  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    1/30

    GHD GlobalHelpDeskHOISTING commissioning with ATV703/2010

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    2/30

    Version :00 of01 03 2010 Page : 2/30

    Table of contents1. Presentation ............................................................................................5

    2. Starting procedure ATV71 in Open Loop .......................................6

    2.1.Motor data ............................................................................................................................................6

    2.2.I/O configuration................................................................................................................................7

    2.3.Optimisation of speed loop ...........................................................................................................7

    2.4.Brake sequence optimization........................................................................................................9

    2.4.1. Adjustment of start ................................................................................................................................................. 9

    2.4.1.1 Adjustment of the Brake Release time (BRT)......................................................................10

    2.4.1.2 Adjustment of brake release current (IBR)............................................................................12

    2.4.2. Adjustment of stop...............................................................................................................................................14

    2.4.2.1 Adjustment of brake engage time (BET) ...............................................................................14

    2.4.2.2 Adjustment of brake engage delay (TBE)..............................................................................16

    2.5.Motor slipping optimization........................................................................................................16

    2.5.1. Method to adjust the nominal motor slip: speed measurement ...............................................17

    2.5.2. Another method to adjust the nominal motor slip: time measurement ...............................17

    3. Starting procedure ATV71 in Close Loop.................................... 18

    3.1.Motor data ......................................................................................................................................... 18

    3.2.I/O configuration.............................................................................................................................19

    3.2.1. Ensure the easiness of braking setting.....................................................................................................19

    3.2.2. Define the motor feedbacks ...........................................................................................................................19

    3.3.Optimization of speed loop ........................................................................................................ 20

    3.4.Brake sequence optimization.....................................................................................................21

    3.4.1. Adjustment of start ..............................................................................................................................................22

    3.4.1.1 Adjustment of the Brake Release time (BRT)......................................................................23

    3.4.1.2 Adjustment of brake release current (IBR)............................................................................24

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    3/30

    Version :00 of01 03 2010 Page : 3/30

    3.4.2. Adjustment of stop...............................................................................................................................................25

    3.4.2.1 Adjustment of brake engage time (BET) ...............................................................................25

    3.4.2.2 Adjustment of brake engage delay (TBE)..............................................................................27

    4. Annexe 1: Load measurement ........................................................28

    5. Annexe 2: Table of known issues....................................................30

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    4/30

    Version :00 of01 03 2010 Page : 4/30

    ictogramsImportant information or caution.

    Computation or calculation.

    Purpose of the chapter or paragraph.

    Additional information or remark.

    Definition type information.

    Clever idea (astuteness).

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    5/30

    Version :00 of01 03 2010 Page : 5/30

    1.PresentationThis document provides additional information and must be used in conjunction with theATV71 user manuals.

    In this document, all the directives for the correct installation have not been considered; thisis the responsibility of the installer of the product.

    Definitions and abbreviations:

    BEN: Brake engine frequency

    BET: Brake engage time

    BFR: Standard motor frequency

    BRT: Brake release time

    FRO: Frequency reference

    FRS: Rated motor frequency

    IBR: Brake release time

    ITH: Motor thermal current

    MMF: Measured output frequency

    NCR: Rated motor current

    NPR: Rated motor power

    NSL: Nominal motor slip

    NSP: Rated motor speed

    SIT: Speed time integral

    SMMF: Unfiltered measured motor speed

    SOTR: Motor torque

    SPG: Speed proportional gain

    SRFR: Motor frequency

    TBE: Adjustment of brake engage delay

    TFR: Maximum frequency

    UNS: Rated motor voltage

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    6/30

    Version :00 of01 03 2010 Page : 6/30

    2.

    Starting procedure ATV71 inOpen Loop

    This procedure has to be used for asynchronous motor in open loop.

    What is important to keep in mind is that in open loop, there is no torque at 0 Hz.

    The VSD cannot hold the load when the frequency is under the slip of motor. In basic accesslevel, the VSD sets the low speed to the rated motor slip.

    To make the settings of product become easier, we recommend you to use thehoisting macro-configuration in SIMPLY START menu.

    The first step is to perform the adjustment of setting without load. Then, when you find a

    good working, you can perform some tests at full load to optimize your settings.

    2.1. Motor data

    In 1.1 Simply start menu:this step ensures the optimum motor control.

    For hoisting application, the motor control type is voltage flux vector control (SVC V).

    You must set the standard motor frequency (BFR), the rated motor power (NPR),

    the rated motor voltage (UNS), the rated motor current (NCR), the rated motorfrequency (FRS), the rated motor speed (NSP), the maximum frequency (TFR)and the motor thermal current (ITH = NCR).

    About the power, if there is no information you have to calculate it with the formulabelow:

    cos85.03 = NCRUNSNPR

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    7/30

    Version :00 of01 03 2010 Page : 7/30

    The Auto tuning must be performed with a cold motor (one day off).

    Set the Macro configuration to: CFG = Hoisting.

    2.2. I/O configuration

    This step ensures the easiness of braking setting.

    Now, you can perform the first movement of the hook to check the sense of rotation. This isimportant for the setting of brake control:

    LI1 is Forward ==> the hook must go UP

    LI2 is Reverse ==> the hook must go DOWN

    If the sense of rotation is not correct, you can change it by the output phase rotation in Motorcontrol menu: PHR = ACB (factory setting: PHR = ABC).

    The speed reference can be given via analogical input or via logical input by using presetspeed function.

    In most of hoisting application, the mode of motor is generator when the load goes downand it is motor when the load goes up. When the mode of motor is generator, thedissipation of this generator energy must be done through resistor or network braking unit.

    2.3. Optimisation of speed loop

    In 1.3 Settings menu:this step reduces the vibration and reduces the overshoot or theundershoot.

    Most of case, the factory settings of speed loop are sufficient. But the factory setting valuesare corresponding to an application inertia which equals to 3 times the motor inertia. Forhoisting, there is a gear box after the motor, so, the application inertia on the motor shaft is

    similar to the motor inertia. In this case with a standard motor, the SPG can be set between20 and 40, and SIT can be set between 100 and 150:

    Speed proportional gain = SPG = 40%;

    When you increase SPG, you reduce the speed overshoot due to a torque jerk. But, ifyou increase too much SPG, you saturate the motor, and you can see it with lots ofoscillation on the torque.

    When you decrease SPG, you reduce the saturation of motor but you increase theovershoot due to a torque jerk.

    Speed time integral = SIT = 100%;

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    8/30

    Version :00 of01 03 2010 Page : 8/30

    When you increase SIT, you reduce the low oscillation of torque. But the speedovershoot becomes higher.

    When you decrease SIT, you reduce the speed overshoot due a torque jerk. But, the

    motor torque starts to oscillate.

    The following curves correspond to the speed reference (FRO in red) and the motor speed(SRFR in green) and the motor torque (SOTR in blue):

    If there is lots of oscillation on the torque waveform:

    Then, decrease SPG.

    If there is an overshoot on the speed like that:

    Then, decrease SIT.

    If the speed waveform looks like that:

    Then, SPG is OK.

    If the speed waveform looks like that:

    Then, SIT is OK.

    If there is an overshoot on the speed like that:

    Then, increase SPG.

    If the torque is oscillating like that:

    Then, increase SIT.

    With the scope of PowerSuite V2.6, you can see frequency reference (FRO), the motorfrequency (SRFR) and the motor torque (SOTR).

    Warning: A too much slack setting of speed loop can make the load slip withoutany detection from product! So you need to perform some tests at full load tocheck the speed loop setting.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    9/30

    Version :00 of01 03 2010 Page : 9/30

    2.4. Brake sequence optimization

    In 1.3 Application funct. menu:this step improves the start and stop of movement.

    The brake control consists in controlling the release and the engage of brake. Both phaseshave different goals:

    2.4.1. Adjustment of start

    The delay between the command of brake (R2) and the mechanical opening of brakecorresponds to the brake release time (BRT).

    During BRT, ATV71 must hold the load: for this, the brake impulse must be set to Yes (BIP =Yes) and the brake release I FW to the nominal motor current (factory setting of hoistingCFG: IBR = NCR).

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    10/30

    Version :00 of01 03 2010 Page : 10/30

    2.4.1.1 Adjustment of the Brake Release time (BRT)

    Set BRT to more than necessary and gradually reduce it. You find the good value of BRTwhen the brake releases without allowing the rotor to move before following the acceleration

    ramp.

    At the real opening of brake, the shaft moves in up direction during BRT.

    You can see that the motor speed (in yellow) increases on the following curve. The realopening of brake is when the motor torque (SOTR in blue) is decreasing from the level ofIBR:

    SOTR in blue, FRO in red, SRFR in yellow

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    11/30

    Version :00 of01 03 2010 Page : 11/30

    On the same curve, you can find the value that you need to decrease in BRT. With cursor(period), the first cursor is on the start of decreasing of SOTR, and the second cursor is whenthe speed reference is different from 0 Hz:

    SOTR in blue, FRO in red, SRFR in yellow

    Here, BRT must be reduced by 0.25s.

    If BRT is too short, the motor torque (SOTR in blue) increase suddenly when the brake isreally engaged:

    SOTR in blue, FRO in red, SRFR in yellow

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    12/30

    Version :00 of01 03 2010 Page : 12/30

    Here, BRT is well set:

    SOTR in blue, FRO in red, SRFR in yellow

    SOTR is the link to the sign of motor speed. When the motor speed is near 0 Hz,you can have some points with the opposite sign like on this scope of SOTR.This is only due to the calculation of SOTR, the real motor torque seen by thedrive is correct.

    2.4.1.2 Adjustment of brake release current (IBR)

    With the IBR current, you adjust the torque current to hold the load during BRT time. So, forhoisting, you must adjust it to the torque that the motor requires to start at full load.

    The first setting is to adjust IBR to the rated motor current: IBR = NCR. After checking thisvalue, you can adjust IBR to the real motor torque at full load.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    13/30

    Version :00 of01 03 2010 Page : 13/30

    SOTR in blue, FRO in red, SRFR in yellow

    By doing some tests at full load (after the adjustment of stop), you can adjust the IBR valuefor the full load.

    SOTR in blue, FRO in red, SRFR in yellow

    Here the IBR corresponds exactly to the load of motor.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    14/30

    Version :00 of01 03 2010 Page : 14/30

    2.4.2. Adjustment of stop

    When the VSD receive a stop order, the speed comes down following the deceleration ramp

    until the brake engage frequency (BEN) is reached. This output frequency is maintainedduring the brake engage time (BET).

    2.4.2.1 Adjustment of brake engage time (BET)

    Set BET to more than necessary and gradually reduce it to a point where the current iscancelled just after the brake is engaged.

    SOTR in blue, FRO in red, SRFR in green

    Here BET is too long because the motor torque (in blue) increases up to limitation at the endof BET. There is this behaviour because the brake is really engaged and the ATV71 is stillenergizing the motor. On this example, BET must be reduced by 0.406s.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    15/30

    Version :00 of01 03 2010 Page : 15/30

    SOTR in blue, FRO in red, SRFR in green

    Then the motor torque does not increase at the end of BET.

    The good value of BET is when the motor current does not increase at the end of BET.

    Nota: If BET is too short, the load will slip a little bit, just after engaging the brake:

    SOTR in blue, FRO in red, SMMF in yellow

    Here, BET must be increased by 0.094s.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    16/30

    Version :00 of01 03 2010 Page : 16/30

    2.4.2.2 Adjustment of brake engage delay (TBE)

    When the motor speed reaches the brake engage frequency (BEN), the brake engage orderis immediately given. To reduce this jerk, with TBE, you can stabilize the motor speed around

    BEN and then at the end of TBE, the drive gives the engage order.

    SOTR in blue, FRO in red, SRFR in green

    With a little value of TBE (here, TBE=0.3s), the engage of brake is really soft.

    2.5. Motor slipping optimization

    The slip optimization is necessary if you need an accurate speed versus the load and areactive regulation. It reduces the speed difference between no-load and full load operation.

    The ATV71 calculates the nominal motor slip (NSL) with the nominal motor speed (NSP) thatyou set before.

    The NSP parameter can be revised if the nominal speed indicated on the motor rating plate

    is not reliable.

    If you do not want to change the rated motor speed NSP, the other way to adjust motor slip isto modify the slip compensation SLP parameter. This parameter is a coefficient applied to thenominal motor slip NSL.

    If SLP is too low, the motor never reach the reference speed.

    If SLP is too high, the motor is overcompensated and becomes unstable.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    17/30

    Version :00 of01 03 2010 Page : 17/30

    2.5.1. Method to adjust the nominal motor slip: speed measurement

    Put SLP = 0

    Run the motor at the nominal motor frequency FRS with nominal load (==> themotor current LCR is equal to the nominal motor current NCR)

    Measure the real speed with a tachymeter

    Set the measured value in NSP, set SLP to 100%

    2.5.2. Another method to adjust the nominal motor slip: time

    measurement

    Measure the time in going down with the nominal load

    Measure the time in going up with the nominal load

    If the time difference is less than 5%, your setting is good

    If the time down is higher than the time up, you must increase SLP

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    18/30

    Version :00 of01 03 2010 Page : 18/30

    3.

    Starting procedure ATV71 inClose Loop

    This procedure has to be used for asynchronous motor in close loop.

    What is important to keep in mind is that in close loop, you can have some torque at 0 Hz.

    To make the settings of product become easier, we recommend you to use thehoisting macro-configuration in SIMPLY START menu.

    The first step is to perform the adjustment of setting without load in open loop. Then, whenyou find a good working, you can perform some tests in close loop to check the settings.After, you need to perform some tests at full load to optimize your settings.

    3.1. Motor data

    In 1.3 Simply start menu:this step ensures the optimum motor control.

    Before working in close loop, we must ensure that the working is correct in openloop. The following is to check the setting of speed loop, of brake control, and tocheck the encoder.

    So at first, the motor control type is voltage flux vector control (SVC V).

    You must set the standard motor frequency (BFR), the rated motor power (NPR),the rated motor voltage (UNS), the rated motor current (NCR), the rated motorfrequency (FRS), the rated motor speed (NSP), the maximum frequency (TFR)and the motor thermal current (ITH = NCR).

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    19/30

    Version :00 of01 03 2010 Page : 19/30

    About the power, if there is no any information you have to calculate it with theformula below:

    cos85.03 = NCRUNSNPR

    Then, the Auto tuning must be performed with a cold motor (one day off).

    Set the Macro configuration to: CFG = Hoisting.

    3.2. I/O configuration

    3.2.1. Ensure the easiness of braking setting

    Now, you can perform the first movement of the hook to check the sense of rotation. This isimportant for the setting of brake control:

    LI1 is Forward ==> the hook must go UP

    LI2 is Reverse ==> the hook must go DOWN

    If the sense of rotation is not correct, you can change it by the output phase rotation in Motorcontrol menu: PHR = ACB (factory setting: PHR = ABC).

    The speed reference can be given via analogical input or via logical input by using presetspeed function.

    In most of hoisting application, the motor mode is generator when the load goes down or itis motor when the load goes up. When the motor mode is generator, the dissipation of thisgenerator energy must be done through resistor or network braking unit.

    3.2.2. Define the motor feedbacks

    Choose the encoder type (ENS), according to the feedback and the option board.

    Set the encoder usage to feedback monitoring: ENU = SEC. With this setting, youwill be able to see the measured output frequency (MMF) in the monitoring menu.

    For incremental encoder, the number of pulse (PGI) must be set correctly. If not,the MMF will be different from the reference (FRH).

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    20/30

    Version :00 of01 03 2010 Page : 20/30

    Then, without load, you can perform the encoder check to validate the encodercoupling (with low speed: 15Hz). You can find the encoder check procedure in themotor control menu (page 77).

    If the test is bad, you can try to change the wiring of encoder (inverse A, A/ by B,B/). If the test is again bad, you have to verify your wiring encoder (supply,signals).

    When the encoder test is good you can work in close loop, Ctt parameter to FVC.

    3.3. Optimization of speed loop

    In 1.3 Settings menu:this step reduces the vibration and reduces the overshoot or theundershoot.

    Most of case, the factory settings of speed loop are sufficient. But, the factory setting valuesare corresponding to an application inertia which equals to 3 times the motor inertia. Forhoisting, there is a gear box after the motor, so, the application inertia on the motor shaft issimilar to the motor inertia. In this case with a standard motor, the SPG can be set between20 and 40, and SIT can be set between 100 and 150:

    Speed proportional gain = SPG = 40%;

    When you increase SPG, you reduce the speed overshoot due to a torque jerk. But, ifyou increase too much SPG, the speed loop becomes unstable, and you create someoscillation on the speed. You can also see it with lots of oscillation on the torque.

    When you decrease SPG, you reduce the instability of motor speed but you increasethe overshoot due to a torque jerk.

    Speed time integral = SIT = 100%;

    When you increase SIT, you reduce the low oscillation of torque. But the speed loopreaction becomes longer and longer, so the speed overshoot becomes higher.

    When you decrease SIT, you reduce the speed overshoot due a torque jerk. But, thespeed loop becomes unstable and it starts to oscillate.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    21/30

    Version :00 of01 03 2010 Page : 21/30

    The following curves correspond to the speed reference (FRO in red) and the motor speed(SRFR in green) and the motor torque (SOTR in blue):

    If the speed oscillates like that:

    Then, decrease SPG.

    If the speed waveform looks like that:

    Then, decrease SIT.

    If the speed waveform looks like that:

    Then, SPG is OK.

    If the speed waveform looks like that:

    Then, SIT is OK.

    If there is a big overshoot like that:

    Then, increase SPG.

    If the speed waveform looks like that:

    Then, increase SIT.

    With the scope of Power Suite V2.6, you can see frequency reference (FRO), the motorfrequency (SRFR) and the motor torque (SOTR).

    Warning: A too much slack setting of speed loop can make the load slip (ANFfault)! So you need to perform some tests at full load to check the speed loopsetting.

    3.4. Brake sequence optimization

    In 1.3 Application funct. menu:this step improves the start and stop of movement.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    22/30

    Version :00 of01 03 2010 Page : 22/30

    The brake control consists in controlling the release and the engage of brake. Both phaseshave different goals: in close loop, the main advantage is that the drive can regulate 0 speed.So, it means that the release and the engage of the brake are done at 0 Hz (instead of slipfrequency in open loop).

    3.4.1. Adjustment of start

    The delay between the command of brake (R2) and the mechanical opening of brakecorresponds to the brake release time (BRT).

    During BRT, ATV71 must hold the load: for this, the brake impulse must be set to Yes (BIP =

    Yes) and the brake release I FW to the nominal motor current (factory setting of hoistingCFG: IBR = NCR).

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    23/30

    Version :00 of01 03 2010 Page : 23/30

    3.4.1.1 Adjustment of the Brake Release time (BRT)

    Set BRT to more than necessary and gradually reduce it. You find the good value of BRTwhen the brake releases without allowing the rotor to move before following the acceleration

    ramp.

    At the real opening of brake, the shaft moves in up direction during BRT. You can see thatthe motor speed (in green) increases on the following curve. The real opening of brake iswhen the motor torque (SOTR in blue) is decreasing from the level of IBR.

    SOTR in blue, FRO in red, SRFR in green

    On this curve, you can find the value that you need to decrease in BRT. With cursor (period),the first cursor is on the start of decreasing of SOTR, and the second cursor is when thespeed reference is different from 0Hz:

    Here, BRT must be reduced by 0.393s.

    If BRT is too short, the motor torque (SOTR in blue) increase when the brake is reallyengaged:

    SOTR in blue, FRO in red, SRFR in yellow

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    24/30

    Version :00 of01 03 2010 Page : 24/30

    Another way to see it is that the motor speed stays at 0 Hz after BRT (with SMMF: unfilteredmeasured motor speed).

    Here, BRT is well set:

    SOTR in blue, FRO in red, SRFR in green

    3.4.1.2 Adjustment of brake release current (IBR)

    With the IBR current, you adjust the torque current to hold the load during BRT time. So, forhoisting, you must adjust it to the torque that the motor requires to start at full load.

    The first setting is to adjust IBR to the rated motor current: IBR = NCR. After verifying thisvalue, you can adjust IBR to the real motor torque at full load.

    SOTR in blue, FRO in red, SRFR in green

    By doing some test at full load (after the adjustment of stop), you can adjust IBR value for thefull load.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    25/30

    Version :00 of01 03 2010 Page : 25/30

    SOTR in blue, FRO in red, SRFR in green

    Here IBR corresponds exactly to the load of motor.

    3.4.2. Adjustment of stop

    When the VSD receive a stop order, the speed comes down following the deceleration rampuntil the 0 Hz is reached. The product holds the load at 0 Hz during the brake engage time(BET).

    3.4.2.1 Adjustment of brake engage time (BET)

    Set BET to more than necessary and gradually reduce it to a point where the current iscancelled just after the brake is engaged.

    SOTR in blue, FRO in red, SMMF in green

    Here BET is too long because the motor speed stays at 0 Hz during a long time. It can be

    reduced by 0.39s.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    26/30

    Version :00 of01 03 2010 Page : 26/30

    Nota: If BET is too short, the load will slip a little bit, just after engaging the brake:

    SOTR in blue, FRO in red, SMMF in green

    Here, you can see that the load is slipping on SMMF measurement. This is because BET istoo short and the brake is not mechanically engaged at the end of BET. So, BET must beincreased by 0.06s.

    SOTR in blue, FRO in red, SMMF in green

    The good value of BET is when the load does not slip at the end of BET.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    27/30

    Version :00 of01 03 2010 Page : 27/30

    3.4.2.2 Adjustment of brake engage delay (TBE)

    For a smother stop, you can set a value for TBE to stabilize the motor speed beforeengaging the brake:

    SOTR in blue, FRO in red, SMMF in green

    Here, the value of TBE is good because the speed is really stabilized before engaging thebrake.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    28/30

    Version :00 of01 03 2010 Page : 28/30

    4.

    Annexe 1: Load measurement

    For hoisting application, the brake release current (IBR) must be adjusted to hold the fullload.

    Depending on application, the load can change (empty or half load) and the setting of IBR forthe full load generates some movement in up direction during the brake release time (BRT).

    This behaviour can be avoided by the use of an external weight sensor that measures theload. With this feedback, the drive adjusts automatically the value of IBR for the torque that

    the actual load of motor needs.

    To commission weights measurement function we have to find the coordinates of two points:(LP1; CP1) and (LP2; CP2).

    Increase BRT to 4 s and activate the external weight measurement: PES = Aix.Then set both coordinates: (LP1; CP1) = (25%; NCR) and (LP2; CP2) = (100%;NCR).

    Verify the working of the weight sensor: check that the value of analogical input inthe monitoring menu is different from 0 V (or 4 mA) or different from 10 V (or 20mA).

    Nota: For the two following points, be careful because the load goes up at the brake releasefrequency.

    For the first coordinates (LP1; CP1), with a weak load:

    Calculate the ratio of load to set it in LP1 = actual weight / maximum weight.Read also the value of analogical input in the monitoring menu.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    29/30

    Version :00 of01 03 2010 Page : 29/30

    Perform several starts and reduce gradually the value of CP1 up to avoid anyshock at the mechanical release of brake.

    For the second coordinates (LP2; CP2), with another load (full load or more thanthe first one):

    Repeat the same manipulation for CP2 and LP2 than for CP1 and LP1.

    When you are in close loop, to find the good value for CP1 and CP2, you do not need toincrease BRT to 4 s. You just need to set the speed reference to 0 Hz and then after BRT,read the motor current value (LCR in A).

    Perform no load and full load tests, to check that there is no shock when the brakeis open no matter what the load is.

    At the end of test, decrease BRT to the value that you find during the adjustmentof the brake control function.

  • 8/13/2019 ATV71 Hoisting_commissionning.pdf

    30/30

    5.

    Annexe 2: Table of knownissues

    Problem Condition Cause Solution

    The load isslipping aftergiving a stoporder

    In open loop withHHP product Bad result of autotuning with V1.1product version

    Upgrade the product versionwith V1.2 or higher

    Vibration onthe motorspeed

    Only in close loop,

    No vibration inopen loop.

    Strong mechanicalcoupling of encoderto the motor shaft

    Use another mechanicalcoupling of encoder

    SCF1 nuisance

    tripping

    HHP product Motor saturation Read the application note:

    SCF1fault motorsaturation.pdf