement of street uc
jitti pind phase ii
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.66
272.99
54.59832 327.59
14
pavement of street uc
jitti pind phase i
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.7
274.12
54.8244 328.95
15
pavement of streets
Kag centeral
Providing
& laying of
shingle
gravel
396.26 368 28.26
8.49
239.93
47.98548 287.91
16
pavement of streets
Kag North
Providing
& laying of
shingle
gravel
396.26 368 28.26
9.06
256.04
51.20712 307.24
17
pavement of street
Kag Moh No.1
Providing
& laying of
shingle
gravel
396.26 368 28.26
18.86
532.98
106.5967 639.58
18
Pavement of street
Aloli No 1
Providing
& laying of
shingle
gravel
396.26 368 28.26
13.99
395.36
79.07148 474.43
19
Pavement of street
Aloli No 2
Providing
& laying of
shingle
gravel
396.26 368 28.26
11.89
336.01
67.20228 403.21
20
pavement of street
Kag Moh No.2
Providing
& laying of
shingle
gravel
396.26 368 28.26
14.92
421.64
84.32784 505.97
21
pavement of street
Aloli Ghurki maira
Providing
& laying of
shingle
gravel
396.26 368 28.26
7.9
223.25
44.6508 267.90
22
pavement of street No
1 Jitti pind
Providing
& laying of
shingle
gravel
396.26 368 28.26
8.49
239.93
47.98548 287.91
23
pavement of street
simla nagar phase i
Providing
& laying of
shingle
gravel 590.34
561.9
28.44 25.19
716.40
143.2807 859.68
24
pavement of street
Alwali
Providing
& laying of 590.34
561.9
28.44 112.17
3190.11
638.023 3828.14
41
shingle
gravel
25
pavement of street
village Simla nagar
phase ii
Providing
& laying of
shingle
gravel 590.34
561.9
28.44 37.37
1062.80
212.5606 1275.36
26
pavement of street
village Jitti pind
phase ii
Providing
& laying of
shingle
gravel 590.34
561.9
28.44 15.57
442.81
88.56216 531.37
Total
14203.4
3
42
UC North
S.No Name of scheme Item of work Rate paid Rate
admissibl
e
Difference Qty overpaym
ent
Add 20%
premium
total
overpayment
1
pavement of street
moh Ramzani
Providing & laying of
shingle gravel
396.26 68 28.26 14.52 410.34
82.06704 492.40
2 pavement of street moh Swatian
Providing & laying of shingle gravel
396.26 368 28.26 18.14
512.64 102.5273 615.16
3
pavement of street
moh Asif abad
Providing & laying of
shingle gravel
396.26 368 28.26
61.76
1745.34
349.0675 2094.41
4 pavement of street moh Tawheed abad
Providing & laying of shingle gravel
396.26 368 28.26 90.34
2553.01 510.6017 3063.61
5
pavement of street
moh feroz pura
Providing & laying of
shingle gravel
396.26 368 28.26
17.38
491.16
98.23176 589.39
6 pavement of street moh Asif abad
Providing & laying of shingle gravel
396.26 368 28.26 14.01
395.92 79.18452 475.11
7
pavement of street
moh Tawheed abad
Providing & laying of
shingle gravel 590.34
561.9 28.44
48.47
1378.49
0 1378.49
Total
8708.57
43
UC Barkot
S.
No
Name of scheme Item of work Rate
paid
Rate
admis
sible
Differ
ence
Qty overpaymen
t
Add
20%
premium
total
overpaym
ent
1
PCC road Kharian
to GGHS Kharian
phase iii
Providing &
laying of
shingle gravel
396.26 368 28.26 21.77 615.22
123.044 738.26
2
PCC road Kharian
to GGHS Kharian
phase iv
Providing &
laying of
shingle gravel
396.26 368 28.26
21.54
608.72
121.7441 730.46
Total 1468.73
44
Annexure-5
Para No. 1.2.2.4
Detail of sales tax S.No Name of UC Total
1 Kalinger 18,948 2 Sikandar pur 32,000 3 Bandi Sher Khan 166,899 4 Darwaish 18,794 5 Bagra 68,279
6 Shah maqsood 11,520
7 Barkot 80,000
8 Sara e salih 44,000
9 North 33,788
Total 474,228
Detail of pipes & motors supplied Uc Kalinger
Name of scheme E/cost Items supplied Sales tax
WSS gam phase i 100000 32807 5,249
WSS chajka phase i 100000 100,000 16,000
Const of well kalinger phase i 100,000 18430 2,948
151,238 18,948
Detail of pipes & motors supplied Uc Sikandar Pur
Name of scheme E/cost Items supplied Sales tax
WSS Pind munaim No 1 100,000 100,000 16,000
WSS Pind munaim No 2 100,000 100,000 16,000
32,000
45
Detail of Pipes & Motors supplied Uc Bandi sher khan
Name of scheme E/cost items supplied sales tax
Boring 1No. Bajwala 85,000 60,000 9600
boring hand pump village serian Bajwala 200,000 77,463 12394.08
Boring hand pump village Thedi near ghar Hashim khan 100,000 89,234 14277.44
purchase of hand pumpbandi sher khan 100,000 100,000 16000
Boring hand pumpvillage serian 100,000 30,036 4805.76
const of open well moh Saif ur rehman 200,000 20,000 3200
1No. Bore village Gandian 100,000 41095 6575.2
1No. Bore Haji Gulab phase ii 100,000 64520 10323.2
1No. Bore Haji Gulab phase iii 100,000 47588 7614.08
1No. Bore village Parthal Hafiz Arshad 100,000 61890 9902.4
WSS Mehmood(ASI) phase i 100,000 100,000 16000
WSS village Ahmed din Kattian 100,000 100,000 16000
1No. Bore village chitto phula street Kala khan 100,000 38758 6201.28
1No. Bore Saleem Gandian 100,000 44389 7102.24
1No Bore moh Gohar rehman Darshekhel phase i 100,000 48143 7702.88
5No motors/handpump 100,000 100,000 16000
1No motor 20,000 20,000 3200
166898.56
Detail of Pipes & motors supplied Uc Darwaish
Name of scheme E/cost items supplied sales tax
WSS Scheme UC Darwaish 200,000 77,463 12,394
WSS Scheme UC Darwaish 100,000 40,000 6,400
18,794
Detail of Pipes & motors supplied Uc Bagra
Name of scheme E/cost
items
supplied sales tax
boring of well Karwala phase ii 100,000 47,588 7,614
Boring of well near h/o Zahid khan 100,000 61,992 9,919
boring of well h/o muhammad akbar 100,000 46,414 7,426
boring of well Karwala phase i 100,000 47,588 7,614
Boring Karwala No 1 100,000 58,432 9,349
Boring 1No Karwala No 1 100,000 41,729 6,677
3No Bore Motor/handpump 100,000 75,000 12,000
1No bore Karwala No 1 100,000 48,000 7,680
4,380,000 426,743 68,279
46
Detail of Pipes & motors supplied Uc Sara e salih
Name of scheme E/cost
items
supplied sales tax
remaining work WSS sara e salih 100,000 40,000 6,400
instalation of motor pump sara e salih 100,000 100,000 16,000
hand pump near masjid Ameer Hamza 100,000 15000 2,400
installation of motor and hand pumps 42,000 20,000 3,200
wss moh M Ajmal kahan 100,000 20,000 3,200
wss bore Abdul hafiz Moh Noor 100,000 20,000 3,200
wss Khalil urehman 100,000 20,000 3,200
wss M Ashraf Kala khan Moh masjid 100,000 20,000 3,200
wss Mehboob urehman 100,000 20,000 3,200
44,000
Detail of Pipes & motors supplied Uc Shah maqsood
Name of scheme E/cost items supplied sales tax
Installation ofmotor and hand pump Akhwan bandi 100,000 54,000 8,640
bore moh Dheri tanda chowa 100,000 18,000 2,880
11,520
Detail of Pipes & motors supplied Uc North
Name of scheme E/cost items supplied sales tax
Boring of pump community center 200,000 97,357 15,577
Bore masjid moh khoo 200,000 20,000 3,200
Bore community center moh Khoo 200,000 93,819 15,011
33,788
Detail of Pipes & motors supplied Uc Barkot
Name of scheme E/cost items supplied sales tax
1No Bore Kekot 100,000 20,000 3,200
5No bore and hand pump phase i 100,000 100,000 16,000
3No bore and hand pump uc Barkot 100,000 100,000 16,000
4No bore and hand pump Desra 100,000 100,000 16,000
3No bore and hand pump Halli uc Barkot 100,000 60,000 9,600
Installation of motor & hand pump uc Barkot 100,000 100,000 16,000
boring of well Kohela Gali 100,000 20,000 3,200
80,000
47
Annexure-6
Para No. 1.2.1.2
Detail of schemes splitted into phases
S.No Name of UC Total
1 UC Kalinger 2,280,000
2 Bareela 800,000
3 Sikandar pur 1,950,000
4 Bandi Sher Khan 1,330,000
5 Darwaish 550,000
6 Panian 1,100,000
7 Bagra 1,500,000
8 Ladarmang 1,650,000
9 Shah maqsood 400,000
10 jitti pind 2,530,000
11 Barkot 1,400,000
Total 15,490,000
48
Detail of schemes splitted into phases Uc Kalinger
S.No Name of scheme E/cost Year
1 const of open well ring dara kalinger 80,000
2 Pavment of street Gandaf phase i 100,000 2010-11
3 Pavment of street Gandaf phase ii 50000
4 Pavment of street Gandaf phase iii 100000
5 const of link road bala mari phase iii 100000
6 const of community center Kalinger iv 100000
7 WSS gam phase i 100000
8 const of community center Kalinger i 100000
9 WSS chajka phase i 100000
10 const of link road bala mari phase i 100000
11 const of link road bala mari phase iii 100000
12 const of community center Kalinger phase ii 100000
13 WSS gam phase ii 100000
14 const of community center Kalinger phase iii 100000
15 Const of well kalinger phase i 100,000 2011-12
16 WSS Murad Pur 100000
17 WSS Murad Pur phase ii 50000
18 const of road moh Awan lassan Kalinger phase i 100000
19 const of road moh Awan lassan Kalinger phase ii 100000
20 WSS Village Gam phase ii 100000
21 const of open well moh Ibrahim phase i 100000
22 const of open well moh Ibrahim phase ii 100000
23 const of open well moh Ibrahim phase iii 100000
24 WSS Village Gam phase i 100000
2,280,000
49
Detail of schemes splitted into phases Uc Bareela
S.No Name of scheme E/cost year
1 pavement of street Padani phase i 100,000 2011-12
2 pavement of street Padani phase ii 100,000
3 pavement of street Takia Bareela phase i 100,000
4 pavement of street Takia Bareela phase ii 100,000
5 pavement of street/R/wall pind Munaim phase ii 100,000
6 pavement of street/R/wall pind Munaim phase iii 100,000
7 pavement of street Bandi Munaim phase i 100,000
8 pavement of street Bandi Munaim phase ii 100,000
800,000
50
Detail of schemes splitted into phases Uc sikandar pur
S.No Name of scheme E/cost
1 pavement of street h/o manzoor ahmed Mkhan coloney –i 100,000
2 pavement of street malik Abdul Ghafoor Dheri phase –i 100,000
3 pavement of street h/o manzoor ahmed Mkhan coloney -ii 100,000
4 const of culvert Sikandar pur phase-I 100,000
5 const of culvert Sikandar pur phase-Ii 100,000
6 const of culvert Sikandar pur phase-Iii 100,000
7 WSS/sanitation scheme Makhan coloney phase i 100,000
8 WSS/sanitation scheme Makhan coloney phase ii 100,000
9 WSS/sanitation scheme Makhan coloney phase iii 100,000
10 pavement of street malik Abdul Ghafoor Dheri phase –ii 100,000
11 pavement of street malik Abdul Ghafoor Dheri phase –iii 100,000
12 pavement of street malik Abdul Ghafoor Dheri phase –iv 100,000
13 pavement of street malik Abdul Ghafoor Dheri phase –v 100,000
14 pavement of street Moh Akbar din 100,000
15 pavement of street Moh Akbar din phase ii 100,000
16 pavement of street Awan coloney phase i 100,000
17 pavement of street Awan coloney phase ii 100,000
18 pavement of street Awan coloney phase iii 50,000
19 pavement of main street sikandar pur phase ii 100,000
20 pavement of main street sikandar pur phase i 100,000
1,950,000
51
Detail of schemes splitted into phases Uc Bandi sher khan
S.No Name of scheme E/cost Year
1 PCC Habib rehman serian mera Phase i 100,000 2011-12
2 PCC Habib rehman serian mera Phase ii 100,000
3 PCC Habib rehman serian mera Phase iii 100,000
4 1No. Bore Haji Gulab phase i 100,000
5 1No. Bore Haji Gulab phase ii 100,000
6 1No. Bore Haji Gulab phase iii 100,000
7 WSS Mehmood(ASI) phase i 100,000
8 WSS Mehmood(ASI) phase ii 30,000
9 PCC main street Bajwala phase i 100,000
10 PCC main street Bajwala phase ii 100,000
11 PCC road master Asghar phase i 100,000
12 PCC road master Asghar phase ii 100,000
13 const of room Uc Bandi sher khan phase i 100,000
14 const of room Uc Bandi sher khan phase ii 100,000
1,330,000
52
Detail of schemes splitted into phases Uc Darwaish
S.No Name of scheme E/cost
1 Pavement of street Kachi Moh Kajur wala Darwaish phase i 200,000
2 pavement of streets Doian Phase ii 100,000
3 pavement of street/retaining wall phase ii Darwaish 50,000
4 pavement of street Naseem Town Hattar road phase i 100,000
5 pavement of street Naseem Town Hattar road phase ii 100,000
550,000
53
Detail of schemes splitted into phases Uc Panian
S.No Name of scheme E/cost
1 pavement of streets Kangra coloney 200,000
2 pavement of street Abdullah pur 100,000
3 pavement of streets Kangra coloeny 200,000
4 Pavement of street phase 1 Panian 100,000
5 Pavement of street phase ii Panian 100,000
6 Pavement of street Abdullah pur No.1 100,000
7 Pavement of street Abdullah pur No.2 100,000
8 Pavement of street Abdullah pur No.3 100,000
9 Pavement of street Abdullah pur No.4 100,000
1,100,000
54
Detail of schemes splitted into phases Uc Bagra
S.No Name of scheme E/cost
1 PCC Street Akram Khan Phase i 100,000
2 PCC Street Akram Khan Phase ii 100,000
3 PCC steet haji Habib urehman phase iv 50,000
4 PCC steet haji Habib urehman phase iii 100,000
5 Pcc street Babu Tanoli phase iii 100,000
6 Pcc street Babu Tanoli phase iv 100,000
7 PCC Street ch naseer Phase i 100,000
8 PCC Haji Habib urehman ohase ii 100,000
9 PCC Street ch naseer Phase iii 100,000
10 PCC Street ch naseer Phase iv 100,000
11 PCC Street Babur Tanoli Phase i 100,000
12 PCC Street ch naseer Phase iii 100,000
13 PCC Haji Habib urehman ohase i 100,000
14 boring of well Karwala phase ii 100,000
15 PCC street Akram Khan phase iii 50,000
16 boring of well Karwala phase i 100,000
1,500,000
Detail of schemes splitted into phases Uc Ladarmang
S.No Name of scheme E/cost year
1 const of link road saij pur bala phase i 100,000 2010-11
2 const of link road saij pur bala phase ii 100,000
3 const of link road saij pur bala phase iii 100,000
4 const of link road saij pur bala phase iv 100,000
5 const of link road Milyara phase i 100,000
6 const of link road Milyara phase ii 100,000
7 const of link road Milyara phase iv 100,000
8 const of link road Latif abad phase i 100,000
9 const of link road Latif abad phase ii 100,000
10 const of link road Latif abad phase iv 100,000
11 const of link road Latif abad phase iii 100,000
55
12 const of open well moh Daud khan phase i 100,000
13 pavement of street at moh dehri hassan bai phase i 100,000
14 pavement of street at moh dehri hassan bai phase ii 100,000
15 pavemnet of street at Kharan 150,000
16 const of open well moh Daud khan phase ii 100,000
1,650,000
Detail of schemes splitted into phases Uc Shah maqsood
S.No Name of scheme E/cost
1 pavement of street nokaa pa phase i 100,000
2 pavement of street Mohra kalanawan 100,000
3 pavement of street Mohra kalanawan phase i 100,000
4 pavement of street nokaa pa phase ii 100,000
Total 400,000
Detail ofschemes splitted into phases Uc Jitti Pind
S.No Name of scheme E/cost
1 pavement of street Alwali phase iv 100,000
2 pavement of street Alwali phase iii 100,000
3 pavement of street Alwali phase ii 100,000
4 pavement of street Alwali phase i 100,000
5 pavement of street kag phase ii 100,000
6 pavement of street kag phase i 100,000
7 pavement of street simla nagar phase iii 100,000
8 pavement of street simla nagar phase ii 100,000
9 pavement of street uc jitti pind phase v 100,000
10 pavement of street simla nagar phase i 100,000
11 pavement of street uc jitti pind phase iv 100,000
12 pavement of street uc jitti pind phase iii 100,000
13 pavement of street uc jitti pind phase ii 100,000
14 pavement of street uc jitti pind phase i 100,000
15 pavement of street/culvert Jitti pind phase i 100,000
16 pavement of street/culvert Jitti pind phase ii 100,000
56
17 const of path/retianing wall Jitti pind phase i 100,000
18 const of path/retianing wall Jitti pind phase ii 100,000
19 pavement of street simla nagar phase i 200,000
20 pavement of street village Jitti pind phase i 200,000
21 pavement of street village Jitti pind phase ii 200,000
22 pavement of street village Jitti pind phase iii 130,000
Total 2,530,000
57
Detail of schemes splitted into phases Uc Barkot
S.No Name of scheme E/cost
1 PCC road Kharian to GGHS Kharian phase i 100,000
2 PCC road Kharian to GGHS Kharian phase iii 100,000
3 PCC road Kharian to GGHS Kharian phase iv 100,000
4 Boring Neelam Bhoto phase i 100,000
5 Boring Neelam Bhoto phase ii 100,000
6 const of protection wall Malat Mehboob phase i 100,000
7 const of protection wall Malat Mehboob phase ii 100,000
8 widening of road ch faqir Muhammad sari phase i 100,000
9 widening of road ch faqir Muhammad sari phase ii 100,000
10 PCC road moh Sangra phase i 100,000
11 PCC road Sangar phase ii 100,000
12 PCC road Sangar phase iii 100,000
13 widening of road moh Qayum sangar phase i 100,000
14 widening of road moh Qayum sangar phase ii 100,000
Total 1,400,000