Attachment D Maps Figure 1: Project Overview Figure 2: Project Vicinity & Watersheds Figure 3: Index Map with Sheet Numbers Figure 4: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Highwind Substation - outfall structures) [Source: Sheet 1 of Figure 3, WDR Permit Application Package] Figure 5: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 8 – permanent tower footing O&M area in drainage) [Source: Sheet 3 of Figure 3, WDR Permit Application Package] Figure 6: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 13 – Installation of three McCarthy drains) [Source: Sheet 4 of Figure 3, WDR Permit Application Package] Figure 7: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 16 – New Access Road plus installation of two McCarthy drains; Construct 17 – widening of existing access road, installation of new McCarthy drain and maintenance grading of existing access road) [Source: Sheet 6 of Figure 3, WDR Permit Application Package] Figure 8: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 27 – Installation of new McCarthy drain in wetland habitat) [Source: Sheet 14 of Figure 3, WDR Permit Application Package] Figure 9: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 33 –Construct 33 and permanent O&M area located within stream channel and will be converted to rip-rap lined channel for approximately 32 feet) [Source: Sheet 20 of Figure 3, WDR Permit Application Package] Figure 10: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Constructs 44-46 – widening of existing access road, AC Mitigation – zinc ribbon installation, maintenance grading, as well as installation of concrete v-ditch and new concrete outlet, gabion retaining wall, and McCarthy drain) [Source: Sheet 23 of Figure 23, WDR Permit Application Package]
11

Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

Jul 03, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

Attachment D Maps 

Figure 1: Project Overview

Figure 2: Project Vicinity & Watersheds

Figure 3: Index Map with Sheet Numbers

Figure 4: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Highwind Substation - outfall structures) [Source: Sheet 1 of Figure 3, WDR Permit Application Package]

Figure 5: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 8 – permanent tower footing O&M area in drainage) [Source: Sheet 3 of Figure 3, WDR Permit Application Package]

Figure 6: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 13 – Installation of three McCarthy drains) [Source: Sheet 4 of Figure 3, WDR Permit Application Package]

Figure 7: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 16 – New Access Road plus installation of two McCarthy drains; Construct 17 – widening of existing access road, installation of new McCarthy drain and maintenance grading of existing access road) [Source: Sheet 6 of Figure 3, WDR Permit Application Package]

Figure 8: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 27 – Installation of new McCarthy drain in wetland habitat) [Source: Sheet 14 of Figure 3, WDR Permit Application Package]

Figure 9: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Construct 33 –Construct 33 and permanent O&M area located within stream channel and will be converted to rip-rap lined channel for approximately 32 feet) [Source: Sheet 20 of Figure 3, WDR Permit Application Package]

Figure 10: Representative Map of Impacts to Waters under the Water Board and CDFG Jurisdictions (Constructs 44-46 – widening of existing access road, AC Mitigation – zinc ribbon installation, maintenance grading, as well as installation of concrete v-ditch and new concrete outlet, gabion retaining wall, and McCarthy drain) [Source: Sheet 23 of Figure 23, WDR Permit Application Package]

Page 2: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

!(

Kern County

Los Angeles County

Rosamond

Chino

Mesa

Gould

Vincent

Antelope

Goodrich

Mira Loma

Rio Hondo

Whirlwind

Windhub

Highwind

!!!

!!!

!!!

!!!!!!!!!

!!!

!!!

!!!!!!!!!!!!

!!!

!\!\Carson City

Oakland

CA

NV

San Diego

Los Angeles

FresnoSan Jose

LasVegas

Bakersfield

Sacramento

Legend

!( Substation

Antelope Transmission Project

Segment 3B

Segment 3A

Segment 2

Tehachapi Renewable Transmission Project

Segments 4-11

Telecom

66kV

Base map: ESRI Streetmap

Source: Figure 1, WDR Permit Application Package

North America, 2008

0 94.5

Miles ±

Figure 1Project Area Map

Attachment DAntelope Transmission Project – Segment 3B

Page 3: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

")

")

")")")

")

")

")

")

")

")

")

")

")

")

")

")

")") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ")

")

") ")

")

")

")

")")

")

")

")")

")") ")

")

") ") ") ")")")

")")

")")

")

")

")

")

")

")

")

")

")

")

")")

")

")

")

")

Highwind Substation

Windhub Substation

ANTELOPE

FREMONT

Legend

Segment 3B

Segment 3A

Segment 2") New Structure

Impact Areas

Permanent

Temporary

Watershed

Topo

0 4,5002,250

Feet±

Source: Figure 2, WDR Permit Application Package

Figure 2Project Vicinity & Watersheds

Attachment DAntelope Transmission Project – Segment 3B

Page 4: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

")

")

")

")")

")

")

")

")

")

")

")

")

")

")

")

")

")

") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ") ")

")

") ")

")

")

")

")

")

")

")

")

")

")

") ")

")

") ") ") ")

")

")

")

")

")")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

")

7

6

9

5

8

4

3

2

1

11

19

23

25 26 27

28

29

30

10

32

33

34

35 36 37

38

24

15 18

222120

16 17

13 14

12

31

58

Oak Creek Rd

Cameron Canyon Rd

tS ht09

Tehachapi Willow Springs Rd

tC ykco

R

Josh

ua W

ay

58

Rocky Ct

Legend

Segment 3B

Segment 3A

Segment 2") New Structure

Impact Areas

Permanent

Temporary

Mapbook Index

0 3,1001,550

Feet±

Source: Figure 3, WDR Permit Application Package

Figure 3Index Map with Sheet Numbers

Attachment DAntelope Transmission Project – Segment 3B

Page 5: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

3B-1-S-1

3B-1-S-2

Const 2

Const 1

Highwind Sub

LegendSegment 3B

Segment 3A

Segment 2

New Structure

Jurisdictional WatersState Streambed (CDFG/SWRCB)

CDFG Riparian

Wetland

Survey Area

ImpactsAvoided - No Impact

Impacts to Jurisdictional Waters

Permanent

Temporary

Permanent Road

Temporary Road

11

151316

05

07

20

06

04

02

12

03

14

01

17

08

21

0910

182219

23 2524

262827

313029

3332

3534

3836 37

0 200100

Feet

Source: Sheet 1 of Figure 3, WDR Permit Application Package

Figure 4Representative Map of Impacts to Waters

under the Water Board and CDFG Jurisdictions(Highwind Substation – outfall structures)

Attachment DAntelope Transmission Project – Segment 3B

Page 6: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

3B-1-R-6

3B-1-S-5

3B-1-S-6

Const 9

Const 8

Const 7

LegendSegment 3B

Segment 3A

Segment 2

New Structure

Jurisdictional WatersState Streambed (CDFG/SWRCB)

CDFG Riparian

Wetland

Survey Area

ImpactsAvoided - No Impact

Impacts to Jurisdictional Waters

Permanent

Temporary

Permanent Road

Temporary Road

11

151316

05

07

20

06

04

02

12

03

14

01

17

08

21

0910

182219

23 2524

262827

313029

3332

3534

3836 37

0 200100

Feet

Source: Sheet 3 of Figure 3, WDR Permit Application Package

Figure 5Representative Map of Impacts to Waters

under the Water Board and CDFG Jurisdictions(Construct 8 – permanent tower footing O&M

area in drainage)Attachment D

Antelope Transmission Project – Segment 3B

Page 7: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

3B-1-S-5

3B-2-S-12

3B-2-S-10

3B-2-S-11

Const 12

Const 11

Const 10

LegendSegment 3B

Segment 3A

Segment 2

New Structure

Jurisdictional WatersState Streambed (CDFG/SWRCB)

CDFG Riparian

Wetland

Survey Area

ImpactsAvoided - No Impact

Impacts to Jurisdictional Waters

Permanent

Temporary

Permanent Road

Temporary Road

11

151316

05

07

20

06

04

02

12

03

14

01

17

08

21

0910

182219

23 2524

262827

313029

3332

3534

3836 37

0 200100

Feet

Source: Sheet 4 of Figure 3, WDR Permit Application Package

Figure 6Representative Map of Impacts to Waters

under the Water Board and CDFG Jurisdictions(Constructs 10–12 – Installation of three McCarthy drains)

Attachment DAntelope Transmission Project – Segment 3B

Page 8: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

3B-4-R-23

3B-2-R-15

3B-2-S-16

3B-4-S-23

3B-2-S-15

Const 17

Const 18

LegendSegment 3B

Segment 3A

Segment 2

New Structure

Jurisdictional WatersState Streambed (CDFG/SWRCB)

CDFG Riparian

Wetland

Survey Area

ImpactsAvoided - No Impact

Impacts to Jurisdictional Waters

Permanent

Temporary

Permanent Road

Temporary Road

11

151316

05

07

20

06

04

02

12

03

14

01

17

08

21

0910

182219

23 2524

262827

313029

3332

3534

3836 37

0 200100

Feet

Source: Sheet 6 of Figure 3, WDR Permit Application Package

Figure 7Representative Map of Impacts to Waters

under the Water Board and CDFG Jurisdictions(Constructs 17 and 18 – New Access Road

plus installation of two McCarthy drains,widening of existing access road,

installation of new McCarthy drain andmaintenance grading of existing access road)

Attachment DAntelope Transmission Project – Segment 3B

Page 9: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

3B-4-W-30

3B-6-W-37

3B-4-W-32

3B-4-R-32

3B-4-S-31

3B-4-S-32

3B-4-S-30

3B-4-S-30

3B-6-S-37

3B-4-S-32

Const 29

Const 28

Const 27

LegendSegment 3B

Segment 3A

Segment 2

New Structure

Jurisdictional WatersState Streambed (CDFG/SWRCB)

CDFG Riparian

Wetland

Survey Area

ImpactsAvoided - No Impact

Impacts to Jurisdictional Waters

Permanent

Temporary

Permanent Road

Temporary Road

11

151316

05

07

20

06

04

02

12

03

14

01

17

08

21

0910

182219

23 2524

262827

313029

3332

3534

3836 37

0 200100

Feet

Source: Sheet 14 of Figure 3, WDR Permit Application Package

Figure 8Representative Map of Impacts to Waters

under the Water Board and CDFG Jurisdictions(Construct 27 – Installation of newMcCarthy drain in wetland habitat)

Attachment DAntelope Transmission Project – Segment 3B

Page 10: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

3B-6-S-43

Tehachapi Willow Springs RdConst 35

Const 34

Const 33

LegendSegment 3B

Segment 3A

Segment 2

New Structure

Jurisdictional WatersState Streambed (CDFG/SWRCB)

CDFG Riparian

Wetland

Survey Area

ImpactsAvoided - No Impact

Impacts to Jurisdictional Waters

Permanent

Temporary

Permanent Road

Temporary Road

11

151316

05

07

20

06

04

02

12

03

14

01

17

08

21

0910

182219

23 2524

262827

313029

3332

3534

3836 37

0 200100

Feet

Source: Sheet 20 of Figure 3, WDR Permit Application Package

Figure 9Representative Map of Impacts to Waters

under the Water Board and CDFG Jurisdictions(Construct 33 – Construct 33 and permanent O&M arealocated within stream channel and will be converted to

rip-rap lined channel for approximately 32 feet)Attachment D

Antelope Transmission Project – Segment 3B

Page 11: Attachment D Maps...Subs ta ion Antelope Transmission Project Segment 3B Segment 3A Segment 2 Tehachapi Renewable Transmission Project Segments 4-11 Telecom 6kV Base map: ESRI Streetmap

3B-7-R-60

3B-7-R-60

3B-7-S-60

3B-8-S-69

3B-8-S-78

3B-8-S-67

3B-8-S-65

3B-7-S-55

3B-8-S-63

3B-7-S-54

3B-8-S-68

3B-8-S-100

3B-8-S-64

3B-8-S-56

3B-8-S-66

3B-8-S-71

Oak Creek Rd

Const 46

Const 45Const 44

LegendSegment 3B

Segment 3A

Segment 2

New Structure

Jurisdictional WatersState Streambed (CDFG/SWRCB)

CDFG Riparian

Wetland

Survey Area

ImpactsAvoided - No Impact

Impacts to Jurisdictional Waters

Permanent

Temporary

Permanent Road

Temporary Road

11

151316

05

07

20

06

04

02

12

03

14

01

17

08

21

0910

182219

23 2524

262827

313029

3332

3534

3836 37

0 200100

Feet

Source: Sheet 23 of Figure 3, WDR Permit Application Package

Figure 10Representative Map of Impacts to Waters

under the Water Board and CDFG Jurisdictions(Constructs 44-46 – widening of existing access

road, AC Mitigation – zinc ribbon installation,maintenance grading, as well as

installation of concrete v-ditch and new concreteoutlet, gabion retaining wall, and McCarthy drain)

Attachment DAntelope Transmission Project – Segment 3B