JABATAN KEJURUTERAAN AWAMPOLITEKNIK SULTAN ABDUL HALIM MUADZAM
SHAH06000 JITRA KEDAHCQ602 COMPUTER AIDED QUANTITY SURVEYING
PRACTICAL 4LECTURER : PN. NORAINI BINTI MOHD NOORBILMETRICNAME
103DUB12F1026NURNADBILAH BINTI MOHD
203DUB12F1052MUHAMMAD LOKMAN BIN SUHAIRIN
303DUB12F1060NURUL SHAFIZA HANA BINTI JAMALUDIN
403DUB12F1066MUHAMAD AZIQDIN BIN SAHARUDIN
503DUB12F1080JUSIYANA BINTI JUNAIDI
603DUB12F1092SITI SARAH BINTI MOHD POWDZI
Criteria0.51.01.52.02.53.03.54.0Scores
RawWeightTotal
1TechnicalProject does not run satisfactorily. There are too
many technical problems to view the project.Project runs minimally.
There are many technical problems when viewing the project.Project
runs adequately with minor technical problems. Project runs
perfectly with no technical problems. For example, there are no
error messages, all sound, video, or other files are found. x 1
2NavigationButtons or navigational tools are absent or
confusing. No buttons and navigational tools work.Minimal
difficulty experienced while navigating through project. Few
difficulties experienced while navigating through project. Users
can progress intuitively throughout entire project in a logical
path to find information. All buttons and navigational tools work.x
1
3Spelling & GrammarProject has multiple errors in spelling
and/or grammar. (Four or more errors)Project minimally honors rules
of spelling and/or grammar. (Three or less errors)Project
adequately honors most rules of spelling and/or grammar. (Two or
less errors)Project honors all rules of spelling and/or grammar.x
1
4CompletionProject is incomplete and contains many unfinished
elements.Project is incomplete and contains some unfinished
elements.Project is incomplete and contains several unfinished
elements.Project is completely finished.x 1
5Screen Design Screens are either barren and stark or confusing
and cluttered. Exaggerated emphasis on graphics and special effects
weakens the message and interferes with the communication of
content and ideas.Multimedia elements accompany content but there
is little sign of mutual reinforcement. There is no attention to
visual design criteria such as balance, proportion, harmony and
restraint. There is some tendency toward random use of graphical
elements that do not reinforce message.Multimedia elements and
content combine to adequately deliver a high impact message with
the elements and words reinforcing each other.The combination of
multimedia elements and content takes communication to a superior
level. There is clear attention given to balance, proportion,
harmony, and restraint. The synergy reaches the intended audience
with style and pizzazz.x 1
6Citing ResourcesNo sources are properly cited within the
project according to MLA style. ***Few sources are properly cited
within the project according to MLA style. Most sources are
properly cited within the project according to MLA style.All
sources are properly cited within the project according to MLA
style.x 1
7OriginalityThe work is a minimal collection or rehash of other
people's ideas, products, images and inventions. There is no
evidence of new thought.The work is an extensive collection and
rehash of other people's ideas, products, images and inventions.
There is little evidence of new thought or inventiveness.The
project shows some evidence of originality and inventiveness. While
based on an extensive collection of other people's ideas, products,
images and inventions, the work extends beyond that collection to
offer new insights.The project shows significant evidence of
originality and inventiveness. The majority of the content and many
of the ideas are fresh, original, and inventive.x 2
1. Describe the computer usage in preparing work programme.
Most construction contracts require the contractor to produce a
program of works. This can be a non-contractual reference point for
how work will be carried out or it can impose obligations to
deliver the works in a certain way and by certain dates.If the
program of works is included in the list of contract documents it
will become binding on the parties. There are benefits and risks
associated with doing that.
Computerized planning software has become the best alternative
for any agency in formulating their plans. In the construction
industry using planning software has been prioritized and received
support from various government agencies such as PWD, JPS and so
on. Since this technology is still new among local contractors,
contractors had to get talent related to the realization of their
work plans. By using planning software, the owners, contractors and
consultants also able to control and implement a project
(construction) with a more effective and efficient.
Computer usage in prepare work program is flexible features help
the work more efficiently. For example, if forgot to account for
any aspect of a job (like extra labor required for custom door
jambs), simply tell the system to remember that item for all future
jobs. Every future job benefits from everything that has learned
from previous jobs. Using computer can be fast platform for
production and material planning. Operations professionals need to
apply logic and rules that fit the business.
2. Explain the computer application in preparing work
programme.PRIMAVERA SOFTWAREPrimavera Systems is the brand name
under which a range of software packages that collectively form a
comprehensive enterprise project portfolio management (EPPM)
solution are marketed. Primavera was launched in 1983 by Primavera
Systems Inc. and was acquired by Oracle Corporation in
2008.Primavera software includes project management, collaboration
and control capabilities and integrates with other enterprise
software such as Oracle or SAPs ERP systems.On 8 April 2013 Oracle
Corporation announced the release of version 8.4 of Primavera P6
Enterprise Project Portfolio Management. This version was said to
enhance and extend previous work, with improved reporting, user
experience and application integrations. This version incorporated
material from Oracle's acquisitions of Skire and Instantis in
2012.In 2012, Primavera P6 EPPM, upgrade Release 8.2, added
capabilities for governance, project-team participation, and
project visibility. Mobile PPM was introduced through Primaveras P6
Team Member for iPhone and Team Member Web Interface, to streamline
communications between project team members in the field and in the
office. In addition, Primavera P6 Analytics Release 2.0 gained new
enterprise-reporting tools and dashboards for monitoring and
analysing performance data, including geospatial analysis.
Organizations could also investigate comparative trends and
cause-and-effect in multiple projects with Primavera Contract
Management Release 14 as it now includes the report-writing
capabilities of Oracle Business Intelligence Publisher.HOW TO USE
PRIMAVERA SOFTWAREThe installation process guides you through
setting up the module on your computer. Refer to the Administrators
Guide for detailed instructions.Start the Project Management module
Click Start, then choose Programs, Primavera, Project Management.
Log in Before using the module, you must enter a valid login name
and password. If you do not know your login name and/or password,
see your system administrator.
Use the Welcome dialog box to create a new project, open an
existing project or the last open project, or open global data
only.
Mark the Do Not Show This Window Again checkbox if you do not
want the Welcome dialog box to appear each time you open the
module. The last project used at start up automatically opens. To
turn this option back on, choose Edit, User Preferences, then click
the Application tab and mark the Show the Welcome Dialog at Start
up checkbox.Select a portfolio Select a project portfolio to view a
group of projects that have a common characteristic. A portfolio
can contain any number of projects. Choose File, Select Project
Portfolio to select a portfolio.
Modify a portfolioUse the Project Portfolios dialog box to view
and change general information about the selected portfolio. You
can also add and delete portfolios. Choose Enterprise, Project
Portfolios to set up project portfolios.The top portion of the
Project Portfolios dialog box contains information about all
available portfolios, and the lower portion is divided into two
tabs that display specific information about a selected
portfolio.
Use the Set Language dialog box to select the language in which
to display the information in menus, dialog boxes, and messages.
Select a Language To display the Set Language dialog box, choose
Tools, Set Language.
The WorkspaceWhen you first open a project, the Home workspace
displays the main functions available in the module. For example,
click Activities to focus on activity data and customize layouts.
The workspace for each main window consists of a menu bar,
navigation bar, directory bar, toolbar, and command bar.
Display the directory bar Use the directory to display windows
quickly. Choose View, Toolbars, Directory, to display or hide the
directory bar. To display or hide directory bar button text, choose
View, Toolbars, Directory Button Text.
Display the navigation bar Use the navigation bar to move
between open windows. You can also use the navigation bar to
display and hide the directory and open Help for the current window
or dialog box. The navigation bar is displayed or hidden when you
choose View, Toolbars, Navigation Bar. To display or hide
navigation bar button text, choose View, Toolbars, Navigation Bar
Button Text
.
Use shortcut menus Instead of using standard menus and buttons,
you can also use the right mouse button to access frequently used
commands. To use shortcut menus, right-click an element or the
white space in any window, then choose the appropriate
command.Select multiple items To select a group of items that are
next to each other in the display, hold down the Shift key, click
the first item in the group, then click the last item in the group.
To select multiple items that are not next to each other in the
display, hold down the Ctrl key, then click each item you want to
select.
Layout
In the sample layout above, the top part of the window shows
activity data in a Gantt Chart, while the lower part displays the
Activity Details.Customizing DisplaysMost windows and dialog boxes
include a Display or Layout Options bar at the top of the screen
that contains commands that enable you to customize the current
display. Click this bar to display a menu of the commands available
for that window or dialog box. You can also access many of these
commands from the View menu.
You can switch your display from a hierarchical view to a list
view when displaying information, such as resources and the work
breakdown structure that is displayed in different levels. To
switch a display from hierarchy to list view, click the leftmost
column label that appears in the display.
After you change a display to list view, you can also sort the
displayed information by clicking any column label.Sample LayoutThe
sample database included with the module provides standard layouts
that you can use with your own projects.To open a sample layout,
first open one of the projects from the sample database or your own
database in the Activities window then choose View, Layout,
Open.
Using WizardsWizards are a great way to speed up your work. They
quickly guide you through repetitive steps, doing most of the work
for you.The module contains wizards for creating new projects,
adding activities, creating resources, and building reports.
You can specify whether you want wizards to help you add
activities and resources. Other wizards are also available to
create new project, export and import project data, and define
administrative preferences. Wizards are discussed in more detail in
the appropriate chapters of this manual or in the Help.Set wizard
options Choose Edit, User Preferences. Click the Assistance
tab.
Navigate wizards To move between different wizard windows, click
Prev or Next. To save your changes and close the wizard at any
time, click Finish. To close the wizard without saving your
changes, click Cancel.