Top Banner
N O R T H ROMSEY ECOTHERAPY PARK - STAGE 2 PROJECT NO. DRAWING NO. DRAWN DATE 2030 ACLA REV AMENDMENTS DATE SD 01 28.09.20 L Landscape Architecture & Design andscape Architecture & Design Level 1, Suite 2, 278 Church Street, Richmond VIC 3121 T. 9381 4366 www.acla.net.au A FOR REVIEW 05.10.20 LANDSCAPE CONCEPT PLAN - SITE PLAN SCALE 1:200 @ A1 1:400 @ A3 0 5 10 15 20 25 30 35m WILLIAM STREET MAIN STREET PALMER STREET COBAW HEALTH BUILDING EXISTING CARPARK EXISTING ACTIVE NATURE SPACE EXISTING WOODLAND BUFFER TREE PLANTING PICNIC AREA & OPEN SPACE PICNIC AREA & OPEN SPACE REFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN ON DRAWING NO. SD02 ON DRAWING NO. SD02 THERAPEUTIC SPACE THERAPEUTIC SPACE REFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN ON DRAWING NO. SD03 ON DRAWING NO. SD03 WATER PLAY & EPHEMERAL BILLABONG WATER PLAY & EPHEMERAL BILLABONG REFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN ON DRAWING NO. SD04 ON DRAWING NO. SD04 EXTENT OF WORKS EXTENT OF WORKS EXTENT OF WORKS EXTENT OF WORKS EXTENT OF WORKS EXTENT OF WORKS EXTENT OF WORKS EXTENT OF WORKS PROVISIONAL PROVISIONAL PROVISIONAL ENTRANCE SCULPTURES (BRIGIT HELLER) REFER TO COST ITEM 29.01 ACCESSIBLE CAROUSEL WORKS REFER TO COST ITEM 26 SOLAR LIGHT POLES (PROVISIONAL) REFER TO COST ITEM 25 SOLAR LIGHT POLE FUTURE WILLIAM STREET FUTURE WILLIAM STREET CAR PARK WORKS CAR PARK WORKS (NOT PART OF THIS CONTRACT) (NOT PART OF THIS CONTRACT) LP LP Attachment 1 – Stage 2 Design - Romsey Ecotherapy Park AO.2 ATTACHMENT
4

Attachment 1 – Stage 2 Design - Romsey Ecotherapy Park

Jan 26, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Attachment 1 – Stage 2 Design - Romsey Ecotherapy Park

NORTHROMSEY ECOTHERAPY PARK - STAGE 2

PROJECT NO.

DRAWING NO.

DRAWN

DATE

2030ACLAREV AMENDMENTS DATE

SD 0128.09.20

LLandscape Architecture & Design andscape Architecture & Design

Level 1, Suite 2, 278 Church Street,Richmond VIC 3121T. 9381 4366

www.acla.net.au

A FOR REVIEW 05.10.20

LANDSCAPE CONCEPT PLAN - SITE PLANSCALE

1:200 @ A11:400 @ A3

0 5 10 15 20 25 30 35m

WI

LL

IA

M S

TR

EE

T

MA

IN

S

TR

EE

T

P A L M E R S T R E E T

COBAW HEALTH

BUILDING

EXISTING CARPARK

EXISTING ACTIVE NATURE SPACE

EXISTING WOODLAND BUFFER TREE PLANTING

PICNIC AREA & OPEN SPACEPICNIC AREA & OPEN SPACEREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN ON DRAWING NO. SD02ON DRAWING NO. SD02

THERAPEUTIC SPACETHERAPEUTIC SPACEREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN

ON DRAWING NO. SD03ON DRAWING NO. SD03

WATER PLAY & EPHEMERAL BILLABONGWATER PLAY & EPHEMERAL BILLABONGREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN

ON DRAWING NO. SD04ON DRAWING NO. SD04

EXTENT OF WORKSEXTENT OF WORKSEXTENT OF WORKS

EXTENT OF WORKS

EXTENT O

F WO

RK

SEXTEN

T OF W

OR

KS

EXTE

NT O

F W

ORK

S

EXTE

NT O

F W

ORK

S

PROVISIO

NAL

PROVISIONAL

PROVIS

IONAL

ENTRANCE SCULPTURES

(BRIGIT HELLER)REFER TO COST

ITEM 29.01

ACCESSIBLE CAROUSEL WORKS

REFER TO COST ITEM 26

SOLAR LIGHT POLES(PROVISIONAL)REFER TO COST ITEM 25

SOLAR LIGHT POLE

FUTU

RE W

ILLIAM

STR

EE

T

FUTU

RE W

ILLIAM

STR

EE

T

CA

R PA

RK W

OR

KS

CA

R PA

RK W

OR

KS

(NO

T PAR

T OF TH

IS CO

NTR

AC

T)

(NO

T PAR

T OF TH

IS CO

NTR

AC

T)

LP

LP

Attachment 1 – Stage 2 Design - Romsey Ecotherapy Park

AO.2 ATTACHMENT

Page 2: Attachment 1 – Stage 2 Design - Romsey Ecotherapy Park

NORTHROMSEY ECOTHERAPY PARK - STAGE 2

PROJECT NO.

DRAWING NO.

DRAWN

DATE

2030ACLAREV AMENDMENTS DATE

SD 0228.09.20

LLandscape Architecture & Design andscape Architecture & Design

Level 1, Suite 2, 278 Church Street,Richmond VIC 3121T. 9381 4366

www.acla.net.au

A FOR REVIEW 05.10.20

LANDSCAPE CONCEPT PLAN - PICNIC AREA & OPEN SPACESCALE

1:100 @ A11:200 @ A3

0 5 10 15m

EXTENT OF W

ORKS

EXTENT OF W

ORKS

EXTENT OF WORKS

EXTENT OF WORKS

EXTENT OF W

ORKS

EXTENT OF W

ORKS

THERAPEUTIC SPACETHERAPEUTIC SPACEREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN

ON DRAWING NO. SD03ON DRAWING NO. SD03

WATER PLAY & EPHEMERAL BILLABONGWATER PLAY & EPHEMERAL BILLABONGREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN

ON DRAWING NO. SD04ON DRAWING NO. SD04

LEGENDEXISTING TREE TO BE PROTECTED AND RETAINED

PROPOSED TREE100L CONTAINER INSTALL SIZE DENOTED BY:

PROPOSED GARDEN BED APPROX. 4 PLANTS/ METER IN 150mm POTSAUTOMATIC IRRIGATION SYSTEM

PROPOSED CONCRETE PAVINGMIX: ‘GALAXY’ BY HANSON, FINISH: LIGHT HIGH PRESSURE WASH EXPOSED AGGREGATE.

PROPOSED GRASS AREASINSTANT TURF.AUTOMATIC IRRIGATION SYSTEM

PROPOSED CONCRETE PAVINGCOLOUR: ABILOX ‘MORNINGTON PENINSULA, FINISH: STIFF BROOM.

PROPOSED FEATURE PAVING CASTLEMAINE SLATE RANDOM STONE PAVING.

GRANITIC SAND PAVING

ASPHALT PAVING

PROPOSED DRAINAGE PITS

PROPOSED LEVELS

CONCRETE EDGECE

STONE SEATING WALL DRYSTONE STACKED ‘CASTLEMAINE’ ROCKSSW

BRICK SEATING WALL RECYCLED RED BRICKSBSW

STEEL EDGEWEATHERED STEEL FINISHSE

VEHICLE EXCLUSION BOLLARD150mm DIAMETER ACQ TREATED PINE WITH DOME TOP AT VARYING HEIGHTS.

B

PROPOSED POLE LIGHTSCLOSED SYSTEM SOLAR POWER LIGHTS MOUNTED ON POLELPPROPOSED POWER BOLLARDLOCKABLE BOLLARD TO HOUSE ELECTRICAL GPOs INCLUDING 3 PHASE POWER OUTLET.

PB

STONE STEPPERSSAWN PINK MUDSTONE STEPPERSSS

EXISTING CONTOURS0.25m INTERVALS

488.

2548

8.25

488.

0048

8.00

Custom Shade Shelter

Picnic Settings - ‘Reunion’ picnic setting by Spark Furniture with Hardwood timber battens and galvanised steel legs. Customised sizes to provide wheelchair accessibility.

Seat - ‘Victor Harbour’ seat by Spark Furniture.

Bin Surround - Council Standard bin surround by Urban Design Group with custom Interpon ‘Sable Corten’ powder coat finish.

Drink Fountain - ‘Aquafil Bold 850BF’ by Civiq.

BBQ - Dual hotplate electric accessible ‘A Series’ BBQ by DA Christie.

Brick Seating Wall - Recycled red brick seating wall.

Stone Seating Wall - Drystone terraced seating around open grassed space using Castlemaine rock.

Paving Sculpture - Paving sculpture by Glenn Romanis with feature tree at the central junction of the park’s main pathways.

Open Grass Space - Multi-purpose flexible space that can accommodate a wide variety of functions. Approximate area = 582m2

Power Bollard - in garden bed incorporating 3 phase power GPOs.

Storytelling Chair and stools - Carved timber storytelling chair and toadstool seats by Richard Yates (Provisional).

NOTES

OPEN GRASS AREA

488.

0048

8.00

488.0

048

8.00

487.

7548

7.75

487.75487.75

487.5

048

7.50

487.

5048

7.50

487.

2548

7.25

488.

2548

8.25

488.25488.25

488.

5048

8.50

488.

7548

8.75

488.75488.75

489.

0048

9.00

489.00489.00

488.50488.50

488.

7548

8.75

COBAW HEALTH

BUILDING

EXISTING CAR PARK

EXISTING OAK TREE

EXISTING CONCRETE

EXISTING CONCRETE PATH

EXISTING DECK

EXISTING CLIMBING

POLE FOREST

EXISTING HAMMOCK

Proposed custom shelter with hardwood panels to posts and feature ‘rain chain’ to gutter.

Paving Sculpture by Glenn Romanis with feature tree at the central junction of the park’s main pathways.

Proposed picnic settings.

Proposed recycled red brick seating wall

Proposed drystone terraced seating around open grassed space using Castlemaine rock.

Proposed bin surround Proposed drink fountain. Proposed electric BBQ.

Proposed seat with back and armrest.

BBQ

2.5M W

IDE A

SPHALT PATHW

AY

2.5M W

IDE ASPHALT PATHWAY

2.5M WIDE ASPHALT PATHWAY

CE

CE

CE

CE

CE

CE

CE

CECE

CE

SE

PB

LP

CE

CE

CE

CE

CE

CE BSW

BSW

SSW

SSW

SS

W

SSW

SEAT

SEAT

PICNIC

PICNIC

EXTENT OF SHELTER ABO

VE (DASHED)

LB

DF

BB

B

B

B

BB

B

B

B

B

LP

STORYTELLING CHAIR AND STOOLS

(RICHARD YATES) REFER TO COST

ITEM 29.03

PAVING SCULPTURE

(GLENN ROMANIS)

PROVISIONAL

SS

SS

SS

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

1

9

2

7

8

4 5 6

3

7

4

12

2

6

7

5

8

3

12

10

9

3

8

11

1

2

3

4

5

6

7

8

9

10

11

12

Page 3: Attachment 1 – Stage 2 Design - Romsey Ecotherapy Park

NORTHROMSEY ECOTHERAPY PARK - STAGE 2

PROJECT NO.

DRAWING NO.

DRAWN

DATE

2030ACLAREV AMENDMENTS DATE

SD 0328.09.20

LLandscape Architecture & Design andscape Architecture & Design

Level 1, Suite 2, 278 Church Street,Richmond VIC 3121T. 9381 4366

www.acla.net.au

A FOR REVIEW 05.10.20

LANDSCAPE CONCEPT PLAN - THERAPEUTIC SPACESCALE

1:100 @ A11:200 @ A3

0 5 10 15m

WATER PLAY & EPHEMERAL BILLABONGWATER PLAY & EPHEMERAL BILLABONGREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN

ON DRAWING NO. SD04ON DRAWING NO. SD04

PICNIC AREA & OPEN SPACEPICNIC AREA & OPEN SPACEREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN ON DRAWING NO. SD02ON DRAWING NO. SD02

LEGENDEXISTING TREE TO BE PROTECTED AND RETAINED

PROPOSED TREE100L CONTAINER INSTALL SIZE DENOTED BY:45L CONTAINER INSTALL SIZE DENOTED BY:

PROPOSED GARDEN BED APPROX. 4 PLANTS/ METER IN 150mm POTSAUTOMATIC IRRIGATION SYSTEM

PROPOSED CONCRETE PAVINGMIX: ‘GALAXY’ BY HANSON, FINISH: LIGHT HIGH PRESSURE WASH EXPOSED AGGREGATE.

PROPOSED GRASS AREASINSTANT TURF.AUTOMATIC IRRIGATION SYSTEM

PROPOSED CONCRETE PAVINGCOLOUR: ABILOX ‘MORNINGTON PENINSULA, FINISH: STIFF BROOM.

PROPOSED FEATURE PAVING CASTLEMAINE SLATE RANDOM STONE PAVING.

GRANITIC SAND PAVING

ASPHALT PAVING

PROPOSED PEBBLE MULCH 30-50mm ‘DELATITE’ RIVER PEBBLE MIX.

PROPOSED LEVELS

ROCK BOULDERFLAT TOPPED PINK MUDSTONE

CONCRETE EDGECE

STONE SEATING WALL DRYSTONE STACKED ‘CASTLEMAINE’ ROCKSSW

BRICK SEATING WALL RECYCLED RED BRICKSBSW

STEEL EDGEWEATHERED STEEL FINISHSE

FEATURE FENCEFF

NATURAL TREE LOGSLOG

VEHICLE EXCLUSION BOLLARD150mm DIAMETER ACQ TREATED PINE WITH DOME TOP AT VARYING HEIGHTS.

B

REMOVABLE BOLLARDRB

PROPOSED POLE LIGHTSCLOSED SYSTEM SOLAR POWER LIGHTS MOUNTED ON POLELP

STONE STEPPERSSAWN PINK MUDSTONE STEPPERSSS

EXISTING CONTOURS0.25m INTERVALS

488.

2548

8.25

488.

0048

8.00

PROPOSED FEATURE PAVING PORPHYRY COBBLES HIGHLIGHTING THE ‘LABYRINTH TRAIL’ TO THERAPEUTIC SPACE.

WI

LL

IA

M S

TR

EE

T

EXTE

NT O

F W

ORK

S

EXTE

NT O

F W

ORK

S

EXTENT OF WORKS

EXTENT OF WORKS

EXTENT O

F WO

RK

SEXTEN

T OF W

OR

KS

FUTU

RE W

ILLIAM

STR

EE

T

FUTU

RE W

ILLIAM

STR

EE

T

CA

R PA

RK W

OR

KS

CA

R PA

RK W

OR

KS

(NO

T PAR

T OF TH

IS CO

NTR

AC

T)

(NO

T PAR

T OF TH

IS CO

NTR

AC

T)

GRASS

EXISTING CARPARK

Proposed seat with back and armrest.

Pebble mulched swale.

Raised weathered steel beds.

Vehicle exclusion bollards

Climber arbors.

Feature tree.

Vertical sawn rock ‘gorge’ stones

Sound Chimes - Anton Hasell

Feature fence. Labyrinth trail feature paving.

‘Water Clock’ - Anton Hasell

Bike Rail

Recycled red brick seating wall. Stone seating wall.

SEAT

SEAT

SE

AT

BR

SE

AT

SEAT

WATER CLOCK(ANTON HASELL)

CYCLES(CHARLIE ACQUILINA)

ROCK GORGE STONES

SWALE

SW

ALE

SW

ALE

SOUND CHIMES(ANTON HASELL)

SS

CE

CECE

CE

CE

CE

CE

CE

CE

CE

CE

CE

CE

CE

CE

LOG

CE

B

B

B

B

B

B

B

B

B

B

B BB

B

B B B

BB

B

B

B B BB B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

RB

LP

LP

LP

BSW

SSW

SSW

SSW

SSW

BSWFF

FF

FF

FFSE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

SE

FF

FF

WATER FEATURE

FF

FF

2.5M WIDE ASPHALT PATHWAY

2.5M W

IDE A

SP

HA

LT PATHW

AY

2.5M

WID

E A

SP

HA

LT P

ATH

WAY

100L45L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

100L

45L

45L

45L

100L

45L

45L

45L

45L

45L

45L45L

45L

45L 45L

45L

45L

45L45L

45L45L

487.2

5

487.2

5

487.

2548

7.25

487.

5048

7.50

487.

7548

7.75

488.

0048

8.00

488.25488.25

488.

5048

8.50

487.0

048

7.00

486.

7548

6.75

487.

0048

7.00

486.

0048

6.00

486.

2548

6.25

486.50486.50

486.75486.75

485.

7548

5.75

Vehicle exclusion bollards - 3 varying heights arranged in a zig zag formation.

Spiral Bike rail - ‘BR40’ by Urban Design Group.

Garden beds with sensory planting in raised weathered steel planters of varying heights.

Custom steel arbours spanning between raised planters over pathway for climbing plants.

Column water feature to provide the sound of water to the sensory area.

Feature tree at the entrance to the sensory trail.

Feature fence. Approx. 1.2m high split timber pailing feature fence.

‘Labyrinth’ trail’ - defined by a meandering line of porphyry cobble stones inlaid into concrete paving.

Gorge Stones - Vertical sawn boulders arranged in vertical blades to create an abstract rock gorge.

‘Water Clocks’ - water/ sound sculpture by Anton Hasell located at the centre of the sensory labyrinth.

Sound Chimes by Anton Hasell.

‘Cycles’ Sculpture by Charlie Acquilina

Drainage culvert under path with headwalls disguised with mud stone boulders.

NOTES14

15

17

18

19

21

22

23

24

25

26

13

14

14

13

14

7

20

20

15

22

22

18 16

16

16

17

16

16

16

16

16

16

16

16

17

21

21

21

19

22

17

25

21

8

8

3

3

13

24

21

21

20

23

3

3

3

3

13

16

14

17

19

22

24

20 21

23

15

7 8

16

20

Page 4: Attachment 1 – Stage 2 Design - Romsey Ecotherapy Park

NORTHROMSEY ECOTHERAPY PARK - STAGE 2

PROJECT NO.

DRAWING NO.

DRAWN

DATE

2030ACLAREV AMENDMENTS DATE

SD 0428.09.20

LLandscape Architecture & Design andscape Architecture & Design

Level 1, Suite 2, 278 Church Street,Richmond VIC 3121T. 9381 4366

www.acla.net.au

A FOR REVIEW 05.10.20

LANDSCAPE CONCEPT PLAN - WATER PLAY & EPHEMERAL BILLABONGSCALE

1:100 @ A11:200 @ A3

0 5 10 15m

THERAPEUTIC SPACETHERAPEUTIC SPACEREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN ON DRAWING NO. SD03ON DRAWING NO. SD03

PICNIC AREA & OPEN SPACEPICNIC AREA & OPEN SPACEREFER TO ENLARGEMENT PLAN REFER TO ENLARGEMENT PLAN ON DRAWING NO. SD02ON DRAWING NO. SD02

EXISTING TREE TO BE PROTECTED AND RETAINED

PROPOSED TREE100L CONTAINER INSTALL SIZE DENOTED BY:45L CONTAINER INSTALL SIZE DENOTED BY:200mm CONTAINER INSTALL SIZE DENOTED BY:

PROPOSED GARDEN BED APPROX. 4 PLANTS/ METER IN 150mm POTSAUTOMATIC IRRIGATION SYSTEM

PROPOSED CONCRETE PAVINGMIX: ‘GALAXY’ BY HANSON, FINISH: LIGHT HIGH PRESSURE WASH EXPOSED AGGREGATE.

PROPOSED CONCRETE PAVINGCOLOUR: ABILOX ‘MORNINGTON PENINSULA, FINISH: ‘DYNAMIC LIFTER’ FINISH.

PROPOSED CONCRETE PAVINGCOLOUR: ABILOX ‘MORNINGTON PENINSULA, FINISH: STIFF BROOM.

PROPOSED FEATURE PAVING CASTLEMAINE SLATE RANDOM STONE PAVING.

GRANITIC SAND PAVING

ASPHALT PAVING

PROPOSED RUBBER IMPACT ATTENUATION SURFACE

PROPOSED SANDPIT TRIPLE WASHED SANDPIT SAND.

PROPOSED PEBBLE MULCH 30-50mm ‘DELATITE’ RIVER PEBBLE MIX.

VERTICAL LOG STEPPERSHARDWOOD LOG ROUNDS VARYING HEIGHTS, 100mm MIN. TO 400mm MAX. ABOVE FSL.

PROPOSED DRAINAGE PITS

PROPOSED LEVELS

ROCK BOULDERFLAT TOPPED PINK MUDSTONE

CONCRETE EDGECE

BRICK SANDPIT WALL RECYCLED RED BRICKSINSITU CONCRETE CAPPING

SPW

STEEL EDGEWEATHERED STEEL FINISHSE

FEATURE FENCEFF

NATURAL TREE LOGSLOG

VEHICLE EXCLUSION BOLLARD150mm DIAMETER ACQ TREATED PINE WITH DOME TOP AT VARYING HEIGHTS.

B

PROPOSED POLE LIGHTSCLOSED SYSTEM SOLAR POWER LIGHTS MOUNTED ON POLELP

STONE STEPPERSSAWN PINK MUDSTONE STEPPERSSS

EXISTING CONTOURS0.25m INTERVALS

488.

2548

8.25

488.

0048

8.00

LEGEND

Subsurface grated pit with geotextile fabric membrane below sandpit.

Subsurface grated pit with geotextile fabric membrane below pebble mulch at low point of ephemeral billabong.

Provide additional tree planting to supplement the existing woodland buffer planting along the souther park boundary. (Provisional).

NOTES

WI

LL

IA

M S

TR

EE

T

EXTENT OF WORKSEXTENT OF WORKSEXTENT OF WORKS

EXTENT OF WORKS

EXTENT OF W

ORKS

EXTENT OF W

ORKS

PROVISIONALBUILD YOUR OWN CUBBY

FRAME WORKSREFER TO COST

ITEM 28

SS

SSSS SS SS

SS

SS

SS

SS

SS

SS

Proposed seat with back and armrest.

Seeded pebbles along invert of water channel.

LP

Pebble mulched swale. Vehicle exclusion bollards Water channel gate.

SANDPIT

EPHEMERAL BILLABONG

SPW

SPW

EXISTING WOODLAND BUFFER TREE PLANTING

Sandpit with natural stepping log and mudstone edge. Sandpit recycled red brick wall with wheelchair accessible bays. Wheelchair accessible wobble bridge.

KINETIC SCULPTURES(RUDI JASS)

Build your own cubby frame in weathered steel finish. (Provisional)

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

SEAT

SEATC

E

CE

CE

CE

CE

CE

CE

CE

CE

CE

CE

CE

CE

SW

ALE

2.5M WIDE ASPHALT PATHWAY

EXISTING BOUNDARY FENCE

2.5M

WID

E A

SP

HA

LT P

ATH

WAY

FUTU

RE W

ILLIAM

STR

EE

TFU

TUR

E WILLIA

M S

TRE

ET

CA

R PA

RK W

OR

KS

CA

R PA

RK W

OR

KS

(NO

T PAR

T OF TH

IS CO

NTR

AC

T)

(NO

T PAR

T OF TH

IS CO

NTR

AC

T)

100L45L200mm

200mm

200mm200mm

200mm

200mm200mm

200mm

200mm

200mm

200mm 200mm

200mm200mm

200mm

200mm

200mm

200mm

200mm

200mm

200mm

200mm 200mm

200mm

200mm

200mm

200mm

200mm

200mm

200mm

200mm

200mm

200mm

200mm

100L

100L

100L

100L

100L

45L

45L

45L

45L

45L45L

45L

45L

45L

45L

45L

45L

45L

45L

485.50485.50

485.

7548

5.75

486.0

048

6.00

486.

2548

6.25

486.

5048

6.50

486.

7548

6.75

486.75486.75

486.50486.50

486.25486.25

486.00486.00

485.

7548

5.75

485.50485.50 485.25

485.25

484.00484.00

484.00484.00

484.

2548

4.25

484.

7548

4.75

484.5

0

484.5

0

487.

0048

7.00

487.00487.00

3

27

27

27

32

3

33

36

37

13

13 14

14

38

38

38

34

28

2831

29

30

30

31

35

31

3

31

Proposed kinetic sculptures - Rudi Jass2713 14 Hand water pump.28 30Carved log water channels.29

32 33 34 35

36

37

38