Draft Environmental Monitoring Report Semestral Report for July – December 2014 UZB: Talimarjan Power Project Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
176

Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

Sep 16, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

Draft Environmental Monitoring Report Semestral Report for July – December 2014

UZB: Talimarjan Power Project

Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the

Asian Development Bank.

This draft environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

2

ABBREVIATIONS

TPP – Talimarjan Power Plant

CCGT

PMU

-

Combined Cycle Gas Turbine

Project Management Unit

SPS

EIA

NPC

EMP

SEMP

NES

IES

CDM

KMK

PDD

UNFCCC

-

-

-

-

-

-

-

-

-

-

Safeguards policy statement

Environmental impact assessment

Nature Protection Committee

Environmental Management Plan

Site Environmental Management Plan

National environmental specialist

International environmental specialist

Clean Development Mechanism

Karshi Main Canal

Project design document

Framework Convention on Climate Change of the

United Nations

CSMM - Corporate Solutions и Mott MacDonald Team

HDEC - Hyundai Engineering and Construction and Daewoo

International Consortium

HSE plan - Health, Safety and Environmental Plan

WEIGHTS AND MEASURES

MW – Megawatt

km – Kilometer

°C – Celsius degree

Page 3: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

3

GLOSSARY

I Section. Introduction………………..………………………………. 5

1.1 Description of the construction works under the project… 8

1.2Organization of Environmental work..………………….. 9

II Section. Environmental Management ………………………………… 11

2.1 Status of Environmental Management ………………….. 11

2.2 Ecological monitoring..…………………………….…….. 11

Appendix

1.

Decree Cabinet of Ministry of Republic of Uzbekistan

№ 491 «On government ecological expertise»……………..

Appendix

2.

The environmental clearance from Nature Protection

Committee…………………………………………………...

Appendix

3.

Monthly Environmental Monitoring Report (report was

prepared by «Hyundai Engineering and Construction and

Daewoo International Consortium», December

2014)………………………………………………………….

Appendix

4.

Results of environmental inspection (report prepared by the

Supervision consultant of Corporate Solutions и Mott

MacDonald, September 2014)…………..……………..

Appendix

5.

Public complaints-handling mechanism on the Project

“Expansion of Talimarjan TPP with the construction of two

CCGT with a capacity of 450 MW" (PMU, July

2014)…………………………………......................................

Appendix

6.

Letter from the Kashkadarya Regional Committee for the

Nature Protection No. 08-1461 dated on

05.09.2014.…………………………………………………..

Page 4: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

4

NOTE

In this report, "$" refers to US dollars. This environmental monitoring report is a document of the borrower. The views

expressed herein do not necessarily represent those of ADB's Board of Directors,

Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making

any designation of or reference to a particular territory or geographic area in this

document, the Asian Development Bank does not intend to make any judgments as to

the legal or other status of any territory or area.

Company authorized representative

I certify that the data contained in this report completely and accurately represents

operations during this reporting period:

Signature: Yuliya Yakubova

Title: Safeguard Specialist of “Talimarjan TPP” PMU

Date: February 2015

Contact Details:

Telephone: (+998 71) 233-24-30

Mobile: (+998 93) 530-46-21

E-mail: [email protected] , [email protected]

Page 5: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

5

1. INTRODUCTION

The project is implemented in accordance with the Decree of the President of the

Republic of Uzbekistan dated 7 March 2013 No.ПП-1933 "On the measures to

ensure the implementation of the investment project “Expansion of Talimarjan TPP

with the construction of two CCGT with a capacity of 450 MW". The site is an

existing gas fired power plant, which currently generates 800 megawatts (MW). The

project will install two additional combined cycle gas turbine (CCGT) units of about

450 MW each at the site.

Based on ADB's safeguards policy statement (SPS), the Project is classified as

follows: (i) environment (category A) – environmental impact assessment (EIA), (ii)

involuntary resettlement (category C) – no actions, and (iii) indigenous peoples

(category C) – no actions. Therefore, an environmental clearance from ADB was

obtained in December 2009.

According of Decree Cabinet of Ministry of Republic of Uzbekistan № 491 «On government ecological expertise» the Project is classified as a class 1 Project (is attached in appendix 1) Under the Uzbekistan Environmental Legislation. The environmental clearance was obtained from Nature Protection Committee (NPC) on 5 October 2009. According to the legislation of the Republic of Uzbekistan the correction is made after 3 years, a new Conclusion of Ecological Expertise № 18/768 dated 13 August 2013 is received (attached in appendix 2).

The objective of this report is to provide a progress in implementing

Environmental Management Plan and Environmental Monitoring Plan (EMP) as

stated in the Environmental impact. This Report was prepared to cover the period of

July-December 2014.

Overall Environmental Information

Is the project materially

compliant with all relevant

ADB Requirements

Yes �

No �

Is the project materially

compliant with all

Yes �

Page 6: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

6

applicable environmental

and social laws and

regulations?

No �

Have there been any

accidents or incidents that

have caused damage to the

environment, brought

about injuries or fatalities,

affected project labour or

local communities,

affected cultural property,

or created liabilities for

the company?

Yes �

No �

Have there been any

changes to environment,

social, labour or health

and safety laws or

regulations that have

materially affected the

company?

Yes �

No �

How many inspections did

Uzbekenergo perform

during the reporting

period?

1 On October 17th 2014 the Monitoring of

compliance with environmental measures

was conducted at the construction site of

CCGT by Yuliya Yakubova, PMU Safeguard

Specialist. Visual inspection on the main

environmental indicators was conducted.

Violations of environmental legislation and

safety regulations were not revealed.

Construction works are mostly in compliance

with the agreed Environmental Management

Plan.Environmental Specialist at the plant

Nizom Rakhimov conducts a Monitoring of

compliance with environmental measures on

a monthly basis.

Page 7: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

7

How many inspections

have been conducted by

the Supervision

Consultant during the

reporting period?

2 Natasha Sim, Supervision Consultant has

visited construction site: in September and

October 2014.

According to results of the conducted

inspections the Consultant provided the PMU

with reports. The environmental inspection

results from September 2014 is presented in

Appendix 4.

How many inspections

have been conducted by

local ecological bodies

during the reporting

period?

0 Due to the fact that the Talimarjan TPP is

restricted access enterprise, the Karshi

Regional Committee for the Nature

Protection conducts the coordination

inspection 1 time in 3 years.

The latest actions inspection at EU

Talimarjan TPP was held in March 2014.

However that inspection did not involve

construction site since the Contractor and

Subcontractor are separate legal entities, thus

inspection of their activities shall be

conducted on individual basis, as per

prescribed rules.

How many inspections

have been conducted by

other organizations during

the reporting period?

1 As a part of ADB-mission on October 17th

2014 ADB’s experts Dewi Utami and Firuza

Insanvaleeva conducted environmental audit

at the construction site of the project.

Have these visits resulted

in any penalties, fines

and/or corrective action

plans?

Yes �

No �

Has the Company engaged

any contractors for

project-related work in the

Yes �

No �

Contract Agreement

No.SJSC/UzbekEnergo/ICB-2010-001

between the UE "Talimarjan TPP", SJSC

Page 8: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

8

reporting period? "Uzbekenergo" and the Consortium of the

foreign companies «Hyundai Engineering

and Construction and Daewoo International

Consortium» for the “turnkey” construction

of two combined-cycle plants with a capacity

of 450 MW was signed on 07 March 2013.

Were any of the violations

stated above the

responsibility of

contractors?

Yes �

No �

Have any operations been

reduced, temporarily

suspended or closed down

due to environmental,

health, safety or labour

reasons?

Yes �

No �

Please describe any environment or social programmes, initiatives or sub-projects

undertaking during the reporting period to improve the company’s environmental or

social performance and/or management systems:

Within the framework of the project Capacity development program is

implemented under Loan # 2630). Selection of Consultant for environmental and

social Safeguards and Gender is implemented under this program as one of the

subcomponents.

Over a reporting period on this subcomponent a tender was held on 25.12.2014 to

select a consulting company.

1.1. DESCRIPTION OF CONSTRUCTION WORK

During the period under review the project is at the stage of construction works. According to the report on project implementation for December 2014, submitted by Hyundai Engineering and Construction and Daewoo International Consortium (HDEC), progress of the project as of December 2014. is 50.25%.

Page 9: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

9

1.2. ORGANIZATION OF ENVIRONMENTAL WORK

There are no changes in the composition of the Environment Department. PMU Environment Specialist - Yuliya Yakubova Station Ecologist - Nizom Rakhimov

On the part of Corporate Solutions and Mott MacDonald Team (CSMM) the local

consultant on Social, Gender and Environmental issues Lyudmila Khegay is

involved. From November 1, 2014 the International Environmental Specialist of

"Corporate Solutions Consulting Limited" Natasha Sim doesn’t work in this project.

Currently the management of "Uzbekenergo" approved the candidature of new

international expert but this, however, requires the approval of the competent

authorities of the Republic of Uzbekistan. Approval of the candidature of new

international expert on environmental protection is a priority issue, as CSMM doesn’t

conduct any work on environmental and social issues from November 1, 2014.

Since 10 October 2013 the Contractor's representative Mr. Jeong Hyeon Kim

works at the construction site, who provides active support and regular inspections on

HSE in accordance with the Environmental Management Plan, as well as his assistant

Khusan Khidirov, Environmental and Safety Specialist. Since June 2014 a safety and

environmental engineer – Amanov Oybek has also been working on construction site.

In April 2014 Shaybalov Oybek- subcontractor (Tupolang) ecologist was

employed.

Page 10: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

10

Regarding environmental works: The Contractor shall (a) establish an operational system for managing environmental impacts, (b) carry out all of the monitoring and mitigation measures set out in the Environmental Management Plan (EMP).

The Contractor shall submit to the Employer monthly reports on the carrying out

of such measures.

As of today HDEC provides PMU with monthly progress reports, which includes

a chapter "HSE Management", as well as separate monthly report on « environmental

protection and safety code » (attached in appendix 3).

The consultant also provides PMU with a quarterly report, that includes a section

on HSE, the report on monitoring the implementation of the Environment Work Plan

after visiting the construction site, as well as monthly and semi-annual reports on the

results of an environmental inspection.

All these reports PMU reviews, analyzes and takes corrective measures if needed.

According to the results of joint activities Contractor - Consultant - PMU the semi-

annual Environmental reports for the ADB are carried out.

Also according to ADB policy, the PMU sends the semi-annual Environmental

reports to the Kashkadarya Regional Committee for the Nature Protection for

reference.

ADB

Ms. Dewi Utami

PMU

Yuliya Yakubova

No international expert on

the part of CSMM

Hundai

Mr. Jeong Hyeon Kim

Hundai

Khusan Khidirov

CSMM

Lyudmila Khegay

Talimarjan TPP

Nizom Rakhimov

Hundai

Oybek Amanov

Tupolang

Oybek Shaybalov

Page 11: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

11

II. ENVIRONMENTAL MANAGEMENT PLAN (EMP)

2. 1 STATUS OF ENVIRONMENTAL MANAGEMENT PLAN.

In September 2013, HDEC has provided the HSE plan, which includes the Site

Environmental Management Plan (SEMP) and Environmental Protection Plan. This

plan has been reviewed by the PMU and the Consultant and sent to the Contractor for

updating. When updating the HSE plan the Contractor was recommended to base

upon the environmental impact assessment (2009), Environmental Action Plan

(2009).

This plan was under updating 2 more times and the final third version of the EMP,

which was acceptable to PMU and Consultant, was completed in January 2013.

It was also agreed, that every 6 months the SЕМР will be revised for continual

improvement. In May 2014, HDEC, PMU, and CS-MM revised and checked SЕМР

to reflect current conditions and status of site. The objective is to ensure continual

improvement (ISO 14000).

The new Site Based Environmental Management Plan (SВЕМР) was finally

updated by the Contractor and submitted to the PMU.

The new plan is convenient for the ongoing project and guarantees minimum

negative impacts on the environment. SBEMP will be observed by the Contractor

and monitored by SJSC “Uzbekenergo” and the Consultant.

With the letter No. 384 dated on 09.10.2014 PMU has officially notified HDEC of

the approval of the latest version of SВЕМР as a working document.

2. 2 ECOLOGICAL MONITORING.

Based on EIA, the PMU with the Station ecologist has carried out the Monitoring

of compliance with the requirements of the Environmental Management Plan

(SEMP) at the construction site. Jointly with the ADB the PMU conducted the

environmental monitoring in October 2014, but station ecologist conducts a visual

inspection of the construction site on a monthly basis. The main violation detected

during inspections is insufficient watering of green spaces. During the construction

works the watering system has been damaged. Therefore the trees growing on the

Page 12: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

12

surrounding grounds need additional watering. Contractor shall also increase the

number of waste containers to provide greater separation of waste by type.

The Chemical Analysis Laboratory of the station also carries out monthly

analyzes of water samples from the Karshi Main Canal and sewage treatment plants.

All violations detected would be recorded and eliminated as work proceeds. In

the accounting period no material breaches of operational code for electrical

installations requirements, which may negatively influence the state of environment

has been recorded. Preoperational and construction works are being conducted in

accordance with environmental legislation of the Republic of Uzbekistan.

Monitoring of the implementation of SEMP on a regular basis is conducted by the

Consultant. In the accounting period Consultant has conducted 2 environmental

audits. Audit findings are described in (attached in appendix 4).

The audit revealed violations of SEMP. All comments of Consultant were sent to

the Contractor to correct violations. Specifically the HDEC has improved drainage

system of sedimentation water tanks at the cement plant, 4 water meters for cold

water were installed, the device to prevent spilling of fuel was installed in the motor

garage and filling stations.

HDEC engineers conduct daily tours and site surveys. All environmental

indicators are monitored: quality of the water, open air, warehousing and recycling of

household and industrial waste, noise level, means of transport, safety code etc. More

detailed information on the Contractor’s activities can be found in monthly reports by

HDEC on environmental protection and safety code (attached in appendix 3).

Instrumental gauging of noise levels in June are as follows: Table 2.2.1

Page 13: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

13

The EPC Contractor also has concluded a contract with the company for waste

disposal and carries out regular HSE trainings.

According to the recommendations of Co ltd «Nazar Business Technology»,

which in October 2013 conducted ecological audit on the project, the Contractor has

Page 14: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

14

been carrying out systematic trainings on environmental protection and safety code

(on 30th of each month).

For the purpose of project information release semi-annual reports by PMU are

submitted to local agency on conservation of nature and local authority.

Labour and human population complaints mechanism is also implemented as part

of the project. For this purpose there is available free a « book of complaints and

suggestions » in the staff office (attached in appendix 5). In the accounting period no

human population claims have been noted.

The PMU is attentive to recommendations of the CSMM-consultant to improve

the monitoring of the implementation of SEMP and to improve the rating of the

project. The consultant recommended that the Contractor (HDEC) is to develop a

regulatory environmental documentation for the period of construction works and to

provide the local authority for the nature protection with statistical reports. To resolve

this issue HDEC officially appealed to the Kashkadarya Regional Committee for the

Nature Protection and received a reply letter No. 08-1461 dated on 05.09.2014 with

explanations (Appendix 6).

Monitoring shows that the environmental requirements at the stage of construction

works are fulfilled satisfactorily. In the accounting period no violation of

environmental regulation, or claims from the human population have been noted.

This semi-annual report on the monitoring of environment protection covers the

period of July - December 2014.

Page 15: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

Appendix N 1

Decree of

Cabinet of Ministry of Republic of Uzbekistan.

On Confirmation of Government Ecological Expertise in Republic of Uzbekistan

In accordance with Action program for executing the of Decree of President of

Republic of Uzbekistan dated 2 June of 2000 N UP – 2612 “Measures for

implementing of Program of Liberalization and deepening of reforms in political,

economic and spiritual areas of society and providing of the safety of country” and

also for purposed of implementing the Law of Republic of Uzbekistan on “Ecological

expertise” and implementing measures for development of legal-normative basis of

providing of ecological safety Cabinet of Ministry approves:

1. To confirm:

Regulation on government ecological expertise of Republic Uzbekistan accorind the

appendix 1.

List of activities according which is government ecological expertise is being carried

out according the № 2.

2. Control for executing of this decree is on responsibility of deputy of Prime Minister

of Republic of Uzbekistan T.H. Haltaeva.

Prime- Minister of Republic of Uzbekistan U.Sultanov.

Tashkent city

31 December 2001

№ 491

Page 16: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

Appendix N 2

To decree of Cabinet of Minister dated 31 December 2001

№ 491

List

Of Types of Activities for which is government ecological expertise is made on.

Types of activities which at 1 category of influencing the environment (high risk)

1. Auto roads, subways railways, high speed roads and loading terminals of

republican status.

2. Airports.

3. Base oil and oil products I category.

4. Reservoir with a capacity of over 200 million cubic meters.

5. Mining and processing plant capacity of over one million tons of ore per year.

6. Municipal waste landfills (for cities with populations of more than 200 thousand

people.).

7. Hydroelectric power plants with a capacity of 30 MW.

8. Production of mining and mining-chemical raw materials to the volume of the rock

mass production 2 million cubic meters. M / year or more,

reclamation pits formed during extraction.

9. Extraction of fuel resources (oil, gas, coal, etc.).

10. Plants of ferrous and nonferrous metallurgy.

11. Leather-tanning business.

12. Sewage treatment plant capacity of more than 280 thousand cubic meters. m /

day.

13. Power lines of republican status and national interstate status.

Page 17: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

15. Machine-building Industry (Aircraft, Automotive, Tractor, motor building, etc.).

16. Designated storage or disposal of toxic wastes and tailings pond.

17. Incinerators.

18. Oil and gas pipelines of national importance.

19. Oil and gas refineries.

20. Dams.

21. Underground gas storage facilities.

22. Landfills leaching.

23. Enterprises using heap leach technology.

24. Enterprises Waste Processing I and II hazard classes.

26. Manufacture of accumulators, galvanic batteries and components.

27. The production of asbestos and asbestos products.

28. Manufacture of explosives.

29. Production of equipment or devices containing toxic substances regulated by

international agreements.

30. Production, use and storage of radioactive materials (isotopes).

31. Manufacture of rubber and rubber products.

32. Production of glass containing toxic contaminants.

33. Manufacture of tobacco products.

34. Production of cement.

35. Reclamation of tailings ponds of toxic waste.

36. The warehouses of toxic chemicals of national importance.

37. Thermal power station and other installation for burring with thermal capacity

300 MW or more and also facilities with nuclear reactors.

39. Pharmaceutical factories (with the exception of enterprises on packaging of

finished drugs).

40. Chemical complexes and factories.

Page 18: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

1

Letterhead of the State Committee for Nature Protection of the Republic of Uzbekistan

13 August 2013 No. 18/768

C O N C L U S I O N

of Government Ecological Expertise

Subject: Environmental impact assessment of the "Expansion of

Talimarjan TPP with the construction of two CCGT with a

capacity of 450 MW" project

Employer: UE “Talimarjan TPP”

Designer: OJSC “Teploelectroproect”

Mr. NORMUMINOV A.A.

Director of UE “Talimarjan TPP”

cc: Mr. MAMANAZAROV M.KH.

Chairman of Kashkadaryaoblkomprirody

Ms.BAYMATOVA T.B.

Technical director of OJSC “Teploelectroproect”

Materials of the first stage of Environmental impact assessment of the

"Expansion of Talimarjan TPP with the construction of two CCGT with a capacity

of 450 MW" has been submitted for the Government Ecological Expertise.

The enterprise is located at Nuristan settlement, Nishan area, Kashkadarya

region in 18 km from the Nishan area center. The nearest residential buildings are

in 700 m to the north-east from the enterprise, in 1.0 km from priority sources of

pollutant emissions to atmosphere. To the east from TPP at a distance of 1.0 km

there is the rail road Karshi-Termez-Dushanbe.

The station is located on the right bank of the Karshi Main Kanal, which is

connected with Talimarjan reservoir (in 7 km).

Talimarjan TPP is focused on power generation; the installed capacity - 800

MW. The power generation in 2012 is amounted to 5516308.8 thousand kWh.

Natural gas is used as a main and reserve fuel at TPP, gas flow rate in 2012 is

Page 19: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

2

amounted to 1323074.4 knm³, at that, specific reference fuel consumption for

electrical supply is determined in a value of 313.25 g/kWh, heat-167.99 kg/Gcal.

At existing situation the process equipment of TPP is presented by one

power unit comprising:

- steam turbine К-800-20-5 with a capacity of 800 MW with generator ТВВ

-800-2.

- boiler ТG-805-С3 with steam producing capacity of 2650 ton per hour

The structure of block station includes also a starting heating boiler house

equipped by four boilers U-50-3.9-440GM with steam producing capacity of 50

ton per hour and two water-heating boilers PTVM-30 with heat producing capacity

of 30 Gcal per hour.

The industrial and agricultural enterprises of a southern part of the republic

are experiencing a deficiency in the electric energy as at Talimarjan TPP with the

designed capacity of 3200 MW there is only one power unit with a capacity of 800

MW and being the basic source of electricity generation, thermal power plant is

not able to meet the needs of the served region.

In pursuance of the Resolution of the President of the Republic of

Uzbekistan #ПП-1933 dated 7 March 2013, Talimarjan TPP expansion project

with the construction of two CCGT is developed with increasing its capacity to

1,700 MW. The structure of CCGT includes gas turbine unit with the electrical

capacity of 314 MW, waste-heat steam boiler and steam-turbine condensing unit

with the electrical capacity of 157.7 MW. Natural gas flow rate will make 1267.38

mln.nm³ per year (162.964 nm³/h). Emission of smoke gases from new units is

provided through two individual pipes with a height of 85 m and diameter of 7.2

m.

Management of CCGT is planned through an automated system that allows

ensuring of the control of the process parameters and execution of tasks for

regulation, alarm and blocking of fuel supply in a case of any violations of the

production cycle.

Accommodation of two projected CCGT is planned at the territory of

existing TPP from the main building without additional land acquisition. For

stabilization of natural gas supply with the required parameters of pressure (up to

39.5 bars) the construction of booster compressor station equipped with three gas

compressor is planned.

Water supply of CCGT is provided from existing networks of Talimarjan

TPP (Karshi Main Canal) with consumption for technical needs, taking into

Page 20: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

3

account the available capacities 591182 thousand m³/year. Water for the CCGT

will be used in a cooling water system and chemical water treatment.

Wastewater in the turbines under the straight-through arrangement is

removed into the Karshi Main Canal below the water abstraction point. Losses

replenishment in the process water circulation system is carried out by a fresh

water supply from the additional water intake structures, located at the initial KMC

area (from the Talimarjan reservoir). Considering a high mineralization, rigidity

and turbidity of surface waters under the expansion of TPP the organization of

additional (make-up) water pre-treatment with the arrangement of intake chamber

and drilling waste disposal site is provided. For prevention of deposition and salts

scaling formation as well as for disinfection the water is treated with the inhibitor

and sodium hypochlorite.

Number of wastewaters and sewage waters outlet in Karshi Main Canal

remains unchanged:

- Outlet No.1, through which the sanitary sewage is discharged after

cleaning and drain of the water treatment plant in the manifold (collector) K-3-2 at

a rate of 527.2 m3/h;

- Outlet No.2, directing the partially clean waters of turbine condenser

cooling system of power unit No.1 and two CCGT, as well as brine of distillation

desalination plant in the discharge canal of KMC at a rate of 144243.5 m3/h.

Analysis of the manufacturing parameters of installed equipment shows that

at its design the requirements of water-saving technologies are taken into account:

for comparison - the discharge of sewage waters from two combined cycle gas

turbine will reach 45220 m/h while from the power unit No.1 - 93162 m/h.

Thermal pollution of the Karshi Main Canal water as the result of partially

clean waters discharge after coils cooling shall not exceed 3°C in the summer.

The main source of sewage waters pollution with oil products is oil

lubrication system of turbines. Oily sewage waters to be cleaned at the Integrated

treatment of production waste waters. Under the expansion of thermal power

plant to 1700 MW from 800 MW it is necessary to provide the reconstruction

of facilities on the cleaning of oily sewage waters by adjusting the

concentration of petroleum products to the background values that

characterize the quality of water in Karshi Main Canal at the outlet from the

Talimarjan reservoir.

During the plant operation a carbon and nitrogen oxides, nitrogen and sulfur

dioxides and benzo(a)pyrene get into the atmosphere currently, the bulk is

accounted for the nitrogen dioxide - 2847.6 tons/year and nitrogen oxide - 441.3

Page 21: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

4

tons/year. Gross emission of pollutants is 3289.4 tons/year. Flue gases from power

unit are exhausted through a pipe with 270 m height and with a diameter of 6.6 m.

Atmospheric air in this region is characterized by a moderate content of

pollutants; Talimarjan TPP and motor transport brings the main contribution to the

contamination of the atmosphere with nitrogen dioxide. With TPP emissions the

nitrogen dioxide are generated outside of TPP reaching 0.19 of maximum

permissible concentration (MPC) that is do not exceed the established limits (0.25

MPC).

After the expansion of TPP at developing of its capacity to 1700 MW

from 800 MW the pollutant emissions increase to 4431.29 tons/year (by

1141.89 tons/year), and the maximum concentrations of nitrogen dioxide,

generating with TPP emissions outside of TPP will make 0.24 MPC (without

taking into account a background) at the territory of Nuristan settlement -

0.21 MPC. On other substances – they do not reach the values of 0.1 MPC.

Specific emission rate of pollutants per unit of capacity (MW) are

significantly reduced: from 4.11 tons till 2.6 tons.

The generation of additional types of wastes during the construction of two

CCGTs is not predicted, their quantity is increasing due to high consumption of

lubricants, mercury-containing lamps, work clothing, etc., but standards of wastes

generation will remain at the same level.

For the purpose of noise reduction, CCGTs are equipped with acoustic

enclosure, an Air Filtering and Conditioning System (AFCS) is installed, equipped

with a filtration system and air heating that will provide effective cleaning of the

air flowing to the suction pipe of CCGT.

Environmental expertise of the submitted materials has shown their

compliance with the requirements of the environmental laws on the scope and

content of the first stage of the EIA and considers it necessary to develop the final

stage - Statement of environmental effects (SEE) for the purpose of regulatory

actions on emissions and discharges of pollutants into the environment, waste

generation and emplacement of industrial waste separately by years in view of

the commissioning schedule of CCGTs with a capacity of 450 MW.

For the regulatory actions on discharges of pollutants to surface-stream flow

under the SEE it is necessary to perform schemes of water disposal separately by

discharges and the identifying the sources of pollutants supply in baseline

characteristics. Prediction of water pollution of Karshi Main Canal with sewage

Page 22: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

5

waters of TPP should be calculated depending on the mode of water flow in the

canal.

The draft of environmental impact statement of Talimarjan TPP expansion

project with the construction of two CCGT with a capacity of 450 MW and

increasing the plant capacity to 1700 MW is under the coordination of

Government Ecological Expertise of the State Committee for Nature protection the

Republic of Uzbekistan.

Kashkadarya Regional Committee for Nature Protection should take

under control the compliance with the requirements of environmental laws when

placing the combined cycle gas turbines at the territory of Talimarjan TPP. Prior

to the development and submission of the Statement of environmental effects

by the Government Ecological Expertise it is necessary to submit to the State

Committee for Nature protection the results of status monitoring of the

Karshi Main Canal surface waters before and after discharge of Talimarjan

TPP sewage waters.

Deputy Chairman (signature) K. Sadykov

Action by: Ishmukhamedova T.R.

Tel: 230-16-99

Page 23: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

A 25.Dec.2014 Monthly Report O.Amanov H.Khidirov J.H.KIM

REV. DATE DESCRIPTION DSGN CHKD APPD

. .

.EMPLOYER/ :

CONSULTANT

:

CONTRACTOR/ :

PROJECT/ :

TALIMARJANTHERMAL POWER PLANT EXPANSION PROJECT

TITLE/ :

Monthly Environmental Report

SCALE

DOCUMENT NUMBER

Rev.

.

NONE / B-000-W-48-012 A

TALIMARJAN TPP UNITARY ENTERPRIZE of SJSC UZBEKENERGO

Я « Я Э »

« Э »

Report Отчет

Page 24: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

2

ENVIRONMENTAL REPORT

1. Purpose

The purpose of report is to minimize the adverse impacts on the environment by establishing and maintaining the effective mitigation plans against environmental issues.

.

2. Environmental Issues

2.1 Air Emission

2.2 Dust control

2.3 Noise control

2.4 Wastewater quality control

. 2.5 Waste management control

2.6 Pollutants Spillage control, etc.

. 2.7 Soil Control

3. Environmental Meeting

3.1 Date : 4

th,11

th,18

th,25

th of December every Thursday, 10:00 AM

: 4, 11, 18, 25- -2014 , , 10:00

3.2 Location : Talimarjan HDEC conference room

: - HDEC

3.3 Attendants : HDEC HSE Team, Subcontractor HSE Team and Management

: ( ) HDEC, .

4. Environmental Training

4.1 On the first day of duty – Induction

-

4.2 Subject

Project HSE (Environmental) policy and objectives (Annex 1)

HSE ( ) ( 1)

Environmental management program

Page 25: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

3

Significant environmental aspects identified.

Emergency preparedness and response plan / drill in environmental incident such as oil, chemical

spillage.

, , .

Dust control plan

Noise control plan

Wastewater control plan

Solid waste management and on how to identify hazardous or potentially hazardous wastes

Pollutants spillage control plan

Current applicable environmental laws and regulations

MSDS contents of hazardous materials, etc for concerned operational peoples.

. .

5. Noise Level

Sound Level (dBA) / ( )

Location Test Date / Limits

Remark

04.12.2014 11.12.2014 18.12.2014 25.12.2014

Contractor Office

47,3 43,2 46,1 43,9

85 dBA

Approve

Contractor Camp

49,6 47,7 49,1 48,2

Approve

Power Block Gate

61,3 66,9 70,9 71,5

Approve

Power Bock Area #1

#1

68,9 70,3 78,6 77,8 Approve

Power Bock Area #2

#2

66.3 69.9 73.4 75,7 Approve

Cooling Tower Gate

70,1 67,3 63,1 57,9 Approve

Batch plant

65,6 62,8 59,7 69,7 Approve

Subcontractor Camp area

56,1 58,3 57,9 59,3 Approve

Page 26: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

4

Existing Power Plant Gate

60,7 58,7 60,9 58,8 Approve

Nuristan

62,3 64,4 62,8 61,0 Approve

The Greenhouse of Existing TPP

57,2 75,5 63,5 64,9

Approve

Customs Warehouse

63,2 72,2 58,2 56,9

Approve

Parking lot

59,8 62,5 55,9 59,8 Approve

6. Environmental Status

Description

This Month

Cumulative

No. of Training

42 303

No. Of Persons

612 3278

Training Man Hours

-

1224 6552

7. The Monitoring of Usage

The Monitoring of: :

This Month

Cumulative

Fuel (l) ( )

Diesel 107500 923554

Benzin 315 3886

Electricity (kv/h) ( / ) 20880 385807

Disposed Waste (tons)

( / ) 25 457

Water

( )

Non-potable water (m

3)

8272 82718

Potable water (m

3)

1890 20889

Page 27: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

5

8. Construction Site map

Site map indicates Assembly points, Waste Storage area, Water Sampling points, Sound Level Sampling points, Access roads.

, , , , .

9. Appendicies

Annex 1. Environmental Performance Monitoring sheet

1. Э

Page 28: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

1) Annex 1. Environmental Performance Monitoring sheet

1.

No

Aspect

Mitigation

Location

Monitoring

Responsible

Frequency

Risk Status

1 Management

1.1 Informing

-

Introduce types of emission and countermeasures.

.

HSE

Training

center

HSE

Officially

Contractor

PMU

Yearly

(if required)

(

)

Medium

Emission type and

countermeasures

regular

1.2 Emergency

A

a) Every three months have emergency drills.

.

b) Confirms the role of individual

.

Project Site

Observation

of

emergency

Contractor

Subcontractor

Quarterly

E

a)Medium

Regular drill

conducted in HSE

HSE b) High

HSE

manager,officers

and the other

persons have role

in Emergency plan .

HSE ,

1.3 Traffic

T

a) All traffic signs, signals, and road markings must be

obeyed.

, .

b) Authorized transportation of equipments and

materials entry to the site

Project Site

Inspection of

traffic

conditions

Contractor

Subcontractor

Daily

a) Medium

The employees are

having trainings on

signs and signals

description.

Page 29: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

7

c)Speed of transport vehicles should be strictly

controlled in the access road to TPP

Э .

b) Medium

Only authorized

vehicles can enter

in Site.

c) Medium

The speed limit

signs are posted

and drivers are

being trained for

speed limits

(20km/h).

(20 / ). 1.4 Monitoring

M

Monthly monitoring of the following should take place:

:

Fuel (m3)/

Electricity (KWh)/ Э

Water (m3)/

Project Site

Observation

use of

sources

Contractor

Subcontractor

Monthly

Low

Electricity, Fuel and

usage of Water is

being monitored.

Э ,

.

Page 30: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

8

2 Air

2.1 Plan

Identify all possible air pollution sources related to

construction activities

Project Site

Examination

of air plan

Contractor

PMU

In the

construction

process

Medium

There is no air

emission except

dust but is under

control

H ,

,

2.2 Exhaust

fumes

a) Regularly serviced and maintained to be in good

condition vehicles and Equipment

b) Forbid the burning of waste, wood on site

,

c) Reduce idle time of all vehicles

Maintenanc

e Area

Project Site

Inspection of

air emission

Observation

of air

pollution

Subcontractor

Appropriate

manager

Monthly

a) Medium

All transports are

being serviced and

maintained.

. b) Medium

Burnings are

prohibited on Sites.

C

c)Low

All vehicles are

under control.

.

Page 31: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

9

3 Dust

3.1

Plan

Identify all possible dust pollution sources related to

construction activities

,

Project Site

Examination

dust plan

Contractor

PMU

In the

construction

process

Low

Dust pollution

sources are

identified and being

controlled.

3.2 Watering

Watering should be implemented to control dust

where

:

a)Working areas

b)Exposed areas

c)Active cuts excavation and fill sites

Project Site

Observation of

watering

Contractor

Subcontractor

Daily

Windy Days

During

construction

activity

Low

The schedule of

watering is

prepared and work

process is followed

by the schedule.

3.3 Site control

a) Minimize size and duration of exposed areas

b)Keep hauling roads in good condition

.

Project Site

Observation

dust control

Contractor

Subcontractor

Daily

a)Low

Backfilling exposed

areas

b) Medium

Main roads are kept

clean.

.

3.4

Material

control

Minimize size and duration of materials stockpiles

.

Lay down

yard

Observation

material

storage

Contractor

Subcontractor

Daily

Low

All material are

under control

Page 32: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

10

3.5 Material

control

a)Minimum practical height to limit the fugitive dust

generation from unloading excavated materials

, ,

. b) Cement debagging should take place in a

sheltered area.

Project Site

Batching

Plant area

Observation

of work

Contractor

Subcontractor

Daily

a) Low

Loading and

Unloading works

are being controlled

not to dump dust.

-

.

b) Low

The cement

debagging is

holding inside

temporary

warehouse.

3.6 Vehicle

control

a) Limiting vehicle-entrained dust from unpaved

roads

, ,

b)Limiting vehicle speeds (20 km/h in Project Site)

and restricting traffic volumes

c)Trucks have proper fitting side and tail boards

d)Materials shall also be dampened, if necessary,

Project Site

road

Observation of

traffic

condition

Contractor

Subcontractor

Daily

a) Low

Watering of main

roads is going on 6

times per day.

6

. b) Low

The signs

describing speed

Page 33: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

11

before transportation

, ,

e)Covering trucks during transport of materials

limits are posted on

Site roads.

. c) Low

All trucks have

fitting side and tail

boards.

. d)Low

Materials are

being moistened

during loading time

e) Low

No need to cover

the materials during

transportation

,

Page 34: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

12

4 Noise

4.1 Plan

a)Identify all possible noise pollution sources

related to construction activities

,

b)Posting Signboards on construction sites

and/or stickers on equipment outlining how

affected parties can lodge complaint

/

.

Project Site

Examination

of noise plan

Contractor

PMU

In the

construction

process

a) Low

All noise pollution

sources related to

construction

activities are

identified.

,

.

b) Low

Controlled by

Contractor and

Subcontractor

4.2 Noise level

a) Inspect noise level of the construction

equipment

b) Equipment Noise limit will comply with Item

223 of EIA.

For example. Direction of Nuristan are limited to

80 dba 1m

223 .

. 80 1

c)Use appropriate PPE (earplug, earmuff) if

exceeds noise limits

( , ),

Project Site

Inspection of

noise level

Contractor

Subcontractor

During

construction

activity

a) Low

Noise level is being

inspected weekly.

. b) Low

Equipment Noise

Limit conform with

Item 223 of EIA.

223

Page 35: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

13

c) Low

The employees use

earplugs at noisy

workplaces.

.

4.3 Vehicle control

a)Limiting vehicle speeds (20 km/h at Project

Site)

b) Restrict truck movements to day time and

restrict truck movements to major transport

routes

.

Project Site

road

Observation

of traffic

control

Contractor

Subcontractor

Daily

a) Medium

Speed limit signs

are posted on Site

roads.

b) Medium

The restriction

movement of

transport routes are

controlled

4.4 Vehicle

control

Regularly serviced and maintained to be in good

condition vehicles and Equipment

Maintenance

area

Inspection of

repair

records

Subcontractor

Appropriate

manager

Monthly

Medium

All vehicles are

being serviced and

maintained

periodically.

Page 36: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

14

4.5 Equipment

control

a)Equipment shall be operated within

specifications and capacity

b)Equipment shall be operated in as diversified

manner as possible

c)Equipment shall be turned off when not in use

,

d)Work using machines or vehicles shall be

prohibited in the midnight and the dawn

. e)Air intakes, vents, and stacks should be fitted

with suitable noise attenuating equipment (if

required)

,

(

)

Project Site

Observation

work of

equipment

Contractor

Subcontractor

Daily

a) Low Equipments are being used within specifications and capacity.

.

b) Low The operation of equipment is controlled.

.

c) Low Equipments are turned off if not used .

,

d) Medium Only heavy trucks are working in day time, without permit can't work in night shift

,

..

e) N/A /

Page 37: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

15

4.6 Equipment

control

Select the time when the environment is least

sensitive to noise impact using pile drivers, jack

hammers, and rock drills

,

,

Project Site

Inspection of

noise level

Contractor

Subcontractor

During

construction

activity

Low

The noisy work

processes are held

at suitable time.

.

5 Wastewater

5.1 Plan

a)Identify all possible wastewater pollution

sources related to construction activities

,

b)Compile and implement a wastewater control

plan

Project Site

Examination of

wastewater plan

.

Contractor

PMU

In the

constructio

n process

a) Low

Under the control

by contractor.

.

b) Low

The wastewater

control plan is

being implemented.

. 5.2 Batch plant

control

Wastewater from concrete batching plant

operation and shall not be discharged overland

, ,

Batching

Plant area

Observation of

wastewater

Contractor

Subcontractor

Operation of

batching

plant

Э

Low

Drainage system is

used for

discharging of

Batching plant

wastewater.

.

Page 38: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

16

5.3 Washing water

Undertake settling and neutralization of alkaline

washing water containing excessive cement prior

to discharge

,

,

Batching

Plant area

Observation of

washing water

Contractor

Subcontractor

Operation of

batching

plant

Э

Low

Drainage is used

for settling the

cement prior to

discharge

.

5.4 Washing water

a)All washing of equipment or machinery shall be

undertaken in designated areas

b)Washing of equipment areas must be equipped

with a suitable impermeable floor and sump/oil

trap

/ .

Washing

area

Observation of

washing area

Contractor

Subcontractor

Daily

a) Low

Heavy vehicles are

being washed in

designated area.

. b) Low

Wastewater

disposal system is

in use

.

5.5 Wastewater

emission

Wastewater collected within bunded area around

the fuelling area be disposed of as hazardous

waste

, ,

Fuelling area

Observation of

wastewater

Contractor

Subcontractor

Daily

Low

Installed

wastewater

disposal system.

. Natural water

Natural run-off diverted from the construction

camp.

Camp area

Observation of

natural water

Contractor

Subcontractor

Daily

Low

Natural water runs

off through pipeline

Page 39: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

17

5.6 . in construction site.

.

5.7 Rain water

Heavy rain water plan to be and implemented for

the construction phase of the Project

.

Project

Site

Observation of

rain water

Contractor

Subcontractor

During

Heavy rain

Low

The heavy rain

controlled

5.8 Contaminated

Water

Sand, silt and silt-laden water do not enter the

water drain system or KMC

, ,

Project

Site

Observation of

water system

Contractor

Subcontractor

During

Heavy rain

Low

Water drain system

and KMC are

protected from any

pollution.

.

5.9 Material

control

a)All hazardous material storage areas designed

to reduce risk of spillages

b) All materials covered during transport to

prevent them from spilling

c)Store all liquid/solid waste properly above

ground to avoid spills/leaks

/ /

d)Develop a hazardous materials and handling

plan provide spill response kits at all HazMat

storage areas and work site

Material

storage

areas

Observation of

material storage

condition

Contractor

Subcontractor

Daily

a) Low

Hazardous material

storage is protected

from spillage

. b) Medium

Materials are

watered before

loading

.

Page 40: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

18

.

. e) Chemicals and fuels on site should be kept to

a minimum

c) Low

All liquid/solid

wastes are properly

stored.

/

.

d) Medium

Hazardous

materials and

handling controlled

.

e)Medium

Chemicals and

fuels

on Site are kept

depending on

requirement and

stored in particular

storage area

,

. 5.10 Barrier

Channels, earth bund walls or sandbag barriers

be provided on site to direct rain water to silt

removal facilities

,

Project

Site

Observation of

silt removal

facilities

Contractor

Subcontractor

Daily

Low

Channels provided

on site to direct

rainwater to

removal facilities.

Page 41: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

19

,

,

.

5.11 Hazardous

waste

Storage of hazardous waste in bunded areas to

avoid leaks escaping to the ground or nearby

surface waters

,

Hazardous

waste

bunded area

o

Observation of

hazardous

waste

Contractor

Subcontractor

Weekly

Low

There is no any

hazardous waste

on and bunded

areas of Sites

5.12 Monitoring

a)Monitoring water quality

b)Water samples, sent to local laboratory to be

tested for Water quality ph, oil, debris and etc

, ,

, , . .

Project

Site

Experimentation

of wastewater

Э

Laboratory

Quarterly

.

a)Low

Laboratory test for

water is being held

quarterly.

.

b) Low

Water samples

from potable, non

potable and

sewage are

tested quarterly

,

Page 42: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

20

6 Soil

6.1 Plan

Identify all possible soil pollution sources related

to construction activities

,

Project Site

Examination

of soil plan.

Contractor

PMU

In the

construction

process

Low

All possible soil

pollution sources

are under control

.

6.2 Site

control

a) Minimize the overall slope of the site

b) Ensure good landscaping and erosion control

Project

Site

Observation of

soil emission

Contractor

Subcontractor

During

construction

activity

a) Low

There are no much

slope areas at Sites

b) Low

Landscaping trees

are planted to

prevent erosion

around working site

,

6.3 Covering

a)Exposed slope surface shall be covered during

the rainy day

b)Open stockpiles of construction materials

covered during rainy day

Project

Site

Observation of

material store

Contractor

Subcontractor

During rainy

day

a) Medium

Exposed slope

surface will be

covered with

polyethylene

materials in rainy

days.

Page 43: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

21

.

b) Low

Open stockpiles of

construction

materials are under

control

.

6.4 Sediment

Sediment tanks can be used for settling

wastewater prior to disposal

Project

Site

Inspection of

sediment tank

ability

Contractor

Subcontractor

Install

sediment tank

Low

Sediment tanks

built for settling

wastewater prior to

disposal.

.

6.5 Drainage

facilities

All drainage facilities, erosion and sediment

control structures shall be regularly inspected

and maintained

,

Project

Site

Inspection for

maintenance

Contractor

Subcontractor

Monthly

Low

Refer to

construction

schedule where to

install the drainage

system.

,

.

Page 44: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

22

6.6 Vehicle

control

a)All vehicles and plant cleaned before leaving a

construction site

b)Ensure no earth, mud, debris and the like is

deposited by the mud roads

, , ,

Exits of the

project site

gate

Observation of

traffic

condition

Contractor

Subcontractor

Weekly

a) Medium

Heavy vehicles are

being cleaned.

.

b) Medium

The roads are

being cleaned from

mud after rain.

.

6.7 Road control

.

a)All road works separated from surface waters

b)All roads shall be properly sloped and have

adequate culverts to manage runoff

c)Earth works to construct drainage ditch sand to

lay sub surface drainage conducts

Project

Site road

Observation of

traffic

condition

Contractor

Subcontractor

Daily

a) Low

The road works

made as required

,

b)Low

All roads are sloped

as required

c) N/A /

6.8 Excavated

material

a)Excavated materials possible to used

reclamation fill

b)Surplus excavated materials quarry over

burden, rock rejected for aggregate, aggregate

surplus to the requirements and the like not

discarded in discriminately

,

Project

Site

Observation of

excavated

material

Contractor

Daily

a) Medium

Excavated soil is

being used for

filling for dump pits.

.

Page 45: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

23

, , ,

c)Different types of surplus excavated materials

deposited separately in the spoil dumps

designated for the purpose outside the Project

site

,

b) Low

All rocks are

removed from

Sites.

.

c) Medium

Big stones,

hammered

concretes removed

separately in the

designated spoil

dumps

,

7 Overall Spill Control

7.1 Management

a)Any spillage of fuel shall straight away be

absorbed by using sand or other absorbent

materials

. b)Develop spill response plan

. c)Only people with adequate training and

knowledge should handle fuel and chemicals to

avoid spills

, .

d) Fuelling should be one on concrete surface

provided with spill catch tank that can be easily

Project

Site

Observation

spill

Examination

of spill plan

Observation of

spilling

Contractor

Subcontractor

Daily

Prior to fuel

bulk storage

a) Low

Spillage of fuel and

oil is being

absorbed by using

sand and sawdust.

. b) Low

Spill response plan

is being used.

Page 46: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

24

cleaned and all spilled fuel recovered/safety

disposed

,

e) All repair and maintenance work to be done

either on concrete surface with oil spill catch

basins or oil catch pans provided at all service

areas

-

,

f) Routinely inspect all equipment handling

hazardous materials for leaks and spills

g) All fuel where spills and leakage area possible

e.g. the generator, must have basins installed to

prevent leakage

, ,

h) The recovered materials must be recycled

i) Fuelling equipment must be fitted with proper

fuel nozzles and devices to avoid accidental

spills

. c) Low

Only authorized

employees work

with fuel and

chemicals.

.

d) Medium

The fuelling

process is being

taken on gravel

surfaced fuel point.

. e) Low

All maintenance

works are held in

maintenance shop

with concrete

surface.

.

f) Low

All hazardous

materials are under

Page 47: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

25

control.

. g) Low

The fuel point has

spillage tank and

water reservoir.

h) Low

Recycling is used

where needed.

,

.

i) Low

Used only proper

fuel nozzles and

device.

.

7.2 Storing

a)All fuel stored on site shall be kept in drums or

in bulk tanks

, ,

b)Fuel storage area be located at a designated

place away from any source of ignition or open

Fuel

Storage

area

Observation of

oil storage

Contractor

Subcontractor

Daily

a) Low All fuel is stored in fuel point.

.

b) Low

Page 48: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

26

drain

c) “No Smoking” sign displayed at the storage

location and a charged fire extinguisher of the

correct type

« »

.

d)All fuel tanks and storage areas provided with

concrete embankment store a daily contain spills

e) Provide spill kits at all working areas

The fuel point has been built in designated place

.

c) Low Proper signs are posted and fire extinguisher exists at fuel point.

.

d) Low All fuel tanks and storage areas are safe from spills.

. e) Low Oil spillage trays and absorbents are provided at all working areas

,

.

7.3 Oil emission

Treat oily wastewater in coagulant separator

prior to discharge

Project

Site

Observation of

oily water

Contractor

Daily

Low

There is oil

Page 49: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

27

-

.

Subcontractor

separator for oily

wastewater prior to

discharge.

.

7.4 Refueling

Refueling of vehicles shall take place only in

designated areas

.

Fuel

Storage

area

Observation of

refueling

Contractor

Subcontractor

Daily

Low

The fuelling

process is being

taken only at

designated area.

.

7.5 Training

Fuel handling training shall include chemical

handling in the training program for assigned

personnel.

.

Training

Center

Training of oil

handling

Contractor

As needed

Low

The employees

who work with fuel

or chemicals,

passes by special

training.

,

,

.

8 Waste

8.1 Plan

a)Identify all possible waste pollution sources

b)Procedures detailed in the Material Safety Data

Sheet (MSDS) for hazardous materials included in

pollutants spillage control plan and followed in the even

to fan emergency situation

Project Site

Examination

of waste plan

Contractor

PMU

In the

construction

process

a) Low

All waste pollution

sources are

identified.

Page 50: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

28

,

,

. c) Should have "Keep a waste log" for all type of

wastes produced in construction area.

" " ,

.

.

b) Low

The MSDS and

spillage control

plan is under

control.

MSDS

.

c) Low

"Waste log" has

been given to each

department to

control the waste

" "

. 8.2 Waste

Disposal

Dispose unusable waste streams at permitted waste

disposal facilities

Disposal

facilities

Observation of

waste facility

Contractor

Subcontractor

Weekly

Low

Waste disposal

company takes out

all type of wastes

. 8.3 Waste

disposal

a)Separate waste disposal area shall be designated on

the construction site

b)Separate waste disposal area contains clearly

demarcated skips and bins to allow different types of

waste

Disposal

area

Observation of

waste control

Contractor

Subcontractor

Disposal

company

Daily

a)Low

Placed waste

separation

dumpsters in

designated area.

Page 51: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

29

c) Waste is separated into non-hazardous and

hazardous / potentially hazardous prior to reuse,

recycling or transport to Landfill

/

,

.

d) Domestic, metal scrap, used oil, paper, hazardous

etc.

, , , , . .

.

b)Low

Waste bins are

located for

separation in

designated area.

c) Medium

Waste is being

separated into non-

hazardous and

hazardous.

.

d) Low

Wastes are being

separated.

.

8.4 Reuse

a)Re-use the waste during construction

b)Re-use or recycle waste streams to other users at

other locations

c)The design of formwork could maximize the use of

standard wooden panels

Project

Site

Observation of

reuse waste.

Contractor

Subcontractor

Daily

a) N/A

Waste disposal

company takes out

all type of wastes /

.

b) N/A

Page 52: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

30

d)Alternatives such as steel formwork or plastic facing

could be considered to increase the potential for re-use

, ,

/

c) Low

There are used

standard wooden

formworks.

. d) Low

Steel and wooden

formworks are

reused.

,

u

.

8.5 Recycle

Waste

a .

Develop dedicated area for storage of recycled

material away from active construction works and near

site access point

.

Out of the

project site

Training of

waste disposal

Contractor

Subcontractor

Monthly

Low

There is dedicated

area for storage of

recycling material.

E

.

8.6 Rubbish bins

a) Provide sufficient bins with lids to store the solid

waste produced on a daily basis

,

.

b) Bins not allowed to become overfull and shall be

emptied as a minimum on a weekly basis

.

Project

Site

Observation of

waste disposal

Contractor

Subcontractor

Disposal

company

Weekly

a) Low

Standard waste

bins are placed at

Sites

.

Page 53: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

31

b) Low

Bins are being

cleaned before

overfull.

8.7 Rubbish bins

a)Implement adequate numbers of rubbish bins around

construction site and in construction camps

b)Install signage encouraging use of rubbish bins on

site and in construction camps

,

a)Project

Site

b)Contract

or Camp

c)Subcontr

actor

Camp

Observation of

waste disposal

Contractor

Subcontractor

Wastedisposal

company

Daily

a) Low

Providing with

sufficient waste

bins is ongoing.

b) Low

Waste bins are

marked with proper

signs.

,

. 8.8 Discharge

Prohibit dumping of discharge material in canal or

elsewhere on site

,

Project

Site

Observation of

dumping

Contractor

Subcontractor

Daily

Low

Dumping dredge in

canal is prohibited

. 8.9 Storing

a)Design and implement a temporary waste storage

area for domestic waste

b)Located away from living and eating areas

c)Separation of storage of hazardous and non-

Project

Site

Observation of

waste store

area

Contractor

Subcontractor

Daily

a) N/A

Waste disposal

company takes out

all type of wastes /

Page 54: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

32

hazardous waste

. b) Low

Waste boxes are

located far from

living and eating

places.

M

.

c) Low

Hazardous

materials are stored

in designated area

.

8.10 Storing

Containers used for the storage of chemical wastes

shall

,

,

a)Be suitable for the substance they are holding,

resistant to corrosion, maintained in a good condition,

and securely closed

, ,

,

,

b)Stored chemical in roofed areas with concrete

flooring.

.

Storage

area

Observation of

waste store

area

Contractor

Subcontractor

Daily

a) Low

Placed proper

waste bins in Sites.

.

b) Low

Chemical are

stored in special

chemical storage

area.

8.11 Storing/

The storage area for chemical waste shall

Project Site

Observation of

waste store

Contractor

Daily

a) Low

Chemical storage

Page 55: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

33

a) Be located away from surface water bodies.

b) Be constructed with a weatherproof cover, concrete

floor with bunding, and with adequate securable

storage bins for waste.

,

c) Have appropriate signage and signage system.

. d) Be clearly labeled and used solely for the storage of

chemical waste.

e) Be enclosed on at least 3 sides.

f) Be arranged such as to separate in compatible

materials

,

area

Subcontractor

area is located

away from water.

b) Low

Chemical storage is

Located in concrete

building.

.

c) Medium

The signs

describing chemical

storage area are

posted.

d)N/A

/

e) Low

Chemical storage

area is closed from

all sides.

.

f)Low

Materials

separation

arranged as

Page 56: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

34

properly.

, .

8.12 Training/

Include information on solid waste management in

construction worker training program

.

Training

center

Training of

waste disposal

Contractor

Subcontractor

Monthly

Random

Low

The information on

solid is included in

training program.

.

8.13 Separating

Wood and other scrap material with a commercial

value shall be separated and stored in segregated

areas prior to removal

Project

Site

Observation of

waste control

Contractor

Subcontractor

Daily

Low

Wood and other

scrap are

separated in

specified place

8.14 Battery

The dead batteries will be given to specialized

organizations for reuse

Project

Site

Observation of

battery

Contractor

Subcontractor

Monthly

Low

The dead batteries

will be controlled by

the maintenance

shop for reuse.

.

Page 57: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

35

8.15 Chemical

waste

Disposal of chemical waste shall

a) Be treated by a licensed waste collector.

b)Be to a facility licensed to receive chemical waste,

such as the chemical waste treatment

,

,

c)Hazardous and toxic waste shall not be disposed of

on the canal

d) Hazardous waste shall be removed from the site

property within 6 month.

6 .

e)Hazardous waste shall not be dumped onto the

ground, into rain water sewers or into sanitary sewer

system

, .

Project

Site

Observation of

chemical

waste

Contractor

Subcontract

or

Waste

collector

Daily

N/A

There is no

chemical wastes in

construction site /

.

8.16 Waste of

catering

a)Catering wastes is divided into food waste and

non-food waste

b)All organic food waste generated by kitchen

facilities to be disposed of at the farm

,

c)Food waste daily removed from the kitchen

d)Food waste always contained in plastic

containers for disposal

e) Non-food waste collected in separate containers

as beverage cans, packing materials, etc.

Catering

Observation of

catering

Contractor

Subcontra

ctor

Catering

company

Daily

a) Low

Catering wastes

are divided into

food and non-food

waste

. b)Low

The food wastes

are disposed of at

the farm daily

Page 58: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

36

, , -

, .

.

c)Low

The food waste is

removed daily out

of Kitchen

. d) Low

The food waste is

kept in plastic bag

and in plastic

container.

. e) Low

There is separate

containers for

nonfood waste as

beverage cans,

packing materials in

living camp.

,

.

8.17 Oily

wastewater

Oil and other lubricants must be collected in drums

and disposed of in accordance with CONTRACTOR

Project

Site

Observation of

oily waste

Contractor Daily

Low.

Oil and other

Page 59: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

37

A. Definition

A. High: The activity shall be carried out. Adequate control measures shall be established to bring the risk levels to medium before the activity can be performed.

: . .

B. Medium: The Activity shall be further analyzed to determine if any additional control measure are required. If required, such additional control measures shall be established before the activity can be performed.

: . , .

C. Low: No additional control measures will be required. :

instructions

water.

Subcontractor

lubricants are

disposed of by

Subcontractor in

accordance with

CONTRACTOR

instructions.

.

Page 60: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

1

УЗБЕКИСТАН

Отчет по экологии Ежемесячный аудит

Сентябрь 2014

Расширение Талимаржанской ТЭС | Консультанты реализации проекта |

| КРЕДИТ NO. 2629-UZB |

ФИНАНСИРУЕТСЯ: АЗИАТСКИМ БАНКОМ РАЗВИТИЯ |

СЕНТЯБРЬ 2014 |

• IN ASSOCIATION WITH:• SUBMITTED BY:

Page 61: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

2

Документооборот и проверочная ведомость

Наименование проекта: Проекта Расширения Талимарджанской ТЭС со строительством двух ПГУ мощностью по 450 МВт

№ Контракта: ADB LOAN NO. 2629-UZB

Название документа: Отчет по экологии – Ежемесячный аудит – Сентябрь 2014

История документа:

Версия Дата Подготовлено Проверено Утверждено

1.0 6 октября 2014 Наташа Сим Тери Фут Тери Фут

Page 62: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

3

Аббревиатура

ADB Asian Development Bank - Азиатский банк развития

CS-MM Corporate Solutions and Mott MacDonald Team – группа специалистов Консорциума компаний Corporate Solutions и Mott MacDonald

CCGT Combined Cycle Gas Turbine - Газовая турбина с комбинированным циклом

DMF Design and Monitoring Framework - Схема проектирования и контроля

EA Executing Agency - Организация-исполнитель

EPC Engineering Procurement Construction - Проектирование, материально-техническое снабжение, строительство

GoU Government of Uzbekistan - Правительство Узбекистана

HDEC Consortium of Hyundai and Daewoo - Консорциум компаний Hyundai и Daewoo

H&S Health & Safety - Охрана труда и техника безопасности

HSE Health, Safety, and Environment - Охрана труда, техника безопасности и защита окружающей среды

IA Implementing Agency - Учреждение по реализации программы

IC Implementation Consultant - Консультант по реализации проекта

IAS International Accounting Standards - Международные стандарты бухгалтерского учёта

IFI International Financial Institution - Международный финансовый институт

JICA Japan International Cooperation Agency - Японское Агентство по Международному Сотрудничеству

PAM Project Administration Manual - Руководство по управлению проектом

PFS Project Financial Statements - Финансовая отчётность проекта

PMU Project Implementation Unit - Подразделение по управлению проектом (ГАК «Узбекэнерго»)

TPP Talimarjan Power Project - Проект расширения Талимарджанской

ТЭС

UFRD Fund for Reconstruction and Development of the Republic of Uzbekistan - Фонд реконструкции и развития Республики Узбекистан

UZS Uzbekistan Som (currency unit) - Узбекский сум

VAT Value Added Tax - Налог на добавленную стоимость

WA Withdrawal Application - Заявка на снятие средств

Page 63: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

4

СОДЕРЖАНИЕ

1. ВВЕДЕНИЕ .................................................................................................................................................. 5

2. РЕЗУЛЬТАТЫ .......................................................................................................................................... 12

1.1. СТАТУС ПЗОС .....................................................................................................................................................12 1.2. ПРОВЕРКА ПЗОС ...............................................................................................................................................12 1.1. РЕКОМЕНДАЦИИ ................................................................................................................................................12 РЕКОМЕНДАЦИИ ДЛЯ ГРП ............................................................................................................................................12 1.2. ФОТОГРАФИИ ПЛОЩАДКИ ЗА СЕНТЯБРЬ 2014 ............................ ERROR! BOOKMARK NOT DEFINED.

ПРИЛОЖЕНИЕ A: ПРОТОКОЛ СОВЕЩАНИЯ – СОВЕЩАНИЕ ПО ЭКОЛОГИЧЕСКИМ

ВОПРОСАМ ........................................................................................................................................................ 55

ПРИЛОЖЕНИЕ B: ПИСЬМО В ГРП КАСАТЕЛЬНО ЭКОЛОГИЧЕСКИЗ ВОПРОСОВ ................ 60

ПРИЛОЖЕНИЕ C: ЗАМЕЧАНИЯ К ЕЖЕМЕСЯЧНОМУ ОТЧЕТУ HDEC ЗА ИЮЛЬ 2014......... 63

ПРИЛОЖЕНИЕ D: ЗАМЕЧАНИЯ К ЕЖЕМЕСЯЧНОМУ ОТЧЕТУ HDEC ЗА АВГУСТ 2014 ...... 79

ПРИЛОЖЕНИЕ E: ЗАМЕЧАНИЯ К ЕЖЕМЕСЯЧНОМУ ОТЧЕТУ HDEC ПО ЭКОЛОГИИ ЗА

СЕНТЯБРЬ 2014 .............................................................................................................................................. 94

ПОКАЗАЕЛИ И ТАБЛИЦЫ

Таблица 1: Ключевые экологические вопросы по состоянию на Сентябрь 2014 ............. 6 Таблица 2: Компании работающие в Сентябре 2014 ........................................................ 11 Таблица 3: Контактная информация .................................................................................. 11 Таблица 4: Пересмотренный ПЗОС ориентированный на площадку (HDEC, август 2014)

с CS-MM статус по состоянию на сентябрь 2014 ....................................................... 14

Page 64: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

5

1. ВВЕДЕНИЕ

CS-MM планирует выполнять экологические проверки дважды в год (в ноябре и мае каждого года) и вести ежемесячную регистрацию наблюдений.

Из-за того, что CS-MM не был на строительной площадке в июле, августе и почти весь сентябрь 2014, не были выпущены экологические отчеты. Поэтому данный отчет предоставляет исчерпывающий анализ экологического статуса на строительной площадке по состоянию на сентябрь 2014.

ОБЩЕЕ

Ежемесячная проверка: Сентябрь 2014

Даты посещения площадки: 18, 24, и 25 Сентября 2014

Средняя температура: 30 °C

Дата следующей ежемесячной проверки: Октябрь 2014

Инспекция площадки производилась:

1) Natasha Sim, Инженер по защите ОС CS-MM

Проверенные/выпущенные документы:

� ПЗОС – Проверенная версия за Август 2014

� июль, август, и сентябрь 2014 ежемесячные отчеты по экологии от HDEC

Метод экологических проверок Место и проверка:

� Визуальные осмотры � Обход площадки вместе с

сотрудниками экологами HDEC и Topalang

� Обсуждения управляющими на строительной площадке

� Встреча с директором Topalang � Присутствие на ежемесячном

совещании по ОТ и ТБ

� Область энергоблока � Область башни градирни � Административное здание и столовая � БСУ, область заправки, и область

мойки транспортных средств � Лагери размещения рабочих � Цех ремонта транспортных средств и

офисы на площадке

Детали хода работ по состоянию на конец сентября 2014:

� БСУ (x2), Область мойки транспортных средств, и область заправки топлива в эксплуатации

� Работы по обратной засыпке области башни градирни продолжаются и область насосной станции выкапывается.

� Область энергоблока – обратная засыпка почти завершена, фундамент котла утилизатора 2 был залит, фундамент ГТГ 2 был залит и продолжаются работы по армированию, стержневая арматура для ГТГ 3 установлена, бетон для котла утилизатора 3 находится под выдержкой, ПТГ 1 и 2 are заложены, и происходит установка арматуры установки конденсатоочистки системы регенерации.

� Фундамент Комнаты управления / административного здания был залит. И устанавливаются арматурные стержни и арматурные стойки устанавливаются.

� Здание столовой – завершено и эксплуатируется � Строительство рабочего лагеря (Topalang и HDEC) продолжается

Завершено в данном месяце:

� Встреча с Topalang и HDEC для обсуждения экологических проблем

Планы на следующий месяц

� CS-MM ожидает увидеть большое улучшение в экологических аспектах

Page 65: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

6

environmental concerns (Протокол приложен в Приложении А)

� Официальное письмо отправлено в ГРП касательно проблем защиты ОС (Приложение B)

� В детальной проверке экологии в соответствии с проверенным ПЗОС для строительной площадки

� разрешение природоохранных органов и регистрации продолжаются обсуждаться с ГРП и HDEC

на площадке � Эколог Topalang должен улучшить

меры по мониторингу

Дата 30 сентября 2014

Подписано – Инженер эколог

CS-MM, Наташа Сим

Был выполнен маленький экологический прогресс во время июля и сентября 2014. Очень много беспокойств, которые остаются неизменными и работы которые не соответствуют ПЗОС. Таблица 1 описывает ключевые экологические проблемы по состоянию на сентябрь 2014. Данные проблемы обсуждались с HDEC и Topalang на совещании которое произошло 24 сентября 2014 (Протокол приведен в Приложении A), и официальное письмо в ГРП (Приложение B).

Таблица 1: Ключевые экологические проблемы по состоянию на сентябрь 2014

Issue

Вопрос

Responsible Party

Ответственная сторона

Deadline

Конечный срок

Status

Статус

Environmental Normative Documents (ZEP)

As of the end of September 2014, CS-MM and the PMU have not received a formal letter from HDEC stating that the ZEP for construction is not needed.

Furthermore it is still unclear who is responsible, if at all, for either obtaining a ZEP for operation or paying environmental compensation fees for working facilities (i.e. batch plant, refuelling area, worker’s camps, etc.).

Нормативные документы относящиеся у окружающей среде (ЗЭП)

По состоянию на конец Сентября 2014, CS-MM и ГРП не получили официальное письмо от HDEC в котором говорится, что ЗЭП не нужен для

HDEC Issue ongoing from February 2014

Вопрос продолжается с февраля 2014

HDEC state that they have received an official letter from the Karshi Environmental Committee stating that a ZEP for the construction period is not needed. They have not sent this letter to CS-MM or the PMU.

HDEC is currently in the process of determining what is required for the working facilities and who is responsible for this. It is the opinion of CS-MM, that the EPC Contractor and subcontractor would be responsible for ensuring that working facilities are following local environmental regulations.

HDEC сообщил что они получили официальное письмо от Каршинского Комитета по охране ОС в котором указано что ЗЭП для строительного периода не нужен. Они не отослали данное письмо ни в CS-MM ни в ГРП.

HDEC на данный момент в процессе определения что необходимо для рабочих установок и кто ответственный за это. CS-MM считает

Page 66: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

7

строительства.

Поэтому, не ясно до сих пор, кто является ответственной стороной за получение ЗЭП для эксплуатации, либо за оплату компенсации для рабочих структур (таких как БСУ, область заправки, рабочие лагеря, и т.д.)

что ЕРС Подрядчик и субподрядчик должны быть ответственными за гарантию того, что рабочие установки соответствуют местным экологическим нормативам.

Resource records and quantitative environmental data

The monthly environmental reports from HDEC still do not contain adequate data for CS-MM to do a proper environmental analysis of the construction site.

The following data is outstanding:

- Wastewater quantities - Water usage quantities - Test results from water

quality analysis including information on where the sample were taken from (some of this information is provided in the July 2014 monthly environmental report)

- Type and quantities of waste

- Quantitative emissions results (to the air)

Регистрация ресурсов и количественные показатели по экологии

Ежемесячные экологические отчеты от HDEC до сих пор не содержат правильной информации для того чтобы CS-MM выполнил тщательный экологический анализ строительной площадки.

Следующая информация отсутствует:

- Количество стоков

- Количество используемой воды

- Результаты тестирования из анализа о том где были взяты пробы (некоторая данная информация предоставлена в июле 2014 в ежемесячном отчете по экологии)

HDEC and Topalang

Ongoing issue from the start of the projectВопрос продолжается с начала проекта

Since January 2014 CS-MM have stated that the environmental monthly reports produced by HDEC need to be more detailed. They need to include quantitative environmental data.

С января 2014 CS-MM заявлял неоднократно что ежемесячные отчеты по экологии от HDEC должны быть более детальными. Они должны включать экологические количественные показатели

Resource records need to be improved. This has been emphasized by CS-MM in most of our monthly environmental reports. Without quantitative date it is difficult for us to do any environmental assessment aside from visual site visit inspections.

Регистрацию ресурсов необходимо улучшить. Это было подчеркнуто CS-MM в большинстве ежемесячных отчётов по экологии. Без количественной информации очень трудно для нас выполнить какую-либо экологическую оценку, кроме визуальной проверки площадки.

Based on the HDEC monthly environmental reports for July and August 2014, resource monitoring has improved slightly as there are now water quality results. However the quality indicators for discharge do not show the locations and quantities of discharge.

Основываясь на ежемесячном отчете по экологии за июль и август 2014, контроль ресурсов немного улучшился так как теперь имеются результаты о качестве воды. Однако показатели качества для выброса не отражают места и объемы выбросов.

The Contractor is not producing statistical reports for any environmental authority. If this is not required a letter from the environmental authorities must be provided. Regardless it is international best practice to keep resource records.

Контракт не производит статистические отчеты ни для какого органа по охране ОС. Это не нужно,

Page 67: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

8

качества воды включая информацию

- Тип и количество отходов

-Количество выбросов (в атмосферу)

письмо от органа по контролю состояния окружающей среды должно быть предоставлено. Несмотря на международный опыт необходимости вести регистрацию ресурсов.

Water meters

Lack of water meters has been a concern since the start of the project. Some were purchased by Topalang in June 2014 and partially installed, however they are not being used and are not certified.

Счетчики воды

Недостаток счетчиков воды был беспокойством с начала проекта. Некоторые счетчики были закуплены Topalang в июне 2014 и частично установлены, однако они не используются и не сертифицированы.

Topalang

HDEC

Ongoing from May 2014

Продолжается с Мая 2014

Remains Open. No progress has been made since June 2014 with regards to water meter installation and certification.

Остается открытым. Не выполнено никакого прогресса с июня 2014 касательно установки счетчиков воды и их сертификации.

Topalang confirmed that the water meters are not officially installed. They are not using them to pay for water because the Presidential Decree (PP-1933, 7 March 2013) states that Uzbekenergo is responsible for paying for utilities and therefore there is no incentive for them to use the water meters. Topalang подтвердил что счетчики воды не официально установлены. Они не используют их для оплаты воды согласно Постановления Президента (ПП-1933, от 7 марта 2013) в котором указано что Узбекэнерго ответственный за уплату за коммунальные услуги и поэтому нет причин для них использовать счетчики воды.

However the EMP and international best practice requires that accurate monitoring of resource usage takes place. The water meters do not have to be used for payments, but should be used for recording accurate quantities.

Однако ПЗОС и международный опыт требует того, чтобы велся правильный контроль используемых ресурсов. Счетчики воды не должны использоваться для оплаты, а должны использоваться для регистрации правильного количества.

Drinking water

A filter was installed on the 26/06/2014 however it was damaged / poorly maintained after 20 days of operation and has not been repaired. Workers are drinking from the technical water supply.

Питьевая вода.

Фильтр был установлен 26.06.2014, однако он был сломан/плохо обслуживался технически после 20 дней эксплуатации и до сих пор

Topalang

HDEC

Open. The filter should either be fixed or another source of good quality drinking water needs to be provided to the workers.

Открыт. Фильтр должен быть починен либо другой источник хорошего качества питьевой воды необходимо предоставить для рабочих.

Page 68: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

9

не починен. Рабочие пьют воду для технических нужд.

Drainage on site

Drainage and wastewater treatment at the batch plant, refuelling area, and vehicle washing need to be vastly improved.

Currently there is no drainage at the batch plant (an issue that has been raised several times over the past 3 months).

The refuelling area should be paved and adequate drainage and wastewater treatment should be provided. Furthermore a catch basin around the fuel tanks should be installed.

The vehicle washing area wastewater collection and treatment needs to be improved.

Дренаж на площадке

Очищение дренажа и стоков на БСУ, области заправки и области мойки транспортных средств необходимо хорошо улучшить.

На данный момент отсутствует дренаж на БСУ (вопрос который поднимался несколько раз за последние 3 месяца)

Область заправки должна быть замощена и правильный дренаж, а так же очищение стоков должны быть предоставлены. К тому же бассейн отстойник должен быть установлен вокруг топливных баков

Topalang under the supervision of HDEC

Ongoing issue from May 2014

Open. Still needs to be vastly improved. Topalang has assured improvement by mid-October 2014 during a meeting held on the 24 September 2014 (MoM in Appendix A).

Section 3 of the general terms and conditions of the HDEC and Topalang Contract states:

21.8 “The subcontractor shall be responsible for pollutions emanating from its own equipment”.

Photograph 1, 2, 3, and 8.

Открыт. Все еще необходимо в большой степени улучшить. Topalang заверил улучшение к середине Октября 2014 во время встречи которая прошла 24 сентября 2014 (Протокол прилагается в Приложении А)

Раздел 3 общих положений и условий Контракта между HDEC и Topalang гласит:

21.8 «Субподрядчик должен быть ответственным за загрязнения исходящие из своего собственного оборудования».

Фото 1,2,3 и 8.

Revised EMP

The revised EMP needs to be officially approved by the PMU.

Пересмотренный ПЗОС

Пересмотренный ПЗОС необходимо официально утвердить стороной ГРП.

PMU

ГРП

10 October 2014

10 Октября 2014

Closed. The revised EMP was sent by HDEC to the PMU on the 6 August 2014, however it still needs to be officially approved by the PMU.

Закрыт. Пересмотренный ПЗОС был отправлен HDEC в ГРП 6 августа 2014. Однако ГРП должна его до сих пор официально утвердить.

Waste Management

Waste management on site

HDEC Ongoing issue

Remains Open. Deadline has passed. The waste management situation has

Page 69: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

10

still needs to be improved with more accessible and appropriate waste bins and a waste management plan for various waste types.

Управление отходами

Управление отходами на площадке все еще необходимо улучшить более доступными и более подходящими мусорными баками а так де планом управления отходами для различного типа отходов.

Topalang since May 2014

Вопрос продолжается с мая 2014

only slightly improved.

More bins should be provided and more waste separation should take place.

Остается открытым. Конечные сроки прошли. Ситуация по управлению отходами немного улучшилась.

Больше мусорных баков должно быть предоставлено а так же больше разделения мусора должно происходить на площадке.

HDEC Monthly Environmental Reports

Ежемесячные отчеты HDEC по экологии

The monthly environmental reports from HDEC need to include more detailed information. Furthermore at the moment there are many statements that are misleading (as described in CS-MM comments on the HDEC monthly progress reports). The reports lack information on key environmental issues such as environmental payments, analysis of test results, and any issues with the sub-contractor. Ежемесячные отчеты по экологии от HDEC должны включать больше детальной информации. К тому же на данный момент имеется много заявлений которые вводят в заблуждение (как описано в замечаниях CS-MM к ежемесячным отчетам HDEC о ходе работ). В отчетах не хватает ключевых экологических вопросов, таких как экологические платежи, анализ результатов тестирования, и любые вопросы с субподрядчиком. It appears that the PMU is not transferring the CS-MM comments to HDEC. This is unacceptable and needs to be done in order to achieve improvement. Кажется что ГРП не передает замечания CS-MM в HDEC. Это не

HDEC

PMU

30 October 2014

30 октября 2014

Open.

Refer to Appendix C, D, and E for CS-MM comments on the July, August, and September HDEC Monthly Environmental Reports.

Открыт.

См. Приложение С,D и Е – замечания CS-MM за июль, август и сентябрь к ежемесячным отчетам HDEC по экологии.

Page 70: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

11

приемлемо и необходимо выполнять чтобы добиться улучшения.

Таблица 2: Работающие компании в сентябре 2014

Компания Должность

HDEC Генподрядчик

PGU Tupalang Субподрядчик

KS & Technology S Субподрядчик

Таблица 3: Контактная информация

Имя Компания Должность Контакты (email и/или тел.)

Jeong-Hyeon Kim Hyundai Менеджер по ОТ и ТБ

[email protected]

+998 90 444 1239

Husan Khidirov Hyundai Инженер по От и ТБ

[email protected]

+998 93 423 3114

Oybek Amanov Hyundai Эколог [email protected]

+998 90 639 5418

Bazzarov Irkin Nazomutdiyouvich

PGU Tupalang Инженер по ОТ и ТБ

91 218 65 33

Nizom Rakhimov Talimarjan Эколог +998 93 900 1936

Oybek Shaybalov PGU Tupalang Эколог +998 93 697 1112

Page 71: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

12

2. РЕЗУЛЬТАТЫ

1.1. Статус ПЗОС

Статус выполнения ПЗОС, по состоянию на 26 сентября 2014, показан в Таблице 4. Проверенный ПЗОС от 6 августа 2014 был использован для данного анализа.

Экологическая ситуация на строительной площадке не правильная для многих работ и не соответствует ПЗОС ориентированному на строительную площадку. Данные вопросы обсуждались на совещаниях между Topalang и HDEC 24 сентября 2014 (Протокол в Приложении А) и официальное письмо в ГРП было направлено 26 сентября 2014 (копия письма в Приложении В).

1.2. Проверка ПЗОС

Было согласовано что каждые 6 месяцев ПЗОС будет пересмотрен для постоянного улучшения. В мае 2014, HDEC, ГРП, и CS-MM пересмотрели и проверили ПЗОС чтобы отразить текущие условия и состояние площадки. Цель проверки – гарантировать постоянные улучшения (ISO 14000).

. Пересмотренная версия ПЗОС ориентированного на площадку, была предоставлена в ГРП 6 августа 2014г. HDEC ждет официального утверждения от ГРП. Следующая ревизия ожидается в Ноябре 2014.

1.1. Рекомендации

Рекомендации для ГРП

� Беспокойства поднятые в письме от CS-MM в ГРП должны быть донесены до HDEC

� ГРП должна продолжать гарантировать что местные стандарты по экологии соблюдаются в плане отчетности экологической статистики и разрешений.

� Эксперт ГРП в области ООС должен посещать строительную площадку более чаще (рекомендуется раз в квартал)

� Все замечания и рекомендации предоставляемые CS-MM должны быть переданы в HDEС для выполнения улучшения.

Рекомендации для экологов HDEC и Topalang

ГРП должна рекомендовать следующее для HDEC:

� HDEC должен улучшить текущую экологическую ситуацию, так как много аспектов ПЗОС не выполняются. Письмо от CS-MM в ГРП описывающее необходимые улучшения, так же как и описано в таблице 1 и таблице 4. Следующие области необходимо улучшить:

o Дренаж на площадке o Очищение сточных вод и ее выброс o Регистрация ресурсов (включая установку водных счетчиков) o Управление отходами o Контроль розлива и обучение o Природоохранные разрешения для существующих сооружений и

компенсационные экологические выплаты � Проведение экологическое обучение, когда менеджеры площадки

объясняют цель ПЗС и ответственности. .

Page 72: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

13

Page 73: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

14

Table 4: Revised Site Based Environmental Management Plan (HDEC, August 2014) with CS-MM Status September 2014

No No Aspect

Аспект

Mitigation

Меры по снижению воздействия

Location

Место

Monitoring

Контроль

Responsible

Ответствен

ные

CS-MM comments as of the 25

September 2014

Замечания CS-MM по

состоянию на 25 сентября

2014

1 Management/ Управление

1.1 Informing Introduce types of emission and countermeasures.

Представьте виды выбросов и счетчиков мер.

Officialy

Официально

1) PMU

ГРП

This plan fulfills this point,

and therefore it is considered

complete as long as the

EMP is periodically (every 6

months) updated for

continual improvement.

Данный план выполняет

данный пункт, и поэтому

считается завершенным так

как ПЗОС периодически

(каждые 6 месяцев)

обновляется для постоянного

улучшения.

1.2 Emergency a) Every three months has emergency drills.

Провести противоаварийную тренировку в

каждом три месяце.

b) Confirms the role of individual Подтвердить индивидуальную

ответственность.

Project

Site

Площадка

проекта

Observatio

n of

emergency

Наблюден

ие

1)

Contract

or

Подрядч

ик

2)

Subcontr

actor

Субподр

ядчик

a) Yes. Emergency drills are

taking place and are

recorded in the HDEC

Monthly Progress Reports

(MPR). The next drill is due

in November 2014

b) Yes

а) да. учения по действиям

в чрезвычайных ситуациях

происходят и

Page 74: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

15

регистрируются в

ежемесячных отчетах

HDEC о ходе работ.

Следующее учение по

действиям в чрезвычайных

ситуациях должно

проводиться в ноябре 2014

b) да

1.3 Traffic a) All traffic signs, signals, and road markings

must be obeyed.

Все дорожные знаки, сигналы и дорожные

отметки должны быт соблюдены.

b) Authorized transportation of equipments and

materials entry to the site

Уполномоченная перевозка оборудования и

вступления материалов на сайт

c) Speed of transport vehicles should be strictly

controlled in the access road to TPP

Скорость транспортных средств должны быть

строго контролированы на подъездных дорогах

к ТЭС.

Project

Site

Площадка

проекта

Inspection

of traffic

conditions

Проверка

1)

Contract

or

Подрядч

ик

2)

Subcontr

actor

Субподр

ядчик

a) Traffic signals and road

signs are present on site.

Drivers are occasionally

observed driving too fast or

talking on their phones while

working however it is being

controlled by HDEC.

b) Yes - checks are made on

a random basis

c) Yes

а) указатели дорожного

движения дорожные знаки

присутствуют на площадке.

Наблюдалось что иногда

водители превышают

скорость и говорят по

телефону во время

работы, однако это

контролируется HDEC

b) да-проверки

выполняются нерегулярно

Page 75: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

16

1.4 Monitoring Monthly monitoring of the following should take

place:

� Fuel (m3)/ Топливо

� Electricity (KWh)/ Электричество

� Water (m3)/ Вода

Project

Site

Площадка

проекта

Observatio

n use of

sources

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcontra

ctor

Субподрядч

ик

Resource records need to be

improved. HDEC needs to have

more detailed and accurate

information.

The water meters have not been

installed properly and the actual

consumption is not recorded.

This is unacceptable.

Overall more environmental report monitoring needs to take

place. See Был выполнен маленький экологический прогресс во время июля и сентября 2014. Очень много беспокойств, которые остаются неизменными и работы которые не соответствуют ПЗОС. Таблица 1 описывает ключевые экологические проблемы по состоянию на сентябрь 2014. Данные проблемы обсуждались с HDEC и Topalang на совещании которое произошло 24 сентября 2014 (Протокол приведен в Приложении A), и официальное письмо в ГРП

Page 76: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

17

(Приложение B).

Таблица 1 for more information on this.

Регистрацию ресурсов необходимо улучшить. HDEC необходимо иметь более детальную и правильную информацию. Счетчики воды не были правильно установлены и фактический расход не регистрируется. Это не приемлемо. В общем необходимо проводить больше экологического контроля. См.Таблицу 1 для более детальной информации для этого.

2 Air / Воздух

2.1 Plan / План Identify all possible air pollution sources

related to construction activities

Определить все возможные источники

загрязнения воздуха.

Project

Site

Площадк

а

проекта

Examinatio

n of air

plan

Оценка

1)Contra

ctor

Подрядч

ик

HDEC should provide the plan to CS-MM and the PMU. HDEC должен предоставить план CS-MM и ГРП

2.2 Exhaust fumes

Выхлопные

газы

a) Regularly serviced and maintained to be in

good condition vehicles and Equipment

Транспортные средства и оборудование

постоянно обслуживаются и

поддерживаются в хорошем состоянии

b)Forbid the burning of coal, waste, or wood

on site

Запретить сжигание угля, отходов или дерева

Maintenance

Area

Зона

обслуживан

ия

Project Site

Площадка

проекта

Inspection

of air

emission

Проверка

Observatio

n of air

1)Subcon

tractor

Субподр

ядчик

2)Appropriat

e manager

Соответств

ующий

a) Yes - vehicles in bad

condition are repaired. The

vehicle rental company

needs to supply vehicles in

good condition. The on-site

vehicle repair shop is

operational and in good

condition.

Page 77: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

18

на площадке c)Reduce idle time of all vehicles

Уменьшить время простоя всех транспортных

средств

polution

Наблюден

ие

менеджер b) Yes – no burning is

observed on site.

c) Yes – vehicles are not

seen idling.

А) да- транспортные

средства в плохом

состоянии – чинятся.

Компания аренды

транспортных средств

должна предоставлять

транспортные средства в

хорошем состоянии. Цех

починки транспортных

средств на площадке

работает и в хорошем

состоянии.

b) да- сжигание не

наблюдалось на площадке

с) да-транспортные

средства в нерабочем

состоянии не наблюдались

3

Dust / Пыль

3.1 Plan / План Identify all possible dust pollution sources

related to construction activities

Определить все возможные источники

загрязнения пылью, связанные со

строительными работами

Project

Site

Площадк

а

проекта

Examinatio

n dust plan

Оценка

1)Contra

ctor

Подрядч

ик

2)PMU

ГРП

HDEC should provide CS-MM/PMU with the official list of dust sources; at the moment the environmental officers have only determined the sources informally.

Page 78: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

19

3.2 Watering

Увлажнение

Watering shall be implemented to control dust

where

Увлажнение должно быть применено для

контроля запыленности:

a) Working areas

Рабочие зоны

b) Exposed areas

Открытые зоны

c) Active cuts excavation and fill sites

Действующие срезы выемки и засыпки

Project

Site

Площадк

а

проекта

Observatio

n of

watering

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a, b, c) The roads are

watered 6 times per day

using a water truck.

Furthermore stockpiles and

exposed areas are also

frequently watered. It is

unknown where the water

truck is filled up and the

monthly environmental

reports do not record the

quantities of water used.

A,b,c) дороги поливаются 6

раз в день с помощью

водовоза. А так же отвалы

и экспонированные

области так же часто

поливаются водой. Не

известно где водовоз

наполняется и

ежемесячные отчеты по

экологии не ведут

регистрацию количества

использованной воды.

3.3 Site control

Контроль

площадки

a) Minimize size and duration of exposed

areas

Минимизировать размер и

продолжительность открытых зон

b) Keep hauling roads in good condition

Сохранить транспортировочных дорог в

Project

Site

Площадк

а

проекта

Observatio

n dust

control

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

a) Yes – exposed areas are

kept to a minimum wherever

possible. Furthermore grass

and wheat is being planted

outside of the Power block

area to further reduce dust.

Page 79: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

20

хорошем состоянии. Субподр

ядчик

Photograph 9.

b) Yes - hauling roads are in

decent condition, however

no engineering of the access

roads has taken place.

А) да- экспонированные

области сведены к

минимуму где возможно. К

тому же трава и зелень

посажены снаружи области

Энергоблока чтобы

уменьшить уровень пыли.

Фото 9.

b) да- подъездные дороги в

хорошем состоянии,

однако, проектирование

подъездных дорог не

происходило.

3.4 Material

control

Контроль

материалов

Minimize size and duration of materials

stockpiles

Минимизировать размер и

продолжительность склада материалов.

Lay down

Складская

площадка

Observatio

n material

storage

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Yes – size and duration of

stockpiles are kept to a

minimum.

Да-размер и время

отвалов сведены к

минимуму.

3.5 Material

control

Контроль

материалов

a)Minimum practical height to limit the fugitive

dust generation from unloading excavated

materials

Высота, с которой выкопанные материалы

сбрасываются, должна контролироваться

Project

Site

Площадка

проекта

Observatio

n of work

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

a) Yes – training has been

provided on how to control

dust related to excavated

materials. Dust is still

abundant during excavation

Page 80: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

21

до минимальной практической высоты для

ограничения образования сдуваемой пыли

от разгрузки.

b) Cement debagging should take place in a

sheltered area.

Вынимание из мешков цемента должно

происходить на закрытой площадке

Batching

Plant

area

tractor

Субподр

ядчик

on windy and dry days but its

difficult to practically reduce

this.

Photograph 6.

b) Yes – cement is deposited

directly from the train into the

bunkers.

А) да-обучение было

предоставлено на тему как

контролировать уровень

пыли, которая относится к

выкопанным материалам.

Уровень пыли все еще

большой во время

проведения земляных

работ или в пыльные и

сухие дни, но практически

уровень пыли тяжело

уменьшить.

b) да- цемент разгружается

прямо из поезда в

хранилище.

3.6 Vehicle control

Контроль

транспортных

средств

a) Limiting vehicle-entrained dust from

unpaved roads

Ограничивать пыль, поднимаемую

транспортными средствами, с грунтовых

дорог

b) Limiting vehicle speeds (20 km/h in Project

Site) and restricting traffic volumes

Ограничение скорости транспортных

средств и ограничения объемов

Project

Site road

Дорога

площадк

и

проекта

Observatio

n of traffic

condition

Наблюден

ие

1)

Contract

or

Подрядч

ик

2 )Subco

ntractor

Субподр

ядчик

a) Yes - all roads on site are

currently unpaved, however

dust is being controlled

b) Yes - there are signs on

the road limiting speed and

vehicles are controlled by

HDEC

c) Yes

d) Yes

Page 81: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

22

транспортных потоков

c) Trucks have proper fitting side and tail

boards

Грузовики должны иметь подходящие

боковые и задние откидные стенки

d) Materials shall also be dampened, if

necessary, before transportation

Материалы также должны быть увлажнены,

если необходимо, перед транспортировкой

e) Covering trucks during transport of materials

(if required)

Накрывать грузовики во время

транспортировки материалов

e) Not presently necessary

a) да – все дороги на

площадке на текущий

момент не замощены,

однако уровень пыли

контролируется

b) да- на площадке

имеются дорожные знаки,

которые ограничивают

скорость транспортных

средств и контролируются

HDEC

c) да

d) да

e)на данный момент нет

необходимости

4

Noise / Шум

4.1 Plan / План a) Identify all possible noise pollution sources

related to construction activities

Определить все возможные источники

шума, относящиеся к строительным

работам

b) Posting Signboards on construction sites

and/or stickers on equipment outlining how

affected parties can lodge complaint

Установить вывески на строительных

площадках и/или наклейки на оборудование

с изложением как заинтересованные

стороны могут подать жалобу.

Project

Site

Площадк

а

проекта

Examinatio

n of noise

plan

Оценка

1)Contra

ctor

Подрядч

ик

2)

Subcontr

actor

Субподр

ядчик

a) They have not been

identified in a formal or

systematic way. This should

be improved and a list should

be provided to CS-MM/PMU

b) Not taking place

а) они не были не определены

формально или

систематически. Это должно

быть улучшено и список

должен быть предоставлен в

CS-MM/ГРП

b) не происходит.

Page 82: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

23

4.2 Noise level

Уровень

шума

a) Inspect noise level of the construction

equipment

Проверить уровень шума с использованием

строительного оборудования

b) Equipment Noise limit will comply with Item

223 of EIA.

For example. Direction of Nuristan are limited

to 80 dba 1m

Оборудование определения шума будет

соответствовать пункту 223 ОВОС.

Например. Направление Нуристан

ограничен на 80 дБА 1м

c)Use appropriate PPE (earplug, earmuff) if

exceeds noise limits

Используйте соответствующие СИЗ

(затычка для уш,наушник), если превышает

пределы шума

Project

Site

Площадк

а

проекта

Inspection

of noise

level

Проверка

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a, b) Noise levels are inspected

4 times per month using a hand

held device. The results are

provided to CS-MM and the

PMU in the environmental

monthly reports. It is advised to

also record the time of the

measurements.

c) Not everyone is wearing

appropriate PPE for high-level

noise. Site staff have been

instructed to wear ear

protection.

А,b) уровни шума

проверяются 4 раза в месяц

используя портативный

прибор. Результаты

предосавлены в CS-MM и

ГРП в ежемесячных отчетах

по экологии.

С) не все носят

соответствующие СИЗ для

повышенного уровня шума.

Персонал не

проинструктирован как

носить защиту для ушей.

4.3 Vehicle control

Контроль

транспортных

средств

a) Limiting vehicle speeds (20 km/h at Project

Site )

Ограничение скорости транспортных

средств

b) Restrict truck movements at night time and

Project

Site road

Дорога

площадк

и

Observatio

n of traffic

control

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

a) Yes – there are

occasionally some violations

but HDEC is keeping this

under control

b) Yes – trucks are not

Page 83: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

24

restrict truck movements to major transport

routes

Ограничить передвижение грузовиков

только в ночные часы и ограничить

передвижение грузовиков к основным

транспортным маршрутам.

проекта tractor

Субподр

ядчик

currently being used during

night shifts

а) да – есть некоторые

отклонения но HDEC

держит это под контролем.

b) да-грузовики на данный

момент не используются в

ночную смену

4.4 Vehicle control

Контроль

транспортных

средств

Regularly serviced and maintained to be in

good condition vehicles and Equipment

Транспортные средства и оборудование

постоянно обслуживаются и

поддерживаются в хорошем состоянии

Maintenance

area

Зона

обслуживани

я

Inspection

of repair

records

Проверка

1)Subcon

tractor

Субподр

ядчик

2)Appropriat

e manager

Соответств

ующиймене

джер

Yes. There is a vehicle repair

workshop on site. All

vehicles are kept in good

working condition and HDEC

is controlling this.

Random checks are carried

out and inadequate vehicles

are removed. The

environmental officer

should have a plan for

checking the maintenance

plans of vehicles and be

able to carry out spot

checks.

Да. На площадке

имеется цех по ремонту

транспортных средств.

все транспортные

средства содержатся в

хорошем рабочем

состоянии и HDEC

контролирует это.

Page 84: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

25

Различные проверки

проводятся и

несоответствующие

транспортные средства

удаляются с площадки.

Эколог должен иметь

план проверки планов

технического

обслуживания

транспортных средств

и должен проводить

выборочные проверки

4.5 Equipment

control

Контроль

оборудования

a)Equipment shall be operated within

specifications and capacity

Оборудование должно использоваться в

пределах спецификаций и мощности

b) Equipment shall be operated in as

diversified a manner as possible

Оборудование должно использоваться

максимально диверсифицировано

c) Equipment shall be turned off when not in

use

Оборудование должно выключаться, когда

не используется

d) Work using machines or vehicles shall be

prohibited at night shift work time.

Работы с использованием машин или

транспортных средств должны быть

запрещены в ночное время.

e)Air intakes, vents, and stacks should be

Project

Site

Площадк

а

проекта

Observatio

n work of

equipment

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a) Yes

b) Yes

c) Yes

d) Yes - heavy machinery is

not being used during night

shifts. In the case that it is

needed, a working permit

must be obtained.

e) Yes – vendor packages

are being examined to

ensure they have the

appropriate devices.

a) да

b) да

c) да

d) да – тяжелая техника не

используется в ночные

смены, но в случае

Page 85: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

26

fitted with suitable noise attenuating equipment

(if required)

Воздухозаборники, вентиляторы и

вентиляционные каналы должны быть

оборудованы соответствующим

шумопоглощающим оборудованием (при

необходимости)

необходимости, нужно

получить разрешение.

e)да-поставки поставщика

проверяются на наличие

всех соответствующих

деталей.

4.6 Equipment

control

Контроль

оборудования

Select the time when the environment is least

sensitive to noise impact using pile drivers,

jack hammers, and rock drills

Выбрать время, когда окружающая среда

наименее чувствительна к воздействию

шума при использовании сваебойных

каперов, отбойных молотков и буров

Project

Site

Площадк

а

проекта

Inspection

of noise

level

Проверка

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Yes – this is taking place and

it should also be noted that

the construction site is not

near to any sensitive

receptors.

Да- это происходит и это

должно быть так же

отмечено, что

строительная площадка

находится далеко от

чувствительным во

реципиентов

5

Waste water / Сточные воды

5.1 Plan / План Identify all possible wastewater pollution

sources related to construction activities

Определить все возможные

источникисточных вод, относящиеся к

строительным работам

Project

Site

Площадк

а

проекта

Examinatio

n of

wastewater

plan

Оценка

1)Contra

ctor

Подрядч

ик

They have not been identified

in a formal or systematic way.

This should be improved and

a list should be provided to

CS-MM/PMU

Они не были определены

официально или

систематически. Это должно

быть улучшено и список

должен быть предоставлен

в CS-MM/ГРП

.

Page 86: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

27

5.2 Batch plant

control

Контроль РБУ

Waste water from concrete batching plant

operation and shall not be discharged overland

Сточные воды, образованные от работы

РБУ, не должны сбрасываться на

поверхность земли

Batching

Plant

area

Зона

РБУ

Observatio

n of

wastewater

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Inadequate. The draining as

the batch plant is not

adequate. This was discussed

during the meeting with

Topalang on the 27th

September 2014. The

drawings for the drainage

plans need to be improved

and implemented as soon as

possible.

As with all operational facilities

on site, HDEC need to confirm

what environmental permits are

needed, if any.

Photograph 1, 2, & 3.

Не правильно. Дренаж на

БСУ не правильный. Это

было обсуждено на

совещании с Topalang 27

сентября 2014. Чертежи для

дренажных планов

необходимо улучшить и

выполнить как можно

скорее. Что касается всей

эксплуатации структур на

площадке, HDEC необходимо

подтвердить какие

экологические разрешения

необходимы, если есть

таковые.

Фото 1,2 и 3.

Page 87: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

28

5.3 Washing water

Промывочная

вода

Undertake settling and neutralization of

alkaline washing water containing excessive

cement prior to discharge

Произвести осадку и нейтрализацию воды

щелочения, содержащей большое

количество цемента, до утилизации

Batching

Plant

area

Зона

РБУ

Observatio

n of

washing

water

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Inadequate. The settling

ponds at the batch plant are

not operational and they are

not properly constructed or

designed.

The batch plant is in full

operation.

As with all operational facilities

on site, HDEC need to confirm

what environmental permits are

needed, if any.

Photograph 1, 2, & 3.

Не правильно. Бассейны

отстойники на БСУ не

работают и они не

правильно сооружены либо

спроектированы. БСУ в

полной эксплуатации. Что

касается всех рабочих

сооружений на площадке,

HDEC должен подтвердить

какие экологические

разрешения необходимы,

если есть таковые.

Фото 1,2 и 3.

5.4 Washing water

Промывочная

вода

a) All washing of equipment or machinery shall

be undertaken in designated areas

Мойка всего оборудования и машин должна

производиться в обозначенных зонах

b)Washing of equipment areas must be

equipped with a suitable impermeable floor

Truck

washing

area

Зона

промывк

и

Observatio

n of

washing

area

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

a) No – there is a vehicle

washing area on site,

however vehicles are not

always washed there.

b) Inadequate – the vehicle

Page 88: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

29

and sump/oil trap

Зоны мойки должны быть оборудованы

подходящими водонепроницаемыми

полами источными колодцами /

маслоуловителями.

Субподр

ядчик

washing area is not

properly paved and the oil

trap is not functional. This

needs to be improved as

soon as possible.

As with all operational

facilities on site, HDEC need

to confirm what

environmental permits are

needed, if any.

Photograph 8.

А) Нет- на площадке

имеется область для

мойки транспортных

средств, однако

транспортные средства

не всегда моются там

В) не правильно- область

мойки транспортных

средств не правильно

замощена и масляный

поддон не работает. Это

необходимо

усовершенствовать как

можно скорее.

Что касается всех рабочих

сооружений на площадке,

HDEC должен подтвердить

какие экологические

разрешения необходимы,

если есть таковые.

Page 89: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

30

Фото 8

5.5 Waste water

emission

Выделение

сточных вод

Waste water collected within bunded area

around the fuelling area be disposed of as

hazardous waste

Сточные воды, собранные внутри зоны

обваловки вокруг заправочной зоны,

должны быть утилизированы как опасные

отходы

Fuelling

area

Зона

заправки

Observatio

n of

wastewater

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Inadequate. The refueling

area does not have proper

drainage and therefore the

wastewater cannot be

collected and discharged

effectively.

As with all operational

facilities on site, HDEC need

to confirm what

environmental permits are

needed, if any.

Не правильно. Область

заправки не имеет

правильного дренажа и

поэтому сточная вода не

может быть эффективно

собрана и сброшена.

Что касается всех рабочих

сооружений на площадке,

HDEC должен подтвердить

какие экологические

разрешения необходимы,

если есть таковые.

5.6 Natural water

Естественные

воды

Natural run-off diverted away from any camps

Естественный сток должен быть отведен от

строительного городка

Camp

area

Зона

строительног

о городка

Observatio

n of natural

water

Наблюден

ие

a)Contra

ctor

Подрядч

ик

b)Subcon

tractor

Yes – natural runoff is not

entering any of the camps.

There have been no heavy

rains.

Да- естественный сток не

стекает ни в какой из

Page 90: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

31

Субподр

ядчик

лагерей. Не было сильных

дождей.

5.7 Rain water

Дождевая

вода

Rain water plan to be and implemented for the

construction phase of the Project

План дождевых вод должен быть применен

для строительной фазы Проекта.

Project

Site

Площадк

а

проекта

Observatio

n of rain

water

Наблюден

ие

a)Contra

ctor

Подрядч

ик

b)Subcon

tractor

Субподр

ядчик

There has been no heavy

rain during this reporting

period.

За отчётный период не

было сильных дождей

5.8 Contaminated

water

Загрязненная

вода

Sand, silt and silt-laden water do not enter the

water drain system or KMC

Песок, осадок и вода, насыщенная

взвешенными наносами не должны

попадать в систему дренажа сильных

дождевых вод или КМК

Project

Site

Площадк

а

проекта

Observatio

n of water

system

Наблюден

ие

a)Contra

ctor

Подрядч

ик

b)Subcon

tractor

Субподр

ядчик

a) Yes this is being

controlled.

А) да это контролируется

5.9 Material

control

Контроль

материалов

a) All hazardous material storage areas

designed to reduce risk of spillages

Все зоны хранения опасных материалов

должны быть спроектированы для

уменьшения риска утечек

b) All materials covered during transport to

prevent them from spilling (if needed).

Все материалы должны быть накрыты во

время транспортировки для

предотвращения утечки (При

необходимости).

c)Store all liquid/solid waste properly above

ground to avoid spills/leaks

Material

storage

areas

Зоны

хранения

материалов

Observation of material storage condition Наблюдение

a)Contra

ctor

Подрядч

ик

b)Subcon

tractor

Субподр

ядчик

a) Yes – there is minimal

hazardous material on site at

the moment and there is a

specific storage area

designated for this.

b) Not necessary to cover

materials.

c) Yes – there is minimal

liquid waste, and all solid

waste is stored above

ground.

d) Spill kits are not

currently available on site.

Page 91: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

32

Хранение всех жидких/твердых отходов как

следует над землей во избежание

розлива/утечки d)Develop a hazardous materials and handling

plan .provide spill response kits at all HazMat

storage areas and work site

Разработать план опасных материалов и

обработки. Предоставить комплектов

ликвидации разливов на всех местах

хранения Опасные вещества и на рабочих

сайтах.

e) Chemicals and fuels on site should be kept to a

minimum

Химикаты и топлива на площадке должны

храниться в минимальном количестве

They need to be provided

in all areas where

hazardous material will be

stored and employees

must be trained on how to

use them. Not all workers

are aware of what a spill

response kit is or what the

procedure is if there is a

spill. However there are oil

spill trays located at the

vehicle repair shop.

Photograph 12.

e) Yes – chemicals and fuels

are being kept to a minimum.

a) да-на площадке

содержится минимальное

количество опасных

материалов на данный

момент и имеется

специально отведенная

зона для этого.

b) нет необходимости

покрывать материал

c) да существуем

минимальная потеря

жидкости, и все твердые

отходы хранятся на земле.

d) инструменты для сбора

разлитой жидкости на

данный момент доступны

Page 92: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

33

на площадке. Их

необходимо предоставить

во все областях хранения

опасных материалов и

работники должны быть

обучены тому, как их

использовать. Не все

работники осведомлены

что такое инструменты для

сбора разлитой жидкости и

что делать во время

розлива.

Однако в цеху ремонта

транспортных средств

имеются масляные

поддоны.

Фото 12.

e) да – хранение химикатов

и топлива сведено к

минимуму.

5.10 Straining

Фильтровани

е

Construct of dirt trap, interceptor pond and the

attenuation dam (if required) commenced as

early as possible in the construction phase

Строительство грязеуловителя, отстойника

коллектора сточных вод и сдерживающей

плотины (при необходимости) должно быть

произведено как можно раньше до начала

фазы строительства.

Project

Site

Площадк

а

проекта

Observatio

n of strain

system.

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Not necessary

Нет необходимости

5.11 Hazardous

waste Storage of hazardous waste in bunded areas to

avoid leaks escaping to the ground or nearby

surface waters

Hazardous

waste

Observation of

harzardous

1)Contra

ctor

Hazardous waste has not

been identified in large

Page 93: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

34

Опасные

отходы Хранение опасных отходов в обвалованных

местах, чтобы избежать утечек на землю или

поблизости поверхности воды

bunded area waste

Наблюдение

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

quantities on site.

Опасные отходы не были

определены в больших

количествах на площадке.

5.12 Monitoring

Контроль a) Monitoring water quality according to local

standards

Контроль качества воды в соответствии с

местными стандартами.

b) Water samples, sent to Talimarjan TPP

laboratory to be tested for water quality.

Образцы воды, отправленные на местной

лаборатории, которые будут проверены на

качество воды.

Project

Site

Площадк

а

проекта

Experimentation

of waste water

1)Laborat

ory

Лаборат

ория

a) Water quality results from 7

July 2014 were presented in the

HDEC July 2014 environmental

monthly report. Some

substances were found over the

MPC limit. Furthermore the

quality indicators for

discharge do not show the

locations and quantities of

discharge.

b) Yes – water samples are sent

to the Talimarjan TPP

laboratory.

a) результаты качества воды

от 7 июля 2014 были

предоставлены в

Hежемесячном отчете по

экологии HDEC за июль 2014.

Содержание некоторых

веществ было выше

предельно допустимой

концентрация загрязнённых

веществ. К тому же,

показатели количества для

выброса не показывают

Page 94: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

35

места и количество

выброса.

6

Soil / Почва

6.1 Plan / План Identify all possible soil pollution sources

related to construction activities

Определить все возможные источники

загрязнения почвы, относящиеся к

строительным работам

Project Site

Площадка

проекта

Examinatio

n of soil

plan.

Оценка

1)Contra

ctor

Подрядч

ик

They have not been identified

in a formal or systematic way.

This should be improved and

a list should be provided to

CS-MM/PMU

Они не были определены

официально или

систематически. Это должно

быть улучшено и список

должен быть предоставлен

в CS-MM/ГРП

6.2 Site control

Контроль

площадки

a) Minimize size and duration of exposed

areas

Минимизировать размер и

продолжительность открытых зон

b) Minimize the excavation during construction

of fuel oil Минимизировать экскаваторные

работы во время строительства дамбы

топливного масла и известняка

c) Minimize the overall slope of the site

Минимизировать общий откос площадки

d) Ensure good landscaping and erosion control

Гарантировать хороший контроль

благоустройства и разрушения

Project

Site

Площадк

а

проекта

Observatio

n of soil

emission

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a) Yes

b) This point is still unclear

c) Yes – the overall slops of the

site are being controlled

d) Yes – there are no observed

erosion risks on site, especially

given the climate

a) да

b)данный пункт еще не ясен

c)да-все откосы площадки

контролируются

d) да- не наблюдалось рисков

эрозии на площадке, особенно

учитывая климат

6.3 Covering

Накрытие

a)Exposed slope surface shall be covered

during the rainy day

Project

Site

Observatio

n of

1)Contra

ctor

a, b) There have been no

heavy rains during this

Page 95: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

36

Открытая поверхность скоса должна быть

накрыта в дождливые дни

b)Open stockpiles of construction materials

covered during rainy day

Открытые склады строительных

материалов должны быть накрыты во

время ливней

Площадк

а

проекта

material

store

Наблюден

ие

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

reporting period.

A,b) не было сильных

дождей во время данного

отчетного периода

6.4 Sediment

Осадок

Sediment tanks can be used for settling

wastewater prior to disposal

Грязеуловители достаточной могут быть

использованы для осаждения сточных вод

до утилизации

Equipment

Maintenance,

Batch plant

and Truck

washing areas

Inspection

of

sediment

tank ability

Проверка

1)Contra

ctor

Подрядч

ик

b)Subcon

tractor

Субподр

ядчик

Sediment tanks have not been

properly constructed or

installed. This needs to take

place. See comments to points

5.2, 5.3, 5.4, and 5.5

Отстойники не были

правильно сооружены или

установлены. Это

необходимо выполнить. см.

Замечания к пунктам 5.2, 5.3,

5.4, и 5.5.

6.5 Drainage

facilities

Дренажные

устройства

All drainage facilities, erosion and sediment

control structures shall be regularly inspected

and maintained

Все дренажные сооружения, конструкции

контроля осаждения и эрозии должны

постоянно проверяться и обслуживаться

Inspection

for

maintenan

ce

Проверка

a)Contra

ctor

Подрядч

ик

b)Subcon

tractor

Субподр

ядчик

The drainage facilities at

the construction site are

inadequate. See comments

to points 5.2, 5.3, 5.4, and

5.5

Дренажные сооружения на

строительной площадке не

правильные. См.

замечания к пунктам 5.2,

5.3, 5.4, и 5.5.

6.6 Vehicle control

Контроль

транспортных

a) All vehicles must be cleaned once in a week

Все транспортные средства должны быть

очищены один раз в неделю.

Equipment

maintenance

shop

Observation of

traffic

condition

1)Contra

ctor

Подрядч

a) No Vehicles are washed

on a regular basis however

the vehicle washing area

Page 96: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

37

средств b) Ensure no earth, mud, debris and the like is

deposited by them on roads

Обеспечить, чтобы земля, грязь,

строительный мусор и тому подобное не

скапливались на дорогах

Наблюдение ик

2)Subcon

tractor

Субподр

ядчик

needs to be improved. See

comment on point 5.4

b) Yes – roads are kept

clean and free of debris

a) никакие транспортные

средства не моются на

регулярной основе, однако

область мойки

транспортных средств

необходимо улучшить. См.

замечание к пункту 5.4.

b) да- дороги содержатся в

чистоте и свободные от

мусора.

6.7 Road control

Дорожный

контроль

a) All road works separated from surface

waters

Все дорожные работы должны быть

отделены от поверхностных вод

b) All roads shall be properly sloped and have

adequate culverts to manage run off

Все дороги должны быть скошены

надлежащим образом и иметь

соответствующие водоспуски для

управления стоками

c) Earth works to construct drainage ditches

and to lay subsurface drainage conduits

Земляные работы для строительства

дренажных канав и для прокладки каналов

подпочвенного дренажа

Project

Site road

Дорога

площадк

и

проекта

Observation of

traffic

condition

Наблюдение

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a) N/A - No road works are

taking place as of yet

b) No road works as of yet,

but current access roads are

not sloped, paved, and do

not have any engineered

drainage

c) No road works as of yet,

however the current access

roads do not have drainage

ditches or conduits

a) Нет данных –

никакие дорожные

работы не

Page 97: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

38

происходят на

данный момент

b) Никакие дорожные

работы не

происходят еще,

но подъездные

дороги на данный

момент не

скошены, не

замощены и не

имеют никакого

инженерного

дренажа

c) Никакие дорожные

работы не

происходят еще,

но подъездные

дороги не имеют

никакие

дренажные канавы

или каналы

6.8 Excavated

material

Материалы

выемки

a) Excavated materials possible to used

reclamation fill

Материалы выемки могут быть использованы д

ля повторного заполнения

b) Surplus excavated materials quarry over

burden, rock rejected for aggregate, aggregate

surplus to the requirements and the like not

discarded indiscriminately

Излишние материалы выемки, избыточные

камни, камни, не принятые для заполнения,

Project

Site

Площадка

проекта

Observatio

n of

excavated

material

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)

Subcontr

actor

a) Yes

b) Yes – this is being

controlled by HDEC

c) Yes

a) да

b)да-это контролируется

HDEC

c) да

Page 98: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

39

излишние заполнители и тому подобное не

должны беспорядочно списываться

c) Different types of surplus excavated materials

deposited separately in the spoil dumps

designated for the purpose outside the Project site

Различные типы материалов выемки могут

накапливаться отдельно в отвалах вынутого

грунта, предназначенных для данной цели за

пределами площадки

7

Overall Spill Control/ Общая управления разливов

7.1 Management

Управление

a) Any spillage of fuel shall straight away be

absorbed using sand or other absorbent

materials

Любая утечка топлива должна быть

незамедлительно впитана с

использованием песка или других

впитывающих материалов.

b) Develop spill response plan

разработать план ликвидации разливов.

c) Only people with adequate training and

knowledge should handle fuel and chemicals

to avoid spills

Только люди с адекватной подготовкой и

знанием должны управлять топливо и

химические вещества, чтобы избежать от

утечек.

d) Fuelling should be one on concrete surface

provided with spill catch tank that can be easily

cleaned and all spilled fuel recovered/safety

disposed

Заправка топливом должна происходить на

бетонном покрытии, снабженном коллектором

Project

Site

Площадка

проекта

Observatio

n spill

Наблюден

ие

Examinatio

n of spill

plan

Оценка

Observatio

n of spilling

Наблюден

ие

1)

Contract

or

Подрядч

ик

2)

Subcontr

actor

Субподр

ядчик

a) Not adequate – workers

are not trained on spill

control and there are no

spill kits available on site.

There is some minor oil spills

in the rebar areas but these

are not a major concern.

Photograph 5.

b) HDEC has an internal

spill response plan and

this plan should be well

communicated to and

implemented by all

subcontractors

c) More training should be

provided to

subcontractors regarding

spills and fuel handling.

d) Inadequate – fuelling is

done on a concrete

surface however there is

Page 99: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

40

утечки который легко моется и все разлитое

топливо восстанавливается /безопасно

хранится e) All repair and maintenance work to be done

either on concrete surface with oil spill catch

basins or oil catch pans provided at all service

areas

Все ремонтные работы и работы по

техническому обслуживанию должны

проводиться на бетонной поверхности с

коллектором для масла или поддоном-

ловушкой для масла, которые должны быть

предоставлены на всех сервисных площадках f) Routinely inspect all equipment handling

hazardous materials for leaks and spills

monthly

Регулярно проверять все оборудование

оперирующего с опасными материалами на

утечки и розлив g) All fuel where spills and leakage area

possible e.g. the generator, must have basins

installed to prevent leakage

На всех местах где возможна утечка и розлив

топлива, например генератор, должны быть

предоставлены резервуары для

предотвращения утечки h) The recovered materials must be recycled

monthly

Вторичное сырье должно перерабатываться i) Fuelling equipment must be fitted with proper

fuel nozzles and devices to avoid accidental

spills

Заправочное оборудование должно быть

no spill catch tank

e) Yes – the repair and

maintenance workshop is

concrete and there are oil

spill basins.

Photograph 12.

f) Yes

g) Yes

h) Waste oils are not

produced in large enough

quantities to be recycled.

i) Yes

a) Не правильно-рабочие

не обучены на тему

контроля розлива и

отсутствуют инструменты

для сбора разлитой

жидкости на площадке.

Есть маленькие разливы

масла в области арматуры

но это не является

главным беспокойством

Фото 5.

b) HDEC есть внутренний

план действий во время

розлива и данный план

должен быть хорошо

скоммуникатирован и

выполнен всеми

субподрядчиками.

c) больше обучения

Page 100: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

41

оснащено должными топливными форсунками

для предотвращения случайных утечек

должно быть

предоставлено

субподрядчиками на

тему розливов и

обращению с топливом

d) не правильно –

заправка выполняется на

бетонной поверхности,

однако нет емкости для

протекаемой жидкости

e) да – цех ремонта и

технического

обслуживания

зацементированы и

имеются маслоуловители.

Photograph 12

f)да

g)да

h) Масло бывшее в

употреблении не

производится в больших

количествах для

переработки.

i)да

Page 101: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

42

7.2 Storing

Хранение

a) All fuel stored on site shall be kept in drums

or in bulk tanks

Все топливо, хранимое на площадке,

должно держаться в металлических бочках

или наливных цистернах

b) Fuel storage are a be locate data

designated place away from any source of

ignition or open drain

Зоны хранения топлива должны быть

расположены в определенном месте вдали

от любых источников возгорания или

открытого дренажа

c)“NoSmoking” sign displayed at the storage

location and a charged fire extinguisher of the

correct type

Знак «Не курить» должен быть повешен в

месте хранения и заряженный

огнетушитель соответствующего типа

должен быть готов к использованию.

d) All fuel tanks and storage areas provided

with concrete embankments to readily contain

spills

Все топливные баки и зоны хранения

Fuel Storage area Зона

хранени

я

топлива

Observatio

n of oil

storage

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a) Yes – fuel is kept at the

refueling area in two large

tanks (the area around

should be paved over to

contain accidental spills)

b) Yes

c) Yes

d) Inadequate – the

concrete embankment

needs to be improved.

e) Inadequate – there are

no spill response kits on

site.

Photograph 7.

A) да-топливо

содержится в

области заправки

в двух больших

резервуарах

(область вокруг

должна быть

замощена чтобы

избежать

Page 102: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

43

должны быть предусмотрены с бетонным

защитными дамбами для удержания утечек

e) Provide spill response kits at all working

areas

Обеспечить комплектов ликвидации

разливов на всех рабочих местах

случайных

розливов)

b)да

c)да

d)не правильно – насыпь

бетона необходимо

улучшить.

e) не правильно-

отсутствуют

инструменты сбора

разлитой жидкости на

площадке.

7.3 Oil emission

Выброс

масла

Treat oily wastewater in coalescence separator

prior to discharge

Обрабатывать нефтезагрязненные

промстоки в сепараторе-коагуляторе до

слива.

Project

Site

Площадк

а

проекта

Observatio

n of oily

water

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Inadequate – the oil

separator at the vehicle

washing area is not

adequate and not

functional. This needs to be

improved as soon as

possible.

Photograph 8.

Не правильно – масленый

сепаратор в области

мойки транспортных

средств не правильный и

не функционирует. Это

необходимо

усовершенствовать как

можно скорее.

Фото 8.

Page 103: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

44

7.4 Refueling

Заправка Refueling of vehicles shall take place only in

designated areas Заправка автомобилей будет пройти только

в специально отведенных местах.

Fuel Storage area Зона хранения топлива

Observatio

n of

refuelling

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Yes

Да

7.5 Training

Обучения

Fuel handling training shall include chemical

handling in the training program for assigned

personnel.

Обучения управлением топливо будет

включить в себе химическую обработку в

программе подготовки для назначенных

персоналов.

Training

Center

Центр

обучени

я

Training of

oil handling

Обучение

Contract

or

Подрядч

ик

Training needs to be

increased to include

environmental emergency

situations

Обучение необходимо

увеличить чтобы

включить экологические

аварийные ситуации

8

Waste control/ Kонтроль oтходов

8.1 Plan / План a) Identify all possible waste pollution sources

Определить все возможные источники

отходов

b) Procedures detailed in the Material Safety

Data Sheet (MSDS) for hazardous materials

included in pollutants spillage control plan and

followed in the event of an emergency situation

Процедуры, детально описанные в Листах

данных безопасности материалов для

опасных материалов, должны быть

включены в план контроля утечки

загрязнителей и соблюдаться в случае

чрезвычайной ситуации.

c) Should have "Keep a waste log" for all type

Project

Site

Площадка

проекта

Examinatio

n of waste

plan

Оценка

1)Contra

ctor

Подрядч

ик

a) They have not been

identified in a formal or

systematic way. This should

be improved and a list should

be provided to CS-MM/PMU

b) The spillage control plan needs to be better communicated to all subcontractors c) There is no waste log describing the quantities and types of waste produced on site. It is a requirement of this plan and international best practice. a) они не были определены официально или

Page 104: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

45

of wastes produced in construction area.

Должен иметь "Журнал для отходов» для

всех типов отходов, образующихся в

строительной площадки.

систематически. Это должно быть улучшено и список должен быть предоставлен в CS-MM/ГРП b) план контроля розлива необходимо предоставить всем субподрядчикам c)отсутствует журнал регистрации отходов, который описывает типы отходов производимых на площадке. Это требование данного плана и лучшей международной практики.

8.2 Waste

Disposal

Утилизация

отходов

Dispose unusable waste streams at permitted

waste disposal facilities

Ликвидировать непригодные потоки отходов в

разрешенных местах удаление отходов

Disposal

facilities

Установки

утилизации

Observatio

n of waste

facility

Наблюден

ие

Waste

disposal

company

Организ

ация

коммуна

льных

хозяйств

Yes – the subcontractor has a

contract with a waste disposal

company. Waste is deposited

approximately 4 km from site.

Waste from the vehicle

maintenance area is taken away

and deposited by the vehicle

rental company.

Да- субподрядчик имеет

договор с компанией

утилизации отходов. Отходы

сбрасываются примерно в 4

км от площадки. Отходы с

области техобслуживания

транспортных средств

вывозятся и выбрасываются

арендной компанией

транспортных средств.

8.3 Waste

disposal

a) Separate waste disposal area shall be

designated on the construction site

Disposal

area

Observation

of waste

1)Contra

ctor

a) Yes

b) There are different bins

Page 105: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

46

Утилизация

отходов

Отдельная зона утилизации отходов

должна быть разработана на строительной

площадке

b)Separate waste disposal area contains

clearly demarcated skips and bins to allow

different types of waste

Отдельная зона утилизации отходов

содержит разграниченные контейнеры и

мусорные баки для разделения различных

типов отходов

c) Waste is separated into non-hazardous and

hazardous / potentially hazardous prior to

reuse, recycling or transport to Landfill

Разделение отходов на неопасные и

опасные / потенциально опасные перед

повторным использованием, переработкой

или транспортировкой на свалку.

d) Must be separated to the domestic, metal

scrap, used oil, paper, hazardous etc.

Должны разделяться на внутренний,

металлолом, отработанные масла, бумаги,

опасные и т.д.

Зона

утилизации

control

Наблюден

ие

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

3)Dispos

al

company

Утилизирую

щая

компания

for different types of waste

however waste separation

is not taking place

properly and needs to be

improved. Some form of

waste identification is

required on each and

every bin in both Uzbek

and Russian.

c) Yes

a) Да

b)имеются различные баки

для различного типа

мусора, однако разделение

мусора не происходит

должным образом и

необходимо это улучшить.

Некоторые виды отходов

написаны на баках как на

русском так и на узбекском

языках.

c) да

Page 106: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

47

8.4

Reuse

Вторичное

использовани

е

a) Re-use the waste during construction

Вторично использовать отходы во время

строительства b) Re-use or recycle waste streams to other users

at other locations

Вторично использовать потоки отходов к

другим пользователям в других местах

c)The design of formwork will maximize the

use of standard wooden panels

Проект опалубки будет увеличить

использование стандартных деревянных

панелей

d)Alternatives such as steel formwork or

plastic facing can be considered to increase

the potential for re-use

Альтернативы, такие как стальная опалубка

или пластмассовая облицовка, могут быть

учтены для увеличения возможного

повторного использования

Project

Site

Площадка

проекта

Observatio

n of reuse

waste.

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a, b) Yes – reuse takes place

where possible.

c) Yes

d) Yes

a,b) Да- повторное

испольщование

происходит там где

возможно

c) да

d) да

8.5 Recycle Waste

Переработка

Develop dedicated area for storage of recycled

material away from active construction works

and near site access point

Разработать отдельную зону для продажи

переработанных материалов от

действующих строительных работ и около

места доступа на площадку.

Out of the

project site

Вне

площадки

Training of

waste

disposal

Обучение

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Behind the rebar shop at the

cooling tower there is a

temporary storage area for

scrap metal.

There are bins near the

administration building for

separate waste disposal.

However they are not

being used properly.

Photograph 10 & 11.

Сзади арматурного цеха

около башни градирни

имеется область

Page 107: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

48

временного хранения

металлолома.

Есть баки рядом с

административным

зданием для раздельного

мусора. Однако они не

используются

правильно.

Фото 10 и 11.

8.6 Rubbish bins

Мусорные

баки

a) Provide sufficient bins with lids to store the

solid waste produced on a daily basis

Предоставить достаточное количество баков с

крышками для хранения твердых отходов,

производимых ежедневно.

b) Bins not allowed to become overfull and

shall be emptied as a minimum on a weekly

basis

Баки не должны быть переполнены и

должны опустошаться как минимум

еженедельно.

Project

Site

Площадк

а

проекта

Observatio

n of waste

disposal

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

3)Dispos

al

company

Утилизирую

щая

компания

a) The quantity of waste bins

should be increased. Some of

the bins provided are too

heavy to be manually lifted

and therefore need to be

emptied using shovels

resulting in a high waste to

human contact, which is a

health risk.

b) The bins are emptied in a

timely manner by the waste

disposal company

a) количество мусорных баков

должно быть увеличено.

Некоторые баки слишком

тяжелые и их необходимо

опустошать лопатами, в

тесном контакте с мусором,

что причиняет риск здоровью

b) мусорные баки

опустошаются своевременно

компанией по утилизации

Page 108: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

49

отходов.

8.7 Rubbish bins

Мусорные

баки

Install signage encouraging use of rubbish bins on

site and in construction camps

Установить знаки, рекомендующие

использование мусорных баков на площадке и

в строительном городке

a)Project

Site

Площадка

проекта

b)Camp

Observatio

n of waste

disposal

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

3)Dispos

al

company

Утилизирую

щая

компания

Yes – however proper

separation of waste does

not take place.

Да- однако надлежащее

разделение мусора не

происходи

8.8 Discharge

Сброс

Prohibit dumping of dredge material in canal or

elsewhere on site

Запретить сброс вынутого грунта в КМК, канал

и прочие районы на площадке

Project

Site

Площадк

а

проекта

Observation

of dumping

Наблюдени

е

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Yes – HDEC is controlling

this

Да – HDEC контролирует

это

8.9 Storing

Хранение

a) Design and implement a temporary waste

storage area for domestic waste located away

from living and eating areas

Разработать и применить место временного

хранения отходов для бытовых отходов

расположенного вдали от жилых мест и

мест употребления пищи

b)Separation of storage of hazardous and non-

Project

Site

Площадк

а

проекта

Observatio

n of waste

store area

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Yes

Да

Page 109: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

50

hazardous waste

Отдельное хранение опасных и неопасных

отходов

8.10 Storing

Хранение

Containers used for the storage of chemical

wastes shall

Контейнеры, используемые для хранения

химических отходов, должны

a) Be suitable for the substance they are holding,

resistant to corrosion, maintained in a good

condition, and securely closed

Подходить для веществ, которые в них

хранятся, быть устойчивыми к коррозии,

содержать в хорошем состоянии, и плотно

закрываться

b)Stored chemical in roofed areas with concrete

flooring.

Хранить химикаты в местах с крышей и

бетонным полом.

Storage

area

Зона

хранени

я

Observatio

n of waste

store area

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a) There is minimal chemical

waste produced on site.

b) Yes – there are

designated chemical storage

areas

a) на площадке

производится минимум

химических отходов

b) да- имеются отведенные

области хранения

химикатов

8.11 Storing

Хранение

The storage area for chemical waste shall

Зона хранения химических отходов должна

a) Be located away from surface water bodies.

Находиться вдали от поверхностных вод

b) Be constructed with a weatherproof cover,

concrete floor with bunding, and with adequate

securable storage bins for waste.

Быть построена с устойчивой к погоде крышей,

бетонным полом с обваловкой и с

соответствующими закрепляющимися баками

для отходов

c) Have appropriate signage and signage system.

Иметь соответствующие знаки и систему

Project

Site

Площадка

проекта

Observation

of waste store

area

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

a) The chemical storage

area is located near the

batch plant and at the HDEC

temporary camp and office

buildings

b) Yes

c) Adequate signs and sign

training has been provided

d) Yes

e) Yes, it is enclosed on four

sides

f) Yes

a) область хранения

Page 110: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

51

вывесков.

d) Be clearly labeled and used solely for the

storage of chemical waste.

Быть четко промаркированной и

использоваться исключительно для хранения

химических отходов

e) Been closed on at least 3 sides.

Быть закрытой как минимум с трех сторон

f) Be arranged such as to separate in

compatible materials

Быть организованной таким образом, чтобы

разделять несовместимые материалы

химикатов расположена

рядом с БСУ и на

временном лагере HDEC и

офисных зданиях

b) да

c) правильные знаки и

обучение знакам должны

быть предоставлены

d) да

e)да, загорожено с 4

сторон

f) да

8.12 Training

Обучение

Include information on solid waste

management in construction worker training

program

Включить информацию об управлении

твердыми отходами в программу обучения

строительных рабочих

Training

center

Учебный

центр

Training of

waste

disposal

Обучение

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Yes – this is taking place in

the monthly HSE meetings

and in the induction sessions

for workers.

Да – это происходит на

ежемесячных совещаниях

по ОТ и ТБ и в вводных

сессиях для работников.

8.13 Separating

Сортировка

Wood and other scrap material with a

commercial value shall be separated and

stored in segregated areas prior to removal

Дерево и прочие отходы с коммерческой

ценностью должны быть отделены и

храниться в раздельных зонах до удаления

Project

Site

Площадк

а

проекта

Observatio

n of waste

control

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Yes – there is a scrap metal

storage area behind the

rebar workshop in the

cooling tower area.

Photograph 4.

Да – позади арматурного

цеха в области башни

градирни имеется область

хранения металлолома.

Фото 4

8.14 Battery a) The dead batteries will be given to Project Observatio 1)Contra Batteries are removed by the

Page 111: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

52

Батареи specialized organizations for reuse

Отработанные батареи будет переданы

специализированным организациям для

повторного использования

Site

Площадк

а

проекта

n of battery

Наблюден

ие

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

vehicle rental company

Аккумуляторы удалены

компанией аренды

транспортных средств

8.15 Chemical

waste

Химические

отходы

Disposal of chemical waste shall

Утилизация химических отходов должна

a) Be treated by a licensed waste collector.

Обрабатываться лицензированным

коллектором отходов

b) Be to a facility licensed to receive chemical

waste, such as the chemical waste treatment

Быть учреждением, лицензированным на

получение химических отходов, таким как

учреждение обработки химических отходов

c) Hazardous and toxic waste shall not be

disposed of on the canal

Опасные и токсичные отходы не должны

утилизироваться в канал

d) Hazardous waste shall be removed from the

site property within 6 month.

Опасные отходы должны быть удалены с

площадки в течение 6 месяцев.

e) Hazardous waste shall not be dumped onto the

ground, into rain water sewers or into sanitary

sewer system

Опасные отходы не должны сбрасываться на

землю, дождевые стоки или санитарные стоки

Project

Site

Площадк

а

проекта

Observatio

n of

chemical

waste

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

3)Waste

collector

Коллект

ор

отходов

a, b) There are plans in

place for this

c) Yes

d) Yes

e) Yes – although there is

potentially contaminated

wastewater that is not

being disposed of properly

at the batch plant,

refueling area, and vehicle

washing area.

A,b) существуют

установленные планы для

этого

c)да

d)да

e)да-хотя есть

потенциально

засоренная сточная вода,

которая не сбрасывается

как следует на БСУ,

области заправки и

области мойки

транспортных средств

Page 112: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

53

8.16 Waste of

catering

Кухонные

отходы

a)Catering wastes is divided into food waste

and non-food waste

Кухонные отходы подразделяются на

пищевые и непищевые отходы

b)All organic food waste generated by kitchen

facilities to be disposed of at the farm

Все органические пищевые отходы,

производимые на кухнях должны

утилизироваться на ферме

c)Food waste daily removed from the kitchen

Пищевые отходы должны ежедневно

удаляться с кухни

d)Food waste always contained in plastic

containers for disposal

Пищевые отходы должны всегда храниться

в пластиковых ящиках для утилизации

e) Non-food waste collected in separate

containers as beverage cans, packing

materials, etc.

Непищевые отходы должны собираться в

отдельные контейнеры, например, банки из-

под напитков, упаковочные материалы и пр.

Catering

Места

общественног

о питания

Observatio

n of

catering

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

3)Caterin

g

company

Компани

я

обществ

енного

питания

a) Yes

b) Food waste is taken to

farms for disposal

c) Yes

d) Yes

e) Separation of waste

needs to improve (see

comment to 8.5)

a) да

b) пищевые отходы

отвозятся на фермы

c)да

d)да

e) отделение мусора

необходимо улучшить

(см. Замечание 8.5)

8.17 Oily

wastewater

Масло

содержащие

сточные воды

Oil and other lubricants collected in drums and

disposed of in accordance with

CONTRACTOR instructions

Масло и прочие смазки должны собираться

в металлические баки и утилизироваться в

соответствии с инструкциями Подрядчика

Project

Site

Площадка

проекта

Observatio

n of oily

waste

water.

Наблюден

ие

1)Contra

ctor

Подрядч

ик

2)Subcon

tractor

Субподр

ядчик

Inadequate – oily

wastewater is not being

disposed of properly and

needs to be improved.

Не правильно –

маслянистая вода не

выбрасывается как

следует и необходимо

Page 113: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

54

улучшить

Page 114: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

55

ПРИЛОЖЕНИЕ A: ПРОТОКОЛ СОВЕЩАНИЯ – СОВЕЩАНИЕ ПО

ЭКОЛОГИЧЕСКИМ ВОПРОСАМ

Совещание о состоянии экологии на строительной площадке

Протокол совещания (MoM)

Purpose of the meeting:

Цель совещания

Discuss current status of environmental protection measures at the construction site and the implementation of the EMP/Обсуждение текущего статуса мер по экологической защите на строительной площадке и выполнение ПЗОС

Location:

Место:

Офис Topalang (Mr. Bekov)

Date:

Дата:

24 Сентября 2014

Time:

Время:

15:00 -16:00

Participants:

Участники:

Name/Имя Organization

Организация

Mobile Number

Номер тел.

Designation Title

Должность

Mr. Oybek Amanov

HDEC +998 90 639 5418

Environmental Officer

Специалист по защите ОС

Ms. Natasha Sim

CS-MM +998 94 643 9493 Environmental Expert

Эксперт Эколог

Mr. Bekov Topalang Head of Topalang

Глава Topalang

Prepared by

Подготовлено

: Natasha Sim

Date of Issue

Дата выпуска

: 27s September 2014

Distribution List

Список рассылки

: HDEC

Page 115: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

56

1 CS-MM reminded Topalang that the EMP must be implemented and it is a requirement of the ADB. CS-MM Напомнил Topalang что ПЗОС должен выполняться и это требование АБР.

2 Drainage on site: CS-MM pointed out the following aspects of the EMP:

EMP 5.2 “Waste water from concrete batching plant operation and shall not be discharged overland” – the current drainage and wastewater collection at the batch plant is unacceptable. EMP 5.3 “Undertake settling and neutralization of alkaline washing water containing excessive cement prior to discharge” – this is not taking place EMP 5.4 “Washing of equipment areas must be equipped with a suitable impermeable floor and sump/oil trap” – there is inadequate drainage and a non-functional oil trap at the vehicle washing area EMP 5.5 “Waste water collected within bunded area around the fuelling area be disposed of as hazardous waste” – there is inadequate drainage at the fuelling area EMP 6.4 “Sediment tanks can be used for settling wastewater prior to disposal” – the sediment tanks on site have not been fully constructed and are not operational. EMP 6.5 “All drainage facilities, erosion, and sediment structures shall be regularly inspected and maintained” – drainage facilities are not adequate

EMP 7.3 “Treat oily wastewater in coalescence separator prior to

discharge“ – this is not taking place

Topalang reviewed the drawings for the water disposal areas and

agrees they need to be modified and implemented. They argee

that drainage on site needs to be improved. They state it will be

done in 10 days.

HDEC pointed out that the Topalang/HDEC contract requires

Topalang to discharge wastewater appropriately.

Дренаж на площадке:

CS-MM выделил следующие аспекты ПЗОС:

ПЗОС 5.2 «Сточная вода от эксплуатации БСУ и не должна

сливаться на поверхность земли.»-текущий сбор дренажа и сточной воды на БСУ не приемлем. ПЗОС 5.3 «предпринять осаждение и обеззараживание целочной промывочной воды содержащей излишки цемента перед выбросом»-это не происходит ПЗОС 5.4 «области для мойки оборудования должны быть оборудованы подходящим непромокаемым полом и уловителем для масла/поддоном.- не правильный дренаж и нефункциональный поддон для масла в области мойки транспортных средств. ПЗОС 5.5 «Сточная вода собирается в защищенной от утечки области вокруг области заправки, которая отводится как вредные стоки»- не правильный дренаж в топливной области. ПЗОС 6.4 « Грязеуловители могут использоваться для осаждения сточных вод перед выбросом»-резервуары для отстаивания на площадке не были полностью сооружены и не работают ПЗОС 6.5 «Все дренажные сооружения, эрозия, и сооружения для отстаивания должны регулярно проверяться и поддерживаться в соответствующем состоянии»-дренажные сооружения не правильные ПЗОС 7.3 очищение масляной сточной воды в сепараторе перед

10 days

Page 116: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

57

выбросом»-этого не происходит Topalang проверил чертежи для областей выброса воды и согласился что их необходимо переделать и выполнить. Они согласились что дренаж на площадке необходимо улучшить. Они заявили что это будет выполнено через 10 дней. HDEC подчеркнул что контракт

между Topalang/HDEC обязует Topalang сбрасывать сточную воду

соответствующим образом.

3 Water meters: CS-MM pointed out the following aspects of the EMP:

EMP 1.4 “monthly monitoring of water (m3)” – Although the

quantity of water is being “recorded” it is not being measured as the

water meters have not been tested/certified and therefore are not

officially operational. The comments are misleading here when it

states: “the usage of water is being monitored”. In the “monitoring

of usage” the August monthly report states that the quantity of non-

potable and potable water is the same as in June and July implying

that they are not using the water meters. Topalang states that water meters are not yet officially installed. They are not using them to pay for water because the Presidential Decree (PP-1933, 7 March 2013) states that Uzbekenergo is responsible for paying for utilities and therefore there is no incentive for them to use the water meters. However the EMP requires that accurate monitoring of resource usage takes place. The water meters do not have to be used for payments, but should be used for recording accurate quantities. Счетчики воды: CS-MM выделили следующие аспекты для ПЗОС: ПЗОС 1.4 « ежемесячный мониторинг воды (м3) – хотя количество воды должны «регистрироваться» это не замеряется так как счетчики воды не были протестированы/сертифицированы и не официально работают. Замечания вводят в заблуждение когда говорится: использование воды контролируется». В «мониторинге использования воды» августовский отчет гласит что количество не питьевой воды и питьевой воды одно и то же что и в июне и июле, что показывает факт, что счетчики не используются. Topalang гласит что счетчики воды официально еще не установлены. Они не используют их для оплаты воды потому что Постановление президента (РР-1933, от 7 марта 2013) гласит что Узбекэнерго ответственно за оплату услуг и к тому же нет мотивации для низ использовать счетчики воды. Однако ПЗОС требует чтобы происходил правильный мониторинг используемых ресурсов. Счетчики воды не необходимо использовать для оплат, но должны быть использованы для регистрации правиьного количества.

4 Spill control: Контроль розлива: CS-MM pointed out the following aspects of the EMP: CS-MM подчеркнул следующие аспекты ПЗОС: EMP 5.9 “Develop a hazardous materials and handling plan. Provide spill response kits at all HazMat storage areas and work sties” – CS-MM have never seen any spill kits on site.

Page 117: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

58

ПЗОС 5.9 «Разработать план работы с опасными материалами. Предоставить инструменты для локализации розлива на всех областях хранения опасных материалов и работ на площадке»-CS-M никогда не видел устройства для сбора разлитой жидкости на площадке.

EMP 7.1 a) “Any spillage of fuel shall straight away be absorbed using sand or other absorbent materials” – there is no sand or absorbent materials present by the refuelling station, employees have not been trained on spill control. d) “Fuelling should be done on concrete surface provided with spill catch tank that can be easily cleaned and all spilled fuel recovered/safely disposed” – this is not taking place at the refuelling area e) “All repair and maintenance work to be done either on concrete surface with oil spill catch basins or oil catch pans provided at all service areas” – please provide evidence of this. EMP 7.2 d) “All Fuel tanks and storage areas provided with concrete embankments to readily contain spills” – no yet complete e) Provide spill response kits at all working areas – no spill response kits on site Topalang states that these measures are understood and will be implemented. ПЗОС 7.1. а) «Любой розлив топлива должен быть немедленно впитан используя песок или прочие абсорбирующие материалы» - отсутствуют песок или впитывающие материалы рядом со станцией заправки, работники не были проинструктированы касательно контроля розлива. d) «Заправка должна выполняться на бетонной поверхности которая снабжена резервуаром для разлитой жидкости, который легко моется и все разлитое топливо восстановлено/безопасно хранится»- это не происходит в области заправки.

Е) «Все ремонтные и технические работы должны выполняться либо на бетонной поверхности с маслоуловителями либо с поддонами для масла, которые предоставлены на всех областях обслуживания»-просим предоставить признаки данного выполнения.

Page 118: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

59

ПЗОС 7.2 d) “все резервуары для топлива и области хранения снабженные цементными насыпями должны иметь быстрый доступ к устройствам сбора разлитой жидкости” – еще не закончено e) предоставить устройства сбора разлитой жидкости на всех рабочих областях – на площадке отсутствуют устройства сбора разлитой жидкости Topalang сообщил что данные меры поняты и будут выполнены. Waste management: Управление отходами: CS-MM pointed out the following aspects of the EMP: EMP 8.1 “should keep a waste log for all types of wastes produced in construction site” – there is no waste log currently. The types and quantities of wastes should be recorded. EMP 8.3 d) “Must be separated do the domestic, metal scrap, used oil, paper, hazardous, etc” – waste separation on site should be improved. EMP 8.6 “Provide sufficient bins with lids to store the solid waste produced on a daily basis” – there are not currently sufficient bins on site. More have apparently been ordered but the status has not changed for over 4 months. CS-MM выделил следующие аспекты ПЗОС: ПЗОС 8.1 « необходимо вести регистрацию для всех типов отходов производимых на строительной площадке»-на данный момент отсутствует регистрация отходов. Все типы и количества отходов должны регистрироваться. ПЗОС 8.3 d) «должно отделяться бытовые отходы, металлолом, использованное масло, бумага, опасные отходы и тюлю – подготовка отходов на площадке необходимо улучшить. ПЗОС 8.6 «предоставить достаточное количество мусорных баков с крышками для хранения твердых отходов производимых на ежедневной основе» - на данный момент отсутствует достаточное количество баков на площадке. Видимо было заказано больше, но положение не изменилось более чем за 4 месяца.

Page 119: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

60

ПРИЛОЖЕНИЕ B: ПИСЬМО В ГРП КАСАТЕЛЬНО ЭКОЛОГИЧЕСКИЗ

ВОПРОСОВ

Ref: TPP-CSMM-PMU-LTR-14-0100

26 September 2014 Dear Yusupov Olim M., The environmental situation at the construction site is not adequate and not compliant with the Site Based Environmental Management Plan (EMP). CS-MM raises environmental issues in our monthly environmental reports however we would like to bring your attention specifically to the following issues:

1. The ZEP for construction – it is not clear whether the local regulations of Uzbekistan are being followed in this regard. Apparently HDEC have a letter from the Karshi Environmental Committee stating they do not need the ZEP for construction, however this letter has not been passed to CS-MM or the PMU. Regarding the ZEP for operation of the facilities in operation, HDEC needs to determine who is responsible for obtaining this, if at all. The Contractor is not currently providing any statistical environmental data to any environmental authority and it needs to be confirmed whether this is acceptable. An official letter should be provided.

2. In July 2014 HDEC submitted the revised EMP to the PMU. They are awaiting official approval on this document.

3. There are many aspects of site operation that are not compliant with the EMP (July 2014). The following issues are outstanding:

a. Drainage, collection, and treatment of storm and wastewater are inadequate. This applies in particular to the batch plant area, vehicle washing area, and refueling area. These areas are not paved over in a way that allows for wastewater collection, there is no treatment of wastewater, and although drawings have been produced for wastewater collection and treatment they require modification and have not been implemented. This situation has not improved since February 2014. See Points 5.2, 5.3, 5.4, 5.5, 6.4, 6.5, and 7.3 of the EMP.

b. The water meters for cold and hot water have not been officially installed (no test certificates have been provided to CS-MM). It appears from the monthly environmental reports that the water is being measured using norms as the quantity of non-potable and potable water for each month remains the same, therefore implying the actual consumption is not measured. This is unacceptable from a resource management point of view. See point 1.4 of the EMP.

c. Spill control should be improved on site. Employees need to be trained on spill control and spill kits need to be provided on key areas of the site. See points 5.9, 7.1, and 7.2 of the EMP.

d. Waste management is in need of improvement. More containers should be installed and more waste separation needs to take place. See points 8.1, 8.3, and 8.6 of the EMP.

Page 120: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

61

4. The monthly environmental reports from HDEC need to include more detailed information. Furthermore at the moment there are many statements that are misleading (as described in CS-MM comments on the HDEC monthly progress reports). The reports lack information on key environmental issues such as environmental payments, analysis of test results, and any issues with the sub-contractor.

All these comments have been raised in CS-MM environmental monthly reports as well as in the Appendices of the CS-MM comments on the HDEC Monthly Progress Reports. CS-MM has not received any replies to the comment sheets. Please ensure that the comments are being passed on to HDEC. The issues in this letter regarding the EMP have been brought up in a meeting between Topalang and HDEC on 24 September 2014. MoM and photographs are attached. +++++++++++++++++++++++++ Уважаемый г-н Юсупов, Экологическая обстановка на строительной площадке не правильная и не соответствует Плану защиты ОС для строительной площадки (ПЗОС). CS-MM поднимает экологические проблемы в наших ежемесячных отчетах по экологии, однако, нам бы хотелось обратить ваше внимание особенно на следующие проблемы: 1. ПЗОС для строительства – не ясно выполняются ли местные нормативы в Узбекистане в этом отношении. Видимо HDEC имеет письмо от Каршинского Комитета по охране ОС, которое гласит что им не нужно ЗЭП для эксплуатации сооружений в рабочем состоянии, HDEC необходимо определить кто вообще является ответственным за получение этого. Подрядчик на данный момент не предоставляет никакие статистические экологические данные ни в какой уполномоченный орган по защите ОС и это необходимо подтвердить приемлемо ли это. Должно быть предоставлено официальное письмо. 2. В июле 2014 HDEC предоставил пересмотренный ПЗОС в ГРП. Они ждут официального утверждения данного документа. 3. Существует много аспектов эксплуатации площадки которые не соответствуют ПЗОС (Июль 2014). Имеются следующие нерешенные вопросы: a. А) Дренирование, сбор и очищение ливневой и сточной воды не правильные. Это касается в частности области БСУ, области мытья транспортных средств а так же области заправки. Данные области не замощены таким образом, что позволяет сбор сточной воды, отсутствует очищение сточной воды, и хотя чертежи для сбора и очистки сточной воды производились, их необходимо переделать и они не были реализованы. Данная ситуация не улучшилась с Февраля 2014. См. пункты 5.2, 5.3, 5.4, 5.5, 6.4, 6.5, and 7.3 ПЗОС. b. Счетчики воды для холодной и теплой воды не были официально установлены (не были предоставлены сертификаты тестирования в CS-MM). Из ежемесячных отчетов по экологии очевидно, что вода замеряется согласно использования стандартов, так как количество не питьевой воды и питьевой воды для каждого месяца остается неизменной, следовательно фактический расход не замеряется. Это не приемлемо с точки зрения управления ресурсами. См. пункты 5.9, 7.1 и 7.2 ПЗОС.

Page 121: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

62

c. Контроль розлива должен быть улучшен на площадке. Работников необходимо проинструктировать о контроле розлива а так же устройства сбора разлитой жидкости необходимо предоставить в ключевых областях на площадке. См. пункты 5.9, 7.1, и 7.2 ПЗОС. d. Управление отходами необходимо улучшить. Необходимо установить больше контейнеров и больше отделения мусора должно происходить. См. пункты 8.1, 8.3, и 8.6 ПЗОС. 4. В ежемесячные экологические отчеты от HDEC необходимо включать больше детальной информации. К тому же на данный момент много заявлений которые сбивают с толку (как описано в замечаниях CS-MM к ежемесячным отчетам HDEC о ходе работ). В отчетах не хватает информации о ключевых экологических проблемах, таких как экологические платежи, анализы результатов тестирования и любых вопросов с субподрядчиком. 5. Все данные замечания были подняты в экологических отчетах CS-MM а так же в Приложениях замечаний CS-MM к ежемесячным отчетам HDEC о ходе работ. CS-MM еще не получил никакие ответы в своим листам с замечаниями. Просим убедиться, что замечания были переданы в HDEC. 6. Данные вопросы в данном письме касательно ПЗОС были подняты на совещании между Topalang и HDEC 24 сентября 2014. Протокол совещания и фотографии прилагаются.

Page 122: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

63

ПРИЛОЖЕНИЕ C: ЗАМЕЧАНИЯ К ЕЖЕМЕСЯЧНОМУ ОТЧЕТУ HDEC ЗА ИЮЛЬ 2014

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

No. Reference CS-MM Comment HDEC Response Status

1 General Общее

It would be helpful to receive these comment sheets returned each month with HDEC response to acknowledge receipt and improve progress. As can be seen in this month’s comments – many things are repeated. Было бы полезным получать данные листы с замечаниями, которые возвращаются каждый месяц с ответом HDEC чтобы подтвердить получение и уточнить прогресс. Как наблюдается из замечаний данного месяца, многие вещи повторяются.

O

2 General Общее

In the case that some actions of the EMP have not been implemented HDEC should clearly state: “not yet implemented” and include a detailed explanation of why. Many of the descriptions are misleading. В случае если некоторые действия ПЗОС не были выполнены, HDEC должен четко указывать: «еще не выполнено» и включать детальное объяснение причины. Много объяснений вводят в заблуждение.

O

3 General Общее

Progress needs to be made in making employees aware of the EMP and its implementation, as this is a requirement of the ADB. Currently the subcontractor is not fulfilling the required environmental protection measures as described above. Прогресс необходимо выполнять в информировании

O

Page 123: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

64

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

работников о ПЗОС и его выполнении так как это требование АБР. На данный момент субподрядчик не выполняет требуемые меры по защите ОС как описано выше.

4 General Общее

The ongoing issues relating to environmental payments and normative documents need to be brought up in the HDEC monthly environmental reports to record meetings and progress. At the moment it is still unclear what is needed. CS-MM has stated their opinion in their monthly environmental reports. Продолжающиеся вопросы, касающиеся экологических выплат и нормативных документов необходимо поднять в ежемесячных отчетах HDEC для учета совещаний и прогресса. На данный момент до сих пор не ясно, что необходимо.

O

5 General Общее

The Contractor is not producing statistical reports on environmental data to any environmental authorities. If this is not required, a letter from the environmental authorities must be provided stating this. However if it is required the standard format must be agreed. Подрядчик не производит статистические отчеты по экологической информации ни в какие органы охраны окружающей среды. Если это не необходимо, должно быть предоставлено письмо от органов охраны ОС, в котором это указано. Однако, если это необходимо, стандартный формат должен быть согласован.

6 4 Same comment as the previous two months: O

Page 124: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

65

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

CS-MM would still like to see evidence of this training. Please provide the training slides. То же замечание что и за предыдущие два месяца: CS-MM до сих пор желает видеть признаки данного обучения. Просим предоставить обучающие слайды.

7 5 Same comment as previous month: There is no mention of the revisions to the EMP that were discussed with HDEC, CS-MM, and the PMU. It would make sense to include key information like this in a monthly environmental report. То же замечание что и за предыдущий месяц: Нет упоминания ревизий ПЗОС которые обсуждались с HDEC, CS-MM и ГРП. Было бы разумным включить ключевую информацию подобную этой в ежемесячный отчет по экологии

O

8 5 Same comment as the previous two months: Some aspects of the EMP are not being carried out such as:

a) Emergency preparedness for environmental incidents (section 4.10 of the EMP document).

b) Project key performance indicators (section 4.12 of the EMP document) have not been developed to monitor environmental performance.

То же замечание как и за предыдущие два месяца: Некоторые аспекты ПЗОС не поднимались такие как: А) аварийная готовность для аварийных случаев (раздел

O

Page 125: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

66

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

4.10 документа ПЗОС). В) Основные показатели деятельности проекта (раздел 4,12 документа ПЗОС) не были разработаны для мониторинга экологических показателей

9 5 Same comment as pervious month: Please include a record of the emergency trainings – information on what type of emergency/accident training HDEC provided, to whom, and when. This information should be included in the environmental monthly report. То же замечание что и за предыдущий месяц: Просим включить регистрацию обучений аварийных ситуаций – информация о том, какое обучение о типе аварий/несчастных случаев HDEC предоставил, кому и когда. Данная информация должна быть включена в ежемесячный отчет по экологии.

O

10 5 Same comment as pervious month: Although the quantity of water is being “recorded” it is not being measured as the water meters have not been tested/certified and therefore are not operational. The comments are misleading here when it states: “the usage of water is being monitored”. Information should be included on the status of the water meters as this is important environmental information. То же замечанием что за предыдущий месяц: Хотя количество воды «регистрируется» она не замеряется

O

Page 126: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

67

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

так как счетчики воды не были протестированы/сертифицированы и поэтому не используются. Замечания вводят в заблуждение когда указывается: «использование воды контролируется».

11 5 Same comment as pervious month: Air emissions - There are air emissions aside from dust (for example transport emissions). HDEC should have a full list of all the air emission areas. То же замечание что и в предыдущем месяце: Выбросы в атмосферу – существуют выбросы в атмосферу помимо пыли (например транспортные выхлопы). HDEC должен иметь полный список всех областей где происходит выброс в атмосферу.

O

12 Air emissions - There is no report on the quantity and quality of emissions from the stationary sources and mobile sources. Выброс в атмосферу- отсутствует отчет по количеству и качеству выбросов из стационарных источников и мобильных источников.

13 Is air monitoring taking place at all? If so, please state how is it taking place, at what locations, and the frequency and timing. Везде ли происходить мониторинг воздуха? Если так, просим указать как это происходит, где и частоту и время.

14 5 Same comment as pervious month: Air emissions – It is unclear why the air control plan is “N/A”, as it is applicable.

O

Page 127: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

68

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

То же замечание что и за прошлый месяц: Выбросы в атмосферу – не ясно почему план контроля воздуха «не доступен», так как он применяется.

15 5 Same comment as pervious month: Watering – please state where the water trucks get filled То же замечание что и за прошлый месяц: Увлажнение – просим указать где происходит наполнение водовозов

O

16 5 Same comment as pervious month: Noise plan – Are all the noise pollution sources identified in a formal list format specific to this project? How have they been identified? То же замечание что и за прошлый месяц: План шума – все ли источники шума определены в официальном листе формата специально разработанного для данного проекта? Как они были определены?

O

17 5 Same comment as previous month: Noise plan – Is there a site-specific noise plan? Or only the “HTS-SCS-ANJU-EH-01 Noise” document? То же замечание что и за предыдущий месяц: План шума – существует ли особый шумовой план характерный для площадки? Или только документ “HTS-SCS-ANJU-EH-01 Шум”?

O

18 5 Same comment as previous month: For the past months CS-MM has emphasized that the wastewater

O

Page 128: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

69

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

situation at the batch plant, vehicle washing area, and refuelling area needs to be better controlled. То же замечание что и за предыдущий месяц: За последние месяцы CS-MM подчеркнул что ситуация со сточной водой на областях БСУ, мойки транспортных средств, а так же области заправки необходимо контролировать. The Environmental monthly report states that the wastewater is “under control by the contractor” – this does not provide any information. The drainage situation is improving however it is not considered “under control”. This is very misleading and incorrect. A description of the actual situation should be included. Ежемесячный отчет по экологии указывает что сточная вода «контролируется Подрядчиком»-это не предоставляет никакой информации. Ситуация с дренажем улучшается, однако она не считается «под контролем». Это очень вводит в заблуждение и не правильно. Описание фактической ситуации должно быть включено.

19 5 The wastewater control plan is definitely not being implemented. Same comment as previous month: What is the wastewater control plan? Please provide it.

O

Page 129: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

70

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

План контроля за сточными водами должен быть обязательно введен. То же замечание что и в предыдущий месяц: Каков план контроля сточных вод? Просим предоставить его.

20 5 The batch plant is currently in operation. Therefore it is misleading to state that the “Batch Plant has not started working yet” and stating “N/A”. БСУ на данный момент в эксплуатации. Поэтому заявление о том что «БСУ еще не приступила к работе» и указано что «нет данных» приводит в заблуждение

O

21 5 HDEC should state what the “Controlled wastewater procedure” at the batch plant is. This is insufficient information and this is wastewater is certainly not being controlled. HDEC должен указать что за «Процедура контроля сточных вод» на БСУ. Это не достаточная информация и данная сточная вода обязательно должна контролироваться.

O

22 5 Same comment as previous month: Washing water – the water drainage and discharge at the vehicle washing area not appropriate. CS-MM raised this issue many times however it is not reflected in the monthly environmental report. The status “install wastewater disposal system” is not a good reflection of the current situation. То же замечание что и за прошлый месяц: Промывочная вода – дренаж воды и сброс воды в области

O

Page 130: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

71

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

мойки транспортных средств не правильные. CS-MM поднимал данный вопрос много раз, однако это не отражено в ежемесячном отчете по экологии. Статус «установки систем сброса сточных вод» не является хорошим отражением текущей ситуации.

23 5 Same comment as previous month: Wastewater from the refuelling area should also have adequate drainage and disposal. This is not reflected in the monthly environmental report. The status “install wastewater disposal system” is not a good reflection of the current situation. То же замечание что и за прошлый месяц: Сточная вода с заправочной области должн так же иметь правильный дренаж и выброс. Это не отражается в ежемесячном отчете по экологии. Статус «установки систем сброса сточных вод» не является хорошим отражением текущей ситуации.

O

24 5 Same comment as previous month: Natural water - It is unclear why “natural fun-off diverted away from any camps” is “N/A”. It is applicable and should be elaborated. То же замечание что и за предыдущий месяц: Натуральная вода – не ясно почему «нет данных» о «естественном сливе отведенном от любых лагерей». Это применимо и должно быть тщательно разработано.

O

25 5 The water quality results from the wastewater treatment plant are found in this monthly environmental report. These are the first

O

Page 131: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

72

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

water quality tests from the project. 07/07/2014 Результаты качества воды от установки очищения сточной воды включены в ежемесячный отчет по экологии. Они являются первыми тестами качества воды в проекте. The Monthly environmental report should give an analysis of the results. Ежемесячный отчет по экологии должен предоставлять анализ результатов. The following are found to be higher than the MPC:

1) Mineral Salts: actual – 1532 vs. MPC – 1000 2) Suspended Solids: actual – 32.5 vs. MPC – 30.0 3) Iron: actual – 0.54 vs. MPC – 0.5 4) pH: actual – 8.2 vs. MPC 7.0

1) Минеральные соли: факт – 1532 vs. MPC – 1000 2) Взвешенные твёрдые частицы: факт – 32.5 vs.

MPC – 30.0 3) Железо: факт – 0.54 vs. MPC – 0.5 4) pH: факт – 8.2 vs. MPC 7.0

26 5 Quality indicators for discharge do not show the place and amount of discharge of sewage from contractor buildings. Показатели качества для сброса не показывают место и количество сброса канализации от зданий подрядчика.

27 5 There are also pit latrines on site, which will generate wastewater. What is the situation of the quantity there? Так же на площадке имеются уличные туалеты, которые

Page 132: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

73

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

производят сточные воды. И какова там ситуация с количеством там?

28 5 No report on the washing of vehicles (the quantity of transport, etc), is HDEC monitoring the quality and quantity of wastewater produced at this site? Отсутствует отчет о мойке транспортных средств (количество транспорта, и т.д.), контролирует ли HDEC количество и качество сточной воды производимой в данной области площадки?

29 5 The water quality results for the drinking water are found in this monthly environmental report. Both the filtered water and the not-filtered water results are given. These are the first water quality tests from the project. 07/07/2014 Результаты качества питьевой воды включены в данный отчет по экологии. Приведены результаты как фильтруемой и не фильтруемой воды. Это первые тесты качества воды Проекта. The test results show that the filtered water is better than the non-filtered water. However the filter broke 20 days after installation and has not been fixed. Результаты теста показывают что фильтруемая вода лучше чем не фильтруемая вода. Однако фильтр сломался на 20 день после установки и не был починен. The fact that the filter is broken is not recorded in the monthly

Page 133: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

74

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

environmental report. Another reminder that all key environmental activities that take place MUST be recorded in the environmental monthly report. Факт того что фильтр сломан не отражен в ежемесячном отчете по экологии. Еще одно напоминание о том, что все ключевые работы связанные с ОС ДОЛЖНЫ ротражаться в ежемесячном отчете по экологии.

30 5 Same comment as previous month: It is unclear when the water quality monitoring will take place. It should take place for incoming and outgoing water (drinking water quality should be tested periodically as well) on a quarterly basis. То же замечание что и за прошлый месяц: Не ясно когда контроль качества воды будет происходить. Это должно происходить как для поступающей и выгружаемой воды (тестирование качества питьевой воды так же должно тестироваться периодически) каждый квартал.

O

31 5 Same comment as previous month: What are the soil pollution sources? Is there a formal list? If so, please provide. То же замечание что и за прошлый месяц: Каковы источники загрязнения почвы? Существует ли официальный список? Если да, то просим его предоставить.

O

32 5 Drainage facility – the status states: “planned where to install the O

Page 134: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

75

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

drainage system” – the drawings were reviewed by CS-MM and are deemed inadequate. Furthermore they have not been installed. Дренажные сооружения – статус гласит: «запланировано где устанавливать дренажную систему»-чертежи были проверены CS-MM и признаны неправильными. Поэтому они не были установлены.

33 5 Same comment as previous month: Please state how roads are being cleaned from mud after rain. CS-MM has never observed this taking place on the construction site. Furthermore many of the roads are not paved – making this difficult. То же замечание что и за прошлый месяц: Просим указать как дороги будут очищаться от грязи после дождя. CS-MM никогда не видел чтобы это происходило на площадке. К тому же, очень много не замощённых дорог – что усложняет ситуацию.

O

34 5 Same comment as previous month: Refuelling should not be taking place on gravel surfaces. It should be taking place on an impermeable surface with appropriate drainage. Improvements have been made to pave over the refuelling area, however it is too small and should be enlarged. То же замечание что и за прошлый месяц: Заправка должна происходить на гравийной поверхности. Это должно происходить на непроницаемой поверхности с соответствующим дренажем. Улучшения должны быть сделаны в

O

Page 135: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

76

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

35 5 Same comment as previous month: Spill control – it states that only “authorized employees work with fuel and chemicals” – early it stated that there were no chemicals on site. Please clarify if there are chemicals on site. То же замечание что и за предыдущий месяц: Контроль разлива – гласит что только «авторизованные работники могут работать с топливом и химикатами»-ранее указывалось что на площадке отсутствуют химикаты.

O

36 5 Same comment as previous month: CS-MM has never seen any spill kits on site (only fire fighting stands). То же замечание что и за предыдущий месяц: CS-MM никогда не видел никакие инструменты для сбора разлитой жидкости ( только стойки противопожарные)

O

37 5 Same comment as previous month: Oil emission - It is unclear why “treating oily wastewater” is “N/A”. This is incorrect. То же замечание что за предыдущий месяц: Масляные выбросы – не ясно почему «очищение масляных стоков» «нет данных». Это не правильно.

O

38 5 Same comment as previous month: CS-MM has observed that separation of waste is not happening adequately. This is not reflected in the environmental monthly

O

Page 136: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

77

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

report. То же замечание что и за предыдущие месяцы: CS-MM отметил что разделение отходов не происходит правильно. Это не отражено в ежемесячном отчете по экологии.

39 There are no waste passports – therefore there is no classification of types and quantities of waste (or hazards). То же замечание что и за прошлый месяц: Отсутствуют паспорта опасных отходов – поэтому отсутствует классификация типов и количества отходов (или опасных отходов)

40 5 Same comment as previous month: Recycling waste – this is applicable and the status “N/A” is not correct. То же замечание что и за прошлый месяц: Перерабатываемые отходы – это надлежит выполнению и статус «нет данных» не правильный

O

41 6 Same comment as previous month: The time the samples were taken should be indicated. То же замечание что и за прошлый месяц: Должно быть указано время отбора проб

O

42 8 In the “monitoring of usage” the July monthly report states that the quantity of non-potable and potable water is the same as in June implying that they are not using the water meters. Calculating water usage on a construction site using norms is not acceptable.

O

Page 137: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

78

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – July 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 22/09/14

В «контроле использования» ежемесячного отчета за август указано, что количество не питьевой и питьевой воды то же самое что и в Июне и в Июле, что подразумевает собой факт что они не пользуются счетчиками воды.

Page 138: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

79

ПРИЛОЖЕНИЕ D: ЗАМЕЧАНИЯ К ЕЖЕМЕСЯЧНОМУ ОТЧЕТУ HDEC ЗА АВГУСТ 2014

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

No. Reference CS-MM Comment HDEC Response Status

1 General Overall the report does not describe the actual environmental status at the construction site. В общем отчет не описывает фактический статус ОС на строительной площадке

O

2 General Same comment as previous month: It would be helpful to receive these comment sheets returned each month with HDEC response to acknowledge receipt and improve progress. As can be seen in this month’s comments – many things are repeated. То же замечание что и за предыдущий месяц: Было бы полезным получать данные листы с замечаниями, которые возвращаются каждый месяц с ответом HDEC чтобы подтвердить получение и уточнить прогресс. Как наблюдается из замечаний данного месяца, многие вещи повторяются

O

3 General Same comment as previous month: In the case that some actions of the EMP have not been implemented HDEC should clearly state: “not yet implemented” and include a detailed explanation of why. Many of the descriptions are misleading. То же замечание что и за предыдущий месяц: В случае если некоторые действия ПЗОС не были выполнены, HDEC должен четко указывать: «еще не

O

Page 139: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

80

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

выполнено» и включать детальное объяснение причины. Много объяснений вводят в заблуждение.

4 General Same comment as previous month: Progress needs to be made in making employees aware of the EMP and its implementation, as this is a requirement of the ADB. Currently the subcontractor is not fulfilling the required environmental protection measures as described above. То же замечание что и за предыдущий месяц: Необходимо продолжать осведомлять работников о ПЗОС и его выполнении, так как это требование АБР. На данный момент субподрядчик не выполняет требуемые меры по защите ОС как описано выше.

O

5 General Same comment as previous month: The ongoing issues relating to environmental payments and normative documents need to be brought up in the HDEC monthly environmental reports to record meetings and progress. At the moment it is still unclear what is needed. CS-MM has stated their opinion in their monthly environmental reports. То же замечание как и в предыдущем месяце: Продолжающиеся вопросы касающиеся экологических платежей и нормативных документов необходимо поднять в ежемесячных отчетах HDEC по экологии для регистрации встреч и хода работ. На данный момент до сих пор не ясно что необходимо. CS-MM выразил свое мнение в своих отчетах по экологии.

O

Page 140: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

81

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

6 General The Contractor is not producing statistical reports on environmental data to any environmental authorities. If this is not required, a letter from the environmental authorities must be provided stating this. However if it is required the standard format must be agreed. Подрядчик не производит статистические отчеты по экологии ни в какие органы охраны окружающей среды. Если это не требуется, письмо от органов охраны ОС должно быть получено, в котором это указывается. Однако если это необходимо, тогда нужно согласовать стандартный формат.

7 4 Same comment as the previous months: CS-MM would still like to see evidence of this training. Please provide the training slides. То же замечание как и за предыдущий месяц: CS-MM бы хотел видеть признаки данного обучения. Просим предоставить слайды для обучения.

O

8 5 The revised EMP from July 2014 (Revision D) should have been used in this monthly environmental report. Пересмотренный ПЗОС от Июля 2014 (Рев.D) должен был быть использован в данном отчете по экологии.

O

9 5 Same comment as the previous two months: Some aspects of the EMP are not being carried out such as:

a) Emergency preparedness for environmental incidents (section 4.10 of the EMP document).

b) Project key performance indicators (section 4.12 of the EMP document) have not been developed to monitor

O

Page 141: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

82

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

environmental performance.

10 5 Please state when the next quarterly training on emergencies and accidents will take place То же замечание что и за предыдущий месяц: Некоторые аспекты ПЗОС не выполняются, такие как: А) аварийная готовность для экологических инцидентов (раздел 4.0 документа ПЗОС) В) ключевые показатели выполнения проекта (раздел 4.12 ПЗОС) не были разработаны чтобы контролировать экологические характеристики

11 5 Same comment as pervious month: Please include a record of the emergency trainings – information on what type of emergency/accident training HDEC provided, to whom, and when. This information should be included in the environmental monthly report. То же замечание что и за предыдущий месяц: Просим включить регистрацию аварийных обучений –информацию о каких типах аварийных ситуаций/инцидентов предоставлял обучение HDEC, кому и когда. Данная информация должна быть включена в ежемесячный отчет по экологии.

O

12 5 All the monthly environmental reports state that employees have training on “Traffic – on signs and signals description”. Are the employees being trained on the same material each month? Все ежемесячные экологические отчеты указывают что работники прошли обучение по «ПДД-знаки и описание

O

Page 142: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

83

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

сигналов». Обучаются ли работники по одному и тому же материалу каждый месяц?

13 5 Same comment as pervious month: Although the quantity of water is being “recorded” it is not being measured as the water meters have not been tested/certified and therefore are not officially operational. The comments are misleading here when it states: “the usage of water is being monitored”. Information should be included on the status of the water meters as this is important environmental information. То же замечание что и за предыдущий месяц: Хотя количество воды «регистрируется» , она не замеряется, так как счетчики воды не были тестированы/сертифицированы и поэтому не официально работают. Замечания вводят в заблуждение, когда говорится что «использование воды контролируется».

O

14 5 Same comment as pervious month: Air emissions - There are air emissions aside from dust (for example transport emissions). HDEC should have a full list of all the air emission areas. То же замечание что и в предыдущем месяце: Выбросы в атмосферу – существуют выбросы в атмосферу помимо пыли (например транспортные выхлопы). HDEC должен иметь полный список всех областей где происходит выброс в атмосферу.

O

Page 143: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

84

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

15 5 Air emissions - There is no report on the quantity and quality of emissions from the stationary sources and mobile sources. Выброс в атмосферу- отсутствует отчет по количеству и качеству выбросов из стационарных источников и мобильных источников.

O

16 5 Same comment as pervious months: Watering – please state where the water trucks get filled То же замечание что и за прошлый месяц: Увлажнение-просим указать где наполняются водовозы

O

17 5 Same comment as pervious months: Noise plan – Are all the noise pollution sources identified in a formal list format specific to this project? How have they been identified? То же замечание что и за прошлый месяц: План шума – все ли источники шума определены в официальном листе формата специально разработанного для данного проекта? Как они были определены?

O

18 5 Please state how the “main roads are kept clean” Просим указать как «главные дороги содержатся в чистоте»

O

19 5 Same comment as previous month: Noise plan – Is there a site-specific noise plan? Or only the “HTS-SCS-ANJU-EH-01 Noise” document? То же замечание что и за предыдущий месяц: План шума – существует ли особый шумовой план характерный для площадки? Или только документ “HTS-

O

Page 144: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

85

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

SCS-ANJU-EH-01 Шум”?

20 5 Same comment as previous month: For the past months CS-MM has emphasized that the wastewater situation at the batch plant, vehicle washing area, and refuelling area needs to be better controlled. The Environmental monthly report states that the wastewater is “under control by the contractor” – this does not provide any information. The drainage situation is improving however it is not considered “under control”. This is very misleading and incorrect. A description of the actual situation should be included. То же замечание что и за прошлый месяц: За последние месяцы CS-MM подчеркивал что ситуация со стоками на БСУ, области мойки транспортных средств и области заправки необходимо лучше контролировать. Ежемесячный отчет по экологии указывает что сточная вода «контролируется Подрядчиком»-это не предоставляет никакой информации. Ситуация с дренажем улучшается, однако она не считается «под контролем». Это очень вводит в заблуждение и не правильно. Описание фактической ситуации должно быть включено.

O

21 5 Same comment as previous month: A wastewater control plan is definitely not being implemented.

O

Page 145: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

86

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

What is the wastewater control plan? Please provide it. То же замечание что и за предыдущий месяц: План контроля стоков определенно не выполняется. Каков план контроля стоками? Просим предоставить его.

22 5 Same comment as previous month: The batch plant is currently in operation. Therefore it is misleading to state that the “Batch Plant has not started working yet” and stating “N/A”. То же замечание что и за предыдущий месяц: БСУ на текущий момент в эксплуатации. Поэтому заявление о том, что «БСУ не начала еще работу» и «нет данных» приводит в заблуждение.

O

23 5 Same comment as previous month: HDEC should state what the “Controlled wastewater procedure” at the batch plant is. This is insufficient information and this is wastewater is certainly not being controlled. То же замечание что и за прошлый месяц: HDEC должен указать какая «Процедура контролируемая стоки» на БСУ. Этой информации не достаточно и эти стоки не контролируются.

O

24 5 There is no appropriate oil trap and the area is not fully paved over at the vehicle washing area. Отсутствует подходящий поддон масленый и область не полностью замощена в области мойки транспортных средств. Same comment as previous months:

O

Page 146: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

87

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

Washing water – the water drainage and discharge at the vehicle washing area not appropriate. CS-MM raised this issue many times however it is not reflected in the monthly environmental report. The status “install wastewater disposal system” is not a good reflection of the current situation. То же замечание что и за предыдущий месяц: Вода для промывки – дренаж воды и сброс в области мойки транспортных средств не правильный. CS-MM поднял данный вопрос много раз, однако это не отражено в ежемесячном отчете по экологии. Статус «установка системы сброса стоков» не является хорошим отражением текущей ситуации.

25 5 Same comment as previous months: Wastewater from the refuelling area should also have adequate drainage and disposal. This is not reflected in the monthly environmental report. The status “install wastewater disposal system” is not a good reflection of the current situation. То же замечание что и за прошлый месяц: Сточная вода из области заправки должна так же иметь правильный дренаж и сброс. Это не отражено в ежемесячном отчете по экологии. Статус «установка системы сброса стоков» не является хорошим отражением текущей ситуации.

O

26 5 Same comment as previous month: Natural water - It is unclear why “natural fun-off diverted away from any camps” is “N/A”. It is applicable and should be elaborated.

O

Page 147: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

88

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

То же замечанием что и за предыдущий месяц: Натуральная вода – не ясно почему «нет информации» по «естественному отводу отведенному в сторону от лагерей». Это должно быть разработано.

27 5 Same comment as previous month: There are also pit latrines on site, which will generate wastewater. What is the situation of the quantity there? То же замечание что и за предыдущий месяц: На площадке имеются уличные туалеты, которые будут производить стоки. Какова ситуация с количеством там?

28 5 Same comment as previous months: It is unclear when the water quality monitoring will take place. It should take place for incoming and outgoing water (drinking water quality should be tested periodically as well) on a quarterly basis. То же замечание как и за предыдущий месяц: Не ясно когда мониторинг качества произойдет. Это должно происходить для входящей и для исходящей воды (качество питьевой воды должно проверяться периодически так же) на квартальной основе.

O

29 5 Same comment as previous months: What are the soil pollution sources? Is there a formal list? If so, please provide. То же замечание что и за прошлый месяц: Каковы источники загрязнения почвы? Есть ли официальный список? Если да, то просим предоставить.

O

Page 148: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

89

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

30 5 Please state where landscaping trees have been planted on site Просим указать где деревья были посажены на площадке

O

31 5 Having barricades near slopes is not fulfilling “exposed slope surface shall be covered during the rainy day”. Please amend. Условие наличия ограждений рядом со склонами не выполняется «незащищенная поверхность склона должна быть покрыта во время дождливых дней». Просим исправить

O

32 5 The sediment tanks have not been fully constructed. Only pits have been dug. Therefore stating that “Sediment tanks have been built for settling wastewater prior to disposal” is incorrect and misleading. Резервуары для осадки не были полностью сооружены. Только колодцы были выкопаны. Поэтому заявление о том что «Отстойники были построены для отстаивания сточной воды перед выбросом» является не правильным и вводящим в заблуждение.

O

33 5 Drainage plans are not adequate and have not been installed. Drainage and wastewater treatment needs to be improved at the batch plant, refuelling area, and vehicle washing area. Refer to comment 18. Дренажные планы не правильные и не были установлены. Дренаж и очищение сточной воды необходимо улучшить на БСУ, области заправки, и области мойки транспортных средств. См.замечание 18. Same comment as previous month: Drainage facility – the status states: “planned where to install the

O

Page 149: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

90

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

drainage system” – the drawings were reviewed by CS-MM and are deemed inadequate. Furthermore they have not been installed. То же замечание что и за предыдущий месяц: Дренажные сооружения – статус гласит: «запланировано где устанавливать дренажную систему»-чертежи были проверены CS-MM и признаны неправильными. Поэтому они не были установлены.

34 5 Same comment as previous months: Please state how roads are being cleaned from mud after rain. CS-MM has never observed this taking place on the construction site. Furthermore many of the roads are not paved – making this difficult. То же замечание что и за предыдущий месяц: Просим указать как дороги будет очищаться от грязи после дождя. CS-MM никогда не видел чтобы это происходило. К тому же, многие дороги не замощены – что усложняет ситуацию.

O

35 5 Same comment as previous months: Refuelling should not be taking place on gravel surfaces. It should be taking place on an impermeable surface with appropriate drainage. Improvements have been made to pave over the refuelling area, however it is too small and should be enlarged. То же замечание что и за предыдущий месяц: Заправка должна происходить на гравийной поверхности. Она должна происходить на не проницаемой поверхности с соответствующим дренажем. Улучшения были выполнены

O

Page 150: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

91

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

на всем покрытии топливной области, однако она слишком маленькая и должна быть увеличена.

36 5 Same comment as previous months: Spill control – it states that only “authorized employees work with fuel and chemicals” – early it stated that there were no chemicals on site. Please clarify if there are chemicals on site. То же замечание что и за предыдущий месяц: Контроль розлива – он гласит что только «уполномоченные работники могут работать с топливом и химикатами» - ранее указывалось что химикаты отсутствуют на площадке. Просим уточнить есть ли химикаты на площадке.

O

37 5 Same comment as previous months: CS-MM has never seen any spill kits on site (only fire fighting stands). То же замечание что и за прошлый месяц: СS-MM никогда не видел инструменты для сбора разлитой жидкости (только стенды пожаробезопасности)

O

38 5 There will be oily wastewater (i.e. at the vehicle washing area) Same comment as previous month: Oil emission - It is unclear why “treating oily wastewater” is “N/A”. This is incorrect. Будут иметься масляные сточные воды (например в области мойки транспортных средств) То же замечание, что и за прошлый месяц.

O

Page 151: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

92

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

Масляные выбросы – не ясно почему «очищение масляных стоков» «нет данных». Это не правильно.

39 5 Same comment as previous months: CS-MM has observed that separation of waste is not happening adequately. This is not reflected in the environmental monthly report. То же замечание что и за предыдущие месяцы: CS-MM отметил что разделение отходов не происходит правильно. Это не отражено в ежемесячном отчете по экологии.

O

40 5 Please provide a list with all the different types of waste identified Просим предоставить список с разными типами отходов

O

41 5 Same comment as previous month: There are no waste passports – therefore there is no classification of types and quantities of waste (or hazards). То же замечание что и за прошлый месяц: Отсутствуют паспорта опасных отходов – поэтому отсутствует классификация типов и количества отходов (или опасных отходов)

42 5 Same comment as previous month: Recycling waste – this is applicable and the status “N/A” is not correct. То же замечание что и за прошлый месяц: Перерабатываемые отходы – это надлежит выполнению и статус «нет данных» не правильный

O

Page 152: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

93

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

Monthly Environmental Report – August 2014

- I

CS- MM reply reference Reply date

As incoming doc reference 23/09/14

43 6 Same comment as previous month: The time the samples were taken should be indicated. То же замечание что и за прошлый месяц: Должно быть указано время отбора проб

O

44 8 In the “monitoring of usage” the August monthly report states that the quantity of non-potable and potable water is the same as in June and July implying that they are not using the water meters. В « контроле использования» ежемесячного отчета за август указано, что количество не питьевой и питьевой воды то же самое что и в Июне и в Июле, что подразумевает собой факт что они не пользуются счетчиками воды.

O

Page 153: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

94

ПРИЛОЖЕНИЕ E: ЗАМЕЧАНИЯ К ЕЖЕМЕСЯЧНОМУ ОТЧЕТУ HDEC ПО ЭКОЛОГИИ ЗА СЕНТЯБРЬ 2014

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

No. Reference CS-MM Comment HDEC Response Status

1 General Overall the report does not describe the actual environmental status at the construction site. В общем отчет не описывает фактический статус ОС на строительной площадке

O

2 General Same comment as previous months:

It would be helpful to receive these comment sheets returned each month with HDEC response to acknowledge receipt and improve progress. As can be seen in this month’s comments – many things are repeated. То же замечание что и за предыдущий месяц: Было бы полезным получать данные листы с замечаниями, которые возвращаются каждый месяц с ответом HDEC чтобы подтвердить получение и уточнить прогресс. Как наблюдается из замечаний данного месяца, многие вещи повторяются

O

3 General Same comment as previous months:

In the case that some actions of the EMP have not been implemented HDEC should clearly state: “not yet implemented” and include a detailed explanation of why. Many of the descriptions are misleading. То же замечание что и за предыдущий месяц: В случае если некоторые действия ПЗОС не были выполнены, HDEC должен четко указывать: «еще не выполнено» и включать детальное объяснение причины. Много объяснений вводят в заблуждение.

O

4 General Same comment as previous months:

Progress needs to be made in making employees aware of the EMP and O

Page 154: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

95

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

its implementation, as this is a requirement of the ADB. Currently the subcontractor is not fulfilling the required environmental protection measures as described above.

То же замечание что и за предыдущий месяц: Необходимо продолжать осведомлять работников о ПЗОС и его выполнении, так как это требование АБР. На данный момент субподрядчик не выполняет требуемые меры по защите ОС как описано выше.

5 General Same comment as previous months:

The ongoing issues relating to environmental payments and normative documents need to be brought up in the HDEC monthly environmental reports to record meetings and progress. At the moment it is still unclear what is needed. CS-MM has stated their opinion in their monthly environmental reports. То же замечание как и в предыдущем месяце: Продолжающиеся вопросы касающиеся экологических платежей и нормативных документов необходимо поднять в ежемесячных отчетах HDEC по экологии для регистрации встреч и хода работ. На данный момент до сих пор не ясно что необходимо. CS-MM выразил свое мнение в своих отчетах по экологии.

O

6 General Same comment as previous months:

The Contractor is not producing statistical reports on environmental data to any environmental authorities. If this is not required, a letter from the environmental authorities must be provided stating this. However if it is required the standard format must be agreed. То же замечание с предыдущего месяца: Подрядчик не производит статистические отчеты по экологии ни в какие органы охраны окружающей среды. Если это не требуется, письмо от органов охраны ОС должно

O

Page 155: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

96

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

быть получено, в котором это указывается. Однако если это необходимо, тогда нужно согласовать стандартный формат.

7 4 Same comment as the previous months:

CS-MM would still like to see evidence of this training. Please provide the training slides.

То же замечание как и за предыдущий месяц: CS-MM бы хотел видеть признаки данного обучения. Просим предоставить слайды для обучения.

O

8 5 The numbering system from the revised EMP should be used so

comments can be easily traced to specific actions. Система нумерации из пересмотренного ПЗОС должна быть использоваа чтобы замечания могли быть легко отслеживаемы согласно специфичным действиям.

O

9 5 Section 5 should be labelled “Site Based Environmental Management

Plan (July 2014)” in order to keep track of what revision is being used for monitoring. Раздел 5 должен быть назван : «План Управления ЗОС ориентированный на строительную площадку (июль 2014)» чтобы сохранять отслеживание какие ревизии были использованы для мониторинга.

O

10 5 Same comment as the previous months:

Some aspects of the EMP are not being carried out such as: a) Emergency preparedness for environmental incidents (section

4.10 of the EMP document). b) Project key performance indicators (section 4.12 of the EMP

document) have not been developed to monitor environmental

O

Page 156: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

97

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

performance. То же замечание что и за предыдущий месяц: Некоторые аспекты ПЗОС не выполняются, такие как: А) аварийная готовность для экологических инцидентов (раздел 4.10 документа ПЗОС) В) ключевые показатели выполнения проекта (раздел 4.12 ПЗОС) не были разработаны чтобы контролировать экологические характеристики

11 5 Same comment as previous month:

Please state when the next quarterly training on emergencies and accidents will take place То же замечание что за предыдущий месяц: Просим указать когда следующее квартальное обучение по аварийным ситуациям и происшествиям будет происходить.

O

12 5 Same comment as pervious month:

Please include a record of the emergency trainings – information on what type of emergency/accident training HDEC provided, to whom, and when. This information should be included in the environmental monthly report. То же замечание что за предыдущий месяц:

Просим включить регистрацию аварийных обучений –информацию о каких типах аварийных ситуаций/инцидентов предоставлял обучение HDEC, кому и когда. Данная информация должна быть включена в ежемесячный отчет по экологии.

O

13 5 Same comment as pervious month:

All the monthly environmental reports state that employees have training on “Traffic – on signs and signals description”. Are the employees being trained on the same material each month?

O

Page 157: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

98

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

То же замечание что за предыдущий месяц:

Все ежемесячные экологические отчеты указывают что работники прошли обучение по «ПДД-знаки и описание сигналов». Обучаются ли работники по одному и тому же материалу каждый месяц?

14 5 Same comment as pervious months:

Although the quantity of water is being “recorded” it is not being measured as the water meters have not been tested/certified and therefore are not officially operational. The comments are misleading here when it states: “the usage of water is being monitored”. Information should be included on the status of the water meters as this is important environmental information. HDEC needs to push the subcontractor to get these properly installed and used correctly. То же замечание что и за предыдущий месяц: Хотя количество воды «регистрируется» , она не замеряется, так как счетчики воды не были тестированы/сертифицированы и поэтому не официально работают. Замечания вводят в заблуждение, когда говорится что «использование воды контролируется». Информация должна быть включена о статусе счетчиков воды так как это является важной экологической информацией. HDEC необходимо заставить субподрядчика установить данные счетчики правильно для правильного использования.

O

Page 158: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

99

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

15 5 Same comment as pervious months:

Air emissions - There are air emissions aside from dust (for example transport emissions). HDEC should have a full list of all the air emission areas.

То же замечание что и в предыдущем месяце: Выбросы в атмосферу – существуют выбросы в атмосферу помимо пыли (например транспортные выхлопы). HDEC должен иметь полный список всех областей где происходит выброс в атмосферу.

O

16 5 Same comment as pervious months:

Watering – please state where the water trucks get filled То же замечание что и за прошлый месяц: Увлажнение-просим указать где наполняются водовозы

O

17 5 It was understood that the cement is being directly deposited into the

bunkers. Is debagging of cement still taking place in the temporary warehouse, or is this an old comment. Было понято что цемент напрямую складывается в яму для хранения цемента. Вынимание из мешков цемента до сих пор происходит во временных складах или это старый цемент.

O

18 5 Same comment as pervious months:

Noise plan – Are all the noise pollution sources identified in a formal list format specific to this project? How have they been identified? То же замечание что и за прошлый месяц: План шума – все ли источники шума определены в официальном листе формата специально разработанного

O

Page 159: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

100

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

для данного проекта? Как они были определены?

19 5 Same comment as previous month:

Noise plan – Is there a site-specific noise plan? Or only the “HTS-SCS-ANJU-EH-01 Noise” document? То же замечание что и за предыдущий месяц: План шума – существует ли особый шумовой план характерный для площадки? Или только документ “HTS-SCS-ANJU-EH-01 Шум”?

O

20 5 Same comment as previous month: For the past months CS-MM has emphasized that the wastewater situation at the batch plant, vehicle washing area, and refuelling area needs to be better controlled. The Environmental monthly report states that the wastewater is “under control by the contractor” – this does not provide any information. The drainage situation is improving however it is not considered “under control”. This is very misleading and incorrect. A description of the actual situation should be included. То же замечание что и за прошлый месяц: За последние месяцы CS-MM подчеркивал что ситуация со стоками на БСУ, области мойки транспортных средств и области заправки необходимо лучше контролировать. Ежемесячный отчет по экологии указывает что сточная вода «контролируется Подрядчиком»-это не предоставляет

O

Page 160: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

101

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

никакой информации. Ситуация с дренажем улучшается, однако она не считается «под контролем». Это очень вводит в заблуждение и не правильно. Описание фактической ситуации должно быть включено.

21 5 Same comment as previous months:

A wastewater control plan is definitely not being implemented. What is the wastewater control plan? Please provide it. То же замечание что и за прошлый месяц: План контроля сточных вод точно не выполняется. Каков план контроля стоков? Просим предоставить его.

O

22 5 “Drainage system is used for discharge of batching plant wastewater” is

not taking place. This comment is misleading. There is no proper drainage at the batch plant. «Система дренажа используется для дренирования стоков от БСУ» этого не происходит. Это замечание вводит в заблуждение. Соответствующий дренаж отсутствует на БСУ.

O

23 5 Same comment as previous months:

There is no appropriate oil trap and the area is not fully paved over at the vehicle washing area. Washing water – the water drainage and discharge at the vehicle washing area not appropriate. CS-MM raised this issue many times however it is not reflected in the monthly environmental report. The status “drainage is used for settling the cement prior to discharge” is not taking place. This comment is misleading. There is no proper drainage at the batch plant.

O

Page 161: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

102

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

То же замечание что и за предыдущий месяц: Отсутствует соответствующий масляный поддон и область мойки транспортных средств не замощена. Вода для мойки – дренаж воды и сброс в области мойки транспортных средств не правильный. CS-MM поднимал этот вопрос много раз, однако это не отражено в ежемесячном отчете по экологии. Статус «дренаж используется для осадки цемента перед сбросом» не происходит. Замечание вводит в заблуждение. Отсутствует правильны дренаж на БСУ.

24 5 Same comment as previous months:

Wastewater from the refuelling area should also have adequate drainage and disposal. This is not reflected in the monthly environmental report. The status “install wastewater disposal system” is not a good reflection of the current situation. То же замечание что и за предыдущий месяц: Сточная вода из области заправки должна так же иметь правильный дренаж и сброс. Это не отражено в ежемесячном отчете по экологии. Статус «установка системы сброса сточной воды» не является хорошим отражением текущей ситуации.

O

25 5 Same comment as previous months:

There are also pit latrines on site, which will generate wastewater. What is the situation of the quantity there? То же замечание что и за предыдущий месяц: На площадке имеются уличные туалеты, которые будут производить сточную воду. Какова ситуация с количеством там?

O

26 5 Same comment as previous months:

It is unclear when the water quality monitoring will take place. It should take place for incoming and outgoing water (drinking water quality should be tested periodically as well) on a quarterly basis.

O

Page 162: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

103

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

То же замечание что и за прошлый месяц: Не ясно когда будет происходить мониторинг качества воды. Он должен выполняться как для входящей так и исходящей воды (качество питьевой воды должно тестироваться периодически так же) каждый квартал.

27 5 Same comment as previous months:

What are the soil pollution sources? Is there a formal list? If so, please provide. То же замечание что и за предыдущий месяц: Каковы источники загрязнения почвы? Существует ли официальный список? Если да, то просим предоставить его.

O

28 5 Please state where landscaping trees have been planted on site

Просим указать где были посажены деревья на площадке. O

29 5 Having barricades near slopes is not fulfilling “exposed slope surface

shall be covered during the rainy day”. Please amend. Условие наличия ограждений рядом со склонами не выполняется «незащищенная поверхность склона должна быть покрыта во время дождливых дней». Просим исправить

O

30 5 Same comment as previous month:

The sediment tanks have not been fully constructed. Only pits have been dug. Therefore stating that “Sediment tanks have been built for settling wastewater prior to disposal” is incorrect and misleading.

Резервуары для осадки не были полностью сооружены. Только колодцы были выкопаны. Поэтому заявление о том что «Отстойники были построены для отстаивания сточной воды перед выбросом» является не правильным и вводящим в заблуждение.

O

Page 163: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

104

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

31 5 Drainage plans are not adequate and have not been installed. Drainage

and wastewater treatment needs to be improved at the batch plant, refuelling area, and vehicle washing area. Дренажные планы не правильные и не были установлены. Очищение дренажа и сточной воды необходимо улучшить на БСУ, области заправки и области мойки транспортных средств. Same comment as previous month: Drainage facility – the status states: “planned where to install the drainage system” – the drawings were reviewed by CS-MM and are deemed inadequate. Furthermore they have not been installed. То же замечание что и за предыдущий месяц: Дренажное сооружение – статус гласит: «запланировано место установки системы дренажа» - чертежи были проверены CS-MM и признаны правильными. При этом они не были установлены.

O

32 5 Same comment as previous months:

Please state how roads are being cleaned from mud after rain. CS-MM has never observed this taking place on the construction site. Furthermore many of the roads are not paved – making this difficult. То же замечание что и за предыдущий месяц: Просим указать как дороги очищаются от грязи после дождя. CS-MM никогда не наблюдал этого на строительной площадке. К тому же много из дорог не замощены – это усложняет ситуацию.

O

33 5 Same comment as previous months:

Refuelling should not be taking place on gravel surfaces. It should be taking place on an impermeable surface with appropriate drainage. Improvements have been made to pave over the refuelling area, however

O

Page 164: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

105

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

it is too small and should be enlarged. То же замечание что и за предыдущий месяц: Заправка должна происходить на каменной поверхности. Это должно происходить на непроницаемой поверхности с соответствующим дренажем. Улучшения были сделаны в покрытии область заправки, однако она слишком маленькая и должна быть увеличена.

34 5 Same comment as previous months:

Spill control – it states that only “authorized employees work with fuel and chemicals” – early it stated that there were no chemicals on site. Please clarify if there are chemicals on site. То же замечание что и за предыдущий месяц: Контроль розлива-гласит что только «авторизованные рабочие могут работать с топливом и химикатами»- ранее указывалось что химикаты на площадке отсутствуют. Просим уточнить на данный момент есть ли химикаты на площадке.

O

35 5 Same comment as previous months:

CS-MM has never seen any spill kits on site (only fire fighting stands). То же замечание что и за предыдущий месяц: CS-MM никогда не видел никакие инструменты для сбора разлитой жидкости (только противопожарные стэнды)

O

36 5 The fuel tank is not safe from spills. Please amend.

Резервуар для топлива не защищен от розлива. Просим исправить. O

37 5 There will be oily wastewater (i.e. at the vehicle washing area)

Same comment as previous month: Oil emission - It is unclear why “treating oily wastewater” is “N/A”. This is incorrect.

O

Page 165: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

106

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

Будут иметься масляные стоки (например в области мойки транспортных средств) То же замечание что и за предыдущий месяц: Выброс масла – не ясно почему «нет информации» по «очистке масляных стоков». Это не правильно.

38 5 Same comment as previous months:

CS-MM has observed that separation of waste is not happening adequately. This is not reflected in the environmental monthly report.

То же замечание что и за предыдущие месяцы: CS-MM отметил что разделение отходов не происходит правильно. Это не отражено в ежемесячном отчете по экологии.

O

39 5 Please provide evidence of these waste logs

Просим предоставить наличие данных журналов регистрации отходов

O

40 5 Same comment as previous month:

There are no waste passports – therefore there is no classification of types and quantities of waste (or hazards).

То же замечание что и за прошлый месяц: Отсутствуют паспорта опасных отходов – поэтому отсутствует классификация типов и количества отходов (или опасных отходов)

O

41 6 Same comment as previous month:

The time the samples were taken should be indicated.

То же замечание что и за прошлый месяц:

O

Page 166: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

107

HDEC Project Document Number Title Rev Pur Sim Document Transmittal (DT) Number DT Date

LET-HDEC-PMU-0330 Monthly Environmental Report – September 2014

- I 2/10/14

CS- MM reply reference Reply date

As incoming doc reference 2/10/14

Должно быть указано время отбора проб

42 8 In the “monitoring of usage” the September monthly report states that the

quantity of non-potable and potable water is the same as in June, July, and August, implying that they are not using the water meters. The water meters must be used for record keeping. В « контроле использования» ежемесячного отчета за август указано, что количество не питьевой и питьевой воды то же самое что и в Июне и в Июле, что подразумевает собой факт что они не пользуются счетчиками воды. Счетчики учета воды должны быть использованы для регистрации

O

Page 167: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

108

Page 168: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

Механизм рассмотрения жалоб от населения по проекту «Расширение

Талимарджанской ТЭС со строительством двух ПГУ мощностью

по 450 МВт»

Public complaints-handling mechanism on the Project “Expansion of Talimarjan TPP with the

construction of two CCGT with a capacity of 450 MW"

рис.1 Жалобная Книга

pic. 1 Complaint book

Page 169: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

рис.2 Жалобная книга находится в отделе кадров в свободном доступе

pic. 2 Complaint book is being kept freely available in HR department.

рис. 3 и рис.4 Жалобная книга прошита и пронумерована

pic. 3 & 4 Complaint have sequentially numbered pages that have been bound securely

Page 170: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

рис 5. Жалобная книга пуста, записей нет

pic. 5 Complaint book is empty, there are no entries

рис.6 и рис.7 Отдел кадров, проходная

pic. 6 & 7 HR department, entrance to the Talimarjan TPP

Page 171: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

рис. 8 Время приёма руководством УП «Талимарджанская ТЭС» граждан

pic. 8 Visiting hours for citizens to meet with management of Talimarjan TPP

рис. 9 Время приёма руководством ГАК «Узбекэнерго» граждан по личным вопросам

pic. 9 Visiting hours for citizens to meet with management of SJSC “Uzbekenergo” on

personal issues

Page 172: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

рис. 10 и рис. 11 Объявление о наличии жалобной книги на пункте пропуска на станцию

pic. 10 & 11 Notification at the entrance of Talimarjan TPP that there is a complaint book

available

Page 173: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

рис. 12 и рис 13. Объявление о наличии жалобной книги в посёлке Нуристан, рынок

pic. 12 & 13 Notification at the marketplace in the settlement of Nuristan that there is a

complaint book available

Page 174: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

рис. 14 и рис. 15 Объявление о наличии жалобной книги в посёлке Нуристан, здание для

собраний жителей посёлка, медпункт

pic. 14 & 15 Notification at the meeting hall/ first-aid station in the settlement of Nuristan that

there is a complaint book available

Page 175: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

The State Committee on Nature Protection of the Kashkadarya region of Uzbekistan.

180100 Karshi city, Jayhun st.Tel: 22I-09-59;77I-00-28; Fax: 221-18-97. E-mail:ecologl @uzpak.uz

5 September,2014 J\b 08-1461 Karshi citv

To Director of Hyundai Engineering&Construction

Co.LTD Company E.V.KIMTo Head of "Talimarjan" TPP A.NormuminovCopv:

For lrour LET-HDES-NP-001 petition letter on 2nd September. 2014

Dear Mr. E.V.KIM.

The Committee on Nature Protection per }lb 18/768- conclusion of the State Committee on

Nature Protection of the Republic of Uzbekistan, has reviewed your petition letter and informs

you that:

The State Committee on Nature Protection of the Republic of Uzbekistan performed J\b

181768- positive conclusion about implementing the necessary nature protection measures for

"Construction of Two Combined Cycle Gas Turbine Units 450 MW each for TTPP Expansion

and its environmental impact (l- level)" on l3 August,2013.

. / Contractor should submit a report each quarter_about done work for implementing thev conclusion conditions of "Consfiffioffr;m"mbined Cycle Gas Turbine Units 450 Mweach for TTPP Expansion and its environmental impact (I- level)" according to 2l-article ofooEnvironmental Impact Assessment Law" of Republic of Uzbekistan dated on25 May 2000;

Nsl6l-order, confirmed on 8 September 2011 by chairrnan of the State Committee on Nature

Protection of the Republic of Uzbekistan oostatue about monitoring of implementing nature

protection measures showed on conclusions ofthe state environmental approvals of inspections,

environmental certification agencies and State Environmental Expert Review and cooperation

conditions between the systems of environmental normalizing.

According to this the following information should be provided in the report:

facts about formalizing(legalizing) procedures of this land corresponded with Land Code ofRepublic of Uzbekistan and on 25 February 2013 published J'&54-resolution of Cabinet ofMinisters Republic of Uzbekistan about oolmplementing of urban development activity and

providing with non-agricultural lands, also normalization measures of submitting permission for

the construction of objects" despite the land for construction of Two Combined Cycle Gas

Turbine Unit is located in TTPP area;

copy of the schedule of step by step works designed in the project and approved by

management, also providing with necessary information about done work in accordance with this

schedule.

Until construction's commission based on "Construction of Two Combined Cycle Gas

Turbine Units 450 MW each for TTPP Expansion and its environmental impact (I- level)",

contractor will inspect the object for state environmental impact assessment per o'Statement ofenvironmental consequences" according to the requirements of 15- article of "EnvironmentalImpact Assessment Law" of Republic of Uzbekistan dated on25 May 2000, and according to the

requirements of ooProviding with lands of settlements for implementing urban development

activity, designing of construction objects and registration them, also commissioning of objects"

based on Ng54-resolution of Cabinet of Ministers of Republic Uzbekistan about "implementing

of urban development activity and providing with non-agricultural lands, also normalizingmeasures of performance the permission for the construction of objects" dated on25 February

' 2013 will be accepted for operation..,.

Page 176: Asian Development Bank - Draft Environmental Monitoring ......Asian Development Bank. This draft environmental monitoring report is a document of the borrower. The views expressed

We inform you thaf, based on stafutory indicators of "statement of environmental