The European Organisation for the Safety of Air Navigation ATM Development Within SESAR & NextGen Bo Redeborn Principal Director ATM EUROCONTROL CNS/ATM Avionics Conference, Moscow 18 August 2011
14

ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

Aug 01, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

The European Organisation for the Safety of Air Navigation

ATM Development Within SESAR & NextGen

Bo RedebornPrincipal Director ATM EUROCONTROL

CNS/ATM Avionics Conference, Moscow 18 August 2011

Page 2: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

2

SESAR: Why ?

SESAR• Modernise the European ATM

System• Technical/operational arm of the

Single European Sky legislation• Direct involvement of aviation

industry in all phases• Address European needs and

Global interoperability

SESAR• Modernise the European ATM

System• Technical/operational arm of the

Single European Sky legislation• Direct involvement of aviation

industry in all phases• Address European needs and

Global interoperability

Needs: • Turn off fragmented approach• Accelerate evolution in

response to challenges• Synchronise plans and

actions• from research to

operations• airborne and ground

deployments

Needs: • Turn off fragmented approach• Accelerate evolution in

response to challenges• Synchronise plans and

actions• from research to

operations• airborne and ground

deployments

Traffic forecast to double by 2030Growth must come with significant performance improvementIssues: ATC pushed to its limits; obsolescent technologies; airspace fragmentation

Traffic forecast to double by 2030Growth must come with significant performance improvementIssues: ATC pushed to its limits; obsolescent technologies; airspace fragmentation

Page 3: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

3

2005 2010 2015 2020

2005 2010 2015 2020

SESAR Cohesive Programmefor Stepwise Implementation

DefinitionDefinition

DevelopmentDevelopment

DeploymentDeployment

SESAR Phases

Currentwork

Implementation

Development work

Planning work

European ATM Master Plan

European ATM Master Plan SESAR Joint

UndertakingSESAR Joint Undertaking

Page 4: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

4

SESAR Joint Undertaking

• Public-private partnership to manage the SESAR Development Phase• Execute the European ATM Master Plan• One single ATM R&D programme in Europe

• Innovation from private sector• Public financial stability & enforcement power

• Founding members: • European Commission• EUROCONTROL

• SJU Budget: ~2.1 B€ (till 2016)• EC: 1/3• EUROCONTROL: 1/3• Industry: 1/3, co-financed

Page 5: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

5

SJU Involves All Actors• A Multi-Stakeholders approach

at the heart of the way of working

Airports

GroundIndustry

AirborneIndustry

NationalAuthorities/

Military

NationalAuthorities/

Military

R&D community

R&D community

Staffassociations

Staffassociations

Air Navigation

Service Providers

Airspaceusers

Airspaceusers

Page 6: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

6

SESAR Delivery Approach

• SESAR is focused on delivering at a regular pace

• Project level: 300 operational and technical projects• Develop elements up to maturation & readiness

for operational validation• Programme level: sets of projects jointly undertake

operational validation exercises (mainly through flight trials)

• Validated concept constituents released yearly• With demonstrated benefit• Ready for industrialisation• With a proposed date for start of operation

Page 7: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

7

Future ATM Concept: 3 Essential Considerations

Collaborative decisions based on accurate informationPartnership – Interoperability

ATM Master Plan = focused commitment• Shorter term: synchronised implementation actions• Longer term: common research and validation programme

Network PerformanceTrajectory

Page 8: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

8

International Technical Challenges

• To ensure interoperability, e.g.• Common time reference • New flight plan / flight object (FF-ICE)• 4D Trajectory exchange format• Information Management (data models, quality of service

requirements, sharing rules, distribution process) • D/L applications for trajectory data exchange • New wake vortex separations based on time• Procedures for delegation ATC/Pilots• Time based separations

• Area for particular attention• UAS (sense & avoid: new rules & technologies)

Will require new ICAO and RTCA/EUROCAE materialWill require new ICAO and RTCA/EUROCAE material

Also need short-medium term solutions, e.g. for data comm

Also need short-medium term solutions, e.g. for data comm

Page 9: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

9

Global Perspective

• ICAO “Aviation System Block Upgrades”: sets of clear operational improvements with• air & ground procedures technologies • regulatory requirements & approval process • business case• carrying out of validation trials

• Basis for new Global AN Plan to be endorsed at AN-Conf/12 in 2012

• Alignment with SESAR ensured• Enables coordination with other programmes

Global traffic development spreads the same issues globally

Cooperation early in life cycle is more efficient

Page 10: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

10

NextGen Bio

• Enacted in 2003 by President Bush and Congress• Address congestion and gridlock costing $22Bn annually• Transformation of the NAS

• Joint Planning and Development Office• Plan and co-ordinate partnerships• Public and Private

• Programmatic approach• Stepped implementation 2012 - 2025

• ADS-B • Collaborative ATM Technology - CATMT • Data Communications • NextGen Network Enabled Weather – NNEW• National Airspace System Voice System - NVS• System Wide Information Management - SWIM

Page 11: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

11

SESAR and NextGen Cross Enrichments

• Similarities• Alignment with the ICAO Global ATM concept• Trajectory Management central to operations• Technology• Data communication

• DifferencesSESAR

• Deployment horizons (IOC)• Airport airside operations incl.

turn-around (gate-to-gate)• SWIM – distributed information• Collaborative planning/execution,

user firmly in the loop (user owns the flight trajectory)

• Single reference business/ mission flight trajectory

NextGen• Deployment horizons (IOC)• Airport landside operations incl.

passenger handling (curb-to-curb)• SWIM – centralised information• Collaborative planning/execution,

user firmly in the loop• Weather a major issue• Incl. homeland security

Page 12: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

12

FAA-EUROCONTROL Cooperation: Some Achievements to Date

• Development of guidance material • PBN Seminar given with FAA & ICAO in the various regions

• ICAO reference material, developed in cooperation & jointly maintained by EUROCONTROL & FAA

• Complementary coordinated initiatives on Weather & Flight Exchange models & towards an overarching ATM Information Reference Model (AIRM)

Page 13: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

13

Flightpath 2050 - Europe’s Vision for Aviation Maintaining Global Leadership & Serving Society’s Needs

• 5 Goals• Meeting societal & market needs• Maintaining and extending industrial leadership• Protecting environment and energy supply• Ensuring safety and security• Prioritising research, testing capabilities &

education

• Instruments• (New) Advisory Council for Aeronautics Research in

Europe (ACARE)• Launched at Paris Air Show on 21 June

• SRIA: Strategic Research & Innovation Agenda• To be available in 2012

For ATM:Prepare the post-SESAR

work

For ATM:Prepare the post-SESAR

work

Page 14: ATM Development Within SESAR & NextGen · FAA-EUROCONTROL Cooperation: Some Achievements to Date • Development of guidance material • PBN Seminar given with FAA & ICAO in the

14

Challenges - How to Get There?

• Technical evolution• Multi-facility (ATC, aircraft, airport) consistency• Network-wide effects increase interdependence & sensitivity of

solutions to local situations and perturbations

• Transition

• Convince deciders• Ensure stable commitments

LearningPath

Stability Mixed modes/equipment

SpeedCost GovernanceLast-moverAdvantage

Synchronisation

Financing