Top Banner
ASME BPV II Materials – Conventional ASME Materials Qualification Presented by Jay Cameron Principal Engineer, HSB ASME BPV II Chair ASME SGM/VIII Member, former Officer © 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved.
11

ASME BPV 2021 Code Updates

May 27, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ASME BPV 2021 Code Updates

ASME BPV II Materials –Conventional ASME

Materials Qualification

Presented by Jay Cameron• Principal Engineer, HSB• ASME BPV II Chair• ASME SGM/VIII Member, former Officer

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved.

Page 2: ASME BPV 2021 Code Updates

AGENDA

1. How it’s started

2. Material specifications

3. Material properties

4. Code Cases

5. “Unconventional” materials

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 2

Page 3: ASME BPV 2021 Code Updates

How it’s started(General)1. Request from industry:

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 3

FOREWORD

Page 4: ASME BPV 2021 Code Updates

How it’s started(Specifics)1. Complete data set required:

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 4

ETC., ETC., ETC.

Page 5: ASME BPV 2021 Code Updates

Material specifications

1. ASTM [= Collins]

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 5

Page 6: ASME BPV 2021 Code Updates

Material specifications(cont.)1. Non-ASTM

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 6

Page 7: ASME BPV 2021 Code Updates

Material properties

1. TS, YS, time-independent allowables, physical properties

2. 100K-, 300K-, 500K-hr basis (III-5 = Wright); 10-hr basis properties

3. Creep-fatigue4. Creep buckling

5. Creep buckling

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 7

Page 8: ASME BPV 2021 Code Updates

Code Cases

1. “Try before you buy”

2. Unlimited publication schedule

3. Needs NRC approval

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 8

Page 9: ASME BPV 2021 Code Updates

“Unconventional” materials

1. PM [PM = Gandy, PM & AM = Mann]– SA-988, SA-989 and SB-834

PM specifications– CCs 2770 (I), 2840-1 (VIII)

2916 (I), 2930 (I)

2. NMM [= Hyam]– BPV X, RTP-1– Polymers: VIII-1 App 48

(acrylic); CCs 2411 (IV), 2725-1 (IV), 2795 (VIII), 2837 (VIII)

– Ceramics: VIII-1 Part UIG; CCs 2867-3 (VIII-1, SiC), 2949-1 (VIII-2, concrete)

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 2021 9

Page 10: ASME BPV 2021 Code Updates

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved. August 17, 202110

Page 11: ASME BPV 2021 Code Updates

© 2021 The Hartford Steam Boiler Inspection and Insurance Company. All rights reserved.

Thank you