GHD | Report for Roads and Maritime Services - Nambucca Heads to Urunga Pacific Highway Upgrade, 21/22398 Attachment 2- Main Site Compound Access Road (Activity 1a) - Works Design Package
GHD | Report for Roads and Maritime Services - Nambucca Heads to Urunga Pacific Highway Upgrade, 21/22398
Attachment 2- Main Site Compound
Access Road (Activity 1a) - Works
Design Package
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:00
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6001
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
LOCALITY SKETCHNOT TO SCALE
PROJECT
NAMBUCCAHEADS
HYLANDPARK
VALLABEACHVALLA
NAMBUCCASTATE FOREST
NEWRYSTATE FOREST
TARKEETHSTATE FOREST URUNGA
MYLESTOMFERNMOUNTWEEKES
BOLLANOLLASTATE FOREST
TEEWINGA
TASMANSEA
EXIST
.
PAC
NORT
HCO
AST
RAIL W
AY
RALEIGH
IFIC
BELLINGEN HWY
ROADS AND MARITIME SERVICES
NAMBUCCA AND BELLINGEN SHIRE COUNCILS
H10 PACIFIC HIGHWAY UPGRADENAMBUCCA HEADS TO URUNGA
TEMPORARY TRAFFIC MANAGEMENT - TW6
COVER SHEET
FOR CONSTRUCTION
BALLARDS ACCESS ROAD
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
COVER SHEETTEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6001AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
SIGN POST
SIGN POST DOUBLE SIDED
SPIKEDUMPY PEGBOUNDARY PEG
HAZARDOUS SITE
BORE HOLE
BUILDING FLOOR LEVEL
EDGE OF GARDEN
TREE TRUNK
PEG
BRIDGE PIER COLUMN POINT
RETAINING WALLSTAIRS
FENCEFENCE POST GUIDE POST
HEADSTONE
LARGE SIGN
MAILBOX
MX SURVEY MARK
PM, SSM OR CONTROL MARK
TREE FOLIAGE
SURVEY LEGEND
PUMP
TEST PIT
UNDERGROUND TANK POINTTOP OF RAIL
GUARD FENCE
GATE
GENERAL
GULLY PIT
SUBSOIL DRAIN OUTLET
DRAINAGE PIT
TABLE DRAIN
JUNCTION MANHOLE
HEADWALLINVERT LEVEL AND SIZE
KERB INLET
UNIDENTIFIED POLE
UNIDENTIFIED SERVICE
BATTER DRAIN
DISH DRAIN
DRAINAGE
PIPE AND SIZE
WATER COURSE
OBVERT LEVEL
SUBSOIL FLUSH JOINTCONCRETE JUNCTION BOX
WATER LEVEL POINT
LIGHT AND POWER TRANSFORMER
STAY ANCHOR POLE
RELOCATED TELEPHONE LINE
EXISTING TELEPHONE LINE
ABANDONED OPTICAL FIBRE
RELOCATED TRANSMISSION LINE
EXISTING TRANSMISSION LINE
LIGHTING CABLE
LIGHT POLE
POWER POLE
LIGHT AND POWER POLE
OPTICAL FIBRE CABLE MARKER
OPTICAL FIBRE PITMAIN PIT
TELEPHONE CABLE MARKER
ELECTRICITY
LIGHT WITH OUTREACH
COMMUNICATIONS
SEPTIC TANK
MANHOLE COVER
TAP
METER
STOP VALVE
EXISTING MAIN
AIR VALVEHYDRANT
MAIN MARKER
SEWER
WATER
WIRE ROPE SAFETY BARRIERG4 SAFETY BARRIEREDGE OF PAVEMENTRETAINING WALLPORTABLE CONCRETE BARRIER
DESIGN LEGENDGENERAL
TEMPORARY WORKS CONTROL LINE, TP &CHAINAGE MARK
WATERFILLED BARRIER
TEMPORARY CONSTRUCTION PARAWEB FENCINGEXISTING PAVEMENT
PROPOSED PAVEMENT (TYPE T1)
PROPERTYPROJECT BOUNDARY
LOCAL ROAD CORRIDOR BOUNDARY
CLEARING LIMITS
SERVICES CORRIDOR BOUNDARYEXISTING TITLE BOUNDARY
IN 55.785
SD15.298
OB 49.453
450 Dia
WL 59.453
BP
SK
TP 13
DP
BP
FL 12.12
129.201
?P
EP
JB
WM
RELOCATED MAINABANDONED MAIN
450
?
SK17105.769
126.446
SF
ABANDONED TRANSMISSION LINE
EXISTING OPTICAL FIBRE
ABANDONED TELEPHONE LINE
RELOCATED OPTICAL FIBRE
OFC
OFP
TSP
TC
WH
PUMP
BH 13
NEW SIGN FACE
80
EXISTING SIGN AND POST TO BE REMOVED
EXISTING SIGN TO REMAIN
EXISTING SIGN TO BE RELOCATED
NEW POSITION OF RELOCATED SIGN AND POST1R
1
NEW SIGN FACE INSTALLED ON EXISTING POSTS.F.O.
EXISTING SIGN FACE
EXISTING SIGN TO BE REMOVED ORCOVERPLATE REQUIRED80
NEW SIGN FACE INSTALLED ON NEW POST
SIGNS & LINEMARKING LEGEND
DRAINAGE LEGEND
CRASH CUSHION(QUADGUARD CZ OR RMS APPROVED EQUIVALENT)
E ELECTRICITY
T TELSTRA
SERVICE CONFLICTS
S SEWER
G GAS
W WATER
(AS SPECIFIED ON PLAN)
DRAIN TAG
"D" DENOTES DRAIN DEPTH (M)"S" DENOTES DRAIN SIDE SLOPE (1:S)"W" DENOTES DRAIN BASE WIDTH (M)
TYPES OF DRAIN(C) DENOTES CONCRETE(V) DENOTES VEGETATED(R) DENOTES ROCK PROTECTION(M) DENOTES STEEL-WIRE MATTRESS LINED
FOR DRAIN TYPES REFER TO TYPICALDETAIL DRAWINGS
"W"
"D"
Culvert 5E
Type 1(R)W=2.0 S=2.0 D=0.5
1
"S"
TYPICAL LABEL DESCRIPTIONS
DRAIN / CATCH DRAIN ( AS SPECIFIED)
INTERFACE DRAIN
TRENCH DRAIN
CULVERT - TRANSVERSE
CULVERT - LONGITUDINAL (Ø450 UNO)
GULLY INLET/JUNCTION BOX
INTERFACE DRAIN CLEANOUT
ACCESS CHAMBER
HEADWALL/WINGWALL
SCOUR PROTECTION (ROCK PROTECTION)
TYPE OF DRAIN
LONGITUDINAL STORMWATER STRUCTURE LABEL
"A" DENOTES LINE NUMBER
"1" DENOTES STRUCTURE NUMBER
1/100A0.0321ha
DENOTES DRAINAGE STRUCTURE, NETWORKAND LINE NUMBERSDENOTES CATCHMENT AREA
CULVERT LABEL - TRANSVERSE DRAINAGE
PERMANENT ROAD GEOMETRY
1A
UTILITIES
CROSS SECTIONSFINAL DESIGN
TEMPORARY WORKS CURRENT STAGE DESIGN
TEMPORARY WORKS PREVIOUS STAGE DESIGN
TEMPORARY WORKS NEXT STAGE DESIGNEXISTING SURFACE
PROPOSED WATER MAIN
PROPOSED ELECTRICITY LINE
PROPOSED TELEPHONE LINE
DIVIDING BARRIER LINE (BB)
DIVIDING SEPARATION LINE (S1)
EDGE LINE (E3)
CONTINUITY LINE (C1)
EDGE LINE (E1)
UNBROKEN LANE LINE (L3)
TEMPORARY LIGHTING (INDICATIVE LOCATION ONLY)
OUTSIDE OF TRAFFIC ISLAND (E4)
OUTSIDE OF PAINTED MEDIAN (E5)
PAVEMENT ARROW (RA2(L))PAVEMENT ARROW (RA2(R))PAVEMENT ARROW (RA5(L))PAVEMENT ARROW (RA5(R))
PROPOSED PAVEMENT (TYPE T2)
DIVIDING BARRIER LINE (BB1)
N.T.S.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:09
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6002
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGERPRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
LEGENDTEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6002AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:15
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6003
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
DRAWING INDEX
DRAWING NO. DRAWING NAME
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
DRAWING INDEXTEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6003AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NH2U-DM-TW-6001 TEMPORARY TRAFFIC MANAGEMENT - TW6 COVER SHEETNH2U-DM-TW-6002 TEMPORARY TRAFFIC MANAGEMENT - TW6 LEGENDNH2U-DM-TW-6003 TEMPORARY TRAFFIC MANAGEMENT - TW6 DRAWING INDEXNH2U-DM-TW-6004 TEMPORARY TRAFFIC MANAGEMENT - TW6 NOTESNH2U-DM-TW-6014 TEMPORARY TRAFFIC MANAGEMENT - TW6 DRAINAGE SECTION SHEET 1NH2U-DM-TW-6015 TEMPORARY TRAFFIC MANAGEMENT - TW6 DRAINAGE DETAILS SHEET 1NH2U-DM-TW-6016 TEMPORARY TRAFFIC MANAGEMENT - TW6 TYPICAL DETAILS SHEET 1NH2U-DM-TW-6020 TEMPORARY TRAFFIC MANAGEMENT - TW6 TYPICAL SECTIONS SHEET 1NH2U-DM-TW-6101 TEMPORARY TRAFFIC MANAGEMENT - TW6 BALLARDS ACCESS ROAD GENERAL ARRANGEMENT - SHEET 1NH2U-DM-TW-6102 TEMPORARY TRAFFIC MANAGEMENT - TW6 BALLARDS ACCESS ROAD GENERAL ARRANGEMENT - SHEET 2NH2U-DM-TW-6111 TEMPORARY TRAFFIC MANAGEMENT - TW6 BALLARDS ACCESS ROAD SIGNS AND LINEMARKING - SHEET 1NH2U-DM-TW-6112 TEMPORARY TRAFFIC MANAGEMENT - TW6 BALLARDS ACCESS ROAD SIGNS AND LINEMARKING - SHEET 1NH2U-DM-TW-6201 TEMPORARY TRAFFIC MANAGEMENT - TW6 LONGITUDINAL SECTION - MC60 BALLARDS ROAD SHEET 1NH2U-DM-TW-6202 TEMPORARY TRAFFIC MANAGEMENT - TW6 LONGITUDINAL SECTION - MC60 BALLARDS ROAD SHEET 2NH2U-DM-TW-6301 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 1NH2U-DM-TW-6302 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 2NH2U-DM-TW-6303 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 3NH2U-DM-TW-6304 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 4NH2U-DM-TW-6305 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 5NH2U-DM-TW-6306 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 6NH2U-DM-TW-6307 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 7NH2U-DM-TW-6308 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 8NH2U-DM-TW-6309 TEMPORARY TRAFFIC MANAGEMENT - TW6 CROSS SECTIONS - MC60 BALLARDS ROAD SHEET 9
GENERAL NOTES
1. THE CONSTRUCTION TEAM IS RESPONSIBLE FOR CONFIRMING THEEXACT LOCATION OF ALL EXISTING AND RELOCATED PUBLIC UTILITYPLANT (PUP) PRIOR TO COMMENCEMENT OF ANY WORKS. THECONSTRUCTION TEAM SHALL CARRY OUT THE ROADWORKS IN SUCH AMANNER TO AVOID ANY DAMAGE TO EXISTING PUP.
2. THE EXISTING SERVICES INFORMATION SHOWN ON THE DRAWINGS HASBEEN COMPILED FROM SURVEY INFORMATION AND INFORMATIONSUPPLIED BY THE CONTRACTOR.
3. CONNECTION OF TEMPORARY TRAFFIC WORKS TO EXISTING PAVEMENTTO BE CONSTRUCTED BY SAWCUTTING AND WIDENING AS SHOWN ONPAVEMENT DETAILS DRG. NO. 6016.
4. THE CONSTRUCTION TEAM SHALL ENSURE THAT MEDIANS, TEMPORARYPAVEMENTS, CROSSOVER AND RAMPS ARE KEPT FREE DRAININGDURING THEIR CONSTRUCTION AND USE.
5. ALL PORTABLE SAFETY BARRIER UNITS THAT ARE NOT FLAREDOUTSIDE THE CLEAR ZONE, SHALL HAVE AN END TREATMENT WHICHSATISFIES RMS STANDARDS.
6. ALL PORTABLE SAFETY BARRIER UNITS TO BE INSTALLED INACCORDANCE WITH MANUFACTURER'S SPECIFICATION. WHERE TRITONBARRIERS ARE SPECIFIED AND ARE INTENDED TO ACT AS ACONTAINMENT SYSTEM, THEY SHALL BE FILLED WITH WATER, AS PERTHE MANUFACTURER'S SPECIFICATIONS.
7. THE CONSTRUCTION TEAM IS TO ENSURE WORKERS DO NOT ENTERWITHIN THE MANUFACTURER'S SPECIFIED DEFLECTION ZONE BEHINDANY SPECIFIED BARRIER.
8. THE CONSTRUCTION TEAM SHALL ASSESS AND MANAGEAPPROPRIATELY THE INTERFACE BETWEEN ALL ROAD USERS(PEDESTRIANS, CYCLISTS AND MOTORISTS) AND THE SITE OPERATIONSINCLUDING ACCESS AND EGRESS.
9. ADEQUATE PAVEMENT WIDTH (OR SEALED VERGE) BEHIND ALLPORTABLE SAFETY BARRIERS IS TO BE PROVIDED IN ACCORDANCEWITH MANUFACTURER'S SPECIFICATIONS TO ALLOW SAFE DEFLECTIONSHOULD THEY BE STRUCK.
10. TRAFFIC CONTROL IS TO BE IN ACCORDANCE WITH THE RMS TRAFFICCONTROL AT WORK SITES MANUAL AND AS1742.3.
11. ALL SIGNS ARE TO BE SIZE "C" WITH CLASS 1 RETROREFLECTIVESHEETING UNLESS OTHERWISE SPECIFIED.
12. EXISTING SIGNAGE CONFLICTING WITH THIS TEMPORARY TRAFFICWORKS PLAN ARE TO BE COVERED OR REMOVED. PARTICULARATTENTION SHALL BE GIVEN TO SIGNAGE ASSOCIATED WITH SPEEDCONTROL AND CHANGES IN CARRIAGEWAY WIDTH, SUCH ASOVERTAKING LANES.
13. EXISTING PAVEMENT MARKINGS CONFLICTING WITH THIS TEMPORARYTRAFFIC WORKS PLAN ARE TO BE REMOVED BY BLASTING ,GRINDINGOR SEALING OVER. PARTICULAR ATTENTION SHALL BE GIVEN TODIRECTIONAL PAVEMENT ARROWS.
14. A VEHICLE MOVEMENT PLAN SHALL BE PREPARED FOR CONSTRUCTIONVEHICLE ENTRY/EXIT AT EACH SITE.
15. INTERSECTION AND DIRECTION SIGNS SHALL BE RELOCATED WHERENECESSARY TO BE VISIBLE AT ALL TIMES.
16. ALL CONSTRUCTION SHALL COMPLY WITH THE RELEVANT CURRENTWORKPLACE HEALTH AND SAFETY LEGISLATION.
17. SITE ACCESS GATES ARE TO BE CLOSED AFTER HOURS OR WHEN NOTIN USE.
18. REFLECTIVE DELINEATORS ARE TO BE INSTALLED ON ALL NEWPAVEMENT MARKINGS AND BARRIERS IN ACCORDANCE WITH RMSGUIDELINES.
19. CLEAR VEGETATION AS DIRECTED BY TRAFFIC MANAGER ANDENVIRONMENT MANAGER TO MAINTAIN SIGHT LINES AT HORIZONTALCURVES, DRIVEWAYS AND INTERSECTIONS.
20. EXISTING DRAINAGE PATHS TO BE MAINTAINED AT ALL TIMES.21. VMS SIGNS TO BE PROVIDED FOR ONE WEEK PRIOR AND TWO WEEKS
AFTER OPENING ON THE PACIFIC HIGHWAY EITHER SIDE OF EACHINTERSECTION TO ALERT DRIVERS OF CHANGES TO INTERSECTIONCONFIGURATIONS.
SPECIFICATIONS
UTILITY INFORMATION SHOWN ON THE PLANS DOES NOTDEPICT ANY MORE THAN THE PRESENCE OF A SERVICE,BASED ON AVAILABLE DOCUMENTARY EVIDENCE. THEPRESENCE OF A UTILITY SERVICE, ITS SIZE AND LOCATIONSHOULD BE CONFIRMED BY FIELD INSPECTION, PRIOR TO THECOMMENCEMENT OF ROADWORKS AND THE RELEVANTUTILITY PLANS OBTAINED BY DIALING 1100 OR FAX 1300 652077 (DIAL BEFORE YOU DIG). CAUTION SHOULD BE EXERCISEDWHEN WORKING IN THE VICINITY OF ALL UTILITY SERVICES.
1. THESE DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE FOLLOWING SPECIFICATION LIST WHEREAPPLICABLE.
ROADWORKS SPECIFICATION
RMS D&C G10 TRAFFIC MANAGEMENTRMS D&C R11 STORMWATER DRAINAGERMS D&C R15 KERBS & GUTTERSRMS D&C R16 PRECAST REINFORCED CONCRETE BOX CULVERTSRMS D&C R23 PLASTIC FLEXIBLE PIPESRMS D&C R24 PRECAST CONCRETE ARCHESRMS D&C R31 VERTICAL WICK DRAINSRMS D&C R33 TRENCH DRAINSRMS D&C R37 INTRA-PAVEMENT DETAILSRMS D&C R38 EDGE DRAINSRMS D&C R40 HORIZONTAL DRAINSRMS D&C R44 EARTHWORKS (CUT, FILL, IMPORTED FILL AND IMPORTED SELECTED MATERIAL)RMS D&C R49 CONSTRUCTION OF VERGESRMS D&C R50 STABILISATION OF EARTHWORKSRMS D&C R53 CONCRETE (FOR GENERAL USE) MORTAR AND GROUTRMS D&C R55 ROCK FILLED GABION AND MATTRESSESRMS D&C R58 CONSTRUCTION OF REINFORCED SOIL NAIL WALLSRMS D&C R63 GEOTEXTILES (SEPARATION AND FILTRATION)RMS D&C R64 SOIL NAILINGRMS D&C R67 HIGH STRENGTH GEOSYNTHETIC REINFORCEMENTRMS D&C R68 SHOTCRETE WORKS WITHOUT STEEL FIBRESRMS D&C R71 UNBOUND PAVEMENT COURSE (NORMAL DUTY)RMS D&C R73 HEAVILY BOUND PAVEMENT COURSE (PLANT MIXED USING SLOW SETTING BINDERS)RMS D&C R75 IN SITU PAVEMENT RECYCLING BY DEEP-LIFT CEMENTITIOUS STABILISATIONRMS D&C R82 LEAN-MIX CONCRETE SUBBASERMS D&C R83 JOINTED CONCRETE BASERMS D&C R84 CONTINUOUSLY REINFORCED CONCRETE BASERMS D&C R106 SPRAYED BITUMINOUS SURFACING (WITH CUTBACK BITUMEN)RMS D&C R107 SPRAYED BITUMINOUS SURFACING (WITH POLYMER MODIFIED BINDER)RMS D&C R109 BITUMINOUS SLURRY SURFACINGRMS D&C R111 SPRAYED BITUMINOUS SURFACING (WITH BITUMEN EMULSION)RMS D&C R116 ASPHALT (DENSE GRADED AND OPEN GRADED)RMS D&C R119 OPEN GRADED ASPHALTRMS D&C R121 STONE MASTIC ASPHALTRMS D&C R131 GUIDE POSTSRMS D&C R132 SAFETY BARRIER SYSTEMSRMS D&C R141 PAVEMENT MARKINGRMS D&C R142 RAISED PAVEMENT MARKINGRMS D&C R143 SIGN POSTINGRMS D&C R145 PAVEMENT MARKING (PERFORMANCE BASED)RMS D&C R151 STREET LIGHTINGRMS D&C R152 EMERGENCY TELEPHONESRMS D&C R173 GENERAL CONCRETE PAVINGRMS D&C R174 LANDSCAPE MAINTENANCERMS D&C R176 NATIVE SEED COLLECTIONRMS D&C R178 VEGETATIONRMS D&C R179 LANDSCAPE PLANTINGRMS D&C R201 FENCINGRMS D&C R221 DYNAMIC REPLACEMENTRMS D&C R223 DEEP SOIL MIXING USING DRY MIX METHODRMS D&C R224 WET DEEP SOIL MIXINGRMS D&C R225 CONCRETE INJECTION COLUMNSRMS D&C R271 DESIGN AND CONSTRUCTION OF NOISE WALLSTSI-SP-003 COMMUNICATIONS PROTOCOL FOR ROADSIDE DEVICESTSI-SP-008 GENERAL REQUIREMENTS FOR THE DESIGN, INSTALLATION, COMMISSIONING AND
MAINTENANCE OF VARIABLE MESSAGE SIGNSTSI-SP-017-DCM SPECIFICATION FOR THE CONSTRUCTION OF UNDERGROUND CABLEWAYS
AUS-SPEC SPECIFICATION
C101 DEVELOPMENT CONSTRUCTION, GENERALC201 CONTROL OF TRAFFICC211 CONTROL OF EROSION AND SEDIMENTATIONC212 CLEARING AND GRUBBINGC213 EARTHWORKSC220 DRAINAGEC221 PIPE DRAINAGEC222 PRE CAST BOX CULVERTSC223 DRAINAGE STRUCTURES
AUS-SPEC SPECIFICATION (CONTINUED)
C224 OPEN DRAINS, INCLUDINGK&GC230 SURFACE DRAINAGEC231 SUBSOIL AND FOUNDATION DRAINSC232 PAVEMENT DRAINSC233 DRAINAGE MATSC241 STABILISATIONC242 FLEXIBLE PAVEMENTSC244 SPRAYED BITUMINOUS SURFACINGC245 ASPHALT CONCRETEC247 MASS CONCRETE SUBBASEC248 CONCRETE BASEC254 SEGMENTAL PAVEMENTC255 BITUMINOUS MICROSURFACINGC261 PAVEMENT MARKINGSC263 GUIDE POSTSC264 SPRAYED BITUMINOUS SURFACINGD01 GEOMETRIC ROAD DESIGND02 PAVEMENT DESIGND03 STRUCTURAL BRIDGE DESIGND04 SURFACE DRAINAGE DESIGND05 STORMWATER DRAINAGE DESIGND06 SITE RE-GRADING
2. ALL CONSTRUCTION MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THESPECIFICATION FOR THE WORKS TOGETHER WITH THE REQUIREMENT OF ALL RELEVANTCODES OF PRACTICE REFERRED TO THEREIN AND THE REQUIREMENTS OF ALL STATUTORYAUTHORITIES WHERE APPLICABLE.
3. THE MAINTENANCE FOR TEMPORARY TRAFFIC WORKS IS TO BE IN ACCORDANCE RMS D&C G10.
MATERIALS SPECIFICATION
RMS D&C 3051 UNBOUND AND MODIFIED BASE AND SUBBASE MATERIALS FOR SURFACEROAD PAVEMENTS
RMS D&C 3061 BOUND AND UNBOUND MATERIAL FOR PAVEMENT REPAIRSRMS D&C 3071 SELECTED MATERIAL FOR FORMATIONRMS D&C 3151 COVER AGGREGATE FOR SPRAYED BITUMINOUS SURFACINGRMS D&C 3152 AGGREGATES FOR ASPHALTRMS D&C 3153 RECLAIMED ASPHALT PAVEMENT MATERIALRMS D&C 3202 WAX EMULSION CONCRETE CURING COMPOUNDRMS D&C 3204 PREFORMED JOINT FILLERS FOR CONCRETE ROAD PAVEMENTS AND
STRUCTURESRMS D&C 3211 PORTLAND AND BLENDED CEMENTSRMS D&C 3222 NO-FINES CONCRETERMS D&C 3252 POLYMER MODIFIED BINDERRMS D&C 3253 BITUMEN FOR PAVEMENTSRMS D&C 3254 BITUMEN EMULSIONRMS D&C 3256 COMMINUTED SCRAP RUBBERRMS D&C 3258 AGGREGATE PRECOATING AGENT (FOR BITUMEN)RMS D&C 3259 BITUMEN ADHESION AGENT (FOR BITUMEN)RMS D&C 3261 CUTBACK BITUMENRMS D&C 3268 AGGREGATE PRECOATING AGENT (FOR POLYMER MODIFIED BITUMEN)RMS D&C 3269 BITUMEN ADHESION AGENT (FOR POLYMER MODIFIED BITUMEN)RMS D&C 3351 ROAD MARKING PAINTRMS D&C 3352 FLUORESCENT PLASTIC TRAFFIC CONESRMS D&C 3353 GLASS BEADS (FOR APPLICATION TO ROAD MARKING MATERIALS)RMS D&C 3354 ADHESIVES FOR RAISED PAVEMENT MARKER INSTALLATIONRMS D&C 3356 WATERBORNE ROAD MARKING PAINTRMS D&C 3357 THERMOPLASTIC ROAD MARKING MATERIAL)RMS D&C 3359 PROFILE THERMOPLASTIC ROAD MARKING MATERIALRMS D&C 3360 TWO PART COLD APPLIED ROAD MARKING MATERIALRMS D&C 3368 SKID RESISTANT FRICTION COATING FOR TEMPORARY STEEL ROAD PLATESRMS D&C 3385 BARRIER BOARDSRMS D&C 3400 MANUFACTURE AND DELIVERY OF ROAD SIGNSRMS D&C 3411 SUPPLY OF GUIDE POSTS - TIMBERRMS D&C 3412 SUPPLY OF GUIDE POSTS - NON-TIMBERRMS D&C 3552 DRAINAGE PIPE (CORRUGATED PERFORATED PLASTIC)RMS D&C 3553 SEAMLESS TUBULAR FILTER FABRICRMS D&C 3555 DRAINAGE PIPE (SLOTTED FIBRE-REINFORCED CONCRETE)RMS D&C 3556 STRIP FILTER (GEOCOMPOSITE PLASTIC)RMS D&C 3580 AGGREGATE FILTER MATERIALS FOR SUBSURFACE DRAINAGERMS D&C 3651 PAINTS AND THINNERS FOR STEELWORKRMS D&C 3851 STEEL TAPERED LIGHTING COLUMNSRMS D&C P3074A DESIGN, SUPPLY AND DELIVERY OF SOLAR POWERED, TRAILER MOUNTED,
VARIABLE MESSAGE SIGNS (VMS)
N.T.S.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:21
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6004
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGERPRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
NOTESTEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6004AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
1A BALLARDS ROAD Ch. 494.391, Skew 90°450 RCP (1/1.22 4/2.44) (Class 3, Rubber Ring) (10.98 overall length)Precast HeadwallsOverlay Material 4.9m 3, Backfill Material 1.4m 3
Bedding/Haunch Material 2.5m 3 (HS3)External Dia. 534mm, Pipe Thick. 42mm, Headwall Ht. 230mm
33.16
-5.65
33.23
5.33
DESIGN SURFACE EXISTING SURFACE
INSTALL PRECAST CONCRETEHEADWALL AS PER RMSMODEL DRG. MD.R11.A32.A
INSTALL PRECAST CONCRETEHEADWALL AS PER RMSMODEL DRG. MD.R11.A32.A
CO
NTR
OL
LIN
EM
C60
INLET EXCAVATION 0.5m 3
INSTALL ROCK SCOUR PROTECTION ONBATTER AS PER DETAIL TD03.W1 = 2.0m , L = 4.5m, W2 = 2.3m.
INSTALL ROCK SCOURINLET PROTECTION 0.4m3
NOTE:INSUFFICIENT SURVEY TO CALCULATECATCHMENT AREA AND FLOWS IN THIS AREA.PIPE SIZE BASED ON MINIMUM PERMITTED BY RMS.
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:27
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6014
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
SHEET 1DRAINAGE SECTIONS
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6014AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
143
1
VEGETATED
300
MIN
75mm TOPSOIL ANDHYDROMULCH OR SEED
WIDTH W1
2 UNO1 1
SCALESECTION 1
NTS -
CONSTRUCT EMBANKMENT WHERETOP OF MATTRESS IS HIGHER THANNATURAL SURFACE
EXISTING SURFACE
PRECAST CONCRETEHEADWALL. RMS MODELDRG. MD.R11.A32.A
GEOTEXTILE
WIDTH W2
2-
WID
THW
2
115
115
D
WID
THW
1
PRECAST CONCRETEHEADWALL. RMSMODEL DRG.MD.R11.A32.A
ROCK PROTECTIONd50=150mm
T=2xd50
LENGTH LT=
2xd5
0
D
EMBANKMENT
GEOTEXTILE
0.6 (ROCK CUT-OFF WALL)
LENGTH L
ROCK PROTECTION
SCALESECTION 2
NTS -
d50=150mm
1-
2 UNO
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:34
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6015
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
A
TD02A
TYPICAL DETAILHYDROMULCH/SEED LINED V-DRAIN TYPE 1(M)
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
SHEET 1DRAINAGE DETAILS
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6015AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
B
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
TD03-
TYPICAL DETAILSCOUR PROTECTION
EXISTING PAVEMENT
EXISTING PAVEMENT
250MIN
NEW TEMPORARY PAVEMENTTYPE T2
200mm (DGB20)
SUBGRADE (CBR 5%)
14/7mm 2 COAT FLUSHSEAL (CL320),7mm PRIMERSEAL (CL320)
EXISTING PAVEMENTSUBGRADE (CBR 5%)
200mm DGB20
14/7mm 2 COAT FLUSH SEAL (CL320)7mm PRIMERSEAL (CL320)
EXISTING PAVEMENTSUBGRADE (CBR 5%)
200mm DGB20
7mm PRIMERSEAL (CL320)
EXISTING PAVEMENT
EXISTING PAVEMENT
250MIN
NEW TEMPORARY PAVEMENTTYPE T1
200mm (DGB20)
SUBGRADE (CBR 5%)
7mm PRIMERSEAL (CL320)
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:42
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6016
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
A
TJ02A
TRANSVERSE PAVEMENT JOINTEXISTING PAVEMENT / TEMPORARY PAVEMENT
T2A
TYPICAL DETAILTEMPORARY PAVEMENT TYPE T2
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
SHEET 1TYPICAL DETAILS
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6016AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
T1A
TYPICAL DETAILTEMPORARY PAVEMENT TYPE T1
TJ01A
TRANSVERSE PAVEMENT JOINTEXISTING PAVEMENT / TEMPORARY PAVEMENT
TYPICAL CROSS SECTIONSTN 340 MC60
BALLARDS ROAD
HYDROMULCH/SEED LINED V DRAINTYPE 1(M) REFER TD02 DRG. No. 6015.
HYDROMULCH/SEED LINED V DRAINTYPE 1(M) REFER TD02 DRG. No. 6015.
3:1
MC
60
3.0mLANE
1.0mSHLD
WESTBOUND EASTBOUND
3.0mLANE
1.0mSHLD
4:14:13:1
EXISTINGSURFACE
PAVEMENT TYPE T2 REFER DRG.NO. 6016 FOR DETAILS.
1.2m 1.2m
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
35:48
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6020
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 1 2 3 4m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
SHEET 1TYPICAL SECTIONS
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6020AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
ML-14
ML-14
A
72200
72300
72400
CONTROL LINE MC60
BALLARDS ROAD
CONSTRUCT NEW TEMPORARYPAVEMENT TYPE T1. REFERDRG. NO. 6016 FOR DETAILS.
TYPE 1(M)W = 0 S = 4:1 D = 0.3
TYPE 1(M)W = 0 S = 4:1 D = 0.3
SITE COMPOUNDACCESS
ROAD
SITE COMPOUND
JOIN NEATLY TO EXISTINGPAVEMENT.
HYDROMULCH/SEED LINED TABLE DRAIN.REFER TD02 DRG. NO. 6015 FOR DETAILS.
TYPE 1(M)W = 0 S = 4:1 D = 0.3
TYPE 1(M)W = 0 S = 4:1 D = 0.3
INSTALL ROCK SCOUR3.0m3. REFER DRG NO.6015 FOR DETAILS.
INSTALL ROCK SCOUR0.4m3. REFER DRG NO.6015 FOR DETAILS.
INSTALL 4/2.44 AND 1/1.22 450DIA RCPAND PRECAST HEADWALLS AS PER RMSMODEL DRG. MD.R11.A32.A. REFER DRGNO 6015 FOR DETAILS.
CONSTRUCT NEW TEMPORARYPAVEMENT TYPE T2. REFERDRG. NO. 6016 FOR DETAILS.
TJ026016
TJ016016
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
43:52
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6101
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T2
AF
23/08/13 AF
TI
GENERAL ARRANGEMENT - SHEET 1BALLARDS ACCESS ROAD
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6101AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
ML -
14
ML -
14A
ML -
14B
SM-0
1
72300
72400
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
T
T
T
T
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
X
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OC
OC
O COC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
T
T
T
T
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
OZ
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
X
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXX
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
OC
OC
O COC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OC
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
OU
E
E
TJ016016
CONTROL LINE MC60
PAC
IFIC
HIG
HW
AYSO
UTH
BOU
ND
BALLARDS ROAD
CONSTRUCT NEW TEMPORARYPAVEMENT TYPE T1. REFERDRG. NO. 6016 FOR DETAILS.
TYPE 1(M)W = 0 S = 4:1 D = 0.3
TYPE 1(M)W = 0 S = 4:1 D = 0.3
ALIGNMENT AS PER DESIGN LOTTW3. CONCEPT ALIGNMENT ONLY.
HYDROMULCH/SEED LINED TABLE DRAIN.REFER TD02 DRG. NO. 6015 FOR DETAILS.
HYDROMULCH/SEED LINED TABLE DRAIN.REFER TD02 DRG. NO. 6015 FOR DETAILS.
BALLARDS ROAD SEAGULLINTERIM DESIGN.
JOIN NEATLY TO EXISTING PAVEMENT.
PAC
IFIC
HIG
HW
AYN
OR
THBO
UND
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
51:57
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6102
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T1
AF
23/08/13 AF
TI
GENERAL ARRANGEMENT - SHEET 2BALLARDS ACCESS ROAD
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6102AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
72200
72300
72400
CONTROL LINE MC60
BALLARDS ROAD
SITE COMPOUNDACCESS
ROAD
SITE COMPOUND
BB
W1-
3(L)
W8-
230
W1-3(R)
W8-2
30
W1-3(L)
W8-2
30
W1-3(R)
W8-2
30
W5-22
W5-22
R1-1
D4-1-2
D4-1-2
GATEUHF
D4-1-
2
R2-4
E1E1
TF
C1
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
133:
28:35
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6111
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T2
AF
23/08/13 AF
TI
SIGNS AND LINEMARKING - SHEET 1BALLARDS ACCESS ROAD
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6111AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
72300
72400
CONTROL LINE MC60
PAC
IFIC
HIG
HW
AYSO
UTH
BOU
ND
BALLARDS ROAD
PAC
IFIC
HIG
HW
AYN
ORT
HBO
UND
W2 -3
BB
E1
E1
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
54:05
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6112
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 5 10 15 20m
PRELIMINARY DETAILED DESIGN
JOIN
SS
HEE
T1
AF
23/08/13 AF
TI
SIGNS AND LINEMARKING - SHEET 2BALLARDS ACCESS ROAD
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6112AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
18.8
29
64.7
00
137.
754 18
5.90
8
292.
445
380.
545
493.
097
586.
673
IP.C
H
IP.C
H IP.C
H
IP.C
H
IP.C
H
IP.C
H
IP.C
H
IP.C
H
36.0
35
34.6
94 35.7
99
37.9
76
38.2
42
41.6
95
33.2
49
39.6
56
HT
HT
HT
HT HT
HT
HT
HT
18.8
29
44.7
43
84.6
57
122.
706
152.
802
219.
013
255.
752
329.
137
431.
953
464.
839
521.
355
651.
990
CH
CH C
H CH
CH CH
CH
CH
CH
CH
CH
36.0
35
35.2
77
34.9
96
35.5
71
36.4
79 38.0
59
38.1
51 39.6
80
37.8
37
35.3
69
35.1
84 36.3
72
HT
HT
HT H
T HT
HT HT
HT
HT
HT
HT
HT
71.0
48
364.
411
494.
391
596.
680
CH
CH
CH
CH
34.8
93
40.3
72
34.2
60
37.7
63
HT
HT
HT
HT
DESIGN HEIGHT
NATURAL SURFACE
STATION
VERTICAL DATA
HORIZONTAL DATA
SUPERELEVATION
LONGITUDINAL SECTION MC60
35.8
23
36.0
01
35.4
16
34.9
61
34.9
37
35.2
28
35.5
30
35.9
82
36.7
88
37.4
70
37.8
95
38.0
61
38.1
11
38.1
66
38.3
58
38.7
51
39.3
43
40.0
41
40.3
61
40.2
37
39.6
68
38.6
55
37.2
33
35.7
32
34.5
23
34.3
00
35.0
93
36.3
02
37.1
51
37.6
36
37.7
58
37.5
15
36.9
10
35.9
69
34.9
64
33.9
58
35.8
23
35.9
98
35.3
67
34.8
61
34.9
05
34.9
93
35.2
76
35.6
77
36.4
89
37.4
37
37.9
29
37.9
20
37.8
38
37.8
12
38.2
12
38.6
14
39.2
56
39.7
49
40.4
98
40.1
19
39.3
55
38.2
99
36.6
34
35.2
34
34.3
23
34.2
48
34.6
18
35.4
00
36.9
97
37.7
48
37.5
62
36.9
98
36.2
64
35.4
90
34.6
90
33.6
64
0 20 40 60 80
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520
540
560
580
600
620
640
660
680
700
D=9.012
R=-200.000L=22.182
D=43.939
R=-200.000L=16.920
D=28.040
R=250.000 L=126.493
D=70.748
R=260.000L=44.151 R=-145.000 L=101.171
D=61.782
R=-60.000 L=76.265
D=70.377R=50.000L=52.029
P=-2.923%L=25.914
R=900.000L=39.914
P=1.512%L=38.049
R=1000.000L=30.096
R=-1550.000L=66.211
P=0.250%L=36.739 R=2000.000
L=73.385 R=-900.000L=102.815 P=-7.505%
L=32.886
R=393.775L=56.516
R=-1100.000 L=130.635P=-5.028%L=98.451
LHS=3.000%RHS=0.000%
RHS=3.000%
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
133:
01:27
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6201
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 10 20 30 40mHORIZ.
VERT.0 1 2 3 4m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 1LONGITUDINAL SECTION - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6201AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
CROSSFALL TOMATCH EXISTING
750.
441
IP.C
H31
.422
HT
750.
441
31.4
22
DESIGN HEIGHT
NATURAL SURFACE
STATION
VERTICAL DATA
HORIZONTAL DATA
SUPERELEVATION
LONGITUDINAL SECTION MC60
33.9
58
32.9
52
31.9
4731
.422
33.6
64
32.9
40
31.7
5731
.043
700
720
740
750
R=50.000L=52.029
D=27.332
P=-5.028%L=98.451
LHS=3.000% RHS=3.000%
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
133:
01:35
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6202
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 10 20 30 40mHORIZ.
VERT.0 1 2 3 4m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 2LONGITUDINAL SECTION - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6202AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.8
230.
000
X = 500650.842Y = 6620844.891
CONTROL LINE MC60
DATUM 34.00
STATION 0.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.2
120.
000
X = 500641.407Y = 6620841.579
CONTROL LINE MC60
DATUM 35.00
STATION 10.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.0
010.
000
X = 500632.075Y = 6620837.988
CONTROL LINE MC60
DATUM 34.00
STATION 20.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.7
08-0
.000
X = 500622.934Y = 6620833.936
CONTROL LINE MC60
DATUM 34.00
STATION 30.00M
C60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.4
16-0
.000
X = 500613.921Y = 6620829.605
CONTROL LINE MC60
DATUM 33.00
STATION 40.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.1
39-0
.000
X = 500604.909Y = 6620825.270
CONTROL LINE MC60
DATUM 33.00
STATION 50.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.0
4535
.029
34.9
1034
.899
34.8
61
34.7
1234
.664
34.6
05
35.0
4534
.520
34.8
2034
.856
34.9
61
34.8
5634
.820
34.6
05
-7.4
77-5
.900
-4.7
00-3
.500
-0.0
00
3.50
04.
700
6.15
7
X = 500595.897Y = 6620820.936
CONTROL LINE MC60
DATUM 32.00
STATION 60.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.0
11
34.9
3934
.847
34.7
98
34.8
53
34.7
8234
.692
34.5
46
35.0
11
34.4
7434
.774
34.8
04
34.8
94
34.8
0434
.774
34.5
46
-6.8
13
-5.2
00-4
.000
-3.0
00
-0.0
00
3.00
04.
000
5.41
9
X = 500586.885Y = 6620816.602
CONTROL LINE MC60
DATUM 32.00
STATION 70.00
-3.0% -3.0% -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.9
5634
.793
34.9
05
34.7
0434
.589
34.3
96
34.8
1734
.847
34.9
37
34.8
4734
.817
34.3
96
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.68
6
X = 500577.899Y = 6620812.214
CONTROL LINE MC60
DATUM 33.00
STATION 80.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.8
230.
000
X = 500650.842Y = 6620844.891
CONTROL LINE MC60
DATUM 34.00
STATION 0.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.2
120.
000
X = 500641.407Y = 6620841.579
CONTROL LINE MC60
DATUM 35.00
STATION 10.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.0
010.
000
X = 500632.075Y = 6620837.988
CONTROL LINE MC60
DATUM 34.00
STATION 20.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.7
08-0
.000
X = 500622.934Y = 6620833.936
CONTROL LINE MC60
DATUM 34.00
STATION 30.00M
C60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.4
16-0
.000
X = 500613.921Y = 6620829.605
CONTROL LINE MC60
DATUM 33.00
STATION 40.00
MC
60
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.1
39-0
.000
X = 500604.909Y = 6620825.270
CONTROL LINE MC60
DATUM 33.00
STATION 50.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.0
4535
.029
34.9
1034
.899
34.8
61
34.7
1234
.664
34.6
05
35.0
4534
.520
34.8
2034
.856
34.9
61
34.8
5634
.820
34.6
05
-7.4
77-5
.900
-4.7
00-3
.500
-0.0
00
3.50
04.
700
6.15
7
X = 500595.897Y = 6620820.936
CONTROL LINE MC60
DATUM 32.00
STATION 60.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.0
11
34.9
3934
.847
34.7
98
34.8
53
34.7
8234
.692
34.5
46
35.0
11
34.4
7434
.774
34.8
04
34.8
94
34.8
0434
.774
34.5
46
-6.8
13
-5.2
00-4
.000
-3.0
00
-0.0
00
3.00
04.
000
5.41
9
X = 500586.885Y = 6620816.602
CONTROL LINE MC60
DATUM 32.00
STATION 70.00
-3.0% -3.0% -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.9
5634
.793
34.9
05
34.7
0434
.589
34.3
96
34.8
1734
.847
34.9
37
34.8
4734
.817
34.3
96
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.68
6
X = 500577.899Y = 6620812.214
CONTROL LINE MC60
DATUM 33.00
STATION 80.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
54:31
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6301
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 1CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6301AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0%3.0:1-4.0:1-4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.9
4234
.916
34.8
8134
.852
34.9
11
34.8
7434
.784
34.6
87
34.9
4234
.657
34.9
5734
.987
35.0
77
34.9
8734
.957
34.6
87
-6.0
56-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.29
2
X = 500569.113Y = 6620807.442
CONTROL LINE MC60
DATUM 33.00
STATION 90.00
-3.0% -3.0%3.0:1-4.0:1-4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.8
96
34.6
5134
.790
34.9
93
35.0
4934
.997
34.9
17
34.8
96
35.1
0835
.138
35.2
28
35.1
3835
.108
34.9
17
-5.4
66
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.52
8
X = 500560.494Y = 6620802.370
CONTROL LINE MC60
DATUM 33.00
STATION 100.00
-3.0% -3.0%3.0:1-4.0:1-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.0
68
35.1
2435
.034
35.1
60
35.3
1135
.302
35.2
9035
.281
35.0
68
35.2
5935
.289
35.3
79
35.2
8935
.259
34.9
5935
.281
-5.5
26
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
06.
167
X = 500551.881Y = 6620797.290
CONTROL LINE MC60
DATUM 33.00
STATION 110.00
-3.0% -3.0%3.0:1-4.0:1-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET35
.245
35.1
5735
.303
35.2
76
35.4
5735
.440
35.4
2335
.418
35.2
45
35.4
1035
.440
35.5
30
35.4
4035
.410
35.1
1035
.418
-5.6
04
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
06.
124
X = 500543.267Y = 6620792.210
CONTROL LINE MC60
DATUM 33.00
STATION 120.00
-3.0% -3.0%3.0:1-4.0:1-4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.4
4935
.484
35.4
6735
.503
35.4
59
35.6
4235
.614
35.5
57
35.4
4935
.288
35.5
8835
.618
35.7
08
35.6
1835
.588
35.5
57
-5.6
85-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
6.00
8
X = 500534.556Y = 6620787.300
CONTROL LINE MC60
DATUM 33.00
STATION 130.00
-3.0% -3.0%-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.5
1835
.651
35.7
99
35.6
77
36.1
7136
.126
36.0
6636
.000
35.5
1835
.862
35.8
92
35.9
82
35.8
9235
.862
35.5
6236
.000
-5.3
76-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.20
06.
515
X = 500525.656Y = 6620782.742
CONTROL LINE MC60
DATUM 34.00
STATION 140.00
-3.0% -3.0%3.0:1-4.0:1-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.2
0736
.100
35.8
4536
.128
36.0
43
36.5
8336
.630
36.5
55
36.4
62
36.2
0735
.936
36.2
3636
.266
36.3
56
36.2
6636
.236
35.9
36
36.4
62
-6.0
14-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
6.78
0
X = 500516.581Y = 6620778.544
CONTROL LINE MC60
DATUM 34.00
STATION 150.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.7
6636
.622
36.3
1436
.423
36.4
89
36.8
7637
.037
37.0
14
36.9
38
36.7
6636
.368
36.6
6836
.698
36.7
88
36.6
9836
.668
36.3
68
36.9
38
-6.3
96-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
6.91
3
X = 500507.345Y = 6620774.713
CONTROL LINE MC60
DATUM 35.00
STATION 160.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.2
77
37.3
0636
.962
36.8
19
36.9
46
37.1
8237
.350
37.3
1037
.241
37.2
77
36.7
4137
.041
37.0
71
37.1
61
37.0
7137
.041
36.7
4137
.241
-6.8
09
-5.2
00-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.20
06.
701
X = 500497.963Y = 6620771.253
CONTROL LINE MC60
DATUM 36.00
STATION 170.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
54:39
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6302
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 2CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6302AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.5
4137
.580
37.6
1137
.328
37.4
37
37.5
8737
.683
37.7
33
37.6
58
37.5
4137
.050
37.3
5037
.380
37.4
70
37.3
8037
.350
37.0
50
37.6
58
-6.6
75-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
7.02
4
X = 500488.450Y = 6620768.172
CONTROL LINE MC60
DATUM 36.00
STATION 180.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.7
0737
.765
37.8
2137
.867
37.8
10
37.9
2037
.921
37.8
6537
.793
37.7
0737
.295
37.5
9537
.625
37.7
15
37.6
2537
.595
37.2
9537
.793
-6.4
39-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
06.
697
X = 500478.822Y = 6620765.473
CONTROL LINE MC60
DATUM 36.00
STATION 190.00
-3.0% -3.0%3.0:1-4.0:1-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.8
1537
.881
37.9
5838
.022
37.9
29
37.9
1338
.035
38.0
0137
.944
37.8
1537
.475
37.7
7537
.805
37.8
95
37.8
0537
.775
37.4
7537
.944
-6.2
21-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
06.
610
X = 500469.093Y = 6620763.162
CONTROL LINE MC60
DATUM 36.00
STATION 200.00
-3.0% -3.0%3.0:1-4.0:1-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET37
.916
37.9
8238
.063
38.1
30
37.9
50
37.9
3237
.961
37.9
3637
.882
37.9
1637
.590
37.8
9037
.920
38.0
10
37.9
2037
.890
37.5
9037
.882
-6.1
78-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
06.
078
X = 500459.280Y = 6620761.242
CONTROL LINE MC60
DATUM 36.00
STATION 210.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.8
6737
.911
37.9
9037
.915
37.9
20
37.8
5337
.826
37.5
13
37.8
6737
.641
37.9
4137
.971
38.0
61
37.9
7137
.941
37.5
13
-5.8
78-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.71
3
X = 500449.398Y = 6620759.715
CONTROL LINE MC60
DATUM 36.00
STATION 220.00
-3.0% -3.0%-4.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.6
0737
.527
37.5
98
37.8
88
37.8
0837
.628
37.6
65
37.6
0737
.966
37.9
96
38.0
86
37.9
9637
.966
37.6
65
-5.4
37-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.20
4
X = 500439.463Y = 6620758.585
CONTROL LINE MC60
DATUM 36.00
STATION 230.00
-3.0% -3.0%-4.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.6
1737
.672
37.6
94
37.8
38
37.7
9337
.687
37.6
85
37.6
1737
.991
38.0
21
38.1
11
38.0
2137
.991
37.6
85
-5.4
95-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.22
3
X = 500429.490Y = 6620757.853
CONTROL LINE MC60
DATUM 36.00
STATION 240.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
38.0
9037
.972
37.8
2937
.739
37.7
94
37.7
4837
.712
37.6
06
38.0
9037
.716
38.0
1638
.046
38.1
36
38.0
4638
.016
37.6
06
-6.3
21-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.63
9
X = 500419.497Y = 6620757.497
CONTROL LINE MC60
DATUM 36.00
STATION 250.00
-3.0% -3.0%-4.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.7
0837
.659
37.7
86
37.8
12
37.8
2237
.770
37.6
71
37.7
0838
.046
38.0
76
38.1
66
38.0
7638
.046
37.6
71
-5.3
50-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.49
9
X = 500409.501Y = 6620757.228
CONTROL LINE MC60
DATUM 36.00
STATION 260.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
54:48
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6303
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 3CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6303AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
38.2
5338
.201
38.0
3237
.920
37.9
89
37.9
3637
.904
37.8
29
38.2
5337
.817
38.1
1738
.147
38.2
37
38.1
4738
.117
37.8
29
-6.5
10-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.23
5
X = 500399.504Y = 6620756.959
CONTROL LINE MC60
DATUM 36.00
STATION 270.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
38.3
6138
.398
38.2
6938
.080
38.2
12
38.1
4738
.081
37.9
91
38.3
6137
.938
38.2
3838
.268
38.3
58
38.2
6838
.238
37.9
91
-6.4
70-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.35
8
X = 500389.508Y = 6620756.690
CONTROL LINE MC60
DATUM 36.00
STATION 280.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
38.7
03
38.7
4238
.526
38.3
48
38.4
19
38.3
5838
.283
38.1
77
38.7
03
38.1
1038
.410
38.4
40
38.5
30
38.4
4038
.410
38.1
77
-6.9
84
-5.2
00-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.40
3
X = 500379.511Y = 6620756.421
CONTROL LINE MC60
DATUM 36.00
STATION 290.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET38
.985
39.0
0638
.930
38.7
45
38.6
14
38.5
6538
.489
38.3
86
38.9
85
38.3
3138
.631
38.6
61
38.7
51
38.6
6138
.631
38.3
86
-7.1
64
-5.2
00-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.36
7
X = 500369.515Y = 6620756.151
CONTROL LINE MC60
DATUM 36.00
STATION 300.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
39.2
68
39.2
6539
.262
39.0
81
38.9
28
38.8
8738
.813
38.7
01
39.2
68
38.6
0238
.902
38.9
32
39.0
22
38.9
3238
.902
38.7
01
-7.2
01
-5.2
00-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.49
8
X = 500359.519Y = 6620755.882
CONTROL LINE MC60
DATUM 37.00
STATION 310.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
39.5
15
39.5
0039
.497
39.1
36
39.2
56
39.2
8339
.227
39.1
15
39.5
15
38.9
2339
.223
39.2
53
39.3
43
39.2
5339
.223
39.1
15
-6.9
78
-5.2
00-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.77
7
X = 500349.522Y = 6620755.627
CONTROL LINE MC60
DATUM 37.00
STATION 320.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
39.9
85
39.9
6139
.947
39.9
36
39.5
53
39.5
3039
.630
39.5
57
39.9
85
39.2
9439
.594
39.6
24
39.7
14
39.6
2439
.594
39.5
57
-7.2
75
-5.2
00-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.99
0
X = 500339.523Y = 6620755.653
CONTROL LINE MC60
DATUM 38.00
STATION 330.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
40.2
13
40.2
7240
.312
40.3
46
39.7
49
39.9
4639
.961
39.9
80
40.4
41
40.2
13
39.6
2139
.921
39.9
51
40.0
41
39.9
5139
.921
39.6
21
40.4
41
-6.9
79
-5.2
00-4
.000
-3.0
00
-0.0
00
3.00
04.
000
5.20
0
7.66
2
X = 500329.532Y = 6620756.063
CONTROL LINE MC60
DATUM 39.00
STATION 340.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
40.3
1040
.390
40.4
5740
.513
40.4
90
40.2
6140
.322
40.3
84
40.4
56
40.3
1039
.836
40.1
3640
.166
40.2
56
40.1
6640
.136
39.8
36
40.4
56
-6.6
22-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
7.06
0
X = 500319.564Y = 6620756.857
CONTROL LINE MC60
DATUM 39.00
STATION 350.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
54:56
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6304
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 4CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6304AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0%3.0:1-4.0:1-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
40.1
1140
.157
40.2
6740
.359
40.4
98
40.5
1240
.545
40.5
39
40.8
83
40.1
1139
.941
40.2
4140
.271
40.3
61
40.2
7140
.241
39.9
41
40.8
83
-5.7
10-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
8.02
9
X = 500309.634Y = 6620758.033
CONTROL LINE MC60
DATUM 38.00
STATION 360.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
39.9
3540
.059
40.1
62
40.3
79
40.5
0740
.467
40.6
60
40.8
11
39.9
3540
.234
40.2
64
40.3
54
40.2
6440
.234
39.9
34
40.8
11
-5.2
02-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.20
0
7.83
3
X = 500299.704Y = 6620759.205
CONTROL LINE MC60
DATUM 38.00
STATION 370.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
39.6
46
39.8
4039
.943
40.1
19
40.1
1840
.272
40.5
26
40.6
97
39.6
46
40.1
1740
.147
40.2
37
40.1
4740
.117
39.8
17
40.6
97
-5.8
82
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
7.84
3
X = 500289.719Y = 6620759.702
CONTROL LINE MC60
DATUM 37.00
STATION 380.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
38.7
42
39.5
2239
.460
39.7
51
40.1
9340
.431
40.5
89
40.8
16
38.7
42
39.8
8839
.918
40.0
08
39.9
1839
.888
39.5
88
40.8
16
-8.5
84
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
8.88
9
X = 500279.723Y = 6620759.509
CONTROL LINE MC60
DATUM 37.00
STATION 390.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
38.4
91
39.0
1639
.189
39.3
55
40.3
2240
.431
40.5
62
40.9
90
38.4
91
39.5
4839
.578
39.6
68
39.5
7839
.548
39.2
48
40.9
90
-8.2
30
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
10.4
30
X = 500269.764Y = 6620758.628
CONTROL LINE MC60
DATUM 36.00
STATION 400.00
-3.0% -3.0%
-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.9
10
38.6
5138
.775
38.8
45
39.5
7539
.679
39.8
04
40.3
23
36.9
10
39.0
9739
.127
39.2
17
39.1
2739
.097
38.7
97
40.3
23
-12.
750
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
9.78
3
X = 500259.889Y = 6620757.063
CONTROL LINE MC60
DATUM 35.00
STATION 410.00
-3.0% -3.0%-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.8
85
38.1
9538
.284
38.2
99
39.2
5639
.408
39.5
89
40.5
48
37.8
85
38.5
3538
.565
38.6
55
38.5
6538
.535
38.2
35
40.5
48
-6.5
99
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
12.1
47
X = 500250.145Y = 6620754.821
CONTROL LINE MC60
DATUM 35.00
STATION 420.00
-3.0% -3.0%-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.4
15
37.5
1937
.561
37.4
53
38.5
9138
.731
38.9
08
39.9
72
37.4
15
37.8
6237
.892
37.9
82
37.8
9237
.862
37.5
62
39.9
72
-5.7
87
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
12.4
37
X = 500240.580Y = 6620751.913
CONTROL LINE MC60
DATUM 35.00
STATION 430.00
-3.0% -3.0%-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.7
9536
.582
36.6
34
36.6
34
38.0
2838
.144
38.2
82
39.0
48
36.7
9537
.113
37.1
43
37.2
33
37.1
4337
.113
36.8
13
39.0
48
-5.2
75-4
.000
-3.0
00
-0.0
00
3.00
04.
000
5.20
0
11.9
12
X = 500231.237Y = 6620748.352
CONTROL LINE MC60
DATUM 35.00
STATION 440.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
55:04
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6305
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 5CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6305AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0%3.0:1-4.0:1-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.0
66
35.6
7535
.783
35.8
77
36.8
4236
.935
37.0
45
37.4
23
36.0
66
36.3
6336
.393
36.4
83
36.3
9336
.363
36.0
63
37.4
23
-5.2
11
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
9.28
3
X = 500222.162Y = 6620744.156
CONTROL LINE MC60
DATUM 34.00
STATION 450.00
-3.0% -3.0%-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.7
86
34.9
5035
.006
35.2
34
35.4
6335
.595
35.6
8735
.800
34.7
86
35.6
1235
.642
35.7
32
35.6
4235
.612
35.3
1235
.800
-7.3
05
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
06.
665
X = 500213.398Y = 6620739.345
CONTROL LINE MC60
DATUM 33.00
STATION 460.00
-3.0% -3.0%-4.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.1
88
34.2
8134
.353
34.7
12
34.6
7334
.602
34.5
24
34.1
88
34.8
9634
.926
35.0
16
34.9
2634
.896
34.5
24
-6.8
30
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.48
6
X = 500204.885Y = 6620734.098
CONTROL LINE MC60
DATUM 32.00
STATION 470.00
-3.0% -3.0%3.0:1-4.0:1-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET34
.105
33.9
8634
.042
34.3
23
34.4
7334
.404
34.3
59
34.7
57
34.1
05
34.4
0334
.433
34.5
23
34.4
3334
.403
34.1
03
34.7
57
-5.2
05
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
7.16
4
X = 500196.385Y = 6620728.830
CONTROL LINE MC60
DATUM 32.00
STATION 480.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
33.6
80
33.9
5334
.027
34.2
15
34.3
3834
.456
34.6
87
35.6
61
33.6
80
34.1
6534
.195
34.2
85
34.1
9534
.165
33.6
65
35.6
61
-5.9
40
-4.0
00-3
.000
-0.0
00
3.00
04.
000
6.00
0
11.9
95
X = 500187.885Y = 6620723.562
CONTROL LINE MC60
DATUM 32.00
STATION 490.00
-3.0% -3.0%-4.0:1 -4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
33.6
96
33.9
8234
.068
34.2
48
34.3
3434
.490
35.0
69
36.1
39
33.6
96
34.1
8034
.210
34.3
00
34.2
1034
.180
33.6
80
36.1
39
-5.9
36
-4.0
00-3
.000
-0.0
00
3.00
04.
000
6.00
0
13.3
83
X = 500179.386Y = 6620718.294
CONTROL LINE MC60
DATUM 32.00
STATION 500.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
33.5
35
34.0
2134
.125
34.3
83
34.5
2834
.762
35.1
24
35.9
63
33.5
35
34.4
5034
.480
34.5
70
34.4
8034
.450
34.1
50
35.9
63
-7.6
58
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
10.6
44
X = 500170.886Y = 6620713.026
CONTROL LINE MC60
DATUM 32.00
STATION 510.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
33.7
52
34.1
8534
.303
34.6
18
34.8
3735
.016
35.1
48
35.5
35
33.7
52
34.9
7335
.003
35.0
93
35.0
0334
.973
34.6
73
35.5
35
-8.8
84
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
0
7.78
8
X = 500162.386Y = 6620707.758
CONTROL LINE MC60
DATUM 33.00
STATION 520.00
-3.0% -3.0%-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.3
92
34.6
6434
.772
34.9
50
35.0
1834
.890
35.3
26
34.3
92
35.6
2235
.652
35.7
42
35.6
5235
.622
35.3
26
-8.9
17
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.21
2
X = 500154.028Y = 6620702.275
CONTROL LINE MC60
DATUM 33.00
STATION 530.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
55:13
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6306
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 6CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6306AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0%-4.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.9
52
35.3
5535
.462
35.4
00
35.5
6035
.635
35.8
06
34.9
52
36.1
8236
.212
36.3
02
36.2
1236
.182
35.8
06
-8.9
21
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.50
6
X = 500146.591Y = 6620695.608
CONTROL LINE MC60
DATUM 34.00
STATION 540.00
-3.0% -3.0%-4.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.6
68
35.9
9236
.079
36.3
31
36.1
4136
.225
36.3
49
35.6
68
36.6
5236
.682
36.7
72
36.6
8236
.652
36.3
49
-7.9
38
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.21
4
X = 500140.363Y = 6620687.799
CONTROL LINE MC60
DATUM 34.00
STATION 550.00
-3.0% -3.0%-4.0:1
-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.4
95
36.6
8736
.764
36.9
97
36.7
4836
.857
37.0
07
37.4
32
36.4
95
37.0
3137
.061
37.1
51
37.0
6137
.031
36.7
31
37.4
32
-6.1
43
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
7.30
5
X = 500135.516Y = 6620679.065
CONTROL LINE MC60
DATUM 35.00
STATION 560.00
-3.0% -3.0%3.0:1-4.0:1-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET37
.171
37.2
2037
.344
37.4
30
37.2
66
37.4
6837
.548
37.8
30
38.2
97
37.1
7137
.019
37.3
1937
.349
37.4
39
37.3
4937
.319
37.0
19
38.2
97
-5.6
57-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
9.03
8
X = 500132.186Y = 6620669.648
CONTROL LINE MC60
DATUM 35.00
STATION 570.00
-3.0% -3.0%3.0:1-4.0:1-4.0:1 3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.5
0537
.592
37.7
1137
.811
37.7
48
37.9
2838
.020
38.0
29
38.0
48
37.5
0537
.216
37.5
1637
.546
37.6
36
37.5
4637
.516
37.2
16
38.0
48
-6.0
67-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
0
7.69
6
X = 500130.464Y = 6620659.809
CONTROL LINE MC60
DATUM 36.00
STATION 580.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.7
2537
.799
37.8
0337
.635
37.7
34
37.8
6537
.854
37.8
4237
.819
37.7
2537
.322
37.6
2237
.652
37.7
42
37.6
5237
.622
37.3
2237
.819
-6.4
08-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.20
06.
690
X = 500130.398Y = 6620649.821
CONTROL LINE MC60
DATUM 36.00
STATION 590.00
-3.0% -3.0%3.0:1-4.0:1-4.0:1
3.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.5
7637
.598
37.5
0037
.515
37.5
62
37.5
7237
.547
37.4
96
37.5
7637
.338
37.6
3837
.668
37.7
58
37.6
6837
.638
37.4
96
-5.9
16-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.67
6
X = 500131.990Y = 6620639.960
CONTROL LINE MC60
DATUM 36.00
STATION 600.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.2
78
37.2
6737
.278
37.3
18
37.2
7737
.240
37.1
85
37.2
78
37.5
6237
.592
37.6
82
37.5
9237
.562
37.1
85
-5.2
47
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.51
0
X = 500134.509Y = 6620630.283
CONTROL LINE MC60
DATUM 36.00
STATION 610.00
-3.0% -3.0%-4.0:1 -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
37.0
8337
.005
36.9
79
36.9
98
37.0
3836
.985
36.8
77
37.0
8337
.395
37.4
25
37.5
15
37.4
2537
.395
36.8
77
-5.2
50-4
.000
-3.0
00
-0.0
00
3.00
04.
000
6.07
5
X = 500137.033Y = 6620620.607
CONTROL LINE MC60
DATUM 36.00
STATION 620.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
55:21
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6307
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 7CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6307AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.8
67
36.7
5936
.676
36.5
83
36.8
0636
.745
36.6
18
36.8
67
37.1
3837
.168
37.2
58
37.1
6837
.138
36.6
18
-5.2
87
-4.0
00-3
.000
-0.0
00
3.00
04.
000
6.08
2
X = 500139.557Y = 6620610.930
CONTROL LINE MC60
DATUM 35.00
STATION 630.00
-3.0% -3.0%3.0:1-4.0:1 -4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.7
3336
.658
36.5
3436
.408
36.2
64
36.4
8636
.428
36.3
20
36.7
3336
.490
36.7
9036
.820
36.9
10
36.8
2036
.790
36.3
20
-5.9
32-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.87
9
X = 500142.080Y = 6620601.254
CONTROL LINE MC60
DATUM 35.00
STATION 640.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
36.4
5836
.464
36.4
6136
.270
35.8
89
36.1
8436
.158
36.0
83
36.4
5836
.050
36.3
5036
.380
36.4
70
36.3
8036
.350
36.0
83
-6.4
25-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.29
8
X = 500144.604Y = 6620591.578
CONTROL LINE MC60
DATUM 35.00
STATION 650.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET35
.949
35.9
3835
.926
35.9
28
35.4
90
35.6
7635
.850
35.7
75
35.9
4935
.549
35.8
4935
.879
35.9
69
35.8
7935
.849
35.7
75
-6.4
01-5
.200
-4.0
00-3
.000
-0.0
00
3.00
04.
000
5.87
7
X = 500147.127Y = 6620581.901
CONTROL LINE MC60
DATUM 34.00
STATION 660.00
-3.0% -3.0%3.0:1-4.0:1
-4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
35.5
82
35.6
0835
.627
35.5
73
35.1
67
35.2
9935
.433
35.4
4435
.410
35.5
82
35.0
4735
.347
35.3
77
35.4
67
35.3
7735
.347
35.0
4735
.410
-6.8
09
-5.2
00-4
.000
-3.0
00
-0.0
00
3.00
04.
000
5.20
06.
291
X = 500149.651Y = 6620572.225
CONTROL LINE MC60
DATUM 34.00
STATION 670.00
-3.0% -3.0% -4.0:13.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.9
4134
.903
34.8
5834
.779
34.6
90
34.9
4635
.104
35.0
8935
.052
34.9
4134
.544
34.8
4434
.874
34.9
64
34.8
7434
.844
34.5
4435
.052
-6.3
93-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
06.
726
X = 500151.395Y = 6620562.394
CONTROL LINE MC60
DATUM 34.00
STATION 680.00
-3.0% -4.0:13.0:1
ES6
P
LU6P
LA61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
34.3
68
34.4
3334
.393
34.3
62
34.2
94
34.1
58
34.4
3034
.510
34.5
91
34.5
81
34.3
68
33.9
1234
.251
34.3
09
34.3
71
34.4
61
34.3
7134
.341
34.0
41
34.5
81
-9.7
98
-8.0
15-6
.637
-5.5
06
-3.0
00
-0.0
00
3.00
04.
000
5.20
0
6.82
3
X = 500151.162Y = 6620552.413
CONTROL LINE MC60
DATUM 33.00
STATION 690.00
-3.0% -4.0:13.0:1
LA61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
33.4
41
33.8
40
33.6
64
33.8
7933
.963
34.0
0434
.035
33.1
71
33.8
68
33.9
58
33.8
6833
.838
33.5
3834
.035
-15.
000
-3.0
00
-0.0
00
3.00
04.
000
5.20
06.
691
X = 500148.952Y = 6620542.678
CONTROL LINE MC60
DATUM 32.00
STATION 700.00
-3.0% -4.0:13.0:1
LU65
LA61
MC
61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
32.8
96
33.0
22
33.4
2233
.430
33.3
76
33.3
9133
.425
33.4
6533
.495
32.9
37
33.0
65
33.3
6533
.381
33.4
55
33.3
6533
.335
33.0
3533
.495
-15.
000
-12.
602
-3.0
00-2
.459
-0.0
00
3.00
04.
000
5.20
06.
581
X = 500144.851Y = 6620533.576
CONTROL LINE MC60
DATUM 32.00
STATION 710.00
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
55:30
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6308
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 8CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6308AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.
-3.0% -3.0% -4.0:13.0:1
ES65
LU65
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
32.8
0832
.829
32.8
5932
.891
32.9
40
32.9
3232
.960
32.9
6332
.965
32.8
0832
.537
32.8
3332
.862
32.9
52
32.8
6232
.832
32.5
3232
.965
-6.0
44-5
.238
-4.0
37-3
.000
-0.0
00
3.00
04.
000
5.20
06.
500
X = 500139.023Y = 6620525.469
CONTROL LINE MC60
DATUM 32.00
STATION 720.00
-3.0% -3.0% -4.0:13.0:13.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
32.4
4432
.448
32.4
5232
.459
32.3
68
32.3
6232
.368
32.3
7432
.379
32.4
4432
.030
32.3
3032
.360
32.4
50
32.3
6032
.330
32.0
3032
.379
-6.4
44-5
.200
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
06.
250
X = 500132.022Y = 6620518.332
CONTROL LINE MC60
DATUM 31.00
STATION 730.00
-3.0% -3.0% -4.0:13.0:13.0:1
-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
32.1
81
31.9
8631
.866
31.7
67
31.7
57
31.8
9731
.925
31.9
2131
.902
32.1
81
31.5
2731
.827
31.8
57
31.9
47
31.8
5731
.827
31.5
2731
.902
-7.1
64
-5.2
00-4
.000
-3.0
00
0.00
0
3.00
04.
000
5.20
06.
327
X = 500124.950Y = 6620511.261
CONTROL LINE MC60
DATUM 31.00
STATION 740.00
-3.0% -3.0% -4.0:13.0:13.0:1-4.0:1
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
31.1
08
31.0
0630
.924
31.0
77
31.1
8931
.311
31.3
2631
.338
31.1
08
31.3
2431
.354
31.4
44
31.3
5431
.324
31.0
2431
.338
-5.4
51
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
06.
143
X = 500117.879Y = 6620504.191
CONTROL LINE MC60
DATUM 30.00
STATION 750.00
-3.0% -3.0%
ES61
LU61
MC
60
LU6K
ES6
K
-3.0%
DESIGN HEIGHT
EXISTING SURFACE
OFFSET
31.0
51
30.9
5730
.887
31.0
43
31.1
5631
.280
31.2
9531
.306
31.0
51
31.3
0231
.332
31.4
22
31.3
3231
.302
31.0
0231
.306
-5.3
47
-4.0
00-3
.000
0.00
0
3.00
04.
000
5.20
06.
115
X = 500117.567Y = 6620503.879
CONTROL LINE MC60
DATUM 30.00
STATION 750.44
ORIGINAL DRAWING AT A1 SIZE
REVPHASE
STATUS
CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D.
CLIENT
0 5 10 15 20 25 mm ON A3 ORIGINALDESCRIPTIONDATEREV APPROVALREVIEWED
DRAFTSPERSON
DRAFTING CHECK
DESIGNER
DESIGN CHECK
DESIGN MANAGER
INITIAL DATETITLE
This Drawing may have been prepared using colour and may be incomplete if copiedDRAWN
PROJECT
DRAWING No
RMS PLAN REGISTRATION NoDESIGN LOT
CONTRACTOR
DATE
:8/2
3/20
132:
55:38
PMLO
GIN
NAME
:ARN
OLO
CATI
ON:S
:\01_
Proje
cts\9
0001
\ACA
D\DR
AWIN
GS\06
_TW
6\NH2
U-DM
-TW
-6309
.dwg
Constructing Australia's Future
NAMBUCCA AND BELLINGEN SHIRE COUNCILSPACIFIC HIGHWAY UPGRADE
NAMBUCCA HEADS TO URUNGA
PROJECT MANAGER
0 2 4 6 8mHORIZ.
VERT.0 2 4 6 8m
PRELIMINARY DETAILED DESIGN
AF
23/08/13 AF
TI
BALLARDS ACCESS ROAD SHEET 9CROSS SECTIONS - MC60
TEMPORARY TRAFFIC MANAGEMENT - TW6
1
PRELIMINARY DETAILED DESIGN
1NH2U-DG-TW-6309AO
TI
AODS2013/000070
PDD
TW6
23/08/13
23/08/13
23/08/13
23/08/13
NOTE:1. FOR GENERAL NOTES REFER TO DRG. NO. NH2U-DG-TW-6003.2. FOR LEGEND REFER TO DRG. NO. NH2U-DG-TW-6004.3. FOR DRAINAGE DETAILS REFER TO DRG. NO. NH2U-DG-TW-6015.4. FOR PAVEMENT DETAILS REFER TO DRG. NO. NH2U-DG-TW-6016.