DeliveryConstruction 1

Screed UnitScreed Unit

Page 2: Asphalt Delivery Placement

DeliveryConstruction 2

Operational Principles of the Operational Principles of the ScreedScreed

• Self-leveling Concepts

• Screed Response versus Distance

• Forces Acting on a Screed

Page 3: Asphalt Delivery Placement

DeliveryConstruction 3

Self Leveling - Rubber Tired Paver

Rear Drive Tires Front Bogie Wheels

Line of Pull

Page 4: Asphalt Delivery Placement

DeliveryConstruction 4

Self Leveling – Track Paver

Page 5: Asphalt Delivery Placement

DeliveryConstruction 5

1 inch movement at Tow Point

1/8 inch movement at Leading Edge of Screed

Page 6: Asphalt Delivery Placement

DeliveryConstruction 6

Detail of Screed PathDetail of Screed Path

Tow Point PathTow Point PathStep Amplitude = 100%Step Amplitude = 100%

L = Leveling Arm LengthL = Leveling Arm Length

Screed PathScreed PathDirection of PavingDirection of Paving

63%63% 87%87%

6L6L5L5L4L4L3L3L2L2L1L1L00

96%96% 98%98% 99%99%

L

Screed Responses Verses Distance

Page 7: Asphalt Delivery Placement

DeliveryConstruction 7

Main Forces Acting on Screed Main Forces Acting on Screed

1. Towing Force

2. Force of Material in Front of Screed

3. Frictional Forces

4. Weight of Screed

5. Additional compactive force applied by the screed

The self-leveling action of the screed means it will respond to the various forces acting on it to find its

balance or equilibrium.

Page 8: Asphalt Delivery Placement

DeliveryConstruction 8

Free Body Diagram of Forces on ScreedFree Body Diagram of Forces on Screed

Lowering the pivot point increases the angle of attack

Page 9: Asphalt Delivery Placement

DeliveryConstruction 9

Tow Point

Screed DepthCrank

Pivot Point

F1

F2

F3

Page 10: Asphalt Delivery Placement

DeliveryConstruction 10

Constant Head of Material Volume

Head of Material Volume Too High

Head of Material Volume Too Low

Correct Depth ofMat Maintained

Screed Rises Due toExcess Material ForcedUnder Nose of Screed

Screed Settles Due toInadequate Supporting

Material

How does the head of material affect HMA thickness?

Page 11: Asphalt Delivery Placement

DeliveryConstruction 11

Correct Correct ElevationElevation

Auger Auger OverloadedOverloaded Auger Auger

UnderloadedUnderloaded

Page 12: Asphalt Delivery Placement

DeliveryConstruction 12

Travel

Angle of Attack

Increase the angle of attack, increase the thickness.

Decrease the angle of attack, decrease the thickness.

Page 13: Asphalt Delivery Placement

DeliveryConstruction 13

Page 14: Asphalt Delivery Placement

DeliveryConstruction 14

HOT STOP ConceptHOT STOP Concept

• If constant material flow cannot be maintained, before HMA mix drops in hopper below gates...

• “Hot Stop” the paver as quickly as possible• Wait for next truck• Pick up truck on run and resume speed as

quickly as possible.

Page 15: Asphalt Delivery Placement

DeliveryConstruction 15

RidabilityRidability

• Noticeable pavement defects that destroy smoothness are caused by– Stop and Go Operation– Transverse Joint Construction

• To avoid these irregularities– Keep the paver moving– Pick up trucks on the run– Adjust paver speed to match the mix arrival rate– Keep a uniform head of material– Take time to make good transverse joints

Page 16: Asphalt Delivery Placement

DeliveryConstruction 16

Page 17: Asphalt Delivery Placement

DeliveryConstruction 17

Screed Control SystemsScreed Control Systems

• Who’s Responsible for Changes • Sticking the Mat • Manual Controls • Automatic Controls

Page 18: Asphalt Delivery Placement

DeliveryConstruction 18

Page 19: Asphalt Delivery Placement

DeliveryConstruction 19

Pavement ProfilePavement Profile

Direction of PavingDirection of Paving

Page 20: Asphalt Delivery Placement

DeliveryConstruction 20

Detail of Screed PathDetail of Screed Path

Tow Point PathTow Point PathStep Amplitude = 100%Step Amplitude = 100%

L = Leveling Arm LengthL = Leveling Arm Length

Screed PathScreed PathDirection of PavingDirection of Paving

63%63% 87%87%

6L6L5L5L4L4L3L3L2L2L1L1L00

96%96% 98%98% 99%99%

L

Page 21: Asphalt Delivery Placement

DeliveryConstruction 21

Page 22: Asphalt Delivery Placement

DeliveryConstruction 22

Screed Compaction Screed Compaction

• Screed With Tamping bar– Moved up and down 4mm at a rate of 1500

tamps per minute

Page 23: Asphalt Delivery Placement

DeliveryConstruction 23

• Screed With Tamping bar– This system has large number of moving

parts, required regular maintenance and very heavy

– Slight Indentations in the HMA surface were produced by each stroke of the bar

Page 24: Asphalt Delivery Placement

DeliveryConstruction 24

Screed CompactionScreed Compaction

• Vibrating Screed– Consists of a curved, trough-shaped plate

that has an electric vibrator (3600 vpm with a few thousands of an inch amplitude)

Page 25: Asphalt Delivery Placement

DeliveryConstruction 25

Screed CompactionScreed Compaction

• Vibratory Screed with Strike-Off Plate

Page 26: Asphalt Delivery Placement

DeliveryConstruction 26

Screed HeatersScreed Heaters

• Heating the screed plate to 150ºC• Ensures that the first material placed does

not stick to the screed plate and tear, giving mat a rough texture

Crown ControlCrown Control

• Assist in draining rainfall off the road surface

• adjust a turnbuckle device to flex the bottom of the screed

Page 27: Asphalt Delivery Placement

DeliveryConstruction 27

Screed ExtensionsScreed Extensions

• Basic width of the paver : 2.4 m or 3.0m• Paving width can be extended

– Rigid Screed Extensions– Hydraulically-operated Screed Extensions

• Hydraulically extendible screed are more economical

• Surface texture is different and density is lower under the screed extension than the basic screed unit

Page 28: Asphalt Delivery Placement

DeliveryConstruction 28

Page 29: Asphalt Delivery Placement

DeliveryConstruction 29

Types of Grade Reference Types of Grade Reference

Three Basic Types of Grade References• Erected Stringline • Mobile reference• Joint matching shoe

• Sonic sensor• Laser Technology

Establish a single grade or dual grade for both

Grade and slope control

Page 30: Asphalt Delivery Placement

DeliveryConstruction 30

Grade sensorsGrade sensors

• Longitudinal Grade Sensor – Transverse cross slope Device

• Dual Grade Sensors

Page 31: Asphalt Delivery Placement

DeliveryConstruction 31

Stringlines

Supports at every 25ft on tangents and 10ft on

horizontal curves

Page 32: Asphalt Delivery Placement

DeliveryConstruction 32

Page 33: Asphalt Delivery Placement

Stringline in a Runaway Overlay Stringline in a Runaway Overlay

DeliveryConstruction 33

Page 34: Asphalt Delivery Placement

DeliveryConstruction 34

Stringline Grade Reference Stringline Grade Reference

• Disadvantages– Difficult to maintain correct elevation– Need high tensile strength line– Time consuming (need survey crew)– Truck drivers, equipments and all personal must

stay away• Advantages

– Controls the actual grades– Essential for Airfield paving– Prevents “bird baths”

Page 35: Asphalt Delivery Placement

DeliveryConstruction 35

Balancing ProductionBalancing Production

TruckingTrucking CompactionCompaction

PavingPavingHMA HMA FacilityFacility