Top Banner
Asset Integrity Management To Enhance Process Safety S.K.Bagchi Addl. Director (Asset Integrity) Oil Industry Safety Directorate
34

Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

Aug 19, 2018

Download

Documents

nguyenphuc
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

Asset Integrity Management

To

Enhance Process Safety

S.K.Bagchi

Addl. Director (Asset Integrity)

Oil Industry Safety Directorate

Page 2: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

SIZE OF THE HYDROCARBON INDUSTRY IN INDIA

Total installed refining capacity : ~ 194 MMTPA

Oil production capacity : ~ 38 MMTPA

Gas production capacity : ~ 130 MMSCMD

Gas Pipeline : ~ 14,000 km

Volume of POL handling : ~ 145 MMTPA

Crude & Product pipeline : ~ 26,000 km

Page 3: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

ASSETS OF PROCESS PLANTS ARE INHERENTLY

HAZARD PRONE

Assets of process plants are inherently hazard prone

due to the following reasons:

• Large inventory of petroleum products are highly

inflammable;

• Processing at high pressure, temperature;

• Using hazardous chemicals;

• High complexity & process integration;

• Loss of containment results in Fire/Explosion; and,

• History of major incidents in India & abroad

Page 4: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Date of accident – April 2, 2010

Catastrophic Rupture of Heat Exchanger

Seven Fatalities

Page 5: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Post-Incident View of D/E/F NHT Heat Exchanger Bank

The naphtha and hydrogen likely auto ignited upon release into the

atmosphere, creating a large fireball.

Page 6: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

The Incident

• Catastrophic Rupture of Heat Exchanger in Catalytic Reformer / Naphtha Hydrotreater Unit.

• Workers were in the final stage of start up activities of A/B/C bank of HE after cleaning. The D/E/F HE remained in service during this operation.

• E exchanger in the middle of D/E/F bank catastrophically ruptured.

• Seven fatalities (1- shift supervisor, 6- operators)

• Highly flammable hydrogen and naphtha at more than 500 deg. F released from the ruptured HE

• The naphtha and hydrogen auto ignited upon release into atmosphere.

Page 7: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Key Findings

• The CS HE shell failed due to High Temperature Hydrogen Attack

(HTHA).

• API 941- Nelson curve: Cr-Mo steel & SS better & safe material than

CS

• The welds of exchanger shell were not post weld heat treated.

• Rupture took place in the unclad portion of pressure containing shell.

• Tesoro did not monitor actual operating conditions of the B and E

exchangers

• Inspection for HTHA is very difficult. It may be microscopic and may

be present in small localised area. Specific technique and skill of the

inspector is required. This is a difficult inspection challenge.

Page 8: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Process Flow of NHT Unit

Page 9: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Example of Fouling Deposits on the Inside of Heat Exchanger

Tubes. Fouling greatly reduces heat transfer between the shell-

side and tube-side process fluids.

Page 10: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Figure- Fabrication layout of the B and E heat Exchangers

Page 11: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Figure -Circumferential Weld Damage in the B Heat Exchanger.

Page 12: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

TESRO ANACORTES REFINERY

Lesson Learnt:

• Inherently safe material (Cr-Mo steel & SS) could have prevented the

Heat Exchanger shell rupture. (Design)

• Monitoring of actual operating conditions of the B and E exchangers

should have been done. (Production)

• HTHA was not identified by Inspection. (Inspection)

• Repair / replacement of damaged shell of heat exchanger due to

HTHA was not carried out. (Maintenance)

• Difficult inspection challenge to identify HTHA (Inspection)

Page 13: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

ASSET INTEGRITY

Page 14: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

ASSET INTEGRITY MANAGEMENT SYSTEM

Key components:

• Design, fabricate and install all facilities and equipment in

accordance with applicable industry codes and recognised

best practices.

• Operate facilities and equipment within design tolerances

and within the safe operating envelope.

• Routinely inspect and maintain equipment in accordance

with industry codes and recognised practices, including

manufacturer recommendations where appropriate.

• Analyse equipment failures to determine their cause.

Page 15: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

ASSET INTEGRITY MANAGEMENT SYSTEM

• Conduct all related tasks using trained and qualified

individuals who use approved procedure and complete the

tasks as scheduled.

• Use high quality parts and materials, including a system for

positive material identification (PMI).

• Maintain an equipment archive with up to date equipment

history.

• Safely dismantle and dispose of the facility at the end of its

life cycle.

A systematic implementation of the above will help in

preventing accidents.

Page 16: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

COMMON CAUSES OF INCIDENTS

Maintenance, Inspection Related-

• Not adhering to PMS schedule

• Delay in handing equipment for Inspection

• Overstretching equipment run

• Postponement of Tank M&I & Annual Turnaround schedule

• Mechanical seal failures

• Improper maintenance practices

• Impaired safety critical items for long time

• Integrity of flame proof fittings not maintained

• Not undertaking proper inspection upon repair

Page 17: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

RISK BASED INSPECTION

What is RBI-

• RBI is a method for using Risk as a basis for prioritising and managing the efforts of an inspection program.

• In an operating plant, a relatively large percentage of the risk is associated with a small percentage of equipment items.

• These potential high-risk components can require greater attention through a revised inspection plan

• RBI permits the shift of Inspection & Maintenance resources to provide a higher level of coverage on the high risk items and an appropriate effort on lower risk equipment.

Page 18: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

PROBABILITY

CONSEQUENCE

RISK

INTERNAL

CORROSION

EXTERNAL

CORROSION CRACKING

& OTHERS

Release of flammable/ Toxic material Release of

excessive pressure

Environment

damage Production

loss

RISK ANALYSIS

Page 19: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

RISK MATRIX

.

Page 20: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

MANAGING ACCEPTABLE RISK

.

Page 21: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

MANAGING ACCEPTABLE RISK

INSPECTION COSTS (level of inspection activities)

R

I S

K

Risk Using RBI

Risk with Typical Inspection Program

Risk Based Inspection

Uninspectable Risk

Page 22: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

THE TRANSITION

.

Page 23: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

RBI PLANNING PROCESS

.

Page 24: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

MULTIDISCIPLINARY TEAM

inspector

corrosion engineer operator

maintenance

process engineer

inspector

corrosion engineer operator

maintenance

process engineer

Page 25: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

Benefits from RBI Implementation

• Optimise Inspection expenditure by focussing on high risk items

and employ most appropriate inspection technique to reduce

operating risk.

• Extension of turn around interval

• Reduction of turn around period as some inspection can be done

on stream.

• Increase inspection efficiency and effectiveness

• Reduce risk exposure and increase safety and reliability of the

plant

Page 26: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

Reliability Centered Maintenance (RCM)

(Best suited for Rotary, Instrument & light

Electrical items)

Page 27: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

Role of RCM

• RCM is a technique for developing a most cost effective PM

program.

• The elimination of counter productive tasks leads to more

effective maintenance.

• RCM creates awareness in Maintenance professionals regarding

six patterns of failures. Maintenance professionals, as such, comes to terms with the

reality of randomness after decades in bathtub.

• An awareness of these facts has led some organisations to

abandon the idea of PM altogether for failures with minor

consequences.

Page 28: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

A

C

D

E

F

B

F Failure is not dependent on age

Page 29: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

RCM Process Overview

STEP-1

RCM process determines the functions and associated performance standards of the assets in its present operating context.

• Output, Thru’put, Quality

• Safety & Environmental Integrity, Quality

STEP-2

RCM process identifies the ways in which the asset can fail to live up to these expectations (failed states).

.

Page 30: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

RCM Process Overview

STEP-3

Then follows FMECA (failure modes and effects criticality analysis), to identify all the events which are reasonably likely to cause each failed state.

STEP-4

RCM process seeks to identify a suitable failure management policy for dealing with each failure mode in the light of its consequences and technical characteristics.

.

Page 31: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

RCM Process Overview

STEP-5

The RCM process provides powerful rules based on RCM decision logic diagram and decides whether any failure management policy is technically appropriate and worth doing.

Failure management policy options include:

– predictive maintenance – preventive maintenance – detective maintenance – change the design or configuration of the system – change the way the system is operated – run-to-failure.

Page 32: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

RCM Process Overview

Failure Management – Basics

• The consequences of failures are far more important than their technical characteristics.

• Proactive maintenance is not to avoid failure per se, but to avoid or at least to reduce the consequence of failure.

• It also encourages us to think more broadly about different ways to manage failure, rather than to concentrate only on failure prevention.

Page 33: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

BENEFITS OF RCM

• Greater safety and environmental integrity

• Improved operating performance(output, product quality and customer service)

• Greater maintenance cost effectiveness

• Longer useful life of expensive items

• A comprehensive data base

• Better team work

.

Page 34: Asset Integrity Management To Enhance Process … Bagchi.pdf · Asset Integrity Management To Enhance Process Safety S.K.Bagchi ... Reformer / Naphtha Hydrotreater Unit. ... Tubes.

THANKS

.