ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK 2000+ Gustaaf Janssens Maastricht UAC Project Manager P2L.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
MAS UAC AREA OF RESPONSIBILITYMAS UAC AREA OF RESPONSIBILITYTitle:C:\Applic\ACAD\MAPS\Workrout\111-0247.eps Creator:AutoCAD PSOUTPreview:This EPS picture was not savedwith a preview included in it.Comment:This EPS picture will print to aPostScript printer, but not toother types of printers.
The Maastricht Multi-stackThe Maastricht Multi-stack Multi-stack configuration worksMulti-stack configuration works Accommodates FANS1/A aircraft in MAS UAC airspace to interface Accommodates FANS1/A aircraft in MAS UAC airspace to interface
with the ATN SARPS compliant FDPSwith the ATN SARPS compliant FDPS Full transparency for the end-usersFull transparency for the end-users It takes advantage of existing FANS1/A equipped aircraft: It takes advantage of existing FANS1/A equipped aircraft:
Potentially 10% flights in MAS UAC could be FANS1/A equipped. Potentially 10% flights in MAS UAC could be FANS1/A equipped. This translates to 10 000 AGDL flights/monthThis translates to 10 000 AGDL flights/month
Supports IRRF workSupports IRRF work Enabler to develop joint oceanic and domestic AGDL-proceduresEnabler to develop joint oceanic and domestic AGDL-procedures
develop global Domestic-Oceanic Air Ground Data Link procedures develop global Domestic-Oceanic Air Ground Data Link procedures (SPOM)(SPOM)
Airlines can choose preferred protocolAirlines can choose preferred protocol Extension possibleExtension possible
Operational pilot projectOperational pilot project Maintain momentum & gained experiencesMaintain momentum & gained experiences Encourage more airlines to use AGDL (FANS, ATN)Encourage more airlines to use AGDL (FANS, ATN) Act as a catalyst for AGDL ground segment Act as a catalyst for AGDL ground segment implementation in core areaimplementation in core area
Feedback on simulated & theoretical benefitsFeedback on simulated & theoretical benefits
Support Link 2000+ ProgrammeSupport Link 2000+ Programme Feedback into Standardisation bodiesFeedback into Standardisation bodies
Data Link available to the users to obtain feedback onData Link available to the users to obtain feedback on Distribution of tasks amongst sector teamDistribution of tasks amongst sector team Feedback on HMI DevelopmentFeedback on HMI Development Enabler for automated functionsEnabler for automated functions
• ATN activities start again in 2003ATN activities start again in 2003
• We can progress already now when we make We can progress already now when we make use of FANS1/A and focus on the commonality use of FANS1/A and focus on the commonality with ATN and accommodate the differences. with ATN and accommodate the differences.
• We serve our users best when we succeed to We serve our users best when we succeed to establish a uniform AG Data Link system that establish a uniform AG Data Link system that makes the best use of the available Air-Ground makes the best use of the available Air-Ground communication meanscommunication means
• AG Data Link implementation can be boosted AG Data Link implementation can be boosted when we can provide evidence from daily when we can provide evidence from daily operational use, to confirm the calculated and operational use, to confirm the calculated and simulated benefitssimulated benefits