Top Banner
2/26/2014 1 Presented by: Erike Young, MPPA, CSP, ARM 1 Chapter 2 Enterprise Risk Management in an Organization
22

ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

Aug 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

1

Presented by:

Erike Young, MPPA, CSP, ARM

1

Chapter 2

Enterprise Risk Management in an Organization

Page 2: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

2

Top-Down/Bottom-up Approaches to ERM

Page 3: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

3

Top-Down/Bottom-up Approaches to ERM

Top-Down/Bottom-up Approaches to ERM

• Traditional approach to risk management is a bottom-up approach – Information about risk is collected through

organization’s business operations • Injury data, inspections, org charts, industry, etc..

– Disadvantages • 1st major disadvantage May not identify critical

emerging risks – Harder to detect waste, fraud, abuse, shortcuts

• 2nd disadvantage – process may be perceived as bureaucratic – Based on lagging data

Page 4: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

4

Top-Down/Bottom-up Approaches to ERM

• Top-Down Approach

– Senior management decides which risks pose a significant threat or opportunity for the organization

– Advantage

• Provides high-level view of the entire organization and the risks that are central to meeting organization objectives

– Disadvantages

• Dependence on reports from middle management to senior management

• Limited view of risks that may be percolating in various areas of the organization

Building Blocks of Bottom-up and Top-Down ERM

Page 5: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

5

Building Blocks of Bottom-up and Top-Down ERM

Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM

program and levels of maturity

• Main purpose of RMM is to evaluate or improve business processes

• Typically five levels of maturity based upon Carnegie Mellon Model – Ad-hoc – No formal risk management process and little awareness of the

concept

– Initial – Basic risk management processes with no attempt at ERM

– Defined – Formal risk management process, at least for project management

– Managed – Quantitative metrics for identification, assessment, and response to risk

– Optimizing – Ongoing improvement to the risk management process and a robust organizational risk culture

Page 6: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

6

Risk Maturity Model

• RIMS Risk Maturity Model (self-assessment tool) seven attributes of an ERM Program – ERM based approach

– ERM process management

– Risk Appetite management

– Root cause discipline

– Uncovering risks

– Performance management

– Business resiliency and sustainability

Page 7: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

7

Risk Maturity Model

• Other Models – Broker developed

• AON, Marsh

– Credit Rating • Standard and Poor’s

• Other uses for RMM – Balanced scorecards

– Benchmarking

Key Organizational Functions Related to ERM

Need for alignment

Page 8: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

8

Chapter 3

Enterprise Risk Management Framework and Process

Page 9: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

9

Modeling an ERM Framework and Process

• Risk Management Framework – A foundation for applying the risk management process

throughout the organization

• Risk management programs should be built on a framework that best aligns with their operations – Many risk management frameworks will share common

components.

– Components should be adapted to organization’s objectives and operations

• Primary Purpose of Framework – Integrate risk management throughout the organization

ERM Framework and Process Model

• Common elements – Framework Model

• Lead and establish • Align and integrate • Allocate resources • Communicate and report

– Process Model • Scan environment • Identify risks • Analyze risks • Treat risks • Monitor and Assure

Page 10: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

10

Components of a Risk Management Framework

• Lead and Establish Accountability

– Techniques use to establish accountability

• Identify risk owners and their roles in the organization

• Establish Key Performance Indicators (KPI)

• Establish Key Risk Indicators (KRI) and use them to evaluate performance

• Develop risk criteria to evaluate the significance of risks

Page 11: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

11

Components of a Risk Management Framework

• Lead and Establish Accountability – Risk Owner

• An individual accountable for the identification, assessment, treatment, and monitoring of risks in a specific environment.

– KPI • Financial or nonfinancial measurement that defines how

successfully an organization is progressing toward its long-term goals.

– KRI • A tool used by an organization to measure the uncertainty of

meeting a strategic business objective.

– Risk Criteria • Information used as a basis for measuring the significance of

a risk

Components of a Risk Management Framework

• Align and Integrate – Align risk management with an organization’s

objectives and integration of risk management process • Aligned at both strategic and operational level

– After alignment developed, integrate into operational processes • Strategic planning

• Performance management

• Process Management

• Internal Control

• Compliance

• Governance

Page 12: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

12

Components of a Risk Management Framework

• Allocate Resources

– Commitment to risk management is willingness to allocate resources necessary to effectively implement process throughout organization

– Typical resource needs are training and adaptation of systems

– CFO must determine appropriate capital allocation and risk characteristics of the organization’s business units or products

Components of a Risk Management Framework

• Communicate and Report – Senior management must effectively communicate

the purpose and importance of risk management process to the entire organization

– Communication across organizational functions is necessary for the design of an effective risk management process

– Allows for ongoing monitoring and improvement – Reporting information at different levels

• Senior management receive executive summaries • Managers receive more detailed reports regarding areas of

responsibility • Emerging risks should also be included

Page 13: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

13

Risk Management Policy

• Clear risk management policy statement will help obtain buy-in from managers and employees

• Should address key elements of risk management framework

Page 14: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

14

Designing and Implementing an ERM Framework and Process

• Gap Analysis – Compare organization’s existing risk management

framework and processes against an international standard to identify gaps

• Evaluation of Internal and External Env. – Internal

• Understand organizations objectives and risk appetite

• Evaluate org structure and major categories of risk in each area to map risks

• Evaluate resources needed to implement and maintain framework and program (equipment, systems, people)

• Identify communication channels both formal and informal

Designing and Implementing an ERM Framework and Process

• Evaluation of Internal and External Env. (cont)

– External

• External environment includes these factors – Economic

– Political

– Legal and regulatory

– Technology

– Natural

– Competitive landscape

• Evaluate operations using key risk factors as a guide

Page 15: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

15

Designing and Implementing an ERM Framework and Process

• Integration into Existing Processes

– Key factors to successful integration

• Align risk management objectives and policy with organization’s overall objectives and risk appetite

• Use existing processes

– Critical component of integration is assigning responsibility and accountability for risk management within each functional area

• Usually department heads (risk owners)

Designing and Implementing an ERM Framework and Process

• Commitment of Resources

– Categories of necessary resources

• Technology, including equipment and systems – Enterprise Risk Management Information System

• Administrative persons

• Specialists, either internal or external

• Analysis

• Training

Page 16: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

16

Designing and Implementing an ERM Framework and Process

• Communication and Reporting – Communicating

• Communicating RM policy is key step in integration process. The more senior leader the better

• Training is key element of communicating – UC Risk Summit

• Communication should be more than just metrics, but should also discuss how well culture is adapting

– Reporting • Provide timely and relevant information regarding key

metrics to managers for areas of responsibility

• Tie risk metrics to financial reporting results

Designing and Implementing an ERM Framework and Process

• Monitoring and Improvement

– Process improvement cycle

• Plan, Do, Check, Act

• Also known as Deming cycle

Page 17: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

17

ERM vs. Traditional Risk Management Process

• ERM provides broader approach to risk

• Traditional risk management is hazard focused

• ERM provides cycles for continuous improvement

– Systems based

• ERM applies to all operations and risks

ERM vs. Traditional Risk Management Process

• ERM

– Five major steps in ERM process

• Scan environment

• Identify risks

• Analyze risks

• Treat risks

• Monitor and assure

– Steps can occur concurrently, as well as sequentially

Page 18: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

18

ISO 31000:2009 Risk Management –

Principles and Guidelines

• Based on Australian and New Zealand RM Standard

• Scope – Applies to all operations and most activities of an

organization – All type of risks, both positive and/or negative

• Not intended to produce uniformity

– Emphasis is on tailoring its process and framework to each organization

ISO 31000

Page 19: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

19

ISO 31000 Page 3.16

ISO 31000 Risk Criteria

Page 20: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

20

ISO 31000

• Process – Risk Assessment

• Risk Identification • Risk Analysis • Risk Evaluation

– Risk Treatment – Risk Monitoring and Review

• I am extremely savvy in Money – Identify, Analyze, examine/evaluate, Select,

Implement, Monitor

COSO ERM – Integrated Framework

• 1992 – COSO published framework for evaluation of internal control

• 2004 – Updated to ERM – Integrated Framework

– Developed to meet Sarbanes-Oxley Act

Page 21: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

21

COSO

Review page 3.21 – Interrelated components

COSO Cube

Page 22: ARM – 54 Risk Management Principles and Practices Week 2€¦ · Risk Maturity Model • Risk Maturity Model (RMM) used to evaluate development of ERM ... robust organizational

2/26/2014

22

Applying the Risk Management Process

• Review pages 3.25-3.32