GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT & HIGHWAYS Jeevan Tara Building, Sansad Marg, New Delhi-11 0001 Dated: 23rd July, 2015 RW-NH-34066/2/2013-S&R(8) To, The Regional Officer (MORT&H), all States. Sub: Preparation of Project Report for Construction of Proposed ROBsl RUBs & their approaches in replacement of Existing Level Crossings. Please refer MOU (copy enclosed) signed between Ministry of Railways and Ministry of Road transport & Highways for the work of Construction of Road over/ Under Bridges on National Highways corridors. As per para 5 of MOU, it has been decided to deposit the token plan & estimation charges @ Rs. 5 lakhs per ROB/ RUB. You are hereby authorized to pay the required token money i.e Rs. 5.00 Lakhs per ROB! RUB out of work contingency of any ongoing project. Yours faithfully, (A. K. Pand t~/1{~ Superintending Engineer S&R ) For OG (RO) & SS Copy to: 1. 2. Chief Engineer (NH), all States. All Consultants
6
Embed
As Per MOU (@ Rs. 5 Lakhs Per ROB RUB to Railways).
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
GOVERNMENT OF INDIAMINISTRY OF ROAD TRANSPORT & HIGHWAYS
Jeevan Tara Building,Sansad Marg,
New Delhi-11 0001Dated: 23rd July, 2015RW-NH-34066/2/2013-S&R(8)
To,
The Regional Officer (MORT&H), all States.
Sub: Preparation of Project Report for Construction of Proposed ROBsl RUBs & theirapproaches in replacement of Existing Level Crossings.
Please refer MOU (copy enclosed) signed between Ministry of Railways and
Ministry of Road transport & Highways for the work of Construction of Road over/ Under Bridges
on National Highways corridors.
As per para 5 of MOU, it has been decided to deposit the token plan & estimation
charges @ Rs. 5 lakhs per ROB/ RUB.
You are hereby authorized to pay the required token money i.e Rs. 5.00 Lakhs
per ROB! RUB out of work contingency of any ongoing project.
S'hould be located Just out-side/at the railway bowrtdar;!es the e..~enfp4lssi~le .based
on available standard RDSO's span. No earthen e(1l~a:n~m,!?[(!tshpuld'beconstructed
within raHway boundaries. Similarly. wherever neede!1i,;;"}'-- ..:-~" ~: <;:Ad'
,Way of National Highway through over bridge or'ulild~t b,fi(iJ.ge,
} 7. Alongwith the construction of ROB, MORTHINHAI' shall· construct a $llbway tofacilitate movement of pe<3lestriianandvehi.o~lar ..l~~tliC~rG{;qS$ the railway track to'
facilitate closure of level crOSSing by l~allwa~s,<(Q{@!n'5t~(Jct.i0J1,o.f$LI.t;lWt;lywit.hin RaHway
Portien should he done under tn.e superV~sfon'
charges. If subway is not possible, then suitable RQB,witb faint>, snptlld be pfQvideci., . ,.' - --,' '.