Top Banner
40
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ATTCO Brochure
Page 2: ATTCO Brochure
Page 3: ATTCO Brochure
Page 4: ATTCO Brochure
Page 5: ATTCO Brochure
Page 6: ATTCO Brochure
Page 7: ATTCO Brochure
Page 8: ATTCO Brochure

Client: Ministry of Water & Irrigation

Morganti Group Inc./Infilco JV

Consultant: Black & Veatch International

Total project value: US$130 million

Project duration: 2004-2006

This project was designed to collect water from

Wadi Ma’in, Zara Springs and Mujib Dam, subjecting

the combined flows to treatment, including

desalination, and conveying the treated water to the

existing National Park Pump Station site in Southern

Amman.

From this point, treated water will be distributed

to Amman residents for municipal, commercial and

industrial uses by MWJ/WAI. Up to 8 million m3 per

year of the treated water will be conveyed through a

separate pipeline to hotels near the Dead Sea at a later

date.

• The major components of the company’s scope were

a water treatment plant located at Swemeh, Al-Gohr

with a 53 million m3 of treated water, four pumping

stations and a conveyance system 40 km pipeline from the

water treatment plant to Amman with approximately 160

different manholes and chambers.

• The water treatment plant consists of 26 process

structures and buildings which are different in shape, area

and function. Most of these structures are huge and very

complicated.

Wadi Ma’in Zara and Mujib Water Treatment Plant and Conveyance Project

Page 9: ATTCO Brochure
Page 10: ATTCO Brochure

Expansion and Modification

of Ain Ghazal Waste Water

Treatment Plant Project

Client: Ministry of Water & Irrigation

Morganti Group Inc.

Total project value: US$14 million

Project duration: 2004-2005

The strategic purpose of the Ain Ghazal

Pretreatment Plant (AGTP) project is to

provide a steady flow at the outlet of the

existing operation, maximize the use of the new

1500 mm Dia. pipes, optimize the use of the old

1200 mm siphon and minimize the overflow to

WADI (environmental concern). The proposed

extension and modification of the AGTP included

the following:

• New rock trapping chamber and valve chamber.

• New screening and distribution chamber.

• New grit removal and modification of the existing

grit removal plant.

• Modification and renovation of the existing areation

tanks.

• Modification and renovation of the existing blower building.

• New box culverts 3 m x 3 m x 270 m.r.

• New DN 1400 pipes 100 m.r.

Page 11: ATTCO Brochure

Client: Ministry of Water & Irrigation

Morganti Group Inc.

Consultant: Hazen & Sawyer

Total project value: US$70 million

Project duration: 2000-2003

The scope of civil and piping construction in this

project included the construction of:

• Fifteen reservoirs with capacities of 25000 m3,

10000 m3, 6000 m3, 4000 m3, 2000 m3 and 1000 m3.

• Fifteen pump stations.

• Five elevated water reservoirs 45 m in height.

• Installation of all DI, RCP, PVC piping inside all twenty

sites.

• During the construction, 45000 m3 of concrete

were poured with 4200 tons of steel reinforcement,

250000 m3 excavations, in addition to external

finishing, building finishing, which included stone

cladding and others.

In this project, more than 80% of scope was completed

within the first year.

Restructuring and Rehabilitation of Greater Amman’s Water Supply System (C-15)

Page 12: ATTCO Brochure

Client: Ministry of Water & Irrigation

Kolon Engineering & Construction Co. Ltd.

Consultant: Sigma Consulting Engineers

Total project value: US$7.5 million

Project duration: 2001-2002

The project included the following works:

• Construction of aeration tank with the capacity

of 28000 m3.

• Construction of anoxic tank with the capacity of

8000 m3.

• Drying beds,173 cells.

• Maturation ponds 5000 m2.

• Two thickeners.

• Two settling tanks.

• During the construction, 12000 m3 of concrete were

poured with 1300 tons of steel reinforcement, 15000 m2

asphalt paving, 125000 m3 excavations and 40000 m3 backfill.

Madaba Waste Water Treatment Plant

Page 13: ATTCO Brochure

Client: Ministry of Water & Irrigation

Morganti Group Inc.

Consultant: CDM International Inc.

Total project value: US$30 million

Project duration: 1997-1999

The Plant is located 270 km to the South of

Amman. The following works were executed:

• Two oxidation tanks 7 m x 17 m x 6 m.

• Two clarification tanks - circular shape 14 m Dia. x 5 mh.

• Two sludge holding tanks - conical shape 10 m Dia. x 15 mh.

• Two sets of drying beds 82 m x 35 m.

• Flood retaining wall 165 m.r. x 8 mh.

• Wadi Mousa Pump Station 72 mh x 27 mh x 8 mh.

• Taiba Pump Station 30 mh x 14 mh x 8 mh.

• During the construction, 17000 m3 of concrete

were poured with 2000 tons of steel reinforcement.

Wadi Mousa Waste Water Treatment Plant

Page 14: ATTCO Brochure

Client: Ministry of Water & Irrigation

Consultant: Sigma Consulting Engineers, DAR,

and RRI

Total project value: US$18 million

Project duration: 1996-1998

Construction of a waste water treatment plant

with a capacity of 25000 m3 per day located 140 km

to the north of Amman.

The following works were constructed:

• Six aeration tanks 72 m x 18 m x 5.2 m each.

• Six sedimentation tanks 21 m Diameter x 5.0 m each.

• Three sludge holding tanks with circular and

conical shapes.

• Nine box culverts 11 m x 21 m x 3 m height.

• During the construction, 40000 m3 of concrete

were poured with 5000 tons of steel reinforcement

within 14 months of difficult conditions.

Wadi Al-Arab Waste Water Treatment Plant

Page 15: ATTCO Brochure

Client: Ministry of Water & Irrigation

Consultant: Ministry of Water &

Irrigation

Total project value: US$7.5 million

Project duration: 1997-1998

Construction of a waste water treatment plant

90 km north of Amman.

The following works were executed:

• Two aeration tanks - rectangular with semi-

circular shape 60 m x 15 m x 6 m each.

• Two sedimentation tanks - 14 m Diameter x 4 mh.

• One sludge holding tank 8 m Diameter x 10 mh.

• Distributaries structures, grit chamber screen,

pump station 26 m x 12 m x 6 m.

• During the construction, 7000 m3 of concrete

were poured with 800 tons of steel reinforcement

within 8 months.

Wadi Hassan Waste Water Treatment Plant

Page 16: ATTCO Brochure

Client: Jordan Aircraft Maintenance Co.

Ltd. (JorAMCo) and Aircraft Support

Industries pty. Ltd. (Australian)

Consultant: Jordan Aircraft Maintenance

Co. Ltd. (JorAMCo)

Total project value: US$18 million

Project duration: 2007 (9 Months)

The scope of work included all civil, electrical and

mechanical works for a multi-span hangar 155 m

x 88 m x 30 m height with the construction of 17

m height Reinforced Concrete columns with steel

hinges to allow for hangar movement, in addition to a

3255 m2 mezzanine floor.

Scope of work also included the supply and

installation (S&I) of the following:

• Special fire fighting foam deluge system with Viking

foam grating nozzles and sensitive flame detectors.

• Under floor heating system for 13000 m2 floors with boilers

• Sprinkler system.

• Fire alarm system.

• HVAC system.

• Special fire rated man doors, motorized roll-up fire

rated doors, tail doors, etc...

Aircraft Maintenance

Facility at QAIA - Jordan

Page 17: ATTCO Brochure
Page 18: ATTCO Brochure

Client: Nuqul Group

Consultant: Modern Engineering Group

and Design Associates &

Research Bureau (Darb)

Project total value: US$100 million

Project duration: 2006-2007

• This project is an advanced hygienic paper mill

factory with extraordinary structure, which

contains a lot of different shapes and capacities;

production top slabs, tanks, trenches, electrical

and mechanical manholes and pits, different kinds

of pipes, big number of sophisticated machine

foundations, retaining walls, pipe racks, box culverts,

as well as finishing works such as block, plaster,

different kinds of tile, cable racks, cables, lighting, air

conditioning, ducts, sanitary system, and storm water

system.

• Total concrete quantity of 25000 m3 with 2700 tons

of steel reinforcement.

Paper Mill 4 and Jumbo Roll Storage Plant (Al-Snobar)

Page 19: ATTCO Brochure

Client: Samra Electrical Power Generating Co.

Consultant: J.V. Gama and Black & Veatch

Total project value: US$170 million

Project duration: 2004-2006

Samra Thermal Power Station consists of huge

and specialized structures for industrial equipment

such as gas turbine foundations, equipment

foundations, elevated structures for steam turbine,

fuel tank foundations, DM plant building, and dike

walls, in addition to sub-stations, service buildings,

complete infrastructure such as storm system, drain

system, roads, Rip-Rap protection, retaining walls, site

fencing, etc...

Samra ThermalPower Station

Page 20: ATTCO Brochure

Jordan Bromine Plant

Client: Jordan Bromine Co.

Consultant: AMEC and Jordan Bromine Co.

The project value: US$150 million

Project duration: 2003-2006

Scope of work included the following

projects:

• C1: Earth works, infrastructure and

W.W.T.P.

• C10: Civil works and pre-cast concrete

sleepers for 6 km brine line, tail brine and

other lines from JBC plant to C7 and truce

canal.

• C13: Aqaba terminal facility.

• C19: Asphalt works and fire fighting systems.

• C20: Mechanical works, fire fighting system and

deluge systems.

• 60000 Expansion project (civil and mechanical

works) including boiler and chimney erection, new

centrifuge erection and the required mechanical and

piping works.

Page 21: ATTCO Brochure

Client: Jordan Magnesia Co.

Consultant: Jacobs Engineering Inc.

Engineer: J.V. Agra Monenco (AMEC)

and Attilla Dogan

Total project value: US$80 million

Project duration: 1999-2002

The construction included the following:

• Civil works and foundations for plant steel

structure buildings.

• Elevated foundations for Rotary Lime Kiln 8 m

x 6 m x 7 m.

• Construction of huge storage silos foundations

(one pour 2000 m3).

• Service Buildings including 2000 m2 finishing.

• Six sub-stations 6 meter height 4000 m2.

• Storm and sanitary systems (GRP, DIP, and UPVC

pipes).

• Fire fighting System.

• Soil cement stabilizations.

• Road asphalt paving 150000 m2.

• Reinforced Concrete 37000 m2, re-bars 3000 ton.

Jordan MagnesiumOxide Plant

Page 22: ATTCO Brochure

Jordan Magnesium Oxide Plant and Jordan Bromine Plant

Page 23: ATTCO Brochure
Page 24: ATTCO Brochure

Client: Jordan Petroleum and Duro Felguera Co.

Consultant: Jordan Petroleum Refinery Co. Ltd.

Total project value: US$70 million

Project duration: 2000-2001

The construction of this project included all civil

works of gas storage tanks and filling station

for Jordan Petroleum Company.

This project also included the following works:

• Three 500 ton vessel foundations 90 m x 7 m.

• Deep manholes 80 MI-IS.

• Crash barrier walls 250 m.r.

• Excavations in hard rock 25000 m3.

• Backfill 10000 m3.

• Concrete box culvert 150 m.r.

• Special sand fill below and around vessels 20000 m3.

• Storm water system 850 m.r.

Abu Alanda Gas Liquid Project

Page 25: ATTCO Brochure

Client: Biogas Co. and Farmatic Co. (German)

Consultant: Biogas Co.

Total project value: US$5 million

Project duration: 1999-2001

• Biogas and Land Fill Plant Project was the first of

its kind within the Middle East Region to minimize

the emission of 4 million m3 of methane gas in the

air as a first stage, then to minimize the emission of

12.5 million m3 of methane gas into the air.

• In this project, 96 wells for extraction gases and gas

pipe networks were constructed in the land fill area.

• The plant composed of steel and concrete tanks, receiving

station, generator building, hangar, electromechanical works.

Biogas and Land Fill Plant Project - Amman, Jordan

Client: Jordan Bromine Co.

Consultant: Jordan Bromine Co.

Total project value: US$30 million

Project duration: 2004 (8 Months)

Design and build project with a total value of US$3.0 million.

The following works were completed:

• Project design for steel and civil structures.

• Concrete foundations.

• Infrastructure and roads.

• Supply and Installation (S&I) of steel structure, height up to 35.0 m.

All underground and above ground structures consisted of 4000 m3

of concrete, 500 tons of steel reinforcement bars, 600 tons of steel

structure and all necessary works.

Chlor–Alkali Project at Jordan Bromine Plant

Page 26: ATTCO Brochure

Client: Nuqul Group

Consultant: Nuqul Group

Project duration: 8 months

This project included the construction of

three big plants:

1. Modern Aluminum Plant (MODAL)

Construction of 22000 m2 plant with all

machinery foundations, anodizing plant and

settling tanks with treatment plant.

2. Al-Keena Paper Mill

To produce hygienic paper pulp made on total

covered area 18000 m2, with all the facilities

required for one of the most sophisticated plants.

3. Quality Food Factory (UNIUM)

Total built-up area of 6000 m2, this project was

constructed with the best standards of building

to match the food grade industry requirements to

provide the cleanest and most air-tight controlled

atmosphere for the production hall, call stores and

finished product stores.

Nuqul Group Complex

Page 27: ATTCO Brochure

Client: Nuqul Group

Consultant: Nuqul Group

Total project value: US$1.1 million

Project duration: 2006 (3 months)

The construction of this project included

all civil and finishing works for a 2600 m2

building, such as ceramic and marble tiles,

gypsum boards, false ceilings and all mechanical

and electrical works for the building and

mezzanine floors, in addition to the external

finishes and asphalt yards.

Nuqul - 7th CircleCar Exhibition

Page 28: ATTCO Brochure

Client: Majid Al-Futtaim Hypermarket L.L.C.

Consultant: Certified Project Managers (CPM)

Company scope of work: US$2.85 million

Project Duration: 2006

The scope of work included all finishing works

for a 20000 m2 building, such as ceramic tiles,

special internal paint, gypsum boards, false

ceilings, fire rated wooden doors, fire rated steel

shutter doors, handrails, etc...

New Carrefour Hypermarket at City Mall – Amman, Jordan

Page 29: ATTCO Brochure

Client: Jordan Investment & Supply Co. W.L.L

Consultant: Design Associates &

Research Bureau (Darb)

Company scope of work: US$2.35 million

Project duration: 2005-2006

The scope of work included the

construction of a basement floor with

rooms for boilers and pumps, in addition to

a water reservoir.

It also included a 8770 m2 ground floor

for promotions and home-center freezers,

in addition to 3000 m2 mezzanine floor for

management, food court with all external

works, boundary walls and parking areas.

East Amman Safeway Store - Al-Muqablain, Jordan

Page 30: ATTCO Brochure

Client: Ministry of Public Works & Housing

Consultant: Ministry of Public Works & Housing

Total project value: US$1.4 million

Project duration: 2003-2006

The scope of work included the construction

of a mosque with unique structure domes,

vaults and Islamic arches.

This Project had been constructed in four stages:

• First stage: super structure works.

• Second stage: external works which included

granite tiles, Islamic arches, plastering and wooden

doors.

• Third stage: the works included aluminum steel

doors, waterproofing, external yards, electrical and

mechanical works.

• Fourth stage: included stone tiles, all wooden

works, paints, gypsum works, false ceilings, light

fixtures and mechanical works.

Al-Shareefah Fatemah Bent Naser Mosque

Page 31: ATTCO Brochure
Page 32: ATTCO Brochure

Client: U.S Army Corps of Engineers (USACE)

Consultant: U.S Army Corps of Engineers (USACE)

Total project value: US$1.7 million

Project duration: 2006-2007

• The project scope of work included the full

design and construction of two gatehouses, an

engineering building, with the design and installation

of plumbing, HVAC, fire protection and electrical

systems for the above buildings, a perimeter fence

with gates according to the requirements of USACE.

• The scope of work also included rough grading,

drainage, and temporary utilities with connections

for future tie-ins to permanent utilities, a geotechnical

investigation and topographic mapping.

King Abdullah II Special Operations Training Center - Phase 1

Page 33: ATTCO Brochure

Client: Greater Amman Municipality

Consultant: Greater Amman Municipality

Total project value: US$2.70 million

Project duration: 2002-2003

This project represents and shows the

historical events, culture, society, architecture,

and art from the ancient Paleolithic, Neolithic,

Calocholitic stages up to this Era. It was built in a

modern way with high performance quality.

The elements of this project are mainly composed

of stone, marble mosaic, steel works, wood work,

etc...

The total length of this project is about 450 m.

The Promenade of Jordan Project at King Hussein Park

Page 34: ATTCO Brochure

Client: Saed Al-Hnadi

Consultant: Faris Buqaen Engineering

Office

Total project value: US$1.2 million

The Royal Institute of Arabian Horsemanship

Page 35: ATTCO Brochure

Madaba Gas Station Madaba Gas Station

Page 36: ATTCO Brochure

Villa Abdeen Villa Abdeen

Applied Science UniversityApplied Science University Renovation of the Cultural PalaceRenovation of the Cultural Palace

Page 37: ATTCO Brochure

Al Jeizah Gas Factory

Iron and Steel Factory

Millennium Garment Factory

Petra Spinning Factory

Al-Jeizah Gas Factory

Iron and Steel Factory Petra Spinning Factory

Millennium Garment Factory

Page 38: ATTCO Brochure

Construction of roads and bridges on the Zarqa Stream area Construction of roads and bridges on the Zarqa Stream area

Airport Highway - 8th Circle TunnelAirport Highway - 8th Circle Tunnel

Page 39: ATTCO Brochure
Page 40: ATTCO Brochure