AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Dec 22, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

AstroGridGroup 7:

Teemu Toivola Tero Viitala

Page 2: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Problem

• several separate databases

• no common interface between databases

• difficulties of joining related data

• limited observatory time resources

• lack of user skills

Page 3: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Shocks seen in the X-ray

Heavy elementsseen in the optical

Dust seen in the IR

Relativistic electrons seen in the radio

Page 4: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Goals

• a working datagrid for key UK databases

• uniform archive query and datamining interface

• the ability to browse simultaneously multiple datasets

• a set of tools for on-line database analysis and exploration

Page 5: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Members• consortium members

– School of Computer Science, Queens University of Belfast (QUB)

– Institute of Astronomy, University of Cambridge

– Institute for Astronomy, University of Edinburgh

– Dept of Physics and Astronomy, University of Leicester

– Mullard Space Science Laboratory, University of London (MSSL)

– Jodrell Bank Observatory, University of Manchester (JBO)

– Space Data Division, Rutherford Appleton Laboratory (RAL)

• financed by PPARC

• executive board AGLI

• day-to-day management

Page 6: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Project content

• Phase A– architecture definition– begin: 1.9.2001– end: 31.12.2002

• Phase B– implementation– begin: 1.1.2003– end: 31.12.2004

Page 7: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Phase A

• WP-A0 Project Management & Infrastructure

• WP-A1 Science Requirements• WP-A2 - A4 Technology assessment• WP-A5 Pilot programs• WP-A6 Support for future databases• WP-A7 Researching existing technologies• WP-A8 Phase B plan• WP-A9 User Interface

Page 8: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Phase B

• Iterations 1 & 2 (June 2003)– basic engine room components– preliminary interface and contents– OGSI experiments

• Iterations 3 & 4 (December 2003)– engine room continued– interface and contents– international program

Page 9: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Phase B• Iteration 5 & 6 (June 2004)

– datamining – workflow– visualisation – OGSA Integration (demo)

• Iteration 7 & 8 (December 2004) – datamining– query Estimator/Optimizer– resource Registry– visualisation– OGSA Integration

Page 10: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Progress

Page 11: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

Difficulties

• social– organization– common procedures

• technical– lack of standards– uncertainty of future network bandwidth

• financial– lack of funding

Page 12: AstroGrid Group 7: Teemu Toivola Tero Viitala. Problem several separate databases no common interface between databases difficulties of joining related.

"So Why No Integration Tests? So here we are 2 weeks from code freeze, and still the only bug reports I have on integration testing are from the It03 demo."

"I get the feeling people are doing design -> write code -> reflect -> refactor, document -> test. This is a waterfall model and *not appropriate* (except over a day or two!). We should *not* be designing for next year. We have to get out of the waterfall and into coding!"

Risk P I Comment

Grid software is late or non-functional

H VH

will design for this eventuality so that grid services can be replaced by simple web services