Top Banner
Attachment A HDD Table Perry County Drawing Name Drill Name County Township Drill Location Risk Assessment Level (Low / Medium / High) PAPE0002.0000RD.pdf Horse Valley Road Perry Toboyne N: 40.293820 W: 77.654511 low Prepared By: Tetra Tech Rooney 10/14/2016
11

Attachment A - HDD Table

Jan 02, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Attachment A - HDD Table

Attachment AHDD Table

Perry County

Drawing Name Drill Name County Township Drill LocationRisk Assessment Level (Low / Medium / High)

PA‐PE‐0002.0000‐RD.pdf Horse Valley Road Perry ToboyneN: 40.293820W: 77.654511 low

Prepared By:Tetra Tech Rooney 10/14/2016

Page 2: Attachment A - HDD Table

HDD PA-PE-0002.0000-RD (W-L2, S-L6, W-L1)

Given the design, the threat of inadvertent return has been reduced to the maximum extent practicable and in this case that threat is considered to be low. Implementing this design, along with adherence to the Pennsylvania Pipeline Project Inadvertent Return Contingency Plan will ensure inadvertent impacts, if they were to occur, are also minimized to the maximum extent.

The drill will enter/exit 165 feet from the edge of the western most boundary of the wetland W-L2. The drill will travel beneath wetland W-L2 for 1000 feet. Using the results of the geotechnical investigation, as well as several other data points, the entry/exit, angles, and depths have been configured to pass through the best substrates while maintaining pipe integrity (e.g., no large bends). The majority of the substrate that will be passed through is estimated to be partially weathered shale. The drill will continue beneath the eastern most boundary of the wetland W-L2 and will travel 40 feet from the eastern most edge of wetland W-L2 to the western most edge of stream S-L7. The drill will pass 10 feet under the stream S-L7 starting at the western most boundary. The drill will continue beneath the eastern most boundary of the stream S-L7 and will travel 65 feet from the eastern most edge of stream S-L7 to the western most edge of wetland W-L1. The drill will pass 215 feet under the wetland W-L1 starting at the western most boundary. The majority of the substrate that will be passed through is estimated to be partially weathered shale. The drill will continue beneath wetland W-L1 and will enter/exit 115 feet from the eastern most edge of wetland W-L1.

Page 3: Attachment A - HDD Table

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+0

0

11+0

0

12+0

0

13+0

0

14+0

0

15+0

0

15+5

7

HDD EXIT/ENTRYN40.293820W77.654511

HDD ENTRY/EXITN40.292721W77.649117

GEOTECH SB-01

GEOTECH SB-02

900

1000

1100

1200

900

1000

1100

1200

-1+000+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+00

HD

D E

XIT

/EN

TRY

15+5

7E

L.11

41'

HD

D E

NTR

Y/E

XIT

0+00

EL.

1075

'

STA. 14+88EL. 1121'

STA. 9+37EL. 1044'

STA. 3+66EL. 1044'

25'

571'

71'

16°

OV

ER

HE

AD

ELE

CTR

IC13

+58

15'

R=2000'L=551'S=559'

89'R=2000'L=278'S=279'

GE

OTE

CH

SB

-02

7+64

, 38'

LT

GE

OTE

CH

SB

-01

14+4

9, 1

59' L

T

HO

RS

E V

ALL

EY

RD

14+5

8

APPROXIMATE BEDROCK

STA. 0+88EL. 1063'

ED

GE

OF

WE

TLA

ND

L1

HO

RS

E V

ALL

EY

RU

N S

-L6

3+77

ED

GE

OF

WE

TLA

ND

L2

ED

GE

OF

WE

TLA

ND

L1

ED

GE

OF

WE

TLA

ND

L2

LEGENDPERMANENT ROWTEMPORARY CONSTRUCTION ROWTEMPORARY WORKSPACETEMPORARY ACCESS ROADPERMANENT ACCESS ROADSPOIL SPACE ONLYPROPOSED HDDPROPOSED 20" PIPELINEPROPOSED 16" PIPELINEHDD ENTRY-EXIT

PEM WETLANDSPSS WETLANDSPFO WETLANDS

LEGENDPERMANENT ROWTEMPORARY CONSTRUCTION ROWTEMPORARY WORKSPACETEMPORARY ACCESS ROADPERMANENT ACCESS ROADSPOIL SPACE ONLYPROPOSED HDDPROPOSED 20" PIPELINEPROPOSED 16" PIPELINEHDD ENTRY-EXIT

PEM WETLANDSPSS WETLANDSPFO WETLANDS

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWINGEROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEWPROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD832. STATIONING IS BASED ON HORIZONTAL DISTANCES.3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING.5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

DESIGN AND CONSTRUCTION:1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSEDPIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.44. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 20" x 0.456" W.T., X-65, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50).6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.8. CARRIER PIPE NOT ENCASED.9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLANWILL BE IMPLEMENTED AT ALL TIMES.

13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALLTIMES.

TO

TO

DWG NO DWG NO DESCRIPTION

20

03/24/15

09/30/16

02/26/16

05/20/16

HORSE VALLEY ROAD

1"=150' PA-PE-0002.0000-RD

PERRY COUNTY PENNSYLVANIA, TOBOYNE TOWNSHIPS2-0157

A ISSUED FOR REVIEW JAM RMB AAW03/24/15

09/14/15

03/24/15

EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 DLM RMB AAW09/30/16

07/31/15

09/30/16

EP1 REVISED PER PADEP COMMENTS JTW RMB AAW05/20/16

ES-3.03

05/20/16

EP MRS RMB AAW02/26/16

SHEET 2

02/26/16

C ADDED GEOTECH INFO MRS RMB AAW09/14/15

ES-3.03

09/14/15

B ISSUED FOR BID MRS RMB AAW07/31/15

SHEET 2

07/31/15

1557'1569'

0

FEET

75 75 150

GRADE

PA-PE-0002.0000

PA-PE-0005.0000

PA-PE-0002.0000

PA-PE-0004.0000

PULLBACK ALONG ROW

HO

RSE

VAL

LEY

RO

AD

PROPOSED 20" PIPELINE

EXISTING 8" SUNOCO PIPELINE

SUNOCO EASEMENTLIMITS - NOT LOD

-CL (0.1' - 13.5')

-NG EL. 1126'

GEOTECH SB-01

-TOPSOIL (0' - 0.1')

-COMPLETION DEPTH EL. 1106'

-SHALE (18.5' - 20.3')

-SC (13.5' - 18.5')-GROUNDWATER (17.5')

-SM (0.2' - 3.5')

-NG EL. 1079'

GEOTECH SB-02

-TOPSOIL (0' - 0.2')

-COMPLETION DEPTH EL. 1063'

-SHALE (15.0' - 15.9')-SC (3.5' - 15.0')-GROUNDWATER (8.0')

NOTE: REFER TO TEST BORING LOG S2-0157FOR COMPLETE SOIL MATERIAL DESCRIPTION

HORSE VALLEY RUN S-L6

PROPOSED 16" PIPELINE

AutoCAD SHX Text
S-L7S-L7
AutoCAD SHX Text
S-Q70S-Q70
AutoCAD SHX Text
S-Q69S-Q69
AutoCAD SHX Text
S-L6S-L6
AutoCAD SHX Text
W-L2W-L2
AutoCAD SHX Text
W-L2W-L2
AutoCAD SHX Text
W-L2W-L2
AutoCAD SHX Text
W-L1W-L1
AutoCAD SHX Text
W-L1W-L1
AutoCAD SHX Text
W-L2W-L2
AutoCAD SHX Text
W-L1W-L1
AutoCAD SHX Text
W-L2W-L2
AutoCAD SHX Text
P-L1P-L1
AutoCAD SHX Text
P-L2P-L2
AutoCAD SHX Text
(303) 792-5911
Page 4: Attachment A - HDD Table

GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS

GEOTECH SB-01

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+0

0

11+0

0

12+0

0

13+0

0

14+0

0

15+0

0

15+9

7

HDD ENTRY/EXITN40.292760W77.649030

HDD EXIT/ENTRYN40.293887W77.654562

GEOTECH SB-02

900

1000

1100

1200

900

1000

1100

1200

-1+000+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+00

HD

D E

XIT

/EN

TRY

15+9

7E

L.11

45'

HD

D E

NTR

Y/E

XIT

0+00

EL.

1076

'

STA. 14+59EL. 1106'

STA. 10+18EL. 1044'

STA. 3+42EL. 1044'

676'

143'

17'

121'

8°25'

STA. 1+20EL. 1059'

R=1600'L=223'S=223'

16°

R=1600'L=441'S=447'

GE

OTE

CH

SB

-02

7+84

, 56'

LT

GE

OTE

CH

SB

-01

14+6

9, 1

77' L

T

HO

RS

E V

ALL

EY

RD

14+7

4

APPROXIMATE BEDROCK

ED

GE

OF

WE

TLA

ND

L2

ED

GE

OF

WE

TLA

ND

L2

ED

GE

OF

WE

TLA

ND

L2

ED

GE

OF

WE

TLA

ND

L1

ED

GE

OF

WE

TLA

ND

L2

ED

GE

OF

WE

TLA

ND

L1

OV

ER

HE

AD

ELE

CTR

IC13

+74

ED

GE

OF

WE

TLA

ND

L2

ED

GE

OF

WE

TLA

ND

L2

OV

ER

HE

AD

ELE

CTR

IC14

+29

HO

RS

E V

ALL

EY

RU

N S

-L6

4+06

LEGENDPERMANENT ROWTEMPORARY CONSTRUCTION ROWTEMPORARY WORKSPACETEMPORARY ACCESS ROADPERMANENT ACCESS ROADSPOIL SPACE ONLYPROPOSED HDDPROPOSED 20" PIPELINEPROPOSED 16" PIPELINEHDD ENTRY-EXIT

PEM WETLANDSPSS WETLANDSPFO WETLANDS

-INCH HORIZONTAL DIRECTIONAL DRILL

REF. DRAWINGEROSION & SEDIMENT PLAN

AERIAL SITE PLAN

PLAN VIEWPROFILE VIEW

NO. DESCRIPTION DATEBY CHK DATE

REVISIONS

DATEAPP

NOTES Sunoco LogisticsPartners L.P.

SUNOCO PIPELINE, L.P.1. ALL COORDINATES SHOWN ARE IN LATITUDE AND LONGITUDE. ALL MSL ELEVATIONS ARE NAD832. STATIONING IS BASED ON HORIZONTAL DISTANCES.3. ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP ARE NOT RESPONSIBLE FOR LOCATION OF FOREIGN UTILITIES SHOWN IN PLOT PLAN OR PROFILE. THE INFORMATION SHOWN HEREON IS FURNISHED WITHOUT LIABILITY ON THE PART OF ROONEY ENGINEERING, INC. AND SUNOCO PIPELINE, LP, FOR ANY DAMAGES RESULTING FROM ERRORS OR OMISSIONS THEREIN.4. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES. CONTACT ONE CALL AT 811 PRIOR TO DIGGING.5. SUNOCO EMERGENCY HOTLINE NUMBER IS #1-800-786-7440.

PENNSYLVANIA PIPELINE PROJECT

DESIGN AND CONSTRUCTION:1. CONTRACTOR SHALL FIELD VERIFY DEPTH OF ALL EXITING UTILITIES SHOWN OR NOT SHOWN ON

THIS DRAWING.2. THE MINIMUM SEPARATION DISTANCE FROM EXISTING SUBSURFACE UTILITIES SHALL NOT BE LESS

THAN 10 FEET AS MEASURED FROM THE OUTSIDE EDGE OF THE UTILITY TO OUTSIDE OF PROPOSEDPIPELINE.

3. DESIGNED IN ACCORDANCE WITH CFR 49 195 & ASME B31.44. CROSSING PIPE SPECIFICATION: HDD HORZ. LENGTH (L=): HDD PIPE LENGTH (S=): 16" x 0.438" W.T., X-70, API5L, PSL2, ERW, BFW COATING: 14-16 MILS FBE WITH 30-35 MIL ARO (POWERCRETE R95)

5. INTERNAL DESIGN PRESSURE 1480 PSIG (SEAM FACTOR 1.0, DESIGH FACTOR 0.50).6. INSTALLATION METHOD: HORIZONTAL DIRECTIONAL DRILL (HDD).7. PIPELINE WARNING MARKERS SHALL BE INSTALLED ON BOTH SIDES OF ALL ROAD, RAILWAY, AND

STREAM CROSSINGS.8. CARRIER PIPE NOT ENCASED.9. PIPE / AMBIENT TEMPERATURE MUST BE NO LESS THAN 30°F DURING PULLBACK WITHOUT PRIOR

WRITTEN APPROVAL FROM THE ENGINEER.10. CONDUCT 4-HOUR PRE-INSTALLATION HYDROTEST OF HDD PIPE STRING TO MINIMUM 1850 PSIG.11. SEE SUNOCO PENNSYLVANIA PIPELINE PROJECT ESRI WEBMAP FOR ACCESS ROAD ALIGNMENT.

12. SUNOCO PIPELINE, L.P.'S HORIZONTAL DIRECTIONAL DRILL INADVERTENT RETURN CONTINGENCY PLANWILL BE IMPLEMENTED AT ALL TIMES.

13. SUNOCO PIPELINE, L.P.'S EROSION AND SEDIMENTATION CONTROL PLAN WILL BE IMPLEMENTED AT ALLTIMES.

TO

TO

DWG NO DWG NO DESCRIPTION

16

08/31/15

05/20/16

10/07/16

HORSE VALLEY ROAD

1"=150' PA-PE-0002.0000-RD-16

PERRY COUNTY PENNSYLVANIA, TOBOYNE TOWNSHIPS2-0157-16

A ISSUED FOR BID MRS RMB AAW08/31/15

02/26/16

08/31/15

09/14/15

EP2 REVISED PER PADEP COMMENTS RECEIVED 09-06-16 DLM RMB AAW10/07/16

ES-3.03

10/07/16

EP1 REVISED PER PADEP COMMENTS JTW RMB AAW05/20/16

SHEET 2

05/20/16

EP MRS RMB AAW02/26/16

ES-3.03

02/26/16

B ADDED GEOTECH INFO MRS RMB AAW09/14/15

SHEET 2

09/14/15

1597'1610'

0

FEET

75 75 150

GRADE

PA-PE-0004.0000

PA-PE-0002.0000

PA-PE-0005.0000

PA-PE-0002.0000

PULLBACK ALONG ROW

HO

RSE

VAL

LEY

RO

ADPROPOSED 20" PIPELINE

EXISTING 8" SUNOCO PIPELINE

PROPOSED 16" PIPELINE

-CL (0.1' - 13.5')

-NG EL. 1126'

GEOTECH SB-01

-TOPSOIL (0' - 0.1')

-COMPLETION DEPTH EL. 1106'

-SHALE (18.5' - 20.3')

-SC (13.5' - 18.5')-GROUNDWATER (17.5')

-SM (0.2' - 3.5')

-NG EL. 1079'

GEOTECH SB-02

-TOPSOIL (0' - 0.2')

-COMPLETION DEPTH EL. 1063'

-SHALE (15.0' - 15.9')-SC (3.5' - 15.0')-GROUNDWATER (8.0')

NOTE: REFER TO TEST BORING LOG S2-0157FOR COMPLETE SOIL MATERIAL DESCRIPTION

HORSE VALLEY RUN S-L6

Page 5: Attachment A - HDD Table

LEGEND:Geotechnical Soil Boring (SB) Locations

GEOTECHNICAL BORING LOCATIONSHDD S2‐0157PERRY COUNTY, TOBOYNE TOWNSHIP, PASUNOCO PENNSYLVANIA PIPELINE PROJECT

TB‐02

Page 6: Attachment A - HDD Table

240 Continental Drive, Suite 200 Newark, Delaware 19713302.738.7551fax: 302.454.5988

Project Name: SUNOCO PENNSYLVANIA PIPELINE PROJECT Project No.: 103IP3406Project Location: HORSE VALLEY ROAD, NEW GERMANTOWN, PA Page 1 of 1HDD No.: S2-0157 Dates(s) Drilled: 10-14-14 Inspector: E. WATTBoring No.: SB-01 Drilling Method: SPT - ASTM D1586 Driller: S. HOFFERDrilling Contractor: HAD DRILLING Groundwater Depth (ft): 17.5 Total Depth (ft): 20.3

Sample Sample Depth (ft) StrataNo. From To From To (USCS)

0.0 0.1

1 3.0 5.0 0.1 16 1 7 12 13 19

2 8.0 9.1 18 6 18 22 30 40

13.5

3 13.0 13.9 13.5 9 2 50/3" >50

4 18.0 18.9 1 50/5" >50

18.5

5 20.0 20.3 18.5 20.3 50/3" >50

WET ON SPOON AT 17.5'

WATER LEVEL THROUGH AUGERS AT 18.5'

CAVED AT 20'.

WATER LEVEL ON CAVE AT 18'.

Notes/Comments:Pocket Pentrometer Testing DR: DECOMPOSED ROCK

Strata (USCS) Designations are approximated based on visual review, except where indicated in Description of Materials.

* Number of blows of 140 lb. Hammer dropped 30 in. required to drive 2 in. split-spoon sampler in 6 in. increments.N: Number of blows to drive spoon from 6" to 18" interval.

AUGER REFUSAL AT 20'.

TOPSOIL (<1").

MOTTLED (LIGHT GRAY, ORANGE BROWN, YELLOW BROWN, LIGHT

BROWN) SANDY CLAY. (USCS: CL)

VARI-COLORED SILTY CLAY WITH A LITTLE FINE SAND, AND A TRACE

TO A LITTLE FINE SHALE GRAVEL.

DARK GRAY FINE SAND WITH SOME SILTY CLAY AND SOME

UNWEATHERED SHALE FINE TO COARSE GRAVEL.

DARK GRAY FINE SAND AND SILTY CLAY WITH A LITTLE

UNWEATHERED SHALE FINE TO COARSE GRAVEL.

GRAY TO DARK GRAY PARTIALLY WEATHERED SHALE.

CL

SC

TETRA TECH TEST BORING LOG

Strata Depth (ft)

Rec

ov.

(in) Description of Materials 6" Increment Blows * N

Page 7: Attachment A - HDD Table

240 Continental Drive, Suite 200 Newark, Delaware 19713302.738.7551fax: 302.454.5988

Project Name: SUNOCO PENNSYLVANIA PIPELINE PROJECT Project No.: 103IP3406Project Location: HORSE VALLEY ROAD, NEW GERMANTOWN, PA Page 1 of 1HDD No.: S2-0157 Dates(s) Drilled: 10-15-14 Inspector: E. WATTBoring No.: SB-02 Drilling Method: SPT - ASTM D1586 Driller: S. HOFFERDrilling Contractor: HAD DRILLING Groundwater Depth (ft): 8.0 Total Depth (ft): 15.9

Sample Sample Depth (ft) StrataNo. From To From To (USCS)

0.0 0.2

1 3.0 5.0 0.2 3.5 18 SM 2 17 24 27 41

3.5 8.5 LIGHT GRAY TO BROWN FINE SAND AND SILTY CLAY.

2 8.0 8.9 8.5 9 7 50/5" >50

3 13.0 13.8 10 3 50/4" >50

15.0

4 15.0 15.9 15.0 15.9 7 2 50/5" >50

CAVED AT 15'. WATER LEVEL IN OPEN BOREHOLE AT 8'.

Notes/Comments:Pocket Pentrometer Testing DR: DECOMPOSED ROCKS1: 4 TSF

Strata (USCS) Designations are approximated based on visual review, except where indicated in Description of Materials.

* Number of blows of 140 lb. Hammer dropped 30 in. required to drive 2 in. split-spoon sampler in 6 in. increments.N: Number of blows to drive spoon from 6" to 18" interval.

AND CONTINUOSLY AUGERED TO REFUSAL AT 15.9'.

AUGER REFUSAL AT 15'. SUBSEQUENTLY OFF-SET BORING

TOPSOIL (2").

MOTTLED BROWN AND ORANGE BROWN SILTY FINE SAND.

DR WEATHERED TO A FINE SAND WITH SOME SILTY CLAY AND

A LITTLE UNWEATHERED FINE SHALE GRAVEL.

DARK GRAY FINE TO COARSE SAND WITH ALITTLE SILTY CLAY,

AND SOME FINE TO COARASE UNWEATHERED SHALE GRAVEL.

PARTIALLY WEATHERED DARK GRAY SHALE.

SC

TETRA TECH TEST BORING LOG

Strata Depth (ft)

Rec

ov.

(in) Description of Materials 6" Increment Blows * N

Page 8: Attachment A - HDD Table

Test Water Percent USCSHDD Boring Sample Content, % Silts/Clays, % Liquid Plastic Plasticity Classif.No. No. No. From To (ASTM D2216) (ASTM D1140) Limit, % Limit, % Index, % (ASTM D2487)

1 3.0 5.0 16.6 58.7 31 21 10 CL2 8.0 9.1 15.1 83.0 - - - -3 13.0 13.9 11.2 30.0 - - - -4 18.0 18.9 19.3 47.8 - - - -5 21.0 21.3 8.3 16.3 - - - -1 3.0 5.0 14.1 40.7 - - - -2 8.0 8.9 17.3 30.3 - - - -3 13.0 13.8 14.6 13.5 - - - -4 15.0 15.9 10.1 19.5 - - - -

Notes: 1) Sample depths based on feet below grade at time of exploration.

S2-0157

SB-02

SB-01

GEOTECHNICAL LABORATORY TESTING SUMMARYSUNOCO PENNSYLVANIA PIPELINE PROJECT

HDD S2-0157

Atterburg Limits (ASTM D4318)

Depth of Sample (ft.)

Tetra TechNewark, Delaware

Page 9: Attachment A - HDD Table

HDD No. NAMEBORING NO.

REGIONAL GEOLOGY DESCRIPTIONGENERAL 

TOPOGRAPHIC SETTING

BEDROCK FORMATION

GENERAL ROCK TYPE

APPROX MAX FM THICKNESS 

(FT)

DEPTH TO ROCK (Ft bgs) based on nearby well drilling logs

NOTES / COMMENTS

SB‐01

SB‐02

Note : Source of well log data ‐ http://www.dcnr.state.pa.us/topogeo/groundwater/pagwis/records/index.htm.  All other sources as referenced in comments section.

S2‐0157 Shearer

SUNOCO PENNSYLVANIA PIPELINE PROJECTREGIONAL GEOLOGY SUMMARY

HDD S2‐0157

 20‐59

Martinsburg Fm ‐ buff‐weathering, dark‐gray to purple shale and slate with thin interbeds of siltstone, metabentonite, and fine‐grained sandstone.

Martinsburg Fm

Shale and slate with 

interbedded siltstone

Rolling hills (ridge & valley)

Tetra Tech, Inc.Newark, Delaware

Page 10: Attachment A - HDD Table

FIELD DESCRIPTION AND LOGGING SYSTEM FOR SOIL EXPLORATION

GRANULAR SOILS (Sand, Gravel & Combinations)

Density N (blows)* Very Loose 5 or less Loose 6 to 10 Medium Dense 11 to 30 Dense 31to 50 Very Dense 51 or more

Relative Proportions Description Term Percent Trace 1 - 10 Little 11 - 20 Some 21 - 35 And 36 - 50

COHESIVE SOILS (Silt, Clay & Combinations)

ROCK (Rock Cores)

Rock

Quality Designation (RQD), %

Rock Quality Descripti

on 0-25 Very Poor

25-50 Poor 50-75 Fair 75-90 Good

90-100 Excellent *N - Standard Penetration Resistance. Driving a 2.0" O.D., 1-3/8" I.D. sampler a distance of 18 inches into undisturbed soil with a 140 pound hammer free falling a distance of 30.0 inches. The number of hammer blows to drive the sampler through each 6 inch interval is recorded; the number of blows required to drive the sampler through the final 12 inch interval is termed the Standard Penetration Resistance (SPR) N-value. For example, blow counts of 6/8/9 (through three 6-inch intervals) results in an SPR N-value of 17 (8+9).

Groundwater observations were made at the times indicated. Groundwater elevations fluctuate throughout a given year, depending on actual field porosity and variations in seasonal and annual precipitation.

Particle Size Identification Boulders 8 in. diameter or more Cobbles 3 to 8 in. diameter Gravel Coarse (C) 3 in. to ¾ in. sieve Fine (F) ¾ in. to No. 4 sieve Sand Coarse (C) No. 4 to No. 10 sieve

(4.75mm-2.00mm) Medium

(M) No. 10 to No. 40 sieve (2.00mm – 0.425mm)

Fine (F) No. 40 to No. 200 sieve (0.425 – 0.074mm)

Silt/Clay Less Than a No. 200 sieve (<0.074mm)

Consistency N (blows)* Very Soft 3 or less Soft 4 to 5 Medium Stiff 6 to 10 Stiff 11 to 15 Very Stiff 16 to 30 Hard 31 or more

Plasticity Degree of Plasticity Plasticity Index None to Slight 0 - 4 Slight 5 - 7 Medium 8- 22 High to Very High > 22

Page 11: Attachment A - HDD Table