Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Campus Capital Needs Sales Surtax Funded Attachment F Estimate Detail Report Condition Code Facility Longleaf Elementary 1.78 $1,705,621 District School Security $28,980 1.00 Perimeter/Entry Fencing and Gates $2,137 Pedestrian Access and Safety (Fencing) 1.00 $2,137 Building Access Security Equipment $26,843 Public Access Control 1.00 $26,843 Educational Technology $511,325 2.25 Technology Building Cabling $347,844 Structured Cabling 1.00 $347,844 Technology Equipment Renewal $113,771 Computer Replacement 3.00 $28,700 Server Replacement 1.00 $28,364 Switch Replacement 1.00 $25,199 Telephone System Replacement 1.00 $21,284 Wireless Access Points Replacement 1.00 $10,223 Classroom Technology Infrastructure (Electrical, HVAC and Data) $49,711 Student Stations Data Drops 5.00 $49,711 Facility Renewal $1,165,315 1.50 Central Mechanical Plant Renewal $646,476 Booster Pumps, Chilled Water, VFD's and Recirculation pumps 1.00 $98,425 Chillers 1.00 $548,050 Cooling and Heating Control System Renewal $182,311 Building Automation System 1.00 $182,311 Air Conditioning and Air Distribution Equipment Renewal $123,032 HVAC Systems EPA NonͲCompliant Refrigerant 1.00 $123,032 Exterior Building Wall Finish System Renewal $54,424 Expansion / Control Joints 2.00 $16,059 Sealants 2.00 $38,364 Electrical Distribution System Renewal $159,074 TSS Surge Suppression 2.00 $159,074 July 22, 2014
22
Embed
Attachment F - Brevard Public Schoolseagendatoc.brevardschools.org/12-17-2019 School Board... · 2020-02-12 · Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Facilities Services2700 Judge Fran Jamieson WayViera, Florida 32940-6601
Campus Capital Needs Sales Surtax Funded
Attachment F
Estimate
Detail ReportCondition CodeFacility
Longleaf Elementary 1.78 $1,705,621District School Security $28,9801.00
Perimeter/Entry Fencing and Gates $2,137Pedestrian Access and Safety (Fencing) 1.00 $2,137
Building Access Security Equipment $26,843Public Access Control 1.00 $26,843
Educational Technology $511,3252.25
Technology Building Cabling $347,844Structured Cabling 1.00 $347,844
Classroom Technology Infrastructure (Electrical, HVAC and Data) $49,711Student Stations Data Drops 5.00 $49,711
Facility Renewal $1,165,3151.50
Central Mechanical Plant Renewal $646,476Booster Pumps, Chilled Water, VFD's and Recirculation pumps 1.00 $98,425Chillers 1.00 $548,050
Cooling and Heating Control System Renewal $182,311Building Automation System 1.00 $182,311
Air Conditioning and Air Distribution Equipment Renewal $123,032HVAC Systems EPA Non Compliant Refrigerant 1.00 $123,032
Exterior Building Wall Finish System Renewal $54,424Expansion / Control Joints 2.00 $16,059Sealants 2.00 $38,364
Electrical Distribution System Renewal $159,074TSS Surge Suppression 2.00 $159,074
July 22, 2014
Hann.Susan
Highlight
Exhibit F- Design Build Preconstruction Services AmendmentPage 1 of 3
EXHIBIT F
DESIGN BUILD PRECONSTRUCTION SERVICES AGREEMENT
TO THE CONTINUING CONTRACT FOR
DESIGN BUILD SERVICES/RFQ #17-Q-078-DR
BY AND BETWEEN
THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA
2700 Judge Fran Jamieson Way
Viera, Florida 32940-6601
Phone: (321) 631-1911
Fax: (321) 633-4646
AND
WHARTON-SMITH, INC.
FOR THE CONSTRUCTION OF:
SCHOOL: Longleaf Elementary School
PROJECT: Facility Renewal
Exhibit F- Design Build Preconstruction Services AmendmentPage 2 of 3
ARTICLE 1. GUARANTEED MAXIMUM PRICE (GMP)
1.1 Guaranteed Maximum Price (GMP): Not applicable until construction phase. Preconstruction services only based on Design Criteria Package to be prepared by OCI Associates, Inc.
ARTICLE 2. PROJECT TIME
2.1 Project Schedule: Attached to this Amendment will be an attachment noting completion times and intermediate milestone dates estimated for the preconstruction phase.
ARTICLE 3. DESIGN/BUILD FEE
3.1 Design Build Preconstruction Cost Proposal: The Design Builder’s Preconstruction Cost Proposal for the Project shall be a Lump Sum in the amount of One Hundred Fifty-Eight Thousand, Nine Hundred Two Dollars ($158,902.00). NOTE: Allowance for HVAC Systems Pre-Test and Balance will be on a Not-To-Exceed basis. All unused funds will be returned to the School District at the time of preconstruction close-out. Fee will be paid only on cost of work for this item.
ARTICLE 4. REIMBURSABLE GENERAL CONDITIONS COSTS
4.1 General Conditions: General Conditions costs for the Project shall be determined at the time of the Guaranteed Maximum Price Amendment.
ARTICLE 5. LIQUIDATED DAMAGES
5.1 Liquidated Damages: Liquidated damages for the Project shall be determined at the time of the Guaranteed Maximum Price Amendment.
ARTICLE 6. PROJECT REPRESENTATIVES
6.1 Owner’s Representative: Owner designates the individual listed below as its Owner’s Representative to provide direct interface with Design/Builder with respect to Owner’s responsibilities:
Johnathan Wilkes, Owner’s Project Manager.
6.2 Design/Builder Representative: Design/Builder designates the individual listed below as its Design/Builder's Representative to provide direct interface with Owner with respect to Design/Builder's responsibilities:
David Martin, Design Builder's Project Manager.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
Exhibit F- Design Build Preconstruction Services AmendmentPage 3 of 3
SIGNATURES (FOR PROJECTS OVER $50,000) IN WITNESS THEREOF, the above parties have executed this instrument, the name of each party being affixed and these present duly signed by its undersigned representative, pursuant to authority of its governing body.
THE SCHOOL BOARD OF WHARTON-SMITH, INC. BREVARD COUNTY, FLORIDA (Owner): (Consultant)
SIGNATURES (FOR PROJECTS UNDER $50,000) IN WITNESS THEREOF, the above parties have executed this instrument, the name of each party being affixed and these present duly signed by its undersigned representative, pursuant to authority of its governing body.
THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA (Owner): (Consultant)
By: _______________________________ By: ____________________________ Susan Hann, P.E., AICP Print Name: _____________________ Assistant Superintendent/Facilities Services Title: ___________________________ As Designee for Mark W. Mullins, Ed.D., Sup. Date: ___________________________
WHARTON-SMITH CONSTRUCTION GROUPDesign Build Services : Design and Preconstruction Services Proposal
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 3 of 16
November 22, 2019 Mr. Johnathan Wilkes Sr. Project Manager Wharton-Smith, Inc. 750 Monroe Road Sanford, FL 32771 Delivered via email: [email protected] Re: Longleaf Elementary School Professional Engineering Services Proposal Dear Mr. Wilkes: TLC Engineering is pleased to submit the following proposal to provide engineering services for the project referenced above. We appreciate your consideration and look forward to working with you and your staff on this project. PROJECT SCOPE
We understand the project is to consist of addressing the Brevard County School Assessment, Attachment “F”, maintenance logs and information gained in a field visit of November 8, 2019, of the Longleaf Elementary School located in Melbourne, Florida. The project will also include converting building 5 to a chilled water system. Capital Needs Sales Surtax Funded Attachment F budget along with the addition of adding building 5 to the chilled water system is estimated to have a budget of $1,300,000.00. BASIC SCOPE OF SERVICES
Basic Scope of Services shall be as outlined in TLC’s Continuing Contract for MEP/FP Professional Engineering Services with Brevard Public Schools unless specifically modified by this proposal. TLC shall provide professional engineering and design services for:
a. Heating, Ventilating and Air-Conditioning (HVAC) Engineering b. Plumbing Engineering c. Electrical Engineering d. Structural Engineering (as support for mechanical systems)
Design TLC anticipates submittals at the following design stages:
Schematic Design Design Development 90% Construction Documents 100% Construction Documents
Schedule Our schedule for the design effort is 10 working weeks from receipt of Purchase Order and notice to proceed. The design effort will be based on the following:
2 Week(s) – Field verify existing systems
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 4 of 16
Mr. Johnathan Wilkes November 22, 2019 Page 2 of 3
6 Week(s) – Development of Bid Documents 2 Week(s) – Internal QA/QC, provide S/S drawings
PROPOSED CONSTRUCTION PHASE SERVICES
Construction Phase Services are as outlined in AIA Document C401 – 2007 Edition – Standard Form of Agreement Between Architect and Consultant, Article 4.5. Additional Construction Phase Services provided for this project shall include:
1. Response to bidder questions. 2. Response to local permitting officials’ comments. 3. Response to Contractor’s Request for Information (RFI) and submittal review during the
construction period. 4. The design team will take part of a weekly construction meetings and to become generally
familiar with the progress and quality of the construction work in order to determine if the work is being performed in general accordance with the construction documents; project construction is to take place over the summer break of 2020.
ADDITIONAL SERVICES
Additional services, when requested in writing by Wharton-Smith, Inc shall be performed at TLC’s approved hourly rates as outlined in our continuing services contract. Additional Services include those items shown in Attachment A. TLC shall submit the estimated additional services cost for approval and authorization prior to proceeding with a design. FEE
TLC is prepared to provide services as outlined above for a not to exceed fee of Design: $79,200.00 Construction Administration: $19,870.00 based on the terms of our current continuing services contract. See Attachment B for detailed breakdown of fee. If our proposal is acceptable, please submit appropriate authorization (notice to proceed) to allow schedule and completion of proposed scope. Sincerely, TLC Engineering for Architecture Jim Mullen, PE Principal / Mechanical Engineer Gary C. Krueger, PE, CM, LEED AP BD+C Principal / Division Director Attachments
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 5 of 16
CA Service to be captured in GMP Proposal.
Mr. Johnathan Wilkes November 22, 2019 Page 3 of 3
ATTACHMENT A
ADDITIONAL SERVICES
Professional Engineering Services Proposal
1. Construction site visits or attendance at design review meetings, as requested by the Owner or Architect, in excess of site visits per discipline as defined in our proposal.
2. Value Engineering meetings and subsequent engineering or design revisions to incorporate extensive accepted value engineering items, including changes to system design after construction documents have been completed.
3. Significant revisions to the program, design philosophy or Architectural plans after 100% Design Development approval, or to systems selected following schematic phase, and which result in redesign expenses.
4. Document reproduction beyond those required for in-house coordination and submittals as outlined above.
5. Development of “as-built” drawings. TLC will be responsible for creating record drawings of construction documents marked up by the construction manager.
6. Detailed cost estimating services.
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 6 of 16
I.
II.
III. WORK ORDER COMPENSATION/SCHEDULE
HOURS TOTAL
4 $580.00
12 $1,620.00
12 $1,620.00
100 $12,000.00
30 $2,700.00
2 $110.00
$18,630.00
HOURS TOTAL
4 $580.00
18 $2,430.00
20 $2,700.00
160 $19,200.00
60 $5,400.00
2 $110.00
$30,420.00
HOURS TOTAL
4 $580.00
18 $2,430.00
18 $2,430.00
160 $19,200.00
60 $5,400.00
2 $110.00
$30,150.00
TOTAL DESIGN FEE PROPOSAL AMOUNT $79,200.00
HOURS TOTAL
4 $580.00
38 $5,130.00
16 $2,160.00
60 $7,200.00
50 $4,500.00
4 $220.00
$19,790.00SUBTOTAL
Professional Engineer $120.00
Professional Engineer $120.00
Professional Engineer $120.00
Professional Engineer $120.00
Senior Engineer $135.00
Designer $90.00
Admin/Word Processing $55.00
CONSTRUCTION ADMINISTRATION
POSITION HOURLY RATE
Principal $145.00
Project Manager $135.00
SUBTOTAL
Admin/Word Processing $55.00
$90.00
Project Manager
POSITION HOURLY RATE
DESIGN DEVELOPMENT
Designer
$135.00
Senior Engineer
Principal $145.00
$135.00
$145.00
$135.00
Admin/Word Processing
SUBTOTAL
Project Manager
$55.00
Design per the Attachement F and the Facility Assessments of Longleaf Elementary School
Senior Engineer
Designer
$135.00
CONSTRUCTION DOCUMENTS (100%CD)
POSITION HOURLY RATE
$90.00
SUBTOTAL
Principal
Admin/Word Processing $55.00
Designer
Attachment B
POSITION
Project Manager
HOURLY RATE
Senior Engineer $135.00
Principal $145.00
$135.00
$90.00
PROJECT: Brevard County - Longleaf Elementary School
SCOPE OF WORK:
FEE PROPOSAL
The statement of fees under this Service Agreement shall be based on the Standard HourlyRate Schedule for the following work phases:
FIELD SURVEY / SCHEMATIC DESIGN
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
DD/CD's: Owner Approval of Bidding / Permit Documents
Construction Bid / Qualify Subcontractors
Prepare GMP - Facility Renewal Package
GMP Presentation / Board Approval
Owner Direct Purchase Order Process
Update Drawings To Reflect GMP
Permit Application Review
Material Procurement / Construction Planning
Facility Renewal Construction Commencement
Selective Demolition
Mobilize Temporary Facilities
Classroom Techology Infrastructure
Electrical / Low Voltage Upgrades
Mechanical Upgrades
Final Inspections
Test & Balance / Punchlist Activities
Inspections (Partials)
Substantial Completion
Close-Out & Commissioning
Project Complete
DESIGN-BUILD SERVICES FOR FACILITIES RENEWAL
LONGLEAF ELEMENTARY SCHOOL
PRELIMINARY DESIGN-BUILD SCHEDULE
Actual Work
Remaining Work
Critical Remaining Work
Milestone
Page 1 of 1
Project ID: PS-146-01
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 10 of 16
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 11 of 16
INSR ADDL SUBRLTR INSR WVD
DATE (MM/DD/YYYY)
PRODUCER CONTACTNAME:
FAXPHONE(A/C, No):(A/C, No, Ext):
E-MAILADDRESS:
INSURER A :
INSURED INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBERPOLICY EFF POLICY EXP
TYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)
COMMERCIAL GENERAL LIABILITY
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
INSURER(S) AFFORDING COVERAGE NAIC #
Y / N
N / A
(Mandatory in NH)
ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED?
EACH OCCURRENCE $
DAMAGE TO RENTED$PREMISES (Ea occurrence)CLAIMS-MADE OCCUR
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GENERAL AGGREGATE $GEN'L AGGREGATE LIMIT APPLIES PER:
PRODUCTS - COMP/OP AGG $
$
PRO-
OTHER:
LOCJECT
COMBINED SINGLE LIMIT$(Ea accident)
BODILY INJURY (Per person) $ANY AUTO
OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS
AUTOS ONLYHIRED PROPERTY DAMAGE $
AUTOS ONLY (Per accident)
$
OCCUR EACH OCCURRENCE $
CLAIMS-MADE AGGREGATE $
DED RETENTION $ $
PER OTH-STATUTE ER
E.L. EACH ACCIDENT $
E.L. DISEASE - EA EMPLOYEE $If yes, describe under
E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below
POLICY
NON-OWNED
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORETHE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED INACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIODINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THISCERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THISCERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIESBELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZEDREPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement onthis certificate does not confer any rights to the certificate holder in lieu of such endorsement(s).
Certificate holder is additional insured as respects General Liability, Automobile Liability, Pollution
Liability and Excess/Umbrella Liability only if required by written contract, and subject to the terms,
conditions and exclusions as specified in the policy.
Coverage is primary as respects to General Liability & Automobile Liability and non-contributory as subject
(See Attached Descriptions)
The School Board of Brevard County, Florida
2700 Judge Fran Jamieson Way
Viera, FL 32940-6601
WHARTONSClient#: 26140
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 12 of 16
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 13 of 16
ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED?
INSR ADDL SUBRLTR INSD WVD
PRODUCER CONTACTNAME:
FAXPHONE(A/C, No):(A/C, No, Ext):
E-MAILADDRESS:
INSURER A :
INSURED INSURER B :
INSURER C :
INSURER D :
INSURER E :
INSURER F :
POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY)
AUTOMOBILE LIABILITY
UMBRELLA LIAB
EXCESS LIAB
WORKERS COMPENSATIONAND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
AUTHORIZED REPRESENTATIVE
EACH OCCURRENCE $DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence)
MED EXP (Any one person) $
PERSONAL & ADV INJURY $
GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $
PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT
OTHER: $COMBINED SINGLE LIMIT
$(Ea accident)
ANY AUTO BODILY INJURY (Per person) $OWNED SCHEDULED
BODILY INJURY (Per accident) $AUTOS ONLY AUTOS
HIRED NON-OWNED PROPERTY DAMAGE$AUTOS ONLY AUTOS ONLY (Per accident)
$
OCCUR EACH OCCURRENCE
CLAIMS-MADE AGGREGATE $
DED RETENTION $
PER OTH-STATUTE ER
E.L. EACH ACCIDENT
E.L. DISEASE - EA EMPLOYEE $If yes, describe under
E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below
INSURER(S) AFFORDING COVERAGE NAIC #
COMMERCIAL GENERAL LIABILITY
Y / NN / A
(Mandatory in NH)
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORETHE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED INACCORDANCE WITH THE POLICY PROVISIONS.
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIODINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THISCERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THISCERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIESBELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZEDREPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement onthis certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:
CERTIFICATE HOLDER CANCELLATION
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
$
$
$
$
$
8/16/2019
(703) 827-2277 (703) 827-2279
20508
TLC Engineering Solutions, Inc.255 South Orange AveSte 1600Orlando, FL 32801
204273528919437
A 1,000,000
X X 4029282666 3/30/2019 3/30/2020 1,000,00015,000
1,000,0002,000,0002,000,000
1,000,000B
X X 4029282778 3/30/2019 3/30/2020
10,000,000CX X 6024385012 3/30/2019 3/30/2020 10,000,000
10,000A
X 4029282814 3/30/2019 3/30/2020 1,000,000N 1,000,000
1,000,000D Professional Liab. 027015035 3/30/2019 Per Claim 8,000,000
Professional Liability Aggregate Limit: $10,000,000
RE: ALL WHARTON SMITH PROJECTS
Wharton-Smith, Inc. and Owner are included as additional insured with respect to General Liability, Automobile Liability and Umbrella Liability when required by written contract. General Liability, Automobile Liability, Workers Compensation and Umbrella Liability policies include a waiver of subrogation in favor of the additional insureds where permissible by state law and when required by written contract. 30-day Notice of Cancellation will be issued for the General Liability, Automobile Liability, Umbrella Liability, Workers Compensation and Professional Liability policies in accordance with policy terms and conditions.
Valley Forge Insurance Company A(XV)American Casualty Co of Reading, PA A(XV)Continental Insurance Company A(XV)Lexington Insurance Company A, XV
X
3/30/2020
XX
X
X
X
X
X
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 14 of 16
FORM NUMBER:
EFFECTIVE DATE:
ADDITIONAL REMARKS
ADDITIONAL REMARKS SCHEDULE
FORM TITLE:
Page of
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
AGENCY CUSTOMER ID:LOC #:
AGENCY NAMED INSURED
POLICY NUMBER
CARRIER NAIC CODE
Ames & Gough
TLCENGI-01
SEE PAGE 1
1
SEE PAGE 1
ACORD 25 Certificate of Liability Insurance
1
SEE P 1
TLC Engineering Solutions, Inc.255 South Orange AveSte 1600Orlando, FL 32801
SEE PAGE 1
KGODWIN
1
Description of Operations/Locations/Vehicles:waiver of subrogation in favor of the additional insureds where permissible by state law and when required by written contract. 30-day Notice of Cancellation will be issued for the General Liability, Automobile Liability, Umbrella Liability, Workers Compensation and Professional Liability policies in accordance with policy terms and conditions.
RFQ #17-Q-078-DR Continuing Contract Design Build Services for Longleaf Elementary School Facility Renewal
11/26/19 Page 15 of 16
Facilities Services2700 Judge Fran Jamieson WayViera, Florida 32940-6601
Campus Capital Needs Sales Surtax Funded
Attachment F
Estimate
Detail ReportCondition CodeFacility
Longleaf Elementary 1.78 $1,705,621District School Security $28,9801.00
Perimeter/Entry Fencing and Gates $2,137Pedestrian Access and Safety (Fencing) 1.00 $2,137
Building Access Security Equipment $26,843Public Access Control 1.00 $26,843
Educational Technology $511,3252.25
Technology Building Cabling $347,844Structured Cabling 1.00 $347,844