Top Banner
SMART VILLAGES WORKSHOP New Thinking for off-grid communities worldwide ARUSHA, TANZANIA, JUNE 3-5, 2014 PRIVATE SECTOR PRESENTER: DAN KLINCK, COO DC HYDROPOWER LTD (RWANDA) MUSARARA MINI-HYDROPOWER PLANT HYDROPOWER CASE STUDY
38

Arusha | Jun-14 | Dan Klinck, Mini-Hydro

Jun 14, 2015

Download

Engineering

Smart Villages

The workshop in Arusha explored the East African/Tanzanian environment for village energy, local case studies, challenges and opportunities, with a view to formulating policy recommendations for policymakers, funders, NGOs and other stakeholders the region. An important part of the workshop, and indeed the whole Smart Villages initiative work programme, was to gather evidence from existing projects that have provided or facilitated sustainable off-grid energy solutions in the developing world.The workshop gathered more than 50 experts, including policymakers, NGOs, off-grid energy entrepreneurs and others to look for solutions to providing energy to villages off the grid.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

SMART VILLAGES WORKSHOP

New Thinking for off-grid communities worldwide

ARUSHA, TANZANIA, JUNE 3-5, 2014

PRIVATE SECTOR PRESENTER:

DAN KLINCK, COO

DC HYDROPOWER LTD (RWANDA)

MUSARARA MINI-HYDROPOWER PLANT HYDROPOWER CASE STUDY

Page 2: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

MUSARARA MINI-HYDRO PROJECT

Developer • Amahoro Energy (SOGEMR)

Capacity • 438 kW

Scheme • Run-of-the-River Scheme

Construction • 5 Years ( Primary Delays: Funding )

Development

Costs

• USD 2.2M

• 30% Developer

• 40% Debt

• 30% GIZ EnDev Program Grant

Annual Income • USD 500K

Mini-Grid • Original design to provide Shyra Hospital &

Villages with 500 households

• Completed with National Grid Connection

• Constructed 6km of MV Transmission Line

Page 3: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

DIVERSION WEIR

Page 4: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

DIVERSION WEIR

Page 5: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

DIVERSION WEIR

Page 6: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL

Page 7: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL EXCAVATION

Page 8: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL EXCAVATION

Page 9: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

ACCESS ISSUES

Page 10: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL

Page 11: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL

Page 12: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL

Page 13: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL

Page 14: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL & AQUADUCT

Page 15: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL

Page 16: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL & AQUADUCT

Page 17: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL & AQUADUCT

Page 18: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

CANAL & FOREBAY

Page 19: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

FOREBAY

Page 20: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

PENSTOCK

Page 21: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

PENSTOCK

Page 22: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

PENSTOCK

Page 23: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

PENSTOCK

Page 24: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

PENSTOCK

Page 25: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

PENSTOCK

Page 26: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

PENSTOCK (120m)

Page 27: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

POWERHOUSE

Page 28: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

ELECTROMECHANICAL

Page 29: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

OSSBERGER TURBINE

Page 30: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

ON-GRID CELEBRATION

Page 31: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

KEY LESSONS LEARNED

1. Private Plants perform better than Public Plants

(Including Community-Run Plants)

2. Grid-Connected Plants are easier to become

viable and sustainable than isolated ones

3. Conducive Regulatory Frameworks lead to

greater Private Sector contributions to both

Power Supply & Distribution

Page 32: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

MINI HYDRO SUCCES FACTORS

The following are the 5 key factors required to develop

a viable private sector led hydropower project

1. Financially Viable Business Plan

2. Robust Technical Plan

3. Coherant & Favorable Regulatory Environment

4. Strong Plant Ownership Arrangements

5. Expertise (Technical & Management)

Page 33: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

MHP DEVELOPMENT PROCESS GAP

1 • Site Identification

2 • Planning

3 • Financing & Procurement

4 • Construction

5 • Operations & Maintenance

Page 34: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

KSF: DO YOUR HOMEWORK

Page 35: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

KSF: STAY ON SCHEDULE

Page 36: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

KSF: SOURCE LOCALLY

Page 37: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

give a man a fish, eats for

a day … teach a man

to fish and he eats of a

lifetime

KSF: BUILD LOCAL CAPACITY

Page 38: Arusha | Jun-14 |  Dan Klinck, Mini-Hydro

Questions?

Contact Information:

Dan Klinck

COO

T +250 784 912 333

E [email protected]