Top Banner
5 27 29 28 15 33 2020 Hwy Project Descripon 1 MN 4 Reclamaon from MN 55 to the N. Kandiyohi/Stearns County line (D3 is the lead) 2 MN 15 Downtown reconstrucon in Hutchinson from 5th Ave. SW to 2nd Ave. NE 3 MN 15 Ultra thin bonded wearing course (UTBWC) & ADA from CSAH 115 (roundabout) to 5th Ave NE in Hutchinson 4 MN 23 Mill 3” and 7” concrete overlay from near CSAH 24 in Coonwood to US 212 in Granite Falls, plus replace bridges #91419, #91420 & #91459, ADA in Granite Falls and turn lanes at Lyon CSAH 9 & 10 5 MN 23 Snow fence at Lyon CSAH 7 in Marshall 6 MN 29 Replace bridge #9287 over a Montevideo City street 7 MN 55 Reclamaon from the N. Kandiyohi/Stearns Co. to the E Kandiyohi/Stearns Co. Line (D3 is the lead) 8 US 59/14 Repair slide areas from 2018 flood event, mulple locaons 9 MN 67 Inslope repair and stabilizaon 7 miles SE of Granite Falls (shelf project) 10 US 75 Cold in place recycle (CIR) and overlay from Township 127 to MN 7, except in Madison, plus ADA in Bellingham, cul- vert liners, RR crossing in Bellingham and guardrail 11 US 75 Replace bridge #6572 with new bridge #59011 just north of the juncon with MN 23 in Pipestone 12 MN 277 Turn back of Hwy 277 to Chippewa County, cash transfer 2021 Hwy Project Descripon 13 MN 19 Scarify and low slump overlay on bridge 5133 over the Redwood River W. of the juncon of US 71 14 MN 40 Replace bridge #91681 over a County ditch just E of the Chippewa/Kandiyohi Co. line and bridge #6864 over a County ditch 2.4 miles E of MN 277 15 MN 68 Shoulder widening from Minneota to Marshall, replace 4 bridges and culverts 16 US 71 Reduced conflict intersecon at Kandiyohi CR 90, just N of Willmar and U-turn and sidewalk at CSAH 24 in Willmar 17 US 71/ MN 23 Concrete pavement rehab & diamond grinding from the N side of Willmar to the Hwy 71/23 split 18 US 71 Replace bridge #5543 over the Coonwood River 2.8 miles S of US 14 near Sanborn 19 US 71 Replace TC&W RR crossing with new gates and flashing lights on Hwy 71 N in Olivia 20 US 212 Un-bonded concrete overlay 2.3 miles E of MN 23 to Renville & urban recon. in Sacred Heart 2022 Hwy Project Descripon 21 MN 9 Install mid-block crossing at NLS High School in New London with median refuge island 22 US 12 3” mill and overlay from just E of Kandiyohi CSAH 1 to just E of Kandiyohi CSAH 5 23 US 12 Medium mill and overlay from 6th Street to 24th Street in Willmar 24 MN 23 Construct a reduced conflict intersecon (J-turn) at MN 23 and MN 9 in New London 25 MN 23 Construct a four lane roadway from Paynesville to Richmond (North Gap Corridors of Commerce) 26 MN 30 2.5” mill and overlay E of US 59 to the Murray/Coonwood Co. line plus scarify and low slump overlay on bridge #6782 over the Des Moines River 27 US 59 Major concrete pavement rehab (CPR) and diamond grinding, plus reclaim shoulders from just N of the N juncon of MN 30 to US 14 and just N of Lyon CSAH 6 to MN 23 28 US 59 Replace bridges #8886 and #8887 over a stream and ditch crossing 5.6 miles north of Marshall 29 MN 68 Ultra thin bonded wearing course (UTBWC) from Minneota to Marshall 30 US 71 Medium mill and overlay from Viking Drive to US 212 in Olivia plus ADA 31 US 212 Ultra thin bonded wearing course (UTBWC) from just E of Renville CSAH 16 to McLeod CSAH 7 32 US 212 Construct a reduced conflict intersecon at US 212 and McLeod CSAH 1 to the E of Glencoe 33 US 212/ MN 68 Hot in place recycle (HIR) on US 212 from just E of Renville CSAH 16 to McLeod CSAH 7 in Stewart and HIR on MN 68 from Minneota to Marshall 2023 Hwy Project Descripon 34 MN 4 Reclaim and overlay from Cosmos to 1/2 mile S of Meeker CSAH 23 35 US 12 Medium M&O, micro mill & UTBWC from Holcombe Ave in Litchfield to just E of Meeker CSAH 14 in Darwin 36 MN 15 Reclaim and overlay from Hwy 12 to the Meeker/Stearns Co. Line 37 US 19 Replace bridges 826, 8736 & 8737 over the Yellow Medicine River W of US 75, near Ivanhoe 38 MN 22 Medium mill and overlay from US 212 to Cedar Ave in Glencoe, plus ADA 39 MN 23 Construct a four lane roadway from New London to Paynesville (South Gap Corridors of Commerce) 40 MN 23 Replace bridge 5746 over the Redwood River approximately 1 mile E of Florence 41 MN 40/ US 75 Medium mill and overlay plus ADA in Madison on MN 40 from the E jct. of US 75 to Western Ave. and on US 75 from the N jct. of MN 40 to 8th St. 42 MN 67 Downtown reconstrucon in Clarkfield 43 MN 271 Reclaim and overlay on MN 271 from MN 19 to Railroad Street in Hendricks and thin mill and overlay on MN 271 from Maple Street in Hendricks to the State line ATP 8 Area Transportaon Improvement Program (ATIP) 20202023 Fiscal Years 2020 to 2023 State Highway Projects 2023 2021 2020 2022 June 14, 2019 Projects are shown in fiscal years, not construcon years. It is possible a project may be constructed the year before it is depicted on the map. For more informaon, contact: Lindsey Bruer |MnDOT District 8 | Planning Director | [email protected] | 320-979-5534 11 8 15 6 10 4 14 41 42 19 18 26 14 31 30 27 13 43 40 37 20 33 9 12 8 8 35 2 & 3 1 22 34 38 23 32 24 17 7 16 36 21 25 39
1

ATP 8 Area Transportation Improvement Program (ATIP) 2020 2023 2020... · 5 MN 23 Snow fence at Lyon SAH 7 in Marshall 6 MN 29 Replace bridge #9287 over a Montevideo ity street 7

May 19, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ATP 8 Area Transportation Improvement Program (ATIP) 2020 2023 2020... · 5 MN 23 Snow fence at Lyon SAH 7 in Marshall 6 MN 29 Replace bridge #9287 over a Montevideo ity street 7

5 27

29 28

15 33

2020 Hwy Project Description

1 MN 4 Reclamation from MN 55 to the N. Kandiyohi/Stearns County line (D3 is the lead)

2 MN 15 Downtown reconstruction in Hutchinson from 5th Ave. SW to 2nd Ave. NE

3 MN 15 Ultra thin bonded wearing course (UTBWC) & ADA from CSAH 115 (roundabout) to 5th Ave NE in Hutchinson

4 MN 23 Mill 3” and 7” concrete overlay from near CSAH 24 in Cottonwood to US 212 in Granite Falls, plus replace bridges #91419, #91420 & #91459, ADA in Granite Falls and turn lanes at Lyon CSAH 9 & 10

5 MN 23 Snow fence at Lyon CSAH 7 in Marshall

6 MN 29 Replace bridge #9287 over a Montevideo City street

7 MN 55 Reclamation from the N. Kandiyohi/Stearns Co. to the E Kandiyohi/Stearns Co. Line (D3 is the lead)

8 US 59/14 Repair slide areas from 2018 flood event, multiple locations

9 MN 67 Inslope repair and stabilization 7 miles SE of Granite Falls (shelf project)

10 US 75 Cold in place recycle (CIR) and overlay from Township 127 to MN 7, except in Madison, plus ADA in Bellingham, cul-vert liners, RR crossing in Bellingham and guardrail

11 US 75 Replace bridge #6572 with new bridge #59011 just north of the junction with MN 23 in Pipestone

12 MN 277 Turn back of Hwy 277 to Chippewa County, cash transfer

2021 Hwy Project Description

13 MN 19 Scarify and low slump overlay on bridge 5133 over the Redwood River W. of the junction of US 71

14 MN 40 Replace bridge #91681 over a County ditch just E of the Chippewa/Kandiyohi Co. line and bridge #6864 over a County ditch 2.4 miles E of MN 277

15 MN 68 Shoulder widening from Minneota to Marshall, replace 4 bridges and culverts

16 US 71 Reduced conflict intersection at Kandiyohi CR 90, just N of Willmar and U-turn and sidewalk at CSAH 24 in Willmar

17 US 71/ MN 23

Concrete pavement rehab & diamond grinding from the N side of Willmar to the Hwy 71/23 split

18 US 71 Replace bridge #5543 over the Cottonwood River 2.8 miles S of US 14 near Sanborn

19 US 71 Replace TC&W RR crossing with new gates and flashing lights on Hwy 71 N in Olivia

20 US 212 Un-bonded concrete overlay 2.3 miles E of MN 23 to Renville & urban recon. in Sacred Heart

2022 Hwy Project Description

21 MN 9 Install mid-block crossing at NLS High School in New London with median refuge island

22 US 12 3” mill and overlay from just E of Kandiyohi CSAH 1 to just E of Kandiyohi CSAH 5

23 US 12 Medium mill and overlay from 6th Street to 24th Street in Willmar

24 MN 23 Construct a reduced conflict intersection (J-turn) at MN 23 and MN 9 in New London

25 MN 23 Construct a four lane roadway from Paynesville to Richmond (North Gap Corridors of Commerce)

26 MN 30 2.5” mill and overlay E of US 59 to the Murray/Cottonwood Co. line plus scarify and low slump overlay on bridge #6782 over the Des Moines River

27 US 59 Major concrete pavement rehab (CPR) and diamond grinding, plus reclaim shoulders from just N of the N junction of MN 30 to US 14 and just N of Lyon CSAH 6 to MN 23

28 US 59 Replace bridges #8886 and #8887 over a stream and ditch crossing 5.6 miles north of Marshall

29 MN 68 Ultra thin bonded wearing course (UTBWC) from Minneota to Marshall

30 US 71 Medium mill and overlay from Viking Drive to US 212 in Olivia plus ADA

31 US 212 Ultra thin bonded wearing course (UTBWC) from just E of Renville CSAH 16 to McLeod CSAH 7

32 US 212 Construct a reduced conflict intersection at US 212 and McLeod CSAH 1 to the E of Glencoe

33 US 212/MN 68

Hot in place recycle (HIR) on US 212 from just E of Renville CSAH 16 to McLeod CSAH 7 in Stewart and HIR on MN 68 from Minneota to Marshall

2023 Hwy Project Description

34 MN 4 Reclaim and overlay from Cosmos to 1/2 mile S of Meeker CSAH 23

35 US 12 Medium M&O, micro mill & UTBWC from Holcombe Ave in Litchfield to just E of Meeker CSAH 14 in Darwin

36 MN 15 Reclaim and overlay from Hwy 12 to the Meeker/Stearns Co. Line

37 US 19 Replace bridges 826, 8736 & 8737 over the Yellow Medicine River W of US 75, near Ivanhoe

38 MN 22 Medium mill and overlay from US 212 to Cedar Ave in Glencoe, plus ADA

39 MN 23 Construct a four lane roadway from New London to Paynesville (South Gap Corridors of Commerce)

40 MN 23 Replace bridge 5746 over the Redwood River approximately 1 mile E of Florence

41 MN 40/ US 75

Medium mill and overlay plus ADA in Madison on MN 40 from the E jct. of US 75 to Western Ave. and on US 75 from the N jct. of MN 40 to 8th St.

42 MN 67 Downtown reconstruction in Clarkfield

43 MN 271 Reclaim and overlay on MN 271 from MN 19 to Railroad Street in Hendricks and thin mill and overlay on MN 271 from Maple Street in Hendricks to the State line

ATP 8 Area Transportation Improvement

Program (ATIP) 2020—2023

Fiscal Years 2020 to 2023

State Highway Projects

2023

20212020

2022

June 14, 2019

Projects are shown in fiscal years, not construction

years. It is possible a project may be constructed the

year before it is depicted on the map.

For more information, contact: Lindsey Bruer |MnDOT District 8 | Planning Director |

[email protected] | 320-979-5534

11

8

15

6

10

4

14

41

42

19

18

26

14

31

30

27

13 43

40

37

20

33

9

12

8

8

35

2 & 3

1

22

34

38

23

32

24

17

7

16 36

21

25

39