Page 1: AstroGrid presentation to GSC 12 th Feb, 2003 London.

AstroGrid presentation to GSC

12th Feb, 2003London

Page 2: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Introduction

Project statusGSC Issues & ResolutionIteration 01 summaryUpdated project plan

Page 3: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Project Status

Addressed GSC concernsStarted Iteration 01Developed descoped plan

First public demo software International liaisonRecruitmentTraining

Page 4: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Demo software

Joint work with AVO AstroGrid contribution : ACE

remote on-the-fly source extraction

Press demo JBO Jan 20 several other demos since small pool of beta-testers

Several other internal tech demos web service and grid service try-outs

Page 5: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Recruitment and Training

Five recruitments TechLead + 1 in place +3 interviewing this week

Substantial training programme

advanced Java courses OGSA-DAI adopters course

Page 6: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

International Liaison

IVOA meeting Seattle Jan 9-10AstroGrid leading Registry/IAU demosFP6 planning Exchange visits with Aus-VO aim at niches within AstroGrid

architecture

Page 7: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Page 8: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

GSC/AGOC concerns

Risk assessmentDeliverables and MilestonesTechnology choicesArchitectureUser engagement

New Oversight page for AGOC & GSC:http://oversight.astrogrid.org/

Page 9: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Risk assessment

Action has been taken to mitigate risk as indicated in Comment

Page 10: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Milestones: System Functionality

each qtr is milestone deliverables each qtrfresh WPs each qtr Document AGOCRequested similar for scientific milestonesPosted on web site

Page 11: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Milestones: Scientific

Page 12: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Project Monitoring

Milestone Plan and Risk Plan in placeReport against both each AGOCPlan allowed to evolve but only under control

Page 13: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Technology choicesmade before October

design : UML using TogetherSoft ControlCenter development language : Java SOAP web services, then OGSA IAA modelled on Globus CAS own (to standards) Registry

made since October DBMS : DB2 source control : CVS IDE/build : Eclipse/Ant Java libraries: Apache Portal : Apache Cocoon

all crucial choices made

Page 14: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

ArchitectureDevelopment Process: Science problems Science use cases, sequence diagrams Component model (revised after last GSC) Component design features

see focus meeting, 22-Nov-2002 System use cases (& seq diags)

by end of Iteration-01 per-Iteration:

Detailed system design

We are here

Page 15: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Components

Page 16: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

AGOC concerns

early user engagement first new sw in use already Sci.Advisory.Comm being formed beta-pool for June releases

science milestones under development

Page 17: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Page 18: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Work Plan ProcessTSP meets before each quarter first meeting Jan 6th

Agrees Work Packages for that quarter

targets, timescales, methods work group leader and team

Plan delivered before quarter start

Page 19: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Iteration 01: Jan-Mar 2003Portal Initial front end Portlet: structure Registry query portlet

Registry Schema & storage (xml, db?) WS: satisfy simple query for datasets

Grid Implement and test OGSA and OGSA-DAI Grid-based demo with Aus-VO

Cube cutout and interactive visualisation

Architecture refinement

Page 20: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Page 21: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Updated planFunctionality descopedRevised effort estimatesRevised budgetDeployment planRevised Milestone Plan

Page 22: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Component DescopeIn:

Portal Registry (simple) Community server AstroPass Workflow Process control MySpace Data centre Dataset access Tools (wrap existing)

Sextractor, IRAF, AIPS, Solarsoft, …

Out: Ontology-based

Registry Custom tools Server-based

visualisation Parsed AQL

Page 23: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Revised Estimates

Page 24: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Budget summary

Page 25: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Budget LinesTravel Calc: (10*£6K + 13*£2.5K) * 2 years Less per person than Phase A Based on actual expenditure in 2002

Outsourcing Consultancy (eg database tuning) Customisation

Existing tools web/grid services Adapt utilities for portlet use (workflow?) Adapt client tools for server-side (viz?)

Page 26: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Staff Deploymentend-2002FTEs

2003 hires2

TotalFTEs

Leicester 3.5 4.0 7.5

Cambridge 3.0 1.0 4.0

Edinburgh 1 3.0 1.0 4.0

RAL 1.5 0.7 2.2

MSSL 0.6 1.0 1.6

JBO 1 1.0 1.0 2.0

QUB 0.0 1.0 1.0

12.6 9.7 22.3

of whichnon-dev3

TotalPeople

2.5 8

1.0 4

5

4

2

1.0 1

1

4.5 25

1 At Edinburgh, 2 people are funded by AVO and 0.5 by NeSC

At JBO, 1 is funded by AVO3 Includes PM, PS, web developer, AVO interoperability RA

2 Includes Tech Lead, hired Nov-2002 + current round (3.7) + proposed (5.0)

Page 27: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Planned task deploymentLeics Cam Edin RAL MSS

LJBO QUB

Portal X X X

Registry X X

Community X X X

AstroPass X X

Workflow X X X X

Proc control X X X

MySpace X X X

Data centre X X

Data access X X

Page 28: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Page 29: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

Next StepsGSC : Approve de-scoped planGSC : Approve five further developersGSC : Approve 3.7M total budgetGSC : Approve basis for monitoring projectAG : hit Q1 targetsAG : hit Q2 targets

Page 30: AstroGrid presentation to GSC 12 th Feb, 2003 London.

12.02.2003 AstroGrid/GSC Presentation

ToDo: by Jun-2003First working portal, registryOGSA integrationData centre briefingSet up Science Advisory Group (AGSAG?)clarify post-AstroGrid optionsPrepare demos for IAU:

Iteration 02 s/w: Portal & data access Aus-VO: customisation of AstroGrid codebase

OGSA/OGSA-DAI demo: joint AstroGrid/Aus-VO

Scientific Roadshow (for post-IAU)IVOA standards (Registry, Data Access, …)