Top Banner
Arlington Public Schools Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working Group Meeting #2 October 1, 2014
50

Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

May 31, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

SAN ANTONIO‐BEXAR COUNTY PEDESTRIAN SAFETY ACTION PLAN

Arlington Public SchoolsThomas Jefferson Site Evaluation

Preliminary Findings

Thomas Jefferson Working Group Meeting #2October 1, 2014

Page 2: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

INTRODUCTION

Page 3: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• Observations and mode counts during arrival & dismissal on a typical day

• Intersection counts (cars, trucks, pedestrians, bicyclists)• Daily roadway counts (car volume, speed and class) • Parking counts• Crash data• Infrastructure assessment• Intersection operational analysis• Parent, student, staff surveys• Special event observations

Page 4: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• Inclement weather day observations • Community center user survey • Data on use of theatre, cooking kitchen, community center, 

fields and courts• Case studies of similar sites • Analysis of existing transit service• Infrastructure recommendations • Assess impacts of new school and middle school expansion on 

transportation network • Coordinate  with design team on site layout• Parking supply considerations• SRTSTeam

Page 5: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

How does the transportation system currently operate on and surrounding the TJ campus? 

What is the Transportation Demand Management (TDM) potential for the TJcampus? 

How might the transportation system operate if a new elementary school is built?  

Page 6: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

Transportation System Infrastructure

HOW DOES THE TRANSPORTATION SYSTEM CURRENTLY OPERATE ON THE TJ CAMPUS?

Page 7: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 8: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 9: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 10: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

Bike Share Station

Page 11: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 12: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

Route Art 41 4A 10B 23A/23B/23T

Stops on roads…

S. Glebe Road Arlington Blvd S. Glebe Road and 2nd Street

S. Glebe Road

Hours, Monday to Friday

5:30 a.m. to 12:55 a.m.

5:30 a.m. to12:50 a.m.

5:35 a.m. to 1:40 a.m. 

5:30 a.m. to 1:20 a.m.

Headways between 7 a.m. and 5 p.m.

15 to 20 minutes

5 to 40 minutes combined

30 minutes 10 to 30 minutes combined

Page 13: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 14: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• 370 spaces available on TJ campus, including 11 ADA spaces

• 227 spaces available in lots west of middle school, including 5 ADA spaces

• 58 spaces available in community center lot, including 3 ADA spaces

• 57 spaces available in tennis court lot, including 3 ADA spaces

Page 15: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

Transportation System Use

HOW DOES THE TRANSPORTATION SYSTEM CURRENTLY OPERATE ON THE TJ CAMPUS?

Page 16: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

To School

0

5

10

15

20

25

30

35

40

StudentTallyParentSurvey

From School

0

5

10

15

20

25

30

35

40

StudentTallyParentSurvey

Page 17: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

90% Drive

4% Transit4% Walk

1% Carpool

1% Other

Page 18: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

Observation & Mode Count Locations

Traffic Count Locations

Page 19: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 20: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 21: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 22: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 23: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 24: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 25: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 26: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• Community center user survey (mode of travel, parking location)

• Data on use of theatre, cooking kitchen, community center, fields and courts

Page 27: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 28: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

2nd Street Speed Data

OverallSpeed Limit: 25 MPH85th Percentile Speed: 30 MPH

During Arrival and DismissalSchool Zone Speed Limit: 20 MPH85th Percentile Speed: 27MPH/29MPH (AM/PM)

Page 29: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• During arrival, motorists may experience increased delay: 

– Turning right onto Arlington Blvd from S. Old Glebe Road

– Crossing Arlington Blvd on Irving Street 

– Traveling east on Arlington Blvd 

– Traveling west on 2nd Street towards Glebe

– Intersection of 2nd Street & Old Glebe Road

• During dismissal, the study intersections operate better due to less commuter traffic and fewer trips associated with the school

Page 30: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• 370 spaces on TJ campus, including 11 ADA spaces

• Over 1,000 spaces on streets surrounding TJcampus

Page 31: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

*Shows parking before dismissal (~1:30PM) on a typical day

14%

47%42% 44%

0%5%10%15%20%25%30%35%40%45%50%

Occupancy of Lots

Parking Occupancy

Page 32: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• On‐site over 100% occupied

• On‐street approx. 50% occupied (concentrated near school)

Page 33: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• Three years of crash data

• Crash data doesn’t capture near misses or close calls

• Arlington Blvd and Glebe Road ‐most crashes typical of high‐volume roads

• Seven crashes involved pedestrians 

• Two crashes involved bicycles

Page 34: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

WHAT IS THE TDM POTENTIAL FOR THE SITE? 

Page 35: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

Advantages• Joint use potential• Existing multimodal infrastructure

Disadvantages• Existing barriers to non‐Single Occupancy Vehicle travel 

Page 36: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0%

Before school activities

Hills

Lack of adequate pedestrian and bicycle facilities at school (e.g.,…

Lack of bicycle

Lack of crossing guards

School is on the way to another destination

Afterschool activities

Other transportation options are more convenient

Lack of adults to walk or bike with

Weather or climate

Lack of adequate pedestrian and bicycle facilities on the way…

Darkness

Heavy/bulky items to carry

Concerns about bullying, violence, or crime

Distance

Speed of traffic along route

Child's age

Amount of traffic along route

Safety of intersections and crossings

Very Important Somewhat important

Page 37: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• Route 50 (“bike path…has no guardrail between it and Route 50”)

• Intersection of Columbia Pike and Glebe Road (“a great concern that my child has to cross Col Pike & Glebe Road” “no crossing guards at these intersections”) 

• George Mason Drive (“difficult to cross even for adults”)

• Jackson St (“winding hill with cars parked on both sides”)

Page 38: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0%

Concern about violence or crime on route

Hills

Lack of showers or lockers

Need car for travel during work

Difficult road crossings

Lack of adequate sidewalks or pathways

Comfort

Heavy or bulky items to carry

Weather or climate

Convenience

Trip duration

Trip distance

Very important Somewhat important

Page 39: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0%

Don't know how to ride a bike

Concern about violence or crime on route

Bikeshare stations too far away

Need car for travel during work

Lack of secure bicycle parking

Lack of covered bicycle parking

Don't know safe route

Lack of showers or lockers

Don't own a bike or a bikeshare membership

Comfort

Difficult road crossings

Trip duration

Lack of comfortable places to bike (bike lanes, paths, or safe streets)

Trip distance

Convenience

Heavy or bulky items to carry

Weather or climate

Very important Somewhat important

Page 40: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 41: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 42: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 43: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% 35.0% 40.0% 45.0%

Bus does not reliably follow established schedule

Before school activities

Bus stops are not conveniently located

Traffic safety on route to bus stop

Child's age

Bus schedule is not convenient

School is on the way to another destination

Lack of adult supervision

Weather or climate

Heavy/bulky items to carry

Afterschool activities

Prefer other transportation options

Concern about bullying, violence, or crime

Very Important Somewhat Important

Page 44: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0%

Need car for travel during work

Operating hours

Cost

Frequency

Weather or climate

Reliability

Heavy/bulky items to carry

Trip distance

Comfort

Stops/stations too far away

Convenience to APS work location

Convenience to other destinations (e.g., home, errands)

Trip duration

Very important Somewhat important

Page 45: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 46: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working
Page 47: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

HOW MIGHT THE TRANSPORTATION SYSTEM OPERATE IF A NEW ELEMENTARY SCHOOL IS BUILT? 

Page 48: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• Distribution of uses over time – bell times

• Choice versus neighborhood school• Spatial relationship of uses on the site relative to 

transportation facilities (e.g. vehicle and bike parking, pedestrian pathways, transit stops) – school location– combined bus and/or pick‐up/drop‐off areas – parking needs 

• Minimize conflicts between users (i.e. separate modes) 

Page 49: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

Wal

k

Bik

e

Scho

ol B

us

Pers

onal

Ve

hicl

e

Car

pool

Tran

sit

Oth

er

Choice School 5% 1% 66% 27% 1% 0% 0%

Neighborhood School 22% 1% 47% 29% 1% 0% 0%

Page 50: Arlington Public Schools Thomas Jefferson Sitearlingtonva.s3.amazonaws.com/wp-content/uploads/... · Thomas Jefferson Site Evaluation Preliminary Findings Thomas Jefferson Working

• Inclement weather day observations • Community center user survey • Data on use of theatre, cooking kitchen, community center, 

fields and courts• Case studies of similar sites • Analysis of existing transit service• Infrastructure recommendations • Assess impacts of new school and middle school expansion on 

transportation network • Coordinate  with design team on site layout• Parking supply considerations• SRTSTeam