-
Collaboration among Peers and interdis-CiPlinary Peer by
reaChing out to other design Profes-sionals
seeing new and evolving solutions for solving the Problems of
soCiety mani-fested in the
site evaluation that foCuses on working with the Con-ditions
Pres-ent in a har-monious and green way
diagramatiCal analysis of existing Con-ditions Pres-ent in the
miCo and maCro en-vironment of
struCturally sound design foCusing on the eConomy of means by
aPProPriate-ly detailing
sustainable minded de-sign foCusing on Creating healthy en-v i
ro n m e n t s for living and
Bria
n Sa
wye
rC
olle
ge o
f Arc
hite
ctur
e
Port
foli
oar
Chit
eCtu
ral
desi
gnTe
xas T
ech
Univ
ersit
yB.
S. A
rchi
tect
ure
||
|
-
2briansawyer
9806 sage lee dr.houston, tx 77089
e-mail: [email protected]
telephone: 713.584.7909
autodesk-revit+autoCad; archiCad+meP modeler; formZ; 3ds max;
d-Profiler; ecotech; sketchuP;
adobe-illustrator+indesign+Photoshop; mirosoft office
digital
analoghand modeling; wood work; foam modeling; drafting
skills
degree
Current education
education | degrees
texas tech university | College of architecture | lubbock tx |
08/2007-12/2010bachelor of science - architecture | Cum laude
texas tech university | College of architecture | lubbock tx |
01/2011-Presentgraduate school | masters of architecture
Candidate.Propective graduation date: december 15, 2012
texas tech university | College of architecture | lubbock tx |
01/2011-Presentgraduate school | masters in business administration
(mba) Candidate.Propective graduation date: december 14, 2012
employment | research
texas tech university | College of architecture | lubbock tx |
08/2010-Presentteaching assistant - environmental site
designduties: lead study sessions, field student inquiries, manage
grade book
texas tech university | College of architecture | lubbock tx |
01/2011-Presentstudent assistant - John white | historical
Preservationduties: Convert hard copy records into digital format,
Prepare exhibit of historic american building survey (habs)
texas tech university | College of architecture | lubbock tx |
01/2010-06/2010research assistant - urban techduties: Prepare
comprehensive plan for the development of a mixed-use community in
north lubbock
texas tech university | College of architecture | lubbock tx |
08/2008-12/2009teaching assistant - design, environment, and
societyduties: grade, tutor students, field student inquiries
Philowilke Partnership | healthcare architecture firm | houston
tx | 05/2009-8/2009Position - internduties: Computer drafting,
revit modeling, sketch up modeling, project puch-lists
texas tech university | College of architecture | lubbock tx |
05/01/2012-07/26/2012research study abroad - Paris, france: urban
Context explorationobjectives achieved: study form and function of
Paresian urban context; study, document, diagram Classical barroque
architecture and planning principals; Propose new interjection into
city framework.
texas tech university | rawls College of business
admininstration | lubbock tx | 02/2012-PresentPublic relations
graphic design assistant duties: Create event advertisements;
develope marketing strategies for College initiatives; Coordinate
alumni relations Communications.
-
3table of ContentsPortfolio
gradCollaboration studioPage04
gradComPrehensive studioPage08
greensustainable studioPage18
5"
9'-0"
11'-0"
5"
9'-0"
11'-0"
5"
9'-0"
11'-0"
5"
9'-0"
11'-0"
5"
9'-0"
10"
11'-0"
10"11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
1'-0"
14'-0"
1'-0"
10"
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
8th Floor
9th Floor
10th Floor
11th Floor12th Floor
Parking Garage
Slab with Structural Decking
Exterior Glazing
Column: W14x14
Column: W10x10
Column: W12x12
Steel W-Flange Beam:
Steel C-Joist:
Roofbimbuilding information modelingPage22
Page14
gradtoPiCal studio
texas tech university | College of architecture | lubbock tx |
05/01/2012-07/26/2012research study abroad - Paris, france: urban
Context explorationobjectives achieved: study form and function of
Paresian urban context; study, document, diagram Classical barroque
architecture and planning principals; Propose new interjection into
city framework.
-
4Credentials Collaboration ComPrehensive
Image By: BrIan Sawyer
Collaboration
Concept diagrams
Corner Perspective
Preliminarysketches
-
5toPiCal green
designbim
a collaborative design studio focused on combining the three
design disciplines: architecture, landscape architecture, and
interior design. the premise of the studio was to take a project
from Concept to Construction docu-ments incorporating the needs of
each discipline, and uniting the ideals of the group members. the
Project site is located in dallas, just off of turtle Creek Park,
and the concept idea was to create a tranquil and organic
atmosphere to promote a healthy living environ-ment by reflecting
the existing ge-ometries of the surrounding region as well as the
more free flowing patterns occurring in nature.
urbanrevitaliZingmixed-use ComPlexProJeCt summary
ProJeCt data
revitautodesk autoCadadobe illustratoradobe Photoshopadobe
indesign
software:
brian sawyer
James Coffeetanner hensel
Jaclyn Perezallison yank
grouP members:
**all images shown were influenced by my design decisions.
images are labeled according to the creator.
architect
landscape architectlandscape architect
interior designerinterior designer
Preliminary design
drawIngS and dIagramS On THIS Page PrOdUCed By BrIan Sawyer
-
6Credentials Collaboration ComPrehensive
the site consists of a sharp grade change moving from southwest
to northeast, as well as a drop in grade from the site to Cedar
springs. to accommodate this change in grade, the landscape
architects and myself collaborated to design a split in the
building which creates a through axis con-necting the street corner
and katy trail, as well as allowing for a drop in elevation to
front retail closer to the street level.
site designCorner of Carlisle &Cedar sPrings
site summary
Image By: BrIan Sawyer
Image By: BrIan SawyerImage By: BrIan Sawyer
Image By: BrIan Sawyer
Image By: Tanner HenSel
retai
l
Condominium lobby
loft units
Crosswalk
roof garden 1
roof garden 2
THe ImageS BelOw were deSIgned COrrOBOraTIvely By BrIan
Sawyer
and Tanner HenSelImageS PrOdUCed By Tanner HenSel
Collaboration
-
7toPiCal green
designbim
building detailsinteriorrenderings
RESTROO
M
RESTROO
M
UPPER LOBBY
KITCHEN
LOWER LOBBY
RECEPTION
OFFICE 1.
OFFICE 2.
PARKING GARAGE
SERVICE AREA
RESIDE
NT MA
ILBOX
SERVICE AREA
RESTAURANT
BAR
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
CORNER CAFE
CYBER CAFE SITTING AREA
ENTRY
N. 0 1 5 10 20
sitePlan
ground floor Plan
exteriorrenderings
Image By: allISOn yankImage By: JaClyn Perez
Image By: JaClyn Perez Image By: JaClyn Perez
Image By: BrIan Sawyer
-
8Credentials Collaboration ComPrehensive
N. Harwood St.Th
e Par
k
Woo
dall R
odge
rs Fre
eway
Site
the dallas atheneum, as inspired by the richard meiers atheneum,
is a mixed use public building project in the urban environment of
the dallas arts district. the facility consists of a visitors
Center, library, Cafe, facilities offices, offices for the dallas
aia headquarters, seminar rooms, an auditorium, and multiple
gallery display spaces. the project serves as a unique opportunity
to create a new foci of public interest in the dallas arts district
that is located at the planned entrance for the Park public parks
project.
atheneumvisitors Center
ProJeCt summary
ProJeCt data
inkwood
Plexiglas
material:
software:revit
adobe illustratoradobe indesign
adobe Photoshop
reSTaUranT
COUrTyard gallery
ComPrehensive
-
9toPiCal green
designbim
design exPloration
x-rayrendering
Preliminarysketches
interior renderings
OffICe SPaCe
gallery
aerIal Of gallery & lIBrary
-
10Credentials Collaboration ComPrehensive
Elevator Lobby
Mens R.R.
Womens R.R.
Mechanical
Storage/Janitorial
Gallery 2
AV Room
Auditorium
Conference Room
Kitchenette
Print lab StorageMens R.R.
Womens R.R.
Seminar LobbySeminar Room 1
Seminar Room 2
Seminar Storage
Fire Stair
Fire Stair
Fire Stair
AIA Office
Courtyard
Open to Level Below
Open to Level Below
Elevator Lobby
Mens R.R.
Womens R.R.
Mechanical
Storage/Janitorial
Librarian Office
AIA Reference Center
Open to Level Below
Gallery 1
Entrance Lobby
Library
Library Storage
Fire Stair
Fire Stair
Facilities office
Open to Level Below
Open to Level Below
Mens R.R.
Womens R.R.
Mechanical
Storage/Janitorial
Computer Lab
Fire Stair
Fire Stair
Elevator Lobby
Open to Level Below
buildingfloor Plan
buildingsections
Physical model
assemblage
ComPrehensive
-
11toPiCal green
designbim
Parti
Neighboring Geometries
Grid Manipulations
Derivation
the Process is a form giver as a way to establish a basis for
design. for this project a derivation of an-gles was arrived at
through tangent angles and arc relations between the neighboring
site conditions.
-
12Credentials Collaboration ComPrehensive
18
1. Metal Coping at parapet cap2. Exterior Sheathing3. Rigid fire
retardant roof insulation4. 3 Concrete on 14g metal deck5. Batt
Insulation6. Double paned insulated glass7. Gypsum wall board8. Air
barrier9. Finished floor10. W13x34 steel beam11. Polystyrene
insulation12. Suspended acoustic tile ceiling13. Reinforced
concrete slab14. Steel reinforcing15. Steel reinforced pilaster16.
Steel anchor rods17. Concrete Masonry Unit with thermal moisture
barrier18. Reinforcing Mesh19. Concrete facing20. Aluminum fixed
window head.21. Sealant and backer rod22. Stucco facing
1
2
3
4
5
6
7
8
9
10
11
12
13
1415
16
17
19
20
21
22
1. Metal Coping at para pet cap2. Exterior Sheathing3. Rigid
fire retardant roof insulation4. 3 Concrete on 14g metal deck5.
Batt Insulation6. Double paned insu- lated glass7. Gypsum wall
board8. Air barrier9. Finished floor10. W13x34 steel beam11.
Polystyrene insulation12. Suspended acoustic tile ceiling13.
Reinforced concrete slab14. Steel reinforcing15. Steel reinforced
pilaster16. Steel anchor rods17. Concrete Masonry Unit with thermal
mois- ture barrier18. Reinforcing Mesh19. Concrete facing20.
Aluminum fixed win- dow head.21. Sealant and backer rod22. Stucco
facing
analysis
SUmmer
fall
wInTerSPrIng
ComPrehensive
-
13toPiCal green
designbim
1 2 34
1
2
222 33
3 55 5
4
Courtyard: - 14 0
Ground Level: 0 0
Level 1: 3 0
Level 2: 17 5
Cafe: 33 0
Cafe Patio: 43 0
courtyard: -140
ground: 00
2nd floor: 175
cafe: 330
patio: 430
1st floor: 30
3 4 5 2 2 3 2 4 3 2
5 3 1 215
4
2 4 2
3
2
4
3
53 3
1
2
3
2
4
3214 5
5
courtyard: -140
ground: 00
2nd floor: 175
cafe: 330
patio: 430
1st floor: 30
courtyard: -140
ground: 00
2nd floor: 175
cafe: 330
patio: 430
1st floor: 30
Courtyard: - 14 0
Ground Level: 0 0
Level 1: 3 0
Level 2: 17 5
Cafe: 33 0
Cafe Patio: 43 0
Courtyard: - 14 0
Ground Level: 0 0
Level 1: 3 0
Level 2: 17 5
Cafe: 33 0
Cafe Patio: 43 0
3 2
33
35
41
2
25
NoRTH
SoUTH
EAST
WEST
sunstudies
elevations
exteriorrenderings
-
14Credentials Collaboration ComPrehensive
buildingelevations
Preliminary sketches
SOUTH
5 50eaST
5 50
interior rendering
-
15toPiCal green
designbim
with a focus on vernacular design, the lubbock lakeside
Community theatre is designed to respond to the environment and
geography of the canyon landscape in west texas. the entrance on
the north facade is level with the top of the ridge and can be
accessed from the on grade parking. once inside the complex, the
patron is processed around the vertical circulation core of the
lobby to reveal the expansive, multi-level grand lobby. the
the-atre is accessed from both the entry level and the lower lobby.
the facility offices are accessed from the entry level, and the
restaurant is located on the second floor, allowing the restaurant
patio to take advantage of a large rooftop patio of the lower
lobby.
design for PlaCemixed use:Community/theatre/restaraunt
ProJeCt summary
toPiCal
design exPloration
nOrTH
weST
5 50
5 50
ProJeCt data
revitautodesk autoCadadobe illustratoradobe Photoshopadobe
indesign
software:
-
16Credentials Collaboration ComPrehensive
UP
DN
UP
163 SFOffice
102 SFCtrl. Room
UP
UP
DN
DN
UP
DN
194 SFPully for Flyers
DN
4334 SFStage
192 SFDressing/Showers
181 SFDressing/Showers
636 SFWood Shop
2246 SF
Misc Staging &Egress Space
UP
UP
DN
508 SFCostume/ Prop
UP
134 SFStar Dressing
120 SFStar Dressing
655 SFRehursal
177 SFStorage
DN
239 SFMech 2
0102 03
04
05
060708
09
10
11
12
13
1415
1617
18
19
20
21
22
09
28
29
27
30
32
34
37
38
31
33
35
36
0102 03
04
05
060708
09
10
11
12
13
1415
1617
18
19
20
21
22
09
28
29
27
30
32
34
37
38
31
33
35
36
struCturewall seCtion and details
1 2 5
1
2
1.5
3
4 RESTAURANT
ENTRANCE | oFFICE
LoBBy
STAGE SToRAGE
STAGE | LoADING
5 FLy LoFT RooF
-
17toPiCal green
designbim
systems
toPiCal
UP
DN
5996 SFLobby
DN
DN
458 SFFacilities Storage
237 SFMens RR
403 SFMechanical
262 SFWomens RR
163 SFLight
102 SFControl
178 SFSound
DN
UP
DN
DN
DN
DN
UP
DN
DN
UP
DN
UP
163 SFOffice
102 SFCtrl. Room
UP
UP
DN
DN
UP
DN
194 SFPully for Flyers
DN
4334 SFStage
192 SFDressing/Showers
181 SFDressing/Showers
636 SFWood Shop
2246 SF
Misc Staging &Egress Space
UP
UP
DN
508 SFCostume/ Prop
UP
134 SFStar Dressing
120 SFStar Dressing
655 SFRehursal
177 SFStorage
DN
239 SFMech 2
DN
692 SFLounge
58 SFStorage
203 SFM RR
212 SFW RR
DN
239 SFMech 4
182 SFExecutive Office
181 SFConfrence Room
UP
248 SFMens RR
249 SFWomens RR
1767 SFAdmin/Office
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
UP
DN
DN
DN
224 SFTicket Booth
DN
DN
DN
hvaC andstructure
section Cut renderings
site Plan
floor Plans
-
18Credentials Collaboration ComPrehensive
sustainability studio vi : spring 2010
exterior rendering
interior rendering
-
19toPiCal green
designbim
this project is located in a site in san franciscos hayes valley
neighborhood. the neighborhood was once divided by a freeway that
split the area into a class divided sections. the freeway was taken
down by the city and a park was put in its place. the project site
is lo-cated on this park. the objective of this studio was to
design an apart-ment complex that fronts the park and will benefit
the community.
urbansustainable design
ProJeCt summary
ProJeCt data
revit architectureadobe illustratoradobe Photoshopadobe
indesign
software:
sustainable featuressituated to take advantage of natural
breezes storm water retentionlow e glazingnatural lightinglocal
materials
greendesign
-
20Credentials Collaboration ComPrehensive
Apartment 1Apartment 2
Apartment 3
Apartment 4
Apartment 5
Apartment 6
Apartment 7
Apartment 8
Apartment 9Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Bedroom
Hayes Street
Oct
avia
Stre
et
120
120
1 Plywood Decking
1 Plywood substrate
6 3/4 x 12 Glue-Laminated Wood Beam
1/2 Gypsum Drop Ceiling
6 3/4 x 1-4 Glue-Laminated Wood Beam
2 x 6 Wood Floor Joist
Curtain Wall
struCture
-
21toPiCal green
designbim
Fran
klin
St.
Van
Nes
s Ave
.
Marke
t St.
Oct
avia
St.
Fell St.
Linden St.
Hayes St.
Hickory St.
Oak St.
Lilly St.
Paige St.
Ivy St.
Gou
gh S
t.
Hayes Valley San Francisco, CA
West
North
South
site location
elevations
floor Plan
structurediagram
greendesign
-
22Credentials Collaboration ComPrehensive
exterior rendering
structural section
-
23toPiCal green
designbim
bim: fall 2010
system analysis
5"
9'-0"
11'-0"
5"
9'-0"
11'-0"
5"
9'-0"
11'-0"
5"
9'-0"
11'-0"
5"
9'-0"
10"
11'-0"
10"11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
10"
11'-0"
1'-0"
14'-0"
1'-0"
10"
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
8th Floor
9th Floor
10th Floor
11th Floor12th Floor
Parking Garage
Slab with Structural Decking
Exterior Glazing
Column: W14x14
Column: W10x10
Column: W12x12
Steel W-Flange Beam:
Steel C-Joist:
Roofa collaborative design class focused on sustainable, bim
solu-tions to design problems. this class covered building systems
and site integration to create an office complex in downtown
lubbock, tx, using archiCad as the primary design program. the
studio pro-cess consisted of running energy analysis on massing
models to find the most sustainable option, then designing the
core, as well as the structural, mechanical, electrical, and
plumbing systems.
bimsustainable design
ProJeCt summary
ProJeCt data
archiCadarchiCad-mePd-Profilerecotechadobe illustratoradobe
Photoshop
software:
0' -
10"
4' -
0"
Typi
cal
Typ
11' -
0"
(1st
floo
r onl
y)
(8 -
0
on A
ll Oth
er F
loor
s)
See
Build
ing
Sect
ion
Cut
1st Floor
Basement
Slab - Structural Corrugated Steel Decking and Site Cast
Concrete (Typ.)
Slab
W 15x30 Steel I Beam
W 12x30 steel Column
W 8x15 Steel Girder
HVAC System -Variable Air Volume
Store Front Windows - Aluminum type w/Low E Coating: U=.24
2x2 Acoustic Drop Ceiling Tiles
Drop Ceiling Hangers
rene hoelkerClaryssa rodriguezbrian sawyer
grouP members:
**all images shown were completed by me entirely.
bim
-
Brian Sawyer
end.design Portfolio
B.S. Architecture9806 sage lee dr.
houston, tx 77089
e-mail: [email protected]
telephone: 713.584.7909