Top Banner

of 16

Arsi Yota Ihsaningrum (02)

Jun 04, 2018

Download

Documents

Didin Putri M
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    1/16

    TASK OF ENGLISH LANGUAGE

    Home Electrical Instalation Project

    By :

    Name: Arsi Yota Ihsaningrum

    NIM / No. : 1131120117 / 02

    CLASS : D3 TL 1-A

    ELECTRICAL ENGINEERING OF STUDY PROGRAM

    ELECTRO ENGINEERING DEPARTEMENT

    STATE POLYTECHNIC OF MALANG

    2012

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    2/16

    STATE POLYTECHNIC OF MALANG

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    3/16

    Drawn by : Ars i Yo ta Ihsan ingrum

    Scale

    1 : 200

    Drawing Number

    02

    Checked by : Mr. Al i Imron

    Date : 10 July 2012 STATE POLYTECHNIC OF

    MALANG

    HOUSE TYPE

    2. House Type

    House Type is used to know about wide

    of building or wide of land.

    Example : House type 200, House type

    250, House type 450 etc.

    TYPE 140/132

    [TYPE 140/132]TYPE 105/112 TYPE 140/132

    TYPE 185/249 TYPE 250/254

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    4/16

    Drawn by : Ars i Yo ta Ihsan ingrum

    Scale

    1 : 200

    Drawing Number

    03

    Checked by : Mr. Al i Imron

    Date : 10 July 2012 STATE POLYTECHNIC OF

    MALANG

    CONSTUCTION

    3. Constuction

    Construction is form, condition of manifestly of building, which can be

    seen from lenght, wide, and high of building or it can be seen from made

    construction material.For example : Construction of home type 250

    Specification of home type 250

    Wide of home is 250 m2

    Wide of grounding is 254 m2

    Power Reaktif (PLN) = 2200 VA ( Faction R2 )

    Length of house = 16.5 meter

    Width of house = 15 meter

    High of house = 10 meter ( wall and roof )

    High installation of switch = 1.5 meter

    High installation of box contact = 1.5 meter

    Local foundation = Foundation of reinforced concrete times is ril

    Wall = Brick wall is platered by ACI, finishing paint

    Roof = construction wood of borneo super, ceramicSpecification of room :

    a. Terrace 1

    Wide of room : 4.5 m2

    Length of room : 3 m

    Width of room : 1.5m

    High of room : 10 m

    Colour of floor : White

    Colour of wall : White

    b. Terrace 2

    Wide of room : 6 m2

    Length of room : 3 m

    Width of room : 2 m

    High of room : 10 mColour of floor : White

    Colour of wall : White

    c. Living room

    Wide of room : 15 m2

    Length of room : 5 m

    Width of room : 3 m

    High of room : 10 m

    Colour of floor: : White

    Colour of wall : White

    Example of home construction

    at the drawing number 4

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    5/16

    House Ichno graph

    Drawn by : Ars i Yo ta Ihsan ingrum

    Scale

    1 : 200

    Drawing Number

    04

    Checked by : Mr. Al i Imron

    Date : 10 July 2012

    Garden

    Bedroom 1

    Ministrant

    Room

    KitchenAdditional

    Kitchen Dining

    Room

    Guest

    Room

    Living Room

    Toilet

    doorstep

    Balcony 1

    Terrace

    1

    Bathroom

    GardenGarage

    11.5 10 34.75 25.5

    22.5

    11

    5.25

    25

    13.75

    21.25

    26.2

    5

    13.2

    5

    16.7

    5

    27.5 16.26 24 13.5

    Up

    STATE POLYTECHNIC OF

    MALANG

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    6/16

    Drawn by : Arsi Yota Ihsaningrum

    Scale

    1 : 200

    Drawing Number

    05

    Checked by : Mr. Ali Imron

    Date : 10 July 2012 STATE POLYTECHNIC OF

    MALANG

    RECAPITULATION OF LAMP

    4. Recapitulation of Lamp

    Recapitulation of Lampis calculation of lamp to be attach

    room. It can belooked by using roominess and high of r

    be obtained by room flux. Where room flux is divided

    Explaining :

    I used CFL ( Compact Flourescent Lamp ) Rk = Room factor t = total flux of room (lumen) l = total flux of lamp (lumen, from

    catalog) E = Strong of lighting (lux) A = roomines (m) = efficiency of room n = total lamp

    Example of recapitulation lamp

    at drawing number 06

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    7/16

    CALCULATIONOFLAMP

    Skala

    -

    1

    Terrace

    Direct

    3.2

    5

    2.0

    0

    4.00

    0.3

    0

    0.7

    0

    100

    931.3

    4

    930

    1.

    00

    1

    PL-ElectronicWarmwhiteBC

    16W

    2

    GuestRoo

    m

    Direct

    4.2

    5

    2.0

    0

    3.50

    0.3

    9

    0.6

    1

    100

    1400.0

    0

    148

    5

    0.

    94

    1

    MASTERPL-ElectronicPolar23W

    3

    LivingRoo

    m

    Direct

    5.0

    0

    4.8

    0

    3.50

    0.7

    0

    0.3

    0

    100

    7875.0

    0

    430

    0

    1.

    83

    2

    MASTERPL-T/4P57W

    4

    DiningRoom

    Direct

    4.5

    0

    4.0

    0

    3.50

    0.6

    0

    0.4

    0

    100

    4447.0

    6

    430

    0

    1.

    03

    1

    MASTERPL-T/4P57W

    5

    Bedroom1

    Direct

    5.0

    0

    4.5

    0

    3.50

    0.6

    7

    0.3

    3

    100

    6750.0

    0

    350

    0

    1.

    93

    2

    MASTERPL-L/4P2G1140W

    6

    Ministrantroom

    Direct

    2.5

    0

    2.0

    0

    3.50

    0.3

    1

    0.6

    9

    250

    1810.3

    4

    180

    0

    1.

    01

    1

    MASTERPL-C/2P26W

    7

    Toilet

    Direct

    1.0

    5

    2.3

    0

    3.50

    0.2

    7

    0.7

    3

    250

    825.9

    8

    810

    1.

    02

    1

    GenieESaverWarmwhite14

    W

    8

    Bedroom2

    Direct

    2.7

    0

    2.2

    0

    3.50

    0.3

    4

    0.6

    6

    250

    2243.5

    3

    240

    0

    0.

    93

    1

    MASTERPL-T/4P32W

    9

    Kitchen

    Direct

    2.6

    5

    2.3

    0

    3.50

    0.3

    5

    0.6

    5

    250

    2327.1

    8

    240

    0

    0.

    97

    1

    MASTERPL-T/4P32W

    10

    itia

    litc

    Direct

    4.0

    0

    2.0

    0

    3.50

    0.3

    8

    0.6

    2

    250

    3230.7

    7

    320

    0

    1.

    01

    1

    MASTERPL-T/4P42W

    12

    Balcony

    Direct

    3.3

    5

    2.3

    0

    3.50

    0.3

    8

    0.6

    2

    125

    1549.8

    6

    180

    0

    0.

    86

    1

    MASTERPL-C/2P26W

    13

    Garage

    Direct

    5.2

    5

    5.5

    0

    3.50

    0.7

    7

    0.2

    3

    125

    15957

    430

    0

    3.71

    4

    MASTERPL-T/4P57W

    CalculationofLamp

    No

    Room

    LightingType

    Length

    width

    high

    Rk

    (%)

    E(lux

    t(lmn

    l

    (lm

    )

    n

    TypeofLamp

    Drawnby

    :ArsiYotaIhsaningrum

    Draw

    ingNumber

    06

    Checkedby

    :Mr.

    Ali

    Imron

    Date

    :10July2012

    STATE

    POLYTECHNICOFMALAN

    G

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    8/16

    Drawn by : A rs i Yo ta Ihsan ing rum

    Scale

    1 : 200

    Draw ing Number

    7

    Checked by : Mr. Al i Imron

    Date : 10 Ju ly 2012 STATE POLYTECHNIC OF

    MALANG

    WIRING DIAGRAM

    Information :

    = lamp CFL

    = Single Swicth

    = series swicth

    = Stop kontak

    = panel box

    = on plaster

    = in plaster

    KWH

    Up

    B1

    B2

    B2B1

    C

    C

    D

    D

    E E

    FF

    G

    G

    A

    H

    H

    H

    I

    I

    J1

    J1

    J2

    J2

    K

    K

    LL

    5. Wiring Diagram

    Wiring Diagram is diagram which used to explain the connecting cable from

    source voltage ( PLN ) until load. Example : At above

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    9/16

    STATE POLYTECHNIC OFMALANG

    SINGLE LINE DIAGRAM

    kWh

    Group 1

    Group 2

    Group 3

    7 lamp 1 Electric Socket

    5 lamp 2 Electric Socket

    11 lamp 2 Electric Socket

    Drawn by : Ars i Yota Ihsaningrum

    Cheked b y : Mr . A li Im r on

    Date

    10 July 2012

    Drawing Number

    08

    6. Single Line Diagram

    Single Line Diagram is diagram which used to know kinds of burden athouse installation connecting of voltage source. its target is to water

    down read of installation diagram.

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    10/16

    Drawn by : Ars i Yo ta Ihsan ingrum

    Scale

    -

    Drawing Number

    09

    Checked by : Mr. Al i Imron

    Date : 10 July 2012 STATE POLYTECHNIC OF

    MALANG

    POWER RECAPITULATION

    Quantity Power VA Quantity Power VA Power (VA) Current

    1 Terrace 1 18 21.2 - - -

    2 Guest Room 1 23 27.1 1 100 100

    3 Living room 2 58 136.5 1 100 100

    4 Door Step 1 18 21.2 - - -

    5 Bedroom 1 2 58 136.5 2 100 200

    6 Toilet 1 15 17.6 - - -

    7 Bathroom 1 1 36 42.4 - - -

    402.4 400

    Quantity Watt VA Quantity Watt VA Power (VA) Current

    1 Garage 4 58 272.9 - - -

    2 Kitchen 1 36 42.4 1 250 250

    3 Additional Kitchen 1 58 68.2 1 100 100

    4 Dining Room 1 58 68.2 - - -

    5 Ministrant 1 30 35.3 - - -

    6 Balcony 1 23 27.1 - - -

    514.1 350

    No. RoomCFL Electric Socket Tota Load

    814.1

    Total

    802.4

    Total

    CFL Electric Socket Tota Load

    No. Room

    7. Power Recapitulation

    Power recapitulation is calculation of energy

    which is used all component in place or building.

    That can be used to look for strength pass

    of current, using of cable type, protecting ( MCB ).

    The formula of strength pass of current :

    = %

    = %

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    11/16

    CALCULATION OF ARRESTERDrawn by : A rs i Yo ta Ihsan ing rum

    Scale

    -

    Drawing n umber

    10

    Checked by: Mr. Al i Imron

    Date : 10 Ju ly 2012

    CALCULATION OF ARRESTER

    Spanner of Extention

    RE1 = 2

    RE2 = = = 0.086

    A =

    =

    =

    r =

    =

    =

    =

    RG =

    =

    = 14.5

    =

    = 2,7

    RP = = so 4 Electrode is attaced parallel

    Explanation :

    Level of Protection = 99.9 %

    Current of thunder (Ig) = 1.6 kA

    T = Time depth thunder pouncing movement (detik)

    A = wide of electrode(mm2)

    r = electrode radius(m)

    = R trouble ( )

    = constanta ( 5,3 ( 4 electroda parallel )

    = Clay specific mass ( m) 100 m

    LR = Length electrode (m) 8 m

    STATE POLYTECHNIC OF MALANG

    8. Arrester

    Arrester is tool which used to protect house of thunder danger. It work from

    catching thunder , and then it channelled to land used to neutralizing.

    Component of arrester is venial, strand of metal and pillar. To calculate thearrester we require information about high of building, wide of building and

    building pounce thunder. It is made because arrester can be used to better.

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    12/16

    PICTURE OF ARRESTER

    Skala

    -

    16.5 meter

    10

    meter

    Hb = 9 m

    Hb = 9 m

    Hb = 9 m

    STATE POLYTECHNIC OF

    MALANG Drawing Number11

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    13/16

    Skala

    -

    CALCULATION OF GROUNDING SYSTEM

    CALCULA TION OF GROUNDING SYSTEM

    Drawn by : A rs i Yo ta Ihsan ing rum

    Draw ing Number

    12

    Checked by : Mr . A l i Imron

    Date : 10 Ju ly 2012

    STATE POLYTECHNIC OF MAL ANG

    9. Grounding System

    Grounding System is conductor system which relation attributing to system,

    equipments body and of instalation with earth so that can protect human of

    electrics sting, and protect installation components of tension danger /

    current of abnormal.

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    14/16

    Drawn by : Ars i Yo ta Ihsan ingrum

    Scale Draw ing Number

    13

    Checked by : Mr. Al i Imron

    Date : 10 July 2012 STATE POLYTECHNIC OF

    MALANG

    MATERIAL OF INSTALA TION

    No Name of Material Specification Quantity Explanation

    PL-Electronic Warm white BC 16 W 1 component

    MASTER PL-Electronic Polar 23 W 1 component

    MASTER PL-T /4P 57 W 11 component

    MASTER PL-L /4P 2G11 40 W 1 component

    MASTER PL-C /2P 26 W 2 component

    Genie ESaver Warm white 14 W 1 component

    MASTER PL-T /4P 32 W 2 component

    Genie ESaver Warm white 18 W 1 component

    MASTER PL-S /4P 2G7 9W/ 827 3 component

    MASTER PL-T /4P 2G7 36W/827 1 component

    MASTER PL-L /4P 2G11 40 W 1 component

    MASTER PL-T /4P 42 W 1 component

    2 Fitting E27, 250 V / 2 A, BROCO 26 component

    3 Single Switch 250 V / 5 A , BROCO 10 component

    4 Double Switch 250 V / 5 A , BROCO 6 component

    5 Stop Contact 100 VA, BROCO 8 component

    6 Stop Contact 250 VA, BROCO 1 component

    7 MCB 3 pole 12 A, MERLIN GERIN 1 component

    8 Fuse Box 3 pole 25A / 250V, BROCO 1 component

    9 MCB 1 pole 4 A, BROCO 3 component

    10 KWHmeter 1 phase 1 component

    13 NYA cable 2,5 mm Black ( phase ),KABELINDO 165 meter14 NYA cable 2,5 mm Blue (N), KABELINDO 137 meter

    15 NYA cable 2,5 mm Yello (PE), KABELINDO 48 meter

    16 Elbow 5/8", NAGA 26 component

    17 T-Dos 5/8", NAGA 49 component

    18 Cross-Dos 5/8", NAGA 6 component

    19 PVC pipe 5/8" , MASPION 235 meter

    20 PVC clamp 5/8" , MASPION 8 dos

    21 Lasdop 2,3,4 109 component

    22 Wood Spaner 5/8"x5 7 dos

    23 Isolation 5mm, DAIMARU 5 roll

    1 CFL (Compact

    Flourensence

    Lamp)

    MATERIAL OF INSTALATION

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    15/16

    Description of Material

    a. Fluorescant Lamp is lamp capable which yield light by heating red hot fiber ( filamen).Where is

    ever greater [of] energy a fluorescant lamp, hence will be bold progressively lamp. Some

    fluorescant lamp energy size measure that is : 10 watt, 25 watt, 60 watt of dsb.

    b. Lamp fitting / Tender is place to install lamp. Itable to be used for lighting outside room and

    does not need roset], and the physically ,it is stonger from local fitting. Tender have 2 terminal,

    one terminal for the cable of phasa, and one terminal for neutral cable.

    c. Switch is appliance which used to operate 1 lamp or 2 lamp at the same time. Switch is made

    from ceramic materials and have 4 terminal , 2 terminal for the phasa of lamp and 2 terminal

    for neutral.

    d. Push Button is tool which used to start impuls switch or it is used to switch the lamp. It works

    without using breach-block and have 2 terminal one to for output and one for input. And it also

    has ability of 250 V / 1 A.

    e. Electric Socket is apparatus which used to connect burden with source of voltage. It is made

    from ceramic materials. Owning 3 terminal ( phasa,netral, PE) and box contact this have ability100 VA, 250 VA or 500 VA.

    f. Junction Box is place of tacking on cable of component.Junction box have 8 pole. And it just

    can be used to conductor with admitted 1.5 mm2 until 2.5 mm2.

    g. PVC pipe is used to protect the electrics installation cable. It is made from polifinilclorida.

    Pipe of PVC can not be used to the temperature of normal job 60 C. In needed places, pipe

    of PVC have to secure against by mechanical damage, for example in places penetration of

    floor.

    h. MCB ( Miniatur Circuit Breaker ) is tools which used to protect by overload or short circuit. At

    MCB, there are two peacemaker type.That is by thermis and elektromagnetis, peacemaker of

    function termis to protect full current while peacemaker of function elektromagnetis is used to

    protect if happened short circuit. Peacemaker of thermal at MCB have principle which equal tooverload thermal. That use two joined metal ( bimetal),

    i. Cable NYA 2.5 mm2is conductor which used to housing installation because it is relative cheap.

    It is have single core , laminated of] insulation materials of PVC, for external installatio. Colour

    insulation code is yellow, black and blue. Yellow for Grounding, black for phase ang blue for

    neutral.

    j. Elbow is pipe which used to watering down and quicken work of installation but pipe factory

    also provide the tacking on elbow for the road;street of pipe turning bevel.

    k. Clamp is apparatus to detain pipe, so it can be attached at roof or wall. It can be made by iron

    or PVC. Its size is adapted by pipe size.

    l. APP (Alat Pembagi dan Pembatas) / Grader and Constrictor is tool is used by appliancemeasuring ( KWh-meter ) and at the sam time it can used to protecting ( MCB )

  • 8/13/2019 Arsi Yota Ihsaningrum (02)

    16/16

    Electric Socket

    Electric SocketNYA Cable

    MCBLampDouble Switch

    Fitting LampJunction BoxElbowKWh-meter

    Clamp Pipe of PVC