Top Banner
ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan
21

ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

Mar 28, 2015

Download

Documents

Blake Harding
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

ATLAS: Hardware and Upgrades

Liverpool, HEP Christmas Meeting

17 December 2007

Paul Dervan

Page 2: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

Contents

SCT ENDCAP-C past year Ashley, Katharine, Dave, George, Helen, Joost, Neil J, Neil T, Nick, Paul D, Paul P, Phil, Sergey, Scott, Tim + many SCT colleagues

General ATLAS

Super-LHC upgrade activitiesAshley, Gianluigi, Joost, Neil, Peter, Phil, Tony +others joining

Page 3: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

EC-C assembled in Liverpool.Last Year:• Transported to CERN• Tested and Repaired This year:• Installation into ATLAS• Service connections• Warm tests• Cooling installation

• 4 barrels• 2 endcaps with 9 disks each • ~60 m2 of silicon strip detectors• ~4000 modules• 6.3 Million channels• |η| < 2.5

Sct and Inner Detector

Page 4: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

ID-C Status at end of 2006

• SCT integrated into the TRT

• Models tested OK

• Cosmic ray tests carried out

• Waiting for installation into

ATLAS

Page 5: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

SCT EC Installation• EC-C was moved to pit on June 18th Plan

was to move the week before (Friday)

but due to rain postponed to Monday

• EC-C stayed the weekend in the

unloading dock of SR1

• The transport went very smoothly

• Only one crane was necessary

to move EC from SR1 to SCX1

EC-C arrived in the pit around 11am

Accelerations measured < 0.2g

Page 6: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

SCT EC Installation• Alignment of EC-C (Tuesday morning)

and insertion was completed by 19h

• EC-C was positioned ~3.5mm

away from its nominal position

Page 7: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

SCT EC In Position

Page 8: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

• Phase 1 – Pre-Installation – June - July 2007 – (Complete)• Phase 2 – LMTs (Connect & DC test) – August 2007 – (Complete)• Phase 3 – Fibres (Connect & DwD) – August 2007 – (Complete)• Phase 4 – Cooling installation – November - December 2007• Phase 5 – Power modules with cooling – January 2007 Sign off the End-cap (Pixel can now connect-up)• Phase 6 – Full module readout with cooling – March 2007

SCT Installation and Commissioning

Page 9: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

The rest of the ID

• Has been painful because of a short to LAr ground (insulation failure of the sliding rails).

May 24

May 29

Page 10: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

June 25 - June 28 2007

Pixel Installation

Page 11: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

VA-A

VA-C

Ion pump

Both Calorimeter beam pipes are now in position and connected to the Be pipe

Calorimeter beam pipe installation

Page 12: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

22ndnd June 07 June 07

End-cap Toroids installation

Page 13: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

ATLAS Inner Detector Upgrade

• To keep ATLAS running more than 10 years the inner tracker has to be replaced (Current tracker designed to survive up to 730 fb-1 ≈ 10Mrad in strip detectors)

• For the luminosity-upgrade (SLHC) the new tracker will have to cope with >3000 fb-1– much higher occupancy levels

– much higher dose rates 1016neq/cm2 pixel b-layer

9×1014neq/cm2 middle layers

5×1014neq/cm2 outer layers

• For a new tracker by 2015, major international R&D programme already underway. (Current ATLAS Inner Detector TDR CERN/LHCC/97-16 is now 10 years old)

Page 14: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

Pixels:Short (2.4 cm) -strips (stereo layers):Long (9.6 cm) -strips (stereo layers):

r=5cm, 12cm, 18cm, 27cmr=38cm, 49cm, 60cmr=75cm, 95cm

z=±40cmz=±100cmz=±190cm

New SLHC Layout

Including disks this leads to:

Pixels: 5 m2, ~300,000,000 channels

Short strips: 60 m2, ~28,000,000 channels

Long strips: 100 m2, ~15,000,000 channels

Page 15: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

WP3: Sensors

1 01 4

1 01 5

1 01 6

0

5 0 0 0

1 0 0 0 0

1 5 0 0 0

2 0 0 0 0

2 5 0 0 0

# e

lec

tro

ns

1 M e V n f lu e n c e [c m-2

]

1 01 4

1 01 5

1 01 6

0

5 0 0 0

1 0 0 0 0

1 5 0 0 0

2 0 0 0 0

2 5 0 0 0

# e

lec

tro

ns

F lu e n c e [c m-2

]

p F Z S i 2 8 0 m ; 2 5 n s ; -3 0 ° C [1 ]

p -M C z S i 3 0 0 m ;0 .2 -2 .5 s ; -3 0 ° C [2 ]

n E P I S i 7 5 m ; 2 5 n s ; -3 0 ° C [3 ]

n E P I S i 1 5 0 m ; 2 5 n s ; -3 0 °C [3 ]

s C V D D ia m 7 7 0 m ; 2 5 n s ; + 2 0 °C [4 ]

p C V D D ia m 3 0 0 m ; 2 5 n s ; + 2 0 °C [4 ]

n E P I S iC 5 5 m ; 2 .5 s ; + 2 0 °C [5 ]

3 D F Z S i 2 3 5 m [6 ]

Comparison of measured collected charge on different radiation-hard materials and devices (M. Bruzzi, H. F.-W. Sadrozinski, A. Seiden, NIM A 579 (2007) 754–761)

Sign

al (

elec

tron

s)

Signal vs Dose +

++

Latest n-in-p datafrom Liverpool (1000V) Micron

Semiconductor UK Ltd

Liverpool are pushing the n-in-p sensor designs (Gianluigi)

Page 16: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

WP3: Irradiated Microstrip CCE(V)

140mm and 300mm thickness(Micron)Doses up to 1016neq/cm2 (Ljubljana reactor neutrons )

Short microstrip layers to withstand 9×1014neq/cm2 (50% neutrons) at 500V with 750e- noise, → can expect S/N ≈12

Tony Affolder, Gianluigi Case

1.6E15 cm-2

0

5

10

15

20

300 500 700 900 1100

Bias Voltage (V)

Co

llecte

d C

harg

e (

ke-)

300 microns

140 microns

3.0E15 cm-2

0

5

10

15

20

300 500 700 900 1100Bias Voltage (V)

Co

llecte

d C

harg

e (

ke

- )

300 microns

140 microns

1.0E16 cm-2

0.0

5.0

10.0

15.0

20.0

300 500 700 900 1100Bias Voltage (V)

Co

llecte

d C

harg

e (

ke

-)300 microns

140 microns

5.0E14 cm-2

0

2

4

6

8

10

12

14

16

18

20

100 150 200 250 300 350 400 450 500 550

Bias Voltage (V)

Co

lle

cte

d C

ha

rg

e (

ke

-)

300 microns140 microns

Page 17: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

WP4: SLHC Hybrid conceptual layout

Digital I/O

Power/Aux Bus

99mm

99mm

MCC

Power Regulation

24mm

74mm

SE

NS

OR

Readout ASICs

Ashley (provisional)

• 2 ‘fingers’ per hybrid populated with 2 columns of 10 ASICs (40 ASICs total)

• Electrically one item?

• 4 Cu Layers with Kapton dielectric (example from LHCb VELO)

• Working closely with chip designers

• Working on how to layout the redundancy (various ways)

HV

MCC: Module Controller Chip

Page 18: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

WP7: Single-sided Module Concept

Page 19: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

Results Single-sided 1W/sensor Cooling -30 @8000W/m2

1W/Sensor0.38W/ChipMax Chip temp: -10CMax Si Temp: -19.46CTemp Gradient over Si: 1.17C

Page 20: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

Thermal Runaway - Temperature

NB. Conductivity of air = 0 for ease of comparison!

SSM Thermal Runaway(25mm fingers, 0.5mm thk TPG, 0.75mm thk C-C bridge, 2mm dia. tube, 8000W/mK)

No Step, Eg=1.1

0.0

1.0

2.0

3.0

4.0

5.0

6.0

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5

Power Density (mW/mm2 @ 0 deg C)

To

tal

Sil

ico

n P

ow

er

(W)

0.25 W per ASIC

0.30 W per ASIC

0.35 W per ASIC

0.40 W per ASIC

ANSYS - 0.38

Page 21: ATLAS: Hardware and Upgrades Liverpool, HEP Christmas Meeting 17 December 2007 Paul Dervan.

Summary

• SCT: SCT End-cap C installed in ATLAS Awaiting final tests with the cooling

• Upgrade: Liverpool is involved (and leading) in quite a few areas The Upgrade effect is increasing all the time

Merry Christmas