Top Banner
Abek Community Development Program Draft Assessment from Southern Sudan Trip 2009 1
10

Assessment from Southern Sudan Trip 2009

Jul 01, 2015

Download

Business

Assessment from Southern Sudan Trip 2009
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Assessment from Southern Sudan Trip 2009

Abek Community Development Program

Draft Assessment from Southern Sudan Trip 2009

1

Page 2: Assessment from Southern Sudan Trip 2009

Table of Contents1. Photo exhibit of trip pp. 3-82. Tentative Plan pp. 93. Optimization Chart pp. 104. Report pp. 11-165. End Notes pp. 16-176. Exhibits pp. 18-20

1. A- Student Concerns2. B- Student Enrollment3. C- Interviewee List

2

Page 3: Assessment from Southern Sudan Trip 2009

A Community ReturningReturnees traveling north from Juba back to their home communities

Housing for new residents as well as for primary school teachers in Wernyol

3

Page 4: Assessment from Southern Sudan Trip 2009

Preparations in Abek

Healthcare facility set to open in 2010

Wernyol Primary’s one permanent building, constructed by Care Intl in 2007

4

Page 5: Assessment from Southern Sudan Trip 2009

Despite Existing ChallengesSeveral of the classes at Wernyol Primary take place under the trees. Students lack not only facilities, but also supplies and teachers.

And many children in Wernyol do not even make it to school(photo taken while school in session)

5

Page 6: Assessment from Southern Sudan Trip 2009

In Paloi: No Option for Children

Above, fishing for food. Below, minding cattle.

None of these children, all within earshot on a weekday in Paloi, attend school

6

Page 7: Assessment from Southern Sudan Trip 2009

ACDP: Surveying the Situation and Engaging the Community

Meeting with chiefs of Abek Connecting with community members at a town hall meeting 7

Page 8: Assessment from Southern Sudan Trip 2009

Identifying Best Practices and Thinking Through Innovation

New Gates Foundation-funded school in Wungelai

New construction funded by XXXX at a well run school in XXXX

Testing out computers with 8th grade students at Wernyol Primary

8

Page 9: Assessment from Southern Sudan Trip 2009

What’s Next?• Analyze findings of visit to Wernyol• Develop short-term strategy• Begin implementing short-term strategy:

focus on education• Build organization in USA and in Southern

Sudan for the purposes of long-term development of Abek

• Move forward with long-term plans across development projects in coordination with stakeholders and private sector

9

Page 10: Assessment from Southern Sudan Trip 2009

ACDP’s Current and Future Resources &

Capabilities

Greatest Needs of the Abek

Community

Skills & Resources of Existing Collaborators

Optimization2 year

10 year Reasonable,

accessible, and fundraise-able

NGO’s (LWF, NPA, CARE); ACYU;

Chiefs; Teachers

1. Tragedy recovery

2. Immediately deployable solutions

3. Long term development

post-2011

ACDP Planning Methodology

10