MARTA CALVINHO 2014 PORTFOLIO
Mar 26, 2016
M A R T A C A L V I N H O
2 0 1 4P O R T F O L I O
I grew up in Lisbon, Portugal where I attended an American School through out a period of 10 years. This led me to grow up with an interest-ing split cultural experience, which still influ-ences my design sensibilities today.
I completed my Bachelor of architecture in Lisbon and am now in my last semester, of my Masters of Architecture. These distinct cultur-al educations have culminated in an interest for effective and minimalist aesthetics. I am fascinated in applying design and technology to the improvement of our public spaces by developing a method of publicactivation which could be applied worldwide.
About
SKILLS / ABILITIES
Autocad 2014
3D Studio Max
Revit 2014
Rhino and Maxwell
Sketchup
Cinema 4d (Basic)
Apple and Microsoft software
Adobe Creative Suite CS6
HTML+CSS Arduino 3D printing Laser Cutter CNC machine
LANGUAGES
Fluent in English, Portuguese and Spanish
Basic French
Learning Mandarin Chinese
EDUCATION
Carlucci American Int’l School of LisbonInternational Baccalaureate Diploma
University LusíadaBachelor Degree in Architecture
School of the Arts Institute of ChicagoMasters in Architecture
Sep 2006 Jun 2008
Sep 2008 Jul 2011
Sep 2011 May 2014
Marta de Almeida Barreiro Botelho Calvinho162 N. State Street, Chicago, IL [email protected](312) 753 9871www. martacalvinho.com
ACCOMPLISHMENTS
SAIC John Kurtich Foundation Scholarship recepient to travel to Japan summer 2013
Featured in Visionary Drawing Exhibition, SAIC 2013 Fundraising director of AIAS
May 2013 - Jun 2013
Jan 2013 - Feb 2013Sep 2013 - May 2014
WORK EXPERIENCE
Intern at WKK – Lisbon, PortugalPerformed online archiving and organization of completed and proposed projects
Intern at PreBuild – Lisbon, PortugalAssisted with design competition entry for Novartis by creating interior renderings
Jun 2010 – Aug 2010
Dec 2011 – Feb 2011
Aug 2012 – Dec 2012
Feb 2013 – May 2013
Jan 2014 – Present
Teacher Assistant, at SAIC – Chicago,IllinoisDesign Objects: Assist teacher in critiques and students with project execution using the CNC machine, stationary tools, power tools, and hand tools
Architecture Intern at Roula Architects –
Project Manager Assistant at LG Construction –
Chicago, Illinois
Chicago, Illinois
Performed Construction Document revisionsfor detail drawings. Administration Documents: bidding, furniture list, punchlist and field reports.
Project Manager and Construction Assistant, consisted of RFI development, Submittal reviews,sample coordination, budget and schedule, field coordination, subcontractor management
SKILLS / ABILITIES
Autocad 2014
3D Studio Max
Revit 2014
Rhino and Maxwell
Sketchup
Cinema 4d (Basic)
Apple and Microsoft software
Adobe Creative Suite CS6
HTML+CSS Arduino 3D printing Laser Cutter CNC machine
LANGUAGES
Fluent in English, Portuguese and Spanish
Basic French
Learning Mandarin Chinese
EDUCATION
Carlucci American Int’l School of LisbonInternational Baccalaureate Diploma
University LusíadaBachelor Degree in Architecture
School of the Arts Institute of ChicagoMasters in Architecture
Sep 2006 Jun 2008
Sep 2008 Jul 2011
Sep 2011 May 2014
Marta de Almeida Barreiro Botelho Calvinho162 N. State Street, Chicago, IL [email protected](312) 753 9871www. martacalvinho.com
ACCOMPLISHMENTS
SAIC John Kurtich Foundation Scholarship recepient to travel to Japan summer 2013
Featured in Visionary Drawing Exhibition, SAIC 2013 Fundraising director of AIAS
May 2013 - Jun 2013
Jan 2013 - Feb 2013Sep 2013 - May 2014
WORK EXPERIENCE
Intern at WKK – Lisbon, PortugalPerformed online archiving and organization of completed and proposed projects
Intern at PreBuild – Lisbon, PortugalAssisted with design competition entry for Novartis by creating interior renderings
Jun 2010 – Aug 2010
Dec 2011 – Feb 2011
Aug 2012 – Dec 2012
Feb 2013 – May 2013
Jan 2014 – Present
Teacher Assistant, at SAIC – Chicago,IllinoisDesign Objects: Assist teacher in critiques and students with project execution using the CNC machine, stationary tools, power tools, and hand tools
Architecture Intern at Roula Architects –
Project Manager Assistant at LG Construction –
Chicago, Illinois
Chicago, Illinois
Performed Construction Document revisionsfor detail drawings. Administration Documents: bidding, furniture list, punchlist and field reports.
Project Manager and Construction Assistant, consisted of RFI development, Submittal reviews,sample coordination, budget and schedule, field coordination, subcontractor management
SKILLS / ABILITIES
Autocad 2014
3D Studio Max
Revit 2014
Rhino and Maxwell
Sketchup
Cinema 4d (Basic)
Apple and Microsoft software
Adobe Creative Suite CS6
HTML+CSS Arduino 3D printing Laser Cutter CNC machine
LANGUAGES
Fluent in English, Portuguese and Spanish
Basic French
Learning Mandarin Chinese
EDUCATION
Carlucci American Int’l School of LisbonInternational Baccalaureate Diploma
University LusíadaBachelor Degree in Architecture
School of the Arts Institute of ChicagoMasters in Architecture
Sep 2006 Jun 2008
Sep 2008 Jul 2011
Sep 2011 May 2014
Marta de Almeida Barreiro Botelho Calvinho162 N. State Street, Chicago, IL [email protected](312) 753 9871www. martacalvinho.com
ACCOMPLISHMENTS
SAIC John Kurtich Foundation Scholarship recepient to travel to Japan summer 2013
Featured in Visionary Drawing Exhibition, SAIC 2013 Fundraising director of AIAS
May 2013 - Jun 2013
Jan 2013 - Feb 2013Sep 2013 - May 2014
WORK EXPERIENCE
Intern at WKK – Lisbon, PortugalPerformed online archiving and organization of completed and proposed projects
Intern at PreBuild – Lisbon, PortugalAssisted with design competition entry for Novartis by creating interior renderings
Jun 2010 – Aug 2010
Dec 2011 – Feb 2011
Aug 2012 – Dec 2012
Feb 2013 – May 2013
Jan 2014 – Present
Teacher Assistant, at SAIC – Chicago,IllinoisDesign Objects: Assist teacher in critiques and students with project execution using the CNC machine, stationary tools, power tools, and hand tools
Architecture Intern at Roula Architects –
Project Manager Assistant at LG Construction –
Chicago, Illinois
Chicago, Illinois
Performed Construction Document revisionsfor detail drawings. Administration Documents: bidding, furniture list, punchlist and field reports.
Project Manager and Construction Assistant, consisted of RFI development, Submittal reviews,sample coordination, budget and schedule, field coordination, subcontractor management
SKILLS / ABILITIES
Autocad 2014
3D Studio Max
Revit 2014
Rhino and Maxwell
Sketchup
Cinema 4d (Basic)
Apple and Microsoft software
Adobe Creative Suite CS6
HTML+CSS Arduino 3D printing Laser Cutter CNC machine
LANGUAGES
Fluent in English, Portuguese and Spanish
Basic French
Learning Mandarin Chinese
EDUCATION
Carlucci American Int’l School of LisbonInternational Baccalaureate Diploma
University LusíadaBachelor Degree in Architecture
School of the Arts Institute of ChicagoMasters in Architecture
Sep 2006 Jun 2008
Sep 2008 Jul 2011
Sep 2011 May 2014
Marta de Almeida Barreiro Botelho Calvinho162 N. State Street, Chicago, IL [email protected](312) 753 9871www. martacalvinho.com
ACCOMPLISHMENTS
SAIC John Kurtich Foundation Scholarship recepient to travel to Japan summer 2013
Featured in Visionary Drawing Exhibition, SAIC 2013 Fundraising director of AIAS
May 2013 - Jun 2013
Jan 2013 - Feb 2013Sep 2013 - May 2014
WORK EXPERIENCE
Intern at WKK – Lisbon, PortugalPerformed online archiving and organization of completed and proposed projects
Intern at PreBuild – Lisbon, PortugalAssisted with design competition entry for Novartis by creating interior renderings
Jun 2010 – Aug 2010
Dec 2011 – Feb 2011
Aug 2012 – Dec 2012
Feb 2013 – May 2013
Jan 2014 – Present
Teacher Assistant, at SAIC – Chicago,IllinoisDesign Objects: Assist teacher in critiques and students with project execution using the CNC machine, stationary tools, power tools, and hand tools
Architecture Intern at Roula Architects –
Project Manager Assistant at LG Construction –
Chicago, Illinois
Chicago, Illinois
Performed Construction Document revisionsfor detail drawings. Administration Documents: bidding, furniture list, punchlist and field reports.
Project Manager and Construction Assistant, consisted of RFI development, Submittal reviews,sample coordination, budget and schedule, field coordination, subcontractor management
TABLE OF CONTENTS
TABLE OF CONTENTS
Studio
7-9 4523-27
PersonalStructures
17-21 39-43
4711-15
29-31
Work
33-37
2012
ROLLER DERBY
7
FLOW DIAGRAM
Roller derby is a very dynamic and violent sport so I started by wanting to create a simple shell that would contain the sport inside. Something that was pure and simple on the outside but once you entered the intensity of the game would contrast with the outside of the building.It was very important for me to mantain a steady flow of movement around the tracks. I wanted people to go around the track and interact with it as much as possible, as well as engage with the outside. This led to the opening of the large windows, which allowed people from the outside to see this relationship and feel compelled to enter the building.
Studio 2012
Dynamic shell
Shell study
3D print f inal
Flow diagram
8
Studio 2012
1. Ticket area 2. Shopping booth 3. Player elevator 4. Information booth 5. Lobby 6. VIP area 7. Bar 8. Seating 9. Flat track 10. Banked track
Section AA
Ground level
9
Studio 2012
RED HOOK
2013
11
The Red Hook neighborhood functions as two sides: The Back and The Front, which are disconnected from each other. The aim then was to understand what did connect the two sides so that the project could contribute to promote unity as well as diversity in this neighborhood. The solution was a ramp that promotes social interaction through out its development, with spaces such as: market place, playgrounds, residencial farm-ing plots, coffee shop, amphitheatre stairs and gardens.
Studio 2013
Axial change
Food spots
Figure ground
Green space
Demographics
12
1. Community plaza 2. Bike shop 3.Storage 4. Community room 5. Apartment lobby 6. Artist Studios 7. Community plaza 8. Loading dock 9. Gallery space 10. Woodshop classes 11. Commercial space 12. Private bike storage 13. Public bike storage 14.Public woodshop15. garage
1
2
3
4
56
7
8 9
10
11 11
12
13
14
15
Studio 2013
Ground level
13
Studio 2013
Program
14
Studio 2013
SHOWROOM SHOWROOM
WOODSHOP
PARKING SHOPSHOPLAUNDRYLAUNDRYLAUNDRY
LAUNDRYLAUNDRYLAUNDRY
BIKESHOPBIKESHOPBIKESHOPPARKINGPARKING
PARKINGPARKINGPARKINGPARKINGPARKING
DIGITALDIGITALDIGITAL
MANUFACTURING
WOODSHOP
WOODSHOPWOODSHOP
MATERIALMATERIAL
STORAGESTORAGE
Shade studyShade detail
Section AA
15
Studio 2013
Structure
LIBRARY
2013
17
In 2013 I visited 10 cities in Asia and the features which stuck out to me the most were: the respect and harmony with na-ture and the food culture. This project is located in chinatown between the food(north) and residential(south) districts and next to the chinatown market. So I wanted to emphasize this cycle by catering towards it. The north of the project features food kiosks, coffee shop and playful topography. The south of the project features a sitting area in order for the community to come together. On the second level of the library there is a green roof for the community and a terrace with view towards downtown.
Studio 2013
South garden
Foodscapes
Concept
18
LEVEL 2North
North
scale: 1/16”=1’-0”
Section 2scale: 1/8”=1’-0”
Main entrance with information desk
www.autodesk.com/revit
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
Owner
No. Description Date
7
8
DN
2
3
4
5
6
89
10
11
12
1
Level 10' - 0"
Level 210' - 0"
Level 320' - 0"
Level -1-10' - 0"
Studio 2013
LEVEL 2North
North
scale: 1/16”=1’-0”
Section 2scale: 1/8”=1’-0”
Main entrance with information desk
www.autodesk.com/revit
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
ConsultantAddressAddressAddressPhone
Owner
No. Description Date
7
8
DN
2
3
4
5
6
89
10
11
12
1
Level 10' - 0"
Level 210' - 0"
Level 320' - 0"
Level -1-10' - 0"
Section AA
Main lobbyGround level
19
Studio 2013
Activity zones
20
Studio 2013
Structure axonSection detail
21
Studio 2013
LIGHT MANUFACTURE
2012
23
Structures 2012
24
Structures 2012
Celing planGround level
25
Structures 2012
Sections
Elevations
Detail : exterior glass
26
Structures 2012
MaterialsLandscape
27
Structures 2012
Plumbing
Level 1 PLUMBING SECTION
Mech Room
1st �oor
2nd �oor
ROOF
CO water meter
EJ
FD
LAVLAV LAV
WC WC WC WC WC WC WC FCOWC
MensRoom
WomensRoom
Kitchen
LAVLAV LAV LAV
WC WC WC WC WC WC WC
CO
WC
MensRoom
WomensRoom
Kitchen
VTR
2
Diffuser
Vent (supply)
Flow (return)
Flow (supply)
2x4 rectangular light
2x4 rectangular light
2x4 circular light
double switch
switch
Return air
Exhaust
Outside air
2
2
Open to below
Open to top
Open to top
Open to top
Open to top
Open to top
Open to top
Open to top
Open to top
Open to below
Outside air
Exhaust
Return air
Di�user
Vent (supply air)
Flow (return)
Flow (supply)
HVAC DIAGRAM
2x4 rectangular light2x4 circular lightdouble switch
switch
ELECTRICAL DIAGRAM
2
2
Open to below
Open to below
2
Level 2 Level 1
Electrical
UP
168 SF
Storage
155 SF
Mechanical
125 SF
Bathrooms
180 SF
Bathrooms
195 SF
Reception
192 SF
Showroom
OPEN TO ROOF
123 SF
Photocopy
90 SF
Server
221 SF
Kitchen
1588 SF
Open Office
104 SF
Accountant
97 SF
Accountant
146 SF
Meeting Room
87 SFStairs
4052 SF
Warehouse
161 SF
Receiving office
174 SF
Manufacturing office
255 SF
Reception
201 SF
Material Storage
870 SF
Loading Dock
1 2 3 4 5
A
B
C
D
E
F
G
H
76
I
2951 SF
Area
721 SF
Parking
200
201
202
204
203
206
207 208 209
210
211
214
215
212
213
216
3h3
6h2
1h1
4h2
6h2
3h3
4h26h2
3h3
3h3
6h2
2h1
1 A 7
2A8
Bathrooms
PLUMBING
W Down
HW Down
CW Down
HW up
CW upW up
HVAC
2011
29
In 2011 I assisted Prebuild in a competition for re-designing Novartis offices in Portugal. The idea for the interior space began from trying to bring dynamism to an existing space through an economical way. Since there were existing pillars I decided to extend them out and create an exhibition area integrated with benches, inspired in tree roots. The reception area then becomes simultaneously a waiting area and an exhibition space. This idea of tree trunk is then applies to the remaining floors because there are two central cores that run vertically through the building. I assisted the WKK team in the creation of the concept, choos-ing materails, 3D modeling and renders.
Work 2011
30
Work 2011
31
Work 2011
2013
33
While working for Roula Architects I worked in the design for the addition of a Research and Technology facility for Cook County Jail. The facility is divided so that the Basement and 1st level are where the drop and receive of inmates occurs, as well as the place where counseling and medication takes place. In the 2nd to 5th floor is where the inmates are kept in 24 to 38 people cells. I assisted in field reports, furniture bidding, furniture counting, fire plans, interior cell renders and details.
Work 2013
34
Work 2013
Magazine
35
Work 2013
Interior Renders
36
Work 2013
Fire exits planFurniture plan
Documents
37
Details
Work 2013
38
39
I am currently interning at LG Construction + Development, as a project manager assistant. Working on a project on 2036 S. Michigan avenue which consists of the reconversion of a show room to a seven floor luxury residential building.
- Project directory - RFI layout + organization - Signage - Documentation of demolition - Bid list - Big management - Submittal documentation - Loading dock plan, section, site plan - CDOT permit for loading dock construction
Work 2013
40
Project:Project Address:To: Date Sent:Date Due: Date Answered:Submitted By: Cost Implication:Subject:Drawing: Spec Section: Reference:
Request:
Response:
Responded by: Date:
LG CONSTRUCTION + DEVELOPMENTRFI # 032
The Studebaker Lofts - 2036 S. Michigan 2036 S. Michigan AvenueHartshorne Plunkard Architecture 4/8/2014
2234 W. North AvenueChicago, IL 60647
Joe SternbauerLocation of Drain for FC-1 in Tenant/Bike StorageM1.2 & P1-2
According to drawing M1.2 note 11 for FC-1 located in the Tenant/Bike Storage room states "…Provide refrigerant to associated heat pump and drain piping to nearest floor drain." Since there isn't a floor drain shown in the Tenant/Bike Storage room on sheet P1-2, please indicate where the suspended fan coil will be draining the condensation water.
DAILY REPORT #: CONTRACTOR:
from date: to date: Weather:
Names of Employees Date Location Activity
Notes:
Total # of employees:
LG CONSTRUCTION + DEVELOPMENT DAILY LOG
Daily LogRFI’s
41
Work 2013
Signage
42
Work 2013
DNDN
LOADING
444444444444 3 2 1
55566666
77777
44444
EXISTING LIGHT
TO REMAIN, 1 UCM
REMOVE EXIST
TREE AND SALV
EXISTING GR
INSTALL NEW
AND RE-INST
EXISTING GRATE,
HOSE BIBB,
,BBBBIBIB
ESE
SOOH
X
X
X X X X X X X X X X X X
X
X
X X X X X X X X X
EXISTING FIRE
HYDRANT, T
SLIDE GATE
No parking
SLIDE GATE
TEMPORARY DRIVE
SWING GATE
HEAVY DUTY 24/7 DOUBLE HIGH CANOPY WITH TEMP. LIGHTING UNDER SEPERATE PERMIT BY MASON CONTRACTOR. INSTALLED NO LATER THAN 4/15/14
HEAVY DUTY 24/7 PEDESTRIAN CANOPY WITH TEMP. LIGHTING UNDER SEPERATE PERMIT BY MASON CONTRACTOR. INSTALLED NO LATER THAN 4/15/14
8’-0” HIGH FENCE WITH DUST SCREEN
PROTECT EXISTING TREES TO REMAIN TYPICAL (U.N.D)
EAST 21ST STREET TWO WAY TRAFFIC
EXISTING UTILITY POLE- PROTECTED BY COMED
10’ JERSEY BARRIER
4’ HIGH DOCK
NOTES: 1. SIDEWALK CLOSED SIGN
34'-0"
168'-0"
14'-0"
8'-0"
62'-0"
20'-0"
72'-0"6'-0"
12'-0"
0-'2
1"
16'-0"
No parking
72'-0"
1
1
IRE
YP.
G POLE
TYP.
INGAGE
ATE
TREE
ALLTYP.
Loading dock
43
Work 2013
DN
4' -
0"
4' - 9"
8' -
0"
8' - 0" 20' - 0"
4' -
2"3'
- 6
1/32
"2'
- 0"
4' - 9" 6' - 10"
Removable guard rail:42” high21” Mid railToe Rail
Non-slip metal plating existing lockable
roller shade
View of Loading dock: North View of Loading dock: South
Level 1 loading dock: 4’0”
10’ 0” Jersey Barrier
4’ 0”
Level 1
0’ 0”
Level loading dock4’ 0”
Level 1
0’ 0”
Top of gate11’ 0”
Top of gate11’ 0”
Level loading dock
16' -
11
9/16
"
17' -
10"
8' - 0
"
12' - 0"
Guard rail:42” high21” Mid railToe Rail2x4 wood
Loading dock
ACROSS THE STATES
Step 1: Collect reclaimed wood:Collect reclaimed materials along the route. I believe in the importance of reducing waste, particularly from the building industry, and creating a new life for materials that can contrib-ute to the good of public space. Step 2: Transport wood:The idea is to collect these reclaimed materials in one city , and take them to the next city, where they can be re-used. Step 3: Gift:Construct benches for a public space, as a gift from the city before. This will create a bond between the citie as well as liven public space.
Personal 2014
Personal 2014
Communication is key for better architecture
Architects Community
What is architecture? Who is the architect?
? ?
When architects discuss how to help “the community”
X
M A R T A C A L V I N H O2 0 1 4