Hollowcore Precast slab 150mm Mastic sealant cement particle board Vapour barrier Continued Uptight to curtain walling for achieving of thermal Continuity Welded steel angle bracket steel angle welded to underside of structural beam, carrying Hollowcore slab with a minimum bearing 2.5mm Mermolium floor finish Structural Steel Universal I Beam Strucutral reinforced screed Atrium structure (RHS) to support curtain walling frame to engineers specification Bracket between curtain walling and RHS Steel profile bolted to mullion profile, base plate and strucuture on shims and isolatore Extruded aluminium curtain walling box with flush non interputed finish externally , joints to be weathered using a silicon sealent. Water tightnes of 600Pa (class 7) or better and wind load resistance of 2200 Pa or better than required DPC and prefabricated powdered coated aluminium pressing with weep holes sealents to manufactures specification Profile with high density Insulation 25mm Oak treated window frame Soil Medium - allowng of grass and other plants Drain cavity Rigid PIR Ins Thermal Conductivity: 0.020w/M2k Structural steel deck Bracket between Curtain walling frame & RHS Silicone filled flush finishcurtain walling joint Bracket between Curtain walling frame & RHS Atrium structure RHS to supportcurtain wall frame to engineers specifiction 25mm double glazed unit consisting of 8mmK glass internally,12mm argon filled & 6mm optiwhite glass externally with warm edge space bar. Glass held in place using toggles which are placed into position/channels. Extruded aluminium curtain walling box with flush non interputed finish externally , joints to be weathered using a silicon sealent. Water tightnes of 600Pa (class 7) or better and wind load resistance of 2200 Pa or better than required 2350 2 A118 Sim 3 A118 Sim 3 A118 Sim 5 A118 Sim www.autodesk.com/revit Scale LECTURER Drawn by Date Project number Institute of Technology Carlow BSc. in Architectural Technology Year 3 2015-2016 As indicated 26/04/2016 09:34:51 Atrium Details Project Number 3 Carlow Primary Health Care Centre 22/04/2016 Xhevdet Haliti Dan O'Sullivan, Noel Dunne, Mark Duffy A118 1 : 5 Atrium Upstand 1 1 : 5 Atrium Low Corner 2 1 : 5 Atrium Top Corner 3 1 : 20 Wall Section @ Atrium 4 1 : 5 Atrium Zinc Roof Section 5 1 : 1 Atrium 6 1 : 5 Key Plan @ Atrium 7 Atrium 3D NTS 8 62.95M