Assigning Setup Times to Resources_SPD

May 30, 2018

Download

Documents

Larry Sherrod
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/14/2019 Assigning Setup Times to Resources_SPD

    1/29

    System Process DocumentAssigning Setup Times to Resources

    Department

    Responsibility/Role

    File Name 27759748.docRevision

    Document Generation Date 18/01/2010 09:35:00

    Date Modified 1/18/2010 09:35:00 AM

    Last Changed by

    Status

    Assigning Setup Times to Resources

    Trigger:

    Concept

    You can create a performance model for machine and resource setups to include time from one

    setup to another, including the time required to perform the work. If one of your scheduling

    objectives is to sequence or group jobs based on their required setup, you can also include a

    penalty factor in the scheduling calculation.

    Any two setup types within a resource can have a transition time and a transition penalty, which

    means that the scheduler needs the specified time for transition from the former setup to the latter.

    In this topic, you will assign setup times to resources.

    Required Field(s) Comments

    Output - Result(s) Comments

    Additional Information

    Last changed on: 1/18/2010 09:35:00 AM Page 1

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    2/29

    System Process DocumentAssigning Setup Times to Resources

    Procedure

    Step Action

    1. Begin by navigating to the Resources page.

    Click the vertical scrollbar.

    Page 2 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    3/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    2. Click the Manufacturing and Distribution Manager link.

    Last changed on: 1/18/2010 09:35:00 AM Page 3

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    4/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    3. Click the vertical scrollbar.

    Step Action

    4. Click the Resources link.

    Page 4 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    5/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    5. Use the Organizations page to select your organization.

    Last changed on: 1/18/2010 09:35:00 AM Page 5

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    6/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    6. Click the M1 Seattle Manufacturing list item.

    Step Action

    7. Click the OKbutton.

    orPress [Alt+O].

    Page 6 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    7/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    8. Use the Resources page to find the resource that you had already defined.

    Last changed on: 1/18/2010 09:35:00 AM Page 7

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    8/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    9. Click in the Resource field.

    Step Action

    10. Press [F11].

    Page 8 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    9/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    11. Enter the desired information into the Resource field. Enter "CDMOLD".

    Last changed on: 1/18/2010 09:35:00 AM Page 9

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    10/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    12. Press [Ctrl+F11].

    Step Action

    13. Click the Setups button.

    Page 10 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    11/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    14. Use the Setups page to select the setups for which you want to define changeovers.

    Use the arrow button to move the setup from the Available column to the Selectedcolumn.

    Use the double arrow button to move all setups from the Available column to the

    Selected column.

    Last changed on: 1/18/2010 09:35:00 AM Page 11

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    12/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    15. Click the CM66711 list item.

    Page 12 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    13/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    16. Click the > button.

    Step Action

    17. Click the CM66712 list item.

    Last changed on: 1/18/2010 09:35:00 AM Page 13

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    14/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    18. Click the > button.

    Page 14 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    15/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    19. Click the CM66713 list item.

    Step Action

    20. Click the > button.

    Last changed on: 1/18/2010 09:35:00 AM Page 15

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    16/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    21. Click the Save button.

    Page 16 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    17/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    22. Click the Changeovers button.

    orPress [Alt+C].

    Step Action23. Use the Changeover Times page to enter the time it will take to perform the

    changeover and assign a penalty to the changeover if there is one.

    Last changed on: 1/18/2010 09:35:00 AM Page 17

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    18/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    24. Click the Select button.

    orPress [Alt+S].

    Page 18 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    19/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    25. Use the Select Setup Types page to select the setup from the list of available setup

    types.

    Step Action

    26. Click the >> button.

    Last changed on: 1/18/2010 09:35:00 AM Page 19

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    20/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    27. Click the OKbutton.

    orPress [Alt+O].

    Page 20 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    21/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    28. Click the Select button.

    orPress [Alt+c].

    Step Action

    29. Click the >> button.

    Last changed on: 1/18/2010 09:35:00 AM Page 21

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    22/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    30. Click the OKbutton.

    orPress [Alt+O].

    Page 22 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    23/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    31. Use the Refresh List of Changeovers button to automatically generate a list of all

    potential changeover combinations in the From and To fields.

    Step Action

    32. Click the Refresh List of Changeovers button.

    orPress [Alt+R].

    Last changed on: 1/18/2010 09:35:00 AM Page 23

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    24/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    33. Click the Update option.

    Page 24 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    25/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    34. Click the Update option.

    Step Action

    35. Click in the Duration field.

    Last changed on: 1/18/2010 09:35:00 AM Page 25

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    26/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    36. Enter the desired information into the Duration field. Enter "2".

    Page 26 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    27/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    37. Click the Update option.

    Step Action

    38. Click in the Duration field.

    Last changed on: 1/18/2010 09:35:00 AM Page 27

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    28/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    39. Enter the desired information into the Duration field. Enter "2".

    Page 28 Last changed on: 1/18/2010 09:35:00 AM

  • 8/14/2019 Assigning Setup Times to Resources_SPD

    29/29

    System Process DocumentAssigning Setup Times to Resources

    Step Action

    40. Click the Save button.

    Step Action

    41. You have completed the Assigning Setup Times to Resources procedure.

    End of Procedure.