...\argenta-COVER-OCT31.dgn 11/3/2006 1:50:18 PM
MECHANICAL DRAWING INDEXList Engineering Company - 9699 Blue
Larkspur Lane, Suite 203, Monterey, CA 93940Tel: (831) 373-4390 -
Fax: (831) 373-6522Contact: Ron Blue - [email protected]
SHEET# SHEET TITLE
M 0.1 SYMBOLS, ABBREVIATIONS, NOTES & SCHEDULESM 0.2
SCHEDULESM0.3 TITLE 24 COMPLIANCEM 2.1 BASEMENT FLOOR PLAN
MECHANICALM 2.2 GROUND FLOOR MECHANICALM 2.3 SECOND FLOOR
MECHANICALM 2.4 THIRD FLOOR W/ PLAZA MECHANICALM 2.5 THIRD FLOOR
MECHANICALM 2.6 TYPICAL LOWER LEVEL (LEVEL 4 16) PLAN MECHANICALM
2.7 TYPICAL UPPER LEVEL (LEVEL 17 20) PLAN MECHANICALM 2.8 ROOF
PLAN MECHANICALM6.1 DUCT RISER SCHEMATICM 8.1 DETAILSM 8.2
DETAILS
PLUMBING DRAWING INDEXList Engineering Company - 9699 Blue
Larkspur Lane, Suite 203, Monterey, CA 93940Tel: (831) 373-4390 -
Fax: (831) 373-6522Contact: Ron Blue - [email protected]
SHEET# SHEET TITLE
P 0.1 PLUMBING TITLE SHEETP 2.1 BASEMENT FLOOR PLAN PLUMBINGP
2.2 GROUND FLOOR PLAN PLUMBINGP 2.3 SECOND FLOOR PLAN PLUMBINGP 2.4
THIRD FLOOR W/ PLAZA PLUMBINGP 2.5 THIRD FLOOR PLUMBINGP 2.6
TYPICAL LOWER LEVEL (LEVEL 4 16) PLAN PLUMBINGP 2.7 TYPICAL UPPER
LEVEL (LEVEL 17 20) PLAN PLUMBINGP 2.8 ROOF PLAN PLUMBINGP 5.1 DCW,
DHW, DHWR RISER DIAGRAMP 5.2 WASTE & VENT RISER DIAGRAM 1 - 10P
5.3 WASTE & VENT RISER DIAGRAM 11 -1 19P 8.1 DETAILSP 8.2
DETAILS
FIRE PROTECTION DRAWING INDEXList Engineering Company - 9699
Blue Larkspur Lane, Suite 203, Monterey, CA 93940Tel: (831)
373-4390 - Fax: (831) 373-6522Contact: Ron Blue -
[email protected]
SHEET# SHEET TITLE
FP 0.1 SYMBOLS, ABBREVIATIONS, NOTES & SCHEDULESFP 2.1
BASEMENT FLOOR PLAN - FIRE PROTECTIONFP 2.2 GROUND FLOOR PLAN -
FIRE PROTECTIONFP 2.3 SECOND FLOOR PLAN - FIRE PROTECTIONFP 2.4
THIRD FLOOR W/ PLAZA - FIRE PROTECTIONFP 2.5 THIRD FLOOR - FIRE
PROTECTIONFP 2.6 TYPICAL LOWER LEVEL (LEVEL 4 16) - FIRE
PROTECTIONFP 2.7 TYPICAL UPPER LEVEL (LEVEL 17 20) - FIRE
PROTECTIONFP 2.8 ROOF PLAN - FIRE PROTECTIONFP 5.1 RISER DIAGRAM -
FIRE PROTECTIONFP 8.1 DETAILS
ELECTRICAL DRAWING INDEXPrime Design Group - 9099 Soquel Drive,
Suite #9, Aptos, CA 95003Tel: (831) 662-6072 - Fax: (831)
662-6078Contact: Joe Collonge - [email protected]
SHEET # SHEET TITLE
E-0.1 SINGLE LINE DIAGRAME-0.2 ELECTRICAL SCHEDULESE-0.3 PANEL
& MCC SCHEDULESE-0.4 TELEPHONE/DATA/TV RISER DIAGRAME-0.5 TITLE
24 SCHEDULESE-1.0 BASEMENT ELECTRICAL PLANE-1.1 GROUND FLOOR
ELECTRICAL PLANE-1.2 SECOND FLOOR ELECTRICAL PLANE-1.3 PLAZA FLOOR
ELECTRICAL PLANE-1.4 LOWER TYPICAL FLOOR ELECTRICAL PLANE-1.5 UPPER
TYPICAL FLOOR ELECTRICAL PLANE-1.6 ROOF ELECTRICAL PLAN
LS-0.1 LIFE SAFETY RISER DIAGRAMLS-1.0 BASEMENT LIFE SAFETY
PLANLS-1.1 GROUND LEVEL LIFE SAFETY PLANLS-1.2 SECOND LEVEL LIFE
SAFETY PLANLS-1.3 PLAZA LEVEL LIFE SAFETY PLANLS-1.4 LOWER LEVEL
LIFE SAFETY PLANLS-1.5 UPPER LEVEL LIFE SAFETY PLAN
LANDSCAPE DESIGN DRAWING INDEXThe Guzzardo Partnership, Inc.-
836 Montgomery Street, San Francisco CA 94133Tel: (415) 433-4672 -
Fax: (415) 433-5003Contact: Paul Lettieri -
[email protected]
SHEET# SHEET TITLE
L-1.1 LAYOUT NOTES AND LEGENDSL-1.2 PLANTING NOTES AND
LEGENDSL-1.3 PLANTING DETAILSL-2.1 LAYOUT PLANL-3.1 FINE GRADING
PLANL-4.1 PLANTING PLANL-5.1 IRRIGATION PLANL-5.2 IRRIGATION NOTES
AND LEGENDL-5.3 IRRIGATION DETAILSL-6.1 LANDSCAPE DETAILSL-6.2
LANDSCAPE DETAILSL-6.3 LANDSCAPE DETAILSL-7.1 FOUNTAIN NOTES AND
DETAILS
STRUCTURAL DRAWING INDEXNishkian Menninger - 1200 Folsom Street,
San Francisco, CA 94103Tel: (415) 541-9477- Fax: (415)
543-5071Contact: Lawrence Liau - [email protected]
SHEET# SHEET TITLE
S1.1A GENERAL NOTESS1.1B GENERAL NOTESS1.2A TYPICAL CONCRETE
DETAILSS1.2B TYPICAL CONCRETE DETAILSS1.2C TYPICAL CONCRETE
DETAILSS1.2D TYPICAL CONCRETE DETAILSS1.3A TYPICAL CONCRETE
DETAILSS1.3B TYPICAL CONCRETE DETAILSS1.3C TYPICAL CONCRETE
DETAILSS1.4A TYPICAL STEEL DETAILS
S2.1 FOUNDATION BOTTOM STEEL PLAN (BASEMENT)S2.1B FOUNDATION TOP
STEEL PLAN (BASEMENT)S2.2B TYPICAL STEEL DETAILSS2.3 SECOND FLOOR
POST-TENSION PLANS2.3M SECOND FLOOR MILD STEEL PLANS2.4 THIRD FLOOR
POST-TENSION PLANS2.4M THIRD FLOOR MILD STEEL PLANS2.5 4-16th FLOOR
POST-TENSION PLANS2.5M 4-16th FLOOR MILD STEEL PLANS2.6 17th FLOOR
POST-TENSION PLANS2.6M 17th FLOOR MILD STEEL PLANS2.7 18-20th FLOOR
POST-TENSION PLANS2.7M 18-20th FLOOR MILD STEEL PLANS2.8 ROOF FLOOR
POST-TENSION PLANS2.8M ROOF MILD STEEL PLAN
S3.1 TYPICAL MAT SECTION & SCHEDULES3.2 TYPICAL MILD STEEL
SLAB SCHEDULES3.3 TYPICAL CONCRETE BEAM SCHEDULES3.4 TYPICAL
CONCRETE COLUMN SCHEDULES3.5 TYPICAL CONCRETE COLUMN DETAILSS3.6
SHEAR WALL ELEVATIONSS3.7 SHEAR WALL ELEVATIONSS3.8 SHEAR WALL
ELEVATIONSS3.9 SHEAR WALL SECTION & DETAILSS3.10 SHEAR WALL
SECTION & DETAILS
S4.1 SECTION & DETAILSS4.2 SECTION & DETAILSS4.3 SECTION
& DETAILSS4.4 SECTION & DETAILSS4.5 SECTION &
DETAILSS4.6 SECTION & DETAILSS4.7 SCHEMATIC EXTERIOR WALL
DETAILS
ARCHITECTURAL DRAWING INDEXDe Quesada Architects, Inc. 301
Folsom Street, Suite A, San Francisco CA 94105Tel: (415) 434) 3690
- Fax: (415) 434-3694Contact: Mariusz
[email protected]
SHEET # SHEET TITLE
A0.1 COVER PAGE DRAWING INDEXA0.2 PROJECT DATA, PROJECT NOTES
& EXIT DIAGRAM A1.1 PLOT PLANA1.2 EMERGENCY EXIT PATHSA1.3
EMERGENCY EXIT PATHSA1.4 ADA COMPLIANCEA2.1 BASEMENT FLOOR PLANA2.2
GROUND FLOOR PLANA2.3 SECOND FLOOR PLANA2.4 THIRD FLOOR PLAN with
PLAZAA2.5 ENLARGED THIRD FLOOR PLANA2.6 TYPICAL LOWER TOWER FLOOR
PLAN: 4th to 16th FLOORA2.7 TYPICAL UPPER TOWER FLOOR PLAN: 17th to
20th FLOORA2.8 ROOF PLANA2.9 STAIR #1- PLAN DETAILA2.10 STAIR #2-
PLAN DETAILA2.11 STAIR #3- PLAN DETAILA2.11.1 ENLARGED PARTIAL
PLANS & SECTIONSA2.12.0 KEY PLAN: FOR KITCHEN, BATHROOM &
ENTRY PLANSA2.12 KITCHEN, BATHROOM & ENTRY PLANS: UNITS A &
BA2.13 KITCHEN, BATHROOM & ENTRY PLANS: UNITS C,C1,D, &
D1A2.14 KITCHEN, BATHROOM & ENTRY PLANS: UNITS E & FA2.15
KITCHEN, BATHROOM & ENTRY PLANS: UNITS F1 & GA2.16 KITCHEN,
BATHROOM & ENTRY PLANS: UNITS H,H1,I & I1A2.16.1 KITCHEN,
BATHROOM & ENTRY PLANS: UNITS JA2.17 3rd FLOOR REFLECTED
CEILING PLANA2.18 4th to 16th FLOOR REFLECTED CEILING PLANA2.19
17th to 20th FLOOR REFLECTED CEILING PLANA2.20 MAIN LOBBY VESTIBULE
PLANSA2.21 BALCONY DETAILSA2.22 3rd FLOOR- FLOOR TYPESA2.23 4th to
16th FLOOR- FLOOR TYPESA2.24 17th to 20th FLOOR- FLOOR TYPESA3.1
SOUTH ELEVATIONA3.2 EAST ELEVATIONA3.3 NORTH ELEVATIONA3.4 WEST
ELEVATIONA3.51 SOUTH ELEVATION - ENLARGED BUILDING BASE - 1A3.52
SOUTH ELEVATION - ENLARGED BUILDING BASE - 2A3.53 SOUTH ELEVATION -
ENLARGED BUILDING BAS - 3A3.54 SOUTH ELEVATION - ENLARGEDA3.55
SOUTH ELEVATION - ENLARGEDA3.61 EAST ELEVATION - ENLARGED BUILDING
BASE - 1A3.62 EAST ELEVATION - ENLARGED BUILDING BASE - 2A3.63 EAST
ELEVATION - ENLARGEDA3.64 EAST ELEVATION - ENLARGEDA3.71 NORTH
ELEVATION - ENLARGED BUILDING BASE - 1A3.72 NORTH ELEVATION -
ENLARGED BUILDING BASE - 2A3.73 NORTH ELEVATION - ENLARGEDA3.74
NORTH ELEVATION - ENLARGEDA3.81 WEST ELEVATION - ENLARGED BUILDING
BASE - 1A3.82 WEST ELEVATION - ENLARGED BUILDING BASE - 2A3.83 WEST
ELEVATION - ENLARGEDA3.84 WEST ELEVATION - ENLARGEDA4.1 BUILDING
SECTION AA4.2 BUILDING SECTION BA4.3 BUILDING SECTION CA4.4 GARAGE
RAMP SECTIONSA4.4.1 BUILDING SECTION DETAILSA4.5 STAIR SECTION
DETAILSA4.6 STAIR SECTION DETAILSA4.7 BUILDING SECTION DETAILSA4.8
BUILDING SECTION DETAILSA4.9 LOBBY VESTIBULE SECTIONSA5.1 EXTERIOR
WALL DETAILSA5.2 EXTERIOR WALL DETAILSA5.3. EXTERIOR WALL
DETAILSA5.4 EXTERIOR WALL DETAILSA5.5 EXTERIOR WALL DETAILSA5.6
EXTERIOR WALL DETAILSA5.7 EXTERIOR WALL DETAILSA5.8 EXTERIOR WALL
DETAILSA5.9 EXTERIOR WALL DETAILSA5.10 EXTERIOR WALL DETAILSA5.11
EXTERIOR WALL DETAILSA5.12 EXTERIOR WALL DETAILSA5.13 EXTERIOR WALL
DETAILSA7.1 INTERIOR WALL PARTITION SCHEDULEA7.2 GLAZING STC RATING
ZONESA7.3 WINDOW SCHEDULEA7.4 DOOR SCHEDULEA7.5 INT. FINISHES
SCHEDULEA8.1 INTERIOR DETAILSA8.2 INTERIOR DETAILSA8.3 ACOUSTICAL
DETAILSA8.4 FIRESTOPPING DETAILSA8.5 INTERIOR DETAILSA8.6 INTERIOR
DETAILSA9.1 KITCHEN ELEVATIONS- UNITS A, B, C, & DA9.2 KITCHEN
ELEVATIONS- UNITS C1 & D1, E & E1, F & HA9.3 KITCHEN
ELEVATIONS- UNITS F1 & H1, G, & IA9.4 KITCHEN ELEVATIONS-
UNITS I1& J A9.5 BATHROOM ELEVATIONS- UNITS A & BA9.6
BATHROOM ELEVATIONS- UNITS B, C & C1, D & D1, E &
E1A9.7 BATHROOM ELEVATIONS- UNITS F & F1, G, H & H1 A9.8
BATHROOM ELEVATIONS- UNITS I & I1, J & J1A9.11 KITCHEN
CABINET SECTIONSA9.12 KITCHEN CABINET SECTIONS & DETAILSA9.13
BATHROOM CABINET SECTIONS & DETAILS
Tuan & Robinson - 221 Main Street, Suite 945, San Francisco,
CA 94105Tel: (415) 957-2480 - Fax: (415)957-2483Contact: Tim
Mathison - [email protected]
SHEET # SHEET TITLE
SH1.0 NOTESSH1.1 SHORING DETAILSSH2.0 SHORING PLANSH3.0
ELEVATIONS
EXCAVATION - SHORING DRAWING INDEX
TEMPORARY SHORING DESIGN DRAWING INDEXSPI Consulting-35
Embarcadero Cove, Oakland, CA 94606Tel: (510)536-3319 - Fax:
(510)536-3320Contact: Sal Italiano - [email protected]
SHEET # SHEET TITLE
SH-0 NOTESSH-1 SHORING PLANSH-2 POLK & FELL DRIVEN PILE
ELEVATIONSSH-3 CFA PILE & DRIVEN PILE @ D WALL
ELEVATIONSSH-4 DETAILS AND SCHEDULE
CIVIL ENGINEERING DRAWING INDEXTelamon Engineering Consultants,
Inc. - 855 Folsom street, Syite #142, San Francisco, CA 94107Tel:
(415) 837-1336 - Fax: (415) 837-1354Contact: Stella Chiu -
[email protected]
SHEET# SHEET TITLE
C2.0 SITE DEMOLITION PLANC3.0 SITE IMPROVEMENT PLANC3.1
ELECTRICAL VAULT PLAN & TYPICAL NOTESC4.0 SITE GRADING PLANC4.1
SITE EXCAVATION PLANC5.0 SITE UTILITY PLANC6.0 DETAIL SHEET
INTERIOR DESIGN DRAWING INDEXMitchell Freedland Design - 6 East
3rd Avenue, Vancouver, BC, Canada V5T 1C3Tel: (604) 733-3600 - Fax:
(604) 733-3502Contact: Mitchell Freedland -
[email protected]
SHEET# SHEET TITLE
ID-0 COMMON AREAS COVERID-01 MATERIAL AND PRODUCT SPECIFICATION
SUMMARYID-1 FINISH PLANS, RCP, ELEVATIONS & DETAILS. PARKING
LEVEL, TYPICAL LOBBYID-2 FINISH PLAN: MAIN LEVELID-2.1 FLOOR FINISH
PLAN-MAIN LEVELID-3 RCP: MAIN LEVELID-4 ELEVATIONS: MAIN LEVEL -
LOBBYID-5 ELEVATIONS: MAIN LEVEL - ELEVATOR LOBBYID-6 ELEVATIONS:
MAIN LEVEL - MAIL ROOM & PACKAGE ROOMID-7 FINISH PLANS: SECOND
LEVEL & GYMID-8 RCP: SECOND LEVEL & GYMID-9 ELEVATIONS:
SECOND LEVEL ELEVATOR LOBBYID-10 ELEVATIONS: SECOND LEVEL GYMID-11
ELEVATIONS: SECOND LEVEL LOCKER ROOM & WASHROOMID-12 DETAILS:
MAIN & SECOND LEVELID-13 DETAILS: MAIN & SECOND LEVELID-14
DETAILS: MAIN & SECOND LEVELID-15 FINISH PLANS: THIRD LEVEL
COMMON AREASID-16 RCP: THIRD LEVEL COMMON AREASID-17 ELEVATIONS:
THIRD LEVEL COMMON AREASID-18 DETAILS: THIRD LEVEL COMMON
AREASID-19 DETAILS: THIRD LEVEL COMMON AREASID-20 FINISH PLAN &
RCP: LOWER LEVELS: L-4 TO L-16ID-21 ELEVATIONS: LOWER LEVELS: L-4
TO L-16ID-22 FINISH PLANS & RCP: UPPER LEVELS: L-17 TO
L-20ID-23 ELEVATIONS: UPPER LEVELS: L-17 TO L-20 COMMON AREASID-24
DETAILS: LOWER & UPPER LEVELS: L-4 TO L-20 COMMON AREASID-25
FINISH PLANS, RCP, ELEVATIONS & DETIALS: ELEVATOR CABID-26
LOBBY RECEPTION DESK
-
...\argenta-S-INFO-OCT31.dgn 10/31/2006 3:44:24 PM
-
...\argenta-S-INFO-OCT31.dgn 10/31/2006 3:44:59 PM
-
...\argenta-S-INFO-OCT31.dgn 10/31/2006 3:45:42 PM
-
...\argenta-S-INFO-OCT31.dgn 10/31/2006 3:46:07 PM
-
...\argenta-S-INFO-OCT31.dgn 11/9/2006 1:16:15 PM
-
...\Argenta-S- PLANS-OCT31.dgn 11/9/2006 8:22:09 AM
-
...\Argenta-S- PLANS-OCT31.dgn 11/9/2006 8:22:36 AM
-
...\Argenta-S- PLANS-OCT31.dgn 10/31/2006 1:12:22 PM
-
...\Argenta-S- PLANS-OCT31.dgn 10/31/2006 1:12:45 PM
-
...\Argenta-S- PLANS-OCT31.dgn 10/31/2006 3:08:36 PM
-
...\Argenta-S- PLANS-OCT31.dgn 10/31/2006 3:08:59 PM
-
...\Argenta-S- PLANS-OCT31.dgn 10/31/2006 3:11:53 PM
-
...\Argenta-S- PLANS-OCT31.dgn 10/31/2006 1:31:01 PM
-
...\Argenta-S-STAIRSPLN-OCT31.dgn 10/31/2006 2:57:26 PM
-
...\Argenta-S-STAIRSPLN-OCT31.dgn 10/31/2006 2:57:06 PM
-
...\Argenta-S-STAIRSPLN-OCT31.dgn 10/31/2006 2:56:43 PM
-
...\argenta-s-kit-bath-10-31-06.dg 10/31/2006 4:42:02 PM
-
...\argenta-s-kit-bath-10-31-06.dg 10/31/2006 4:45:49 PM
-
...\argenta-s-kit-bath-10-31-06.dg 10/31/2006 4:43:04 PM
-
...\argenta-s-kit-bath-10-31-06.dg 10/31/2006 4:43:40 PM
-
...\argenta-s-kit-bath-10-31-06.dg 10/31/2006 4:45:23 PM
-
...\argenta-s-kit-bath-10-31-06.dg 11/9/2006 4:08:44 PM
-
...\argenta-s-kit-bath-10-31-06.dg 10/31/2006 4:46:19 PM
-
...\Argenta-S-RCP-OCT31.dgn 10/31/2006 2:54:14 PM
-
...\Argenta-S-RCP-OCT31.dgn 10/31/2006 2:52:17 PM
-
...\Argenta-S-RCP-OCT31.dgn 10/31/2006 2:52:49 PM
-
...\Argenta-S-STAIRSPLN-OCT31.dgn 10/31/2006 2:58:00 PM
-
...\Argenta-S-Floor-OCT31.dgn 10/31/2006 2:54:52 PM
-
...\Argenta-S-Floor-OCT31.dgn 10/31/2006 2:55:29 PM
-
...\Argenta-S-Floor-OCT31.dgn 10/31/2006 2:56:03 PM
-
...\Argenta-S-ELEVATIONS-OCT31.dgn 10/31/2006 1:31:53 PM
-
...\Argenta-S-ELEVATIONS-OCT31.dgn 10/31/2006 1:32:25 PM
-
...\Argenta-S-ELEVATIONS-OCT31.dgn 10/31/2006 1:32:47 PM
-
...\Argenta-S-ELEVATIONS-OCT31.dgn 10/31/2006 1:33:06 PM
-
...\Argenta-S-RAMP-SECT-OCT31.dgn 10/31/2006 1:33:39 PM
-
...\Detail Sheets-OCTOBER31.dwg 11/9/2006 8:19:45 AM
-
...\Argenta-S-WALL-OCT31.dgn 10/31/2006 3:52:57 PM
-
...\Argenta-S-wdws-OCT31-06.dgn 10/31/2006 3:17:21 PM
-
...\Argenta-S-wdws-OCT31-06.dgn 10/31/2006 3:17:54 PM
-
...\argenta-s-doors-10-31-06.dgn 10/31/2006 3:49:33 PM
-
...\argenta-finishes-OCT31-06.dgn 11/10/2006 11:51:04 AM
SECOND FLOOR COMMON AREASRm. No. Room Label Floor Base Walls
Ceiling Footnotes
201 (b) Elevator Vestibule Carpet-C-1/ C-2(b) Wood/ FC-2(b),
PT(b) see K/ID-12 Wood-WD-1(b)/Glass-GL-2(b)/ Gypbd.#5/ PT(b)
Gypbd.#5/ PT(b) see H/ID-12 Walls: see ID-9202 (b) Balcony
Carpet-C-1(b) Wood/ FC-2(b), PT(b) see K/ID-12 Gypbd.#5/ PT(b)
Gypbd.#5/ PT(b) 203 (b) Corridor/ Foyer Rubber- RF-1 & RF-2(b)
Wood/ FC-2(b), PT(b) see K/ID-12 Gypbd.#5/ PT(b) Gypbd.#5/ PT(b)
204 Stair #1 Vestibule Conc/Steel trowel finish None Gypbd.#3 /
PT-SG Conc. / Unpainted205 Stair #1 Conc/Steel trowel finish None
Gypbd.#3 / PT-SG Conc. / Unpainted206 Utility/Mechanical Conc/Steel
trowel finish None Conc./Conc.Blk./Gypbd. #3 / PT-HG Conc. /
Unpainted (a)207 Electrical Room Conc/Steel trowel finish None
Conc./Conc.Blk./Gypbd. #3 / PT-HG Conc. / Unpainted (a)208 Stair #2
Conc/Steel trowel finish None Gypbd.#3 / P-SG Conc. / Unpainted209
(b) Exercise Room (Gym-ID) Rubber- RF-3(b) Wood/ FC-2(b), PT(b) see
K/ID-12 Glass-GL-1(b)/ Gypbd.#5/ PT(b) see ID-10 Conc./ PT(b) 210
(b) Locker Room Tile-T-1(b) Wood/ FC-2(b), PT(b) see K/ID-12
Gypbd.#4/ PT(b) Gypbd.#4/ PT(b) 211 (b) Toilet #4 (Gym Washroom-ID)
Tile-T-1(b) Wood/ FC-2(b), PT(b) see K/ID-12 Tile-T-2(b) /Gypbd.#4/
PT(b) see ID-11 Gypbd.#4/ PT(b) 212 (b) Stretching Room Rubber-
RF-3(b) Wood/ FC-2(b), PT(b) see K/ID-12 Glass-GL-1(b)/ Gypbd.#5/
PT(b) see ID-10 Gypbd.#5/ PT(b) see ID-7 for Gl-1 extents213
Storage Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. /
PT-SG214 (b) Toilet #3 Rubber- RF-1(b) Wood/ FC-2(b), PT(b) see
K/ID-12 Gypbd.#4/ PT(b) Gypbd.#4/ PT(b) 215 Janitorial Resilient
Resilient / Coved Conc. / Gypbd. / PT-HG Conc. / Unpainted (a)216
Garage Level C Conc/Light broom finish None Conc./Conc.Blk./Gypbd.
#3 / PT-SG Conc /Spray Insul./Unptd.217 Fan Room Conc/Steel trowel
finish None Gypbd.#2 / Unpainted Conc. / Unpainted218 Stair #3
Vestibule Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. /
Unpainted219 Stair #3 Conc/Steel trowel finish None Gypbd.#3 /
PT-SG Conc. / Unpainted220 Rentable Space #3 Gypbd #1/ Unfinished
Conc. /Unpainted
THIRD FLOOR - COMMON AREASRm. No. Room Label Floor Base Walls
Ceiling Footnotes
301 (b) Elevator Vestibule Carpet-C-1/C-2(b) Wood/ FC-2(b),
PT(b) see J/ID-18 Wood-WD-1(b) /Gypbd.#5/ PT(b) see ID-17 Gypbd.#5/
PT(b) see F/ID-18302 (b) Corridor Carpet-C-1(b)/ Stone-SLAB-1(b)
Wood/ FC-2(b), PT(b) see J/ID-18 Wood-WD-1(b) /Gypbd.#5/ PT(b) see
ID-17 Gypbd.#5/ PT(b) see F/ID-18 Floor: see ID-15 (plan),
A&B/ID18 (detail)303 Stair #1 Vestibule Conc/Steel trowel
finish None Gypbd.#3 / PT-SG Conc. / Unpainted304 Stair #1
Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. / Unpainted305
Stair #2 Vestibule Conc/Steel trowel finish None Gypbd.#3 / PT-SG
Conc. / Unpainted306 Stair #2 Conc/Steel trowel finish None
Gypbd.#3 / PT-SG Conc. / Unpainted307 Trash Resilient Resilient /
Coved Gypbd.#3 / PT-SG Gypbd.#3 / PT-HG308 Utility Conc/Steel
trowel finish None Gypbd.#2 / Unpainted Conc. / Unpainted309 (b)
Lounge Tile-T-1(b) Wood/ FC-2(b), PT(b) see J/ID-18 Wood-WD-1(b),
/Gypbd.#5/ PT(b) see ID-17 Gypbd.#5/ PT(b)-Acous.Tile- ACT-1(b)
Ceiling: see D/ID-18310 (b) Toilet #5 Tile-T-1(b) Wood/ FC-2(b),
PT(b) see J/ID-18 Tile-T-2(b) /Gypbd.#4/ PT(b) see ID-17 Gypbd.#4/
PT(b) 311 (b) Storage Conc.-PT(b) None Gypbd.#3/ PT(b) Gypbd.#3/
PT(b) 312 Heat Pump Conc. / STF None Gypbd. #2 / Unpainted Conc. /
Unpainted
4TH TO 16TH FLOOR - COMMON AREAS -TYPICAL FLOORSRm. No. Room
Label Floor Base Walls Ceiling Footnotes
T01 (b) Elevator Vestibule Carpet-C-1/C-2(b) Wood/ FC-2(b),PT
(b) see G/ID-24 GWB-PT(b), Wood-WD-1(b) see ID-21 GWB PT(b) see
D/ID-24 see ID-20T02 (b) Corridor Carpet-C-1(b)/
Stone-SLAB-1(b)-Unit Entry Wood/ FC-2(b),PT (b) see G/ID-24 GWB
PT(b), Wood-WD-1(b) see ID-21 GWB PT(b) see D/ID-24 Floor: see
ID-20 (plan), A&B/ID24 (detail)T03 Stair #1 Vestibule
Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. / UnpaintedT04
Stair #1 Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. /
UnpaintedT05 Stair #2 Vestibule Conc/Steel trowel finish None
Gypbd.#3 / PT-SG Conc. / UnpaintedT06 Stair #2 Conc/Steel trowel
finish None Gypbd.#3 / PT-SG Conc. / UnpaintedT07 Trash Resilient
Resilient / Coved Gypbd.#3 / PT-SG Gypbd.#3 / PT-HGT08 Utility
Conc/Steel trowel finish None Gypbd.#2 / Unpainted Conc. /
Unpainted
17TH TO 20TH FLOOR - COMMON AREAS- PENTHOUSE FLOORSRm. No. Room
Label Floor Base Walls Ceiling Footnotes
T01 (b) Elevator Vestibule Carpet-C-1/C-2(b) Wood/ FC-2(b),PT
(b) see G/ID-24 GWB, WC-2(b), Wood-WD-1(b) see ID-21 GWB PT(b) see
D/ID-24T02 (b) Corridor Carpet-C-1(b)/ Stone-SLAB-1(b)-Unit Entry
Wood/ FC-2(b),PT (b) see G/ID-24 GWB, WC-2(b), Wood-WD-1(b) see
ID-21 GWB PT(b) see D/ID-24 Floor: see ID-22 (plan), A&B/ID24
(detail)T03 Stair #1 Vestibule Conc/Steel trowel finish None
Gypbd.#3 / PT-SG Conc. / UnpaintedT04 Stair #1 Conc/Steel trowel
finish None Gypbd.#3 / PT-SG Conc. / UnpaintedT05 Stair #2
Vestibule Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. /
UnpaintedT06 Stair #2 Conc/Steel trowel finish None Gypbd.#3 /
PT-SG Conc. / UnpaintedT07 Trash Resilient Resilient / Coved
Gypbd.#3 / PT-SG Gypbd.#3 / PT-HGT08 Utility Conc/Steel trowel
finish None Gypbd.#2 / Unpainted Conc. / Unpainted
MECHANICAL PENTHOUSERm. No. Room Label Floor Base Walls Ceiling
Footnotes
R01 Stair #2 Conc/Steel trowel finish None Gypbd. #2 / Unpainted
Spray fire insul./Unptd.R02 Mechanical Room Conc/Steel trowel
finish None Gypbd. #2 / Unpainted Spray fire insul./Unptd.R03
Control Room Conc/Steel trowel finish None Gypbd. #2 / Unpainted
Spray fire insul./Unptd.R04 Electrical Room Conc/Steel trowel
finish None Gypbd. #2 / Unpainted Spray fire insul./Unptd.
BASEMENT COMMON AREASRm. No. Room Label Floor Base Walls Ceiling
Footnotes
B01 (b) Elevator Vestibule Rubber- RF-1 & RF-2 (b) Wood
/FC-2(b), PT(b) see J/ID-1 Gypbd.#4 / PT(b) Gypbd.#4/ FC-1/ PT(b)
Applied molding @ ceilg. see H/ID-1B02 (b) Corridor Rubber- RF-1(b)
Wood /FC-2(b), PT(b) see J/ID-1 Gypbd.#4 / PT(b) Gypbd.#4 /
PT(b)B03 Stair #1 Vestibule Conc/Steel trowel finish None Conc./
Gypbd #3 / P-SG Conc. / Unpainted (a)B04 Stair #1 Conc/Steel trowel
finish None Conc./Conc.Blk./Gypbd. #3 / PT-SG Conc. / Unpainted
(a)B05 Garage Level A Conc/Light broom finish None
Conc./Conc.Blk./Gypbd. #3 / PT-SG Conc. / Unpainted (a)B06
Mechanical/Utility Conc/Light broom finish /TC None
Conc./Conc.Blk./Gypbd. #3 / PT-SG Conc. / Unpainted (a)B07 Stair #3
Vestibule Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. /
Unpainted (a)B08 Stair #3 Conc/Steel trowel finish None Gypbd.#3 /
PT-SG Conc. / UnpaintedB09 Pump Room Conc/Light broom finish /TC
None Conc./Conc.Blk./Gypbd. #2 / unpainted. Conc. / UnpaintedB10
Electrical Room Conc/Light broom finish None Conc. / Conc. Blk. /
unpainted Conc. / UnpaintedB11 Telephone/CATB Resilient
Resilient/Coved Conc. / Conc. Blk. / unpainted Conc. / UnpaintedB12
Storage #1 Conc/Light broom finish None Conc./Conc.Blk./Gypbd. #2 /
unpainted. Conc. / Unpainted
LOWER TOWER ( 3RD TO 16TH FLOORS) - UNITS B & GRoom Label
Floor Base Walls Ceiling Footnotes
Entry Hardwood MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F
(c)Corridors (when adjacent to Entry) Hardwood MDF, PT-SG Gypbd.
#4, PT-F Gypbd. #4, PT-F (c)Kitchen Hardwood MDF, PT-SG Gypbd. #4
PT-F/Glass Gypbd. #4, PT-F (c) (f)Coat Closet Hardwood MDF, PT-SG
Gypbd. #4, PT-F Gypbd. #4, PT-F (c)Washer & Dryer Closet
Ceramic Tile MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4,
PT-FLiving/Dining Carpet MDF, PT-SG Gypbd. #4, PT-F Gypsum Veneer
over Conc. (c)Corridors (when adjacent to carpeted areas) Carpet
MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F (c)Bedrooms and Adjacent
Closets (Unit B) Carpet MDF, PT-SG Gypbd. #4, PT-F Gypsum Veneer
over Conc.Bedrooms and Adjacent Closet (Unit G) Hardwood MDF, PT-SG
Gypbd. #4, PT-F Gypbd. #4, PT-F (c)WIC (Walk-in Closet) (Units
B,&G) Carpet MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F
(c)Bathroom(s) Ceramic Tile MDF, PT-SG Gypbd. #4,PT-SG, Cer.Tile @
shower/tub Gypbd. #4, PT-SG (c) (d) (e) ;Bathroom Wall Mirror:
UPPER TOWER ( 17TH TO 20TH FLOORS) - ALL UNITSRoom Label Floor
Base Walls Ceiling Footnotes
Entry Hardwood MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F
(c)Corridors (when adjacent to Entry) Hardwood MDF, PT-SG Gypbd.
#4, PT-F Gypbd. #4, PT-F (c)Kitchen Hardwood MDF, PT-SG Gypbd. #4
PT-F/Glass Gypbd. #4, PT-F (c) (f)Coat Closet Hardwood MDF, PT-SG
Gypbd. #4, PT-F Gypbd. #4, PT-F (c)Washer & Dryer Closet
Ceramic Tile MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4,
PT-FLiving/Dining Hardwood MDF, PT-SG Gypbd. #4, PT-F Gypsum Veneer
over Conc. (c)Corridors (when adjacent to carpeted areas) Carpet
MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F (c)Bedrooms and Adjacent
Closets Carpet MDF, PT-SG Gypbd. #4, PT-F Gypsum Veneer over
Conc.WIC (Walk-in Closet) (Units A,C1,D1,E1,F1,G,H1,I1,& J1)
Carpet MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F (c)Bathroom(s)
Ceramic Tile MDF, PT-SG Gypbd. #4,PT-SG, Cer.Tile @ shower/tub
Gypbd. #4, PT-SG (c) (d) (e) ;Bathroom Wall Mirror:
FOOTNOTES
(a) Paint finish applies to all types of wall surfaces within
the room(b) Refer to Interior Designer Specifications &
Drawings for detailed information regarding carpets, paint texture
and colors, stones, etc.(c) Refer to Expanded Floor Plans of Entry,
Kitchen and Bathrooms (d) Refer to Floor Type Plans for closet
floor information (e) Refer to Bathroom Interior Elevations
(Architectural drawings)(f) Refer to Kitchen Interior Elevations
(Architectural drawings) (g) Similar finish as gypsum board #4
level(h) Living/Dining to have Gypbd. #4 at soffit adjacent to bay
windows at the 16th floor at Units C, D, E & F
ABBREVIATIONS
Gypbd.#4 = Gypsum board - The number refers to the level of
surface finish as per US Gypsum's Gypsum Connstruction HandbookMDF=
Medium Density FiberboardPT-F = Paint finish - FlatPT-SG = Paint
finish - Semi gloss PT-HG = Paint finish - High glossV-TF =
Varnished Transparent FinishTC = Traffic Coating
GROUND FLOOR COMMON AREASRm. No. Room Label Floor Base Walls
Ceiling Footnotes
G01 (b) Lobby Vestibule Slate Slate see J/ID-2 Alum Panels Wood
Veneer/ V-TFG02 (b) Lobby Epoxy Terrazo-TER-1/TER-2 (b) Wood/
FC-2(b), PT(b) see K/ID-12 Wood-WD-1(b), Gypbd.#5/ PT(b) see ID-4
Gypbd.#5/ PT(b) Carpet Inset (Inset Rug) see ID-2G03 (b) Consierge
Storage (Package Room-ID) Resilient Resilient (coved) Gypbd.#3/
PT(b) Gypbd.#3/ PT(b) PL-1(b) for Built-In MillworkG04 (b) Elevator
Vestibule Epoxy Terrazo-TER-1/TER-2 (b) Wood/ FC-2(b), PT(b) see
K/ID-12 Wood-WD-1(b),Glass-GL-2(b), Gypbd.#5/ PT(b) see ID-5
Gypbd.#5/ PT(b) see H/ID-12G05 (b) Mail Room Epoxy
Terrazo-TER-1/TER-2 (b) Wood/ FC-2(b), PT(b) see K/ID-12
Wood-WD-1(b), Gypbd.#5/PT(b), SLAB-2(b) see ID-6 Gypbd.#5/ PT(b)
see H/ID-12 Recessed MailboxesG06 (b) Locker Room Resilient.-PT (b)
Wood/ FC-2(b), PT(b) see K/ID-12 Gypbd.#3/ PT(b) Gypbd.#3/ PT(b)G07
(b) Toilet #2 Rubber- RF-1(b) Wood/ FC-2(b), PT(b) see K/ID-12
Gypbd.#4/ PT(b) Gypbd.#4/ PT(b)G08 Fire Control Room Resilient
Resilient (coved) Gypbd.#3 / PT-SG Gypbd.#3 / PT-SGG09 Storage
Conc/Steel trowel finish None Conc. / Gypbd. #3 / PT-SG Conc. /
PT-SGG10 (b) Toilet #1 Rubber- RF-1(b) Wood/ FC-2(b), PT(b) see
K/ID-12 Gypbd.#4/ PT(b) Gypbd.#4/ PT(b)G11 Package Conc/Steel
trowel finish None Conc. / Gypbd. #3 / PT-SG Conc. / PT-SGG12 Trash
Room Conc/Steel trowel finish /TC None Conc./Conc.Blk./Gypbd. #3 /
PT-HG Conc. / Unpainted (a)G13 Garage Level B Conc/Light broom
finish None Conc./Conc.Blk./Gypbd. #3 / PT-SG Conc. / Unpainted
(a)G14 Truck Stall Conc/Light broom finish None Conc. Blk. / PT-SG
Conc. / Unpainted (a)G15 Gas Meters Conc/Steel trowel finish None
Conc. Blk. / Unpainted Conc. / UnpaintedG16 Stair #1 / Exit
Corridor Conc/Steel trowel finish None Gypbd.#3 / PT-SG Conc. /
UnpaintedG17 Rentable Space #1 Conc/Steel trowel finish None Conc.
/ Gypbd. #1 / Unfinished Conc. / UnpaintedG18 Mechanical Conc/Steel
trowel finish None Conc. / Gypbd. #3 / Unpainted Conc. /
UnpaintedG19 Rentable Space #2 Conc/Steel trowel finish None Conc.
/ Gypbd. #1 / Unfinished Conc. / UnpaintedG20 Stair #2 Conc/Steel
trowel finish None Gypbd.#3 / PT-SG Conc. / UnpaintedG21 Storage
Conc/Steel trowel finish None Conc. / Gypbd. #3 / Unpainted Conc. /
Unpainted (a)G22 Display Area Conc/Steel trowel finish None Conc. /
Gypbd. #3 / Unpainted Conc. / Unpainted (a)G23 Switch Room
Resilient Resilient (coved) Gypbd.#3 / PT-SG Conc. / UnpaintedG24
Fuel Pump Room Conc/Steel trowel finish /TC None Gypbd.#3 / PT-SG
Conc. / UnpaintedG25 Stair #3 Vestibule Conc/Steel trowel finish
None Gypbd.#3 / PT-SG Conc. / UnpaintedG26 Stair #3 Conc/Steel
trowel finish None Gypbd.#3 / PT-SG Conc. / UnpaintedG27 Stair #4
Conc/Steel trowel finish None Conc. Blk. / Gypbd.#3 / PT-SG Conc. /
Unpainted (a)
LOWER TOWER ( 3RD TO 16TH FLOORS) - UNITS A, C, D, E, F, H, I
& JRoom Label Floor Base Walls Ceiling Footnotes
Entry Hardwood MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F
(c)Corridors (when adjacent to Entry) Hardwood MDF, PT-SG Gypbd.
#4, PT-F Gypbd. #4, PT-F (c)Kitchen Hardwood MDF, PT-SG Gypbd. #4
PT-F/Glass Gypbd. #4, PT-F (c) (f)Coat Closet Hardwood MDF, PT-SG
Gypbd. #4, PT-F Gypbd. #4, PT-F (c)Washer & Dryer Closet (Units
A, C, D, E, F & J) Ceramic Tile MDF, PT-SG Gypbd. #4, PT-F
Gypbd. #4, PT-FWasher & Dryer Closet (Units H & I)
Resilient Resilient (coved)Living/Dining Carpet MDF, PT-SG Gypbd.
#4, PT-F Gypsum Veneer over Conc.(h) (c)Corridors (when adjacent to
carpeted areas) Carpet MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4, PT-F
(c)Bedrooms and Adjacent Closets Carpet MDF, PT-SG Gypbd. #4, PT-F
Gypsum Veneer over Conc.WIC (Walk-in Closet) (Units
A,C,D,E,F,H,I,& J) Carpet MDF, PT-SG Gypbd. #4, PT-F Gypbd. #4,
PT-F (c)Bathroom(s) Ceramic Tile MDF, PT-SG Gypbd. #4,PT-SG,
Cer.Tile @ shower/tub Gypbd. #4, PT-SG (c) (d) (e) ;Bathroom Wall
Mirror:
-
...\Argenta-S-A8-1-10-31-06.dgn 10/31/2006 4:59:43 PM
-
...\Argenta-S-A8.2-OCT31.dgn 10/31/2006 4:55:47 PM
-
...\Argenta-S-AcousDtls-OCT31.dgn 10/31/2006 3:58:05 PM
-
...\Arg-S-Firestop-Dtls-10-31-06.d 10/31/2006 4:52:50 PM
-
...\Argenta-S-FlrDtls-10-31-06.dgn 10/31/2006 4:49:57 PM
-
...\Argenta-S-A8.6-V8.dgn 10/31/2006 5:01:56 PM
-
...\Argenta-S-KIT-Elev-10-31-06.dg 10/31/2006 4:34:04 PM
-
...\Argenta-S-KIT-Elev-10-31-06.dg 10/31/2006 4:34:38 PM
-
...\Argenta-S-KIT-Elev-10-31-06.dg 10/31/2006 4:35:38 PM
-
...\Argenta-S-KIT-Elev-10-31-06.dg 10/31/2006 4:36:08 PM
-
...\Argenta-S-Bath-Elevs-10-31-06. 10/31/2006 4:13:59 PM
-
...\Argenta-S-Bath-Elevs-10-31-06. 10/31/2006 4:14:33 PM
-
...\Argenta-S-Bath-Elevs-10-31-06. 10/31/2006 4:15:13 PM
-
...\Argenta-S-Bath-Elevs-10-31-06. 11/9/2006 4:23:25 PM
-
...\Argenta-S-Cbnt-Sects-10-31-06- 10/31/2006 4:20:02 PM
-
...\Argenta-S-Cbnt-Sects-10-31-06- 10/31/2006 4:20:32 PM
-
...\Argenta-S-Cbnt-Sects-10-31-06- 10/31/2006 4:21:06 PM
A0-1-OCTOBER31A0-2-OCTOBER31A1-1-OCTOBER31A1-2-OCTOBER31A1-3-OCTOBER31A1-4-OCTOBER31A2-1A2-2A2-3A2-4A2-5A2-6A2-7A2-8A2-9A2-10A2-11A2-11-1-OCTOBER31A2-12-0-OCTOBER31A2-12-OCTOBER31A2-13-OCTOBER31A2-14-OCTOBER31A2-15-OCTOBER31A2-16-1-OCTOBER31A2-16-OCTOBER31A2-17A2-18A2-19A2-20-OCTOBER31A2-21A2-22A2-23A2-24A3-1A3-2A3-3A3-4A3-51-OCTOBER31A3-52-OCTOBER31A3-53-OCTOBER31A3-54-OCTOBER31A3-55-OCTOBER31A3-61-OCTOBER31A3-62-OCTOBER31A3-63-OCTOBER31A3-64-OCTOBER31A3-71-OCTOBER31A3-72-OCTOBER31A3-73-OCTOBER31A3-74-OCTOBER31A3-81-OCTOBER31A3-82-OCTOBER31A3-83-OCTOBER31A3-84-OCTOBER31A4-1-OCTOBER31A4-2-OCTOBER31A4-3-OCTOBER31A4-4A4-4-1-OCTOBER31A4-5-OCTOBER31A4-6-OCTOBER31A4-7-OCTOBER31A4-8-OCTOBER31A4-9-OCTOBER31A5-1-OCTOBER31A5-2-OCTOBER31A5-3-OCTOBER31A5-4-OCTOBER31A5-5-OCTOBER31A5-6-OCTOBER31A5-7-OCTOBER31A5-8-OCTOBER31A5-9-OCTOBER31A5-10-OCTOBER31A5-11-OCTOBER31A5-12-OCTOBER31A5-13-OCTOBER31A7-1-OCTOBER31A7-2-OCTOBER31A7-3-OCTOBER31A7-4-OCTOBER31A7-5-OCTOBER31A8-1-OCTOBER31A8-2-OCTOBER31A8-3-OCTOBER31A8-4-OCTOBER31A8-5-OCTOBER31A8-6-OCTOBER31A9-1-OCTOBER31A9-2-OCTOBER31A9-3-OCTOBER31A9-4-OCTOBER31A9-5-OCTOBER31A9-6-OCTOBER31A9-7-OCTOBER31A9-8-OCTOBER31A9-11-OCTOBER31A9-12-OCTOBER31A9-13-OCTOBER31