Project update November 2015 Community information session The Hon Ian Macfarlane MP, Member for Groom, and the Hon Darren Chester MP, Assistant Minister for Defence, invite local residents to attend a community information session to provide Oakey residents with an update about the environmental investigation. The details for this event are as follows: Date: Friday 4 December 2015 Time: 8am – 10am Location: Oakey RSL, 76 Campbell Street, Oakey RSVP: RSVP to 1800 136 129 or [email protected] by Tuesday afternoon 1 December 2015. Army Aviation Centre Oakey Environmental Investigation About the Investigation The Department of Defence (Defence) is undertaking a long- term environmental investigation and assessment of the groundwater beneath the Army Aviation Centre Oakey (AACO) base and surrounds. It is anticipated the investigation and any subsequent management actions may take several years to implement. The purpose of the investigation is to understand impacts to the environment from the historical use of fire-fighting foams, at the AACO as part of training activities. These foams contained perfluorooctane sulphonate (PFOS) and perfluorooctanoic acid (PFOA), which are two of the many types of per- and polyfluorinated chemicals (PFCs). The information collected will assist Defence to understand the groundwater impacts and contribute to developing appropriate strategies for managing any potential human health and ecological risks. Current works The current stage of works involves undertaking a hydrogeological assessment and a human health and ecological risk assessment. Hydrogeological assessment Defence has commenced a hydrogeological investigation to further understand the nature and extent of the groundwater impacts. This involves: periodic sampling and testing of ground and surface water targeted soil sampling installing groundwater monitoring wells at key locations hydrogeological modelling. Monitoring well installation In September 2015, Defence installed a number of new monitoring wells (pictured below) at the AACO base and surrounding area to assist with ongoing monitoring of the groundwater impacts. Hydrogeological modelling Work has started on developing a hydrogeological model to better understand how groundwater is moving through local aquifers. In October 2015, the Defence project team accessed a number of privately-owned properties in the Oakey area to survey the bores and measure the groundwater level. The information collected will contribute to developing the model. Human health and ecological risk assessment A human health and ecological risk assessment is being undertaken to assess potential risks to human health and the environment. It is anticipated that sampling of selected plant and animal species will occur in early 2016. This testing will be undertaken based on the technical requirements of the investigation. It will not be necessary to collect samples from all plant and animal species within the Investigation Area. Planning ahead Defence is considering a wide range of options for managing contamination sources and pathways. The current stage of works involves reviewing existing information and assessing its feasibility and relevance to Oakey. Outcomes from the hydrogeological assessment and human health and ecological risk assessment will inform potential management strategies. Defence will continue liaising with industry and regulatory professionals around the globe regarding PFC management and remediation technologies. Image: new monitoring wells.