Top Banner
RUSS KATHERMAN ADMINISTRATOR 406-444-3332 [email protected] architecture.mt.gov January 2021 ARCHITECTURE & ENGINEERING DIVISION
16

ARCHITECTURE & ENGINEERING DIVISION

Feb 15, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: ARCHITECTURE & ENGINEERING DIVISION

RUSS KATHERMANADMINISTRATOR

[email protected]

January 2021

ARCHITECTURE & ENGINEERING DIVISION

Page 2: ARCHITECTURE & ENGINEERING DIVISION

DIVISION STRUCTURE

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 2

FY2020-2021 FTE: 17.50 General Fund FTE: 0

Administrator

Planning Manager

Design Engineering

Manager

Construction Engineering

Manager

Accounting / Support Services

Page 3: ARCHITECTURE & ENGINEERING DIVISION

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 3

BACKGROUND

LEGAL AUTHORITY:• Title 18, Chapters 1 and 2, MCA

(construction contracts)

• 17-7-201 through 17-7-224, MCA (LRBP & budget)

FUNDING SOURCE:• Operation is funded by State Special Revenue

(LRBP Major Repair account)

• LRBP funding primarily from two sources:

12% of Coal Severance Tax

2.6% of total Cigarette Tax Revenue

(new) 17-7-208 & -209, MCA

(new) 17-7-221 & -222, MCA

Page 4: ARCHITECTURE & ENGINEERING DIVISION

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 4

BACKGROUND• Administer State’s Long-Range Building Program (LRBP), HB 5 and HB 14

• LRBP established by 38th Legislative Session in 1963, provides for a consolidated, statewide approach to construction and repair of state facilities

• Inventory = 4,949 buildings (September 2020 Facility Assessment Report)

• Size = over 22,650,000 square feet

• Total building infrastructure value = >$4,215,000,000

• Per HB 553 in 2019, LRBP two new components: Major Repair (MR) & Capital Development (CD)

• Currently administering 151 projects from prior sessions

• Projects are statewide and serve Montanans from all walks of life

Page 5: ARCHITECTURE & ENGINEERING DIVISION

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 5

BACKGROUNDPrepare Long Range Building Plan (LRBP) in conjunction with OBPP

• Solicit agency requests for vertical infrastructure projects

• Prioritize those requests

• Coordinate with other programs (DEQ Energy; % for Art)

• Balance program with available funds as presented in the Executive Budget

• Present LRBP program to legislature (Section F, Volume 3 of Executive Budget)

Implement infrastructure bill (HB 5 & 14) as approved by Legislature

• Provide administration and project management from initiation through warranty

• Conduct architect/engineer selection process and planning

• Solicit bids and award construction contracts

• Provide budgeting and accounting services for the LRBP

Page 6: ARCHITECTURE & ENGINEERING DIVISION

A&E current appropriat ions/authorizat ions responsibi l i ty = $302,563,100

A&E new responsibi l i ty for portions of HB 5 & 14 = $209,500,000

• (new) LRBP MR, $26.8M

• (new) LRBP CD, $4.5M

• Capital Land Grant, $3.3M

• Bonds, $71.0M

• SSR/FSR, $34.1M

• Authority, $69.8M

A&E operational budget for the biennium is only 0.9% of total program we manage

FUNDING

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 6

A&E Total Responsibility will be $512,063,100

Page 7: ARCHITECTURE & ENGINEERING DIVISION

KEY ACCOMPLISHMENTS

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 7

COMPLETED PROJECTS:

• Southwest MT Veterans Home, DPHHS

• Norm Asbjornson Hall, MSU

• PJW Education Center Expansion, UM

• Haynes Hall Ventilation Upgrades P1, MSU

• Mazurek Building Bridge Replacement, Capitol

• Diesel Technology Center, MSU-N, Havre

• Upgrade Donaldson Roof, Helena College

• Replace Central Heating System, MMHNCC

• Female Latrines, Ft. Harrison and Lewistown

• MT Hall ADA Upgrades, MSU

• Replace Ft. Peck Hatchery Boiler, FWP

• Forestry Division Mechanic Shop, DNRC

• Energy Improvement Projects, Statewide

Page 8: ARCHITECTURE & ENGINEERING DIVISION

PROJECTS

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION

Re-Roof Pine Hills YCF, DOC

Dental Clinic Addition, GFC

Southwest MT Veterans Home, DPHHS Forensic Lab Boilers, DOJ

8

Page 9: ARCHITECTURE & ENGINEERING DIVISION

PROJECTS

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION

Liberal Arts Bldg Remodel, UMMAES Greenhouse Labs

Life Sciences Addition, MSU-Billings

Glendive MHP Office, DOJ

MSP High-Side Cooling, MSP DOC

9

Page 10: ARCHITECTURE & ENGINEERING DIVISION

PROJECTS

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 10

Mazurek Bridge Replacement, DOA

Before

Romney Hall Renovation, MSU

American Indian Hall, MSU

MLEA Renovation, DOJ

Equipment Storage Buildings, Many Locations, MDT

After

Page 11: ARCHITECTURE & ENGINEERING DIVISION

PROJECTS

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 11

Montana Heritage Center

Military Facilities, DMA

Page 12: ARCHITECTURE & ENGINEERING DIVISION

UPCOMING PRIORITIES

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 12

Continue Development & Implementation of Facility Condition Assessment Program (see 17-7-202 & 2020 FCA Report submitted to LFC/OBPP).

Updating the State’s High-Performance Building Standards.

Increase agencies’ awareness of High-Performance Existing Building Program for Operations & Maintenance.

Strategic changes to workflows for improvements/efficiencies and broader implementation of electronic processes.

GO

AL

4

GO

AL

1G

OA

L 2

GO

AL

3

Page 13: ARCHITECTURE & ENGINEERING DIVISION

UPCOMING PRIORITIES

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 13

Transition an admin support position to a Project Manager position due to increased projects and project demands.

GO

AL

5

Page 14: ARCHITECTURE & ENGINEERING DIVISION

EXECUTIVE BUDGET & LFD COMMENTS

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 14

Executive Budget Request:

• Statewide/Present Law Adjustments

• SWPLs 1 through 3 & PL 4 and 5

• New Proposal to Comply with 17-7-202

• Annual Facility Assessment Software License/Subscription Expenses

LAD Comments/Concerns:

• No concerns identified

Clean Audit for A&E

Page 15: ARCHITECTURE & ENGINEERING DIVISION

SUMMARY

DEPARTMENT OF ADMINISTRATION | ARCHITECTURE & ENGINEERING DIVISION 15

• Budget requests are present-law adjustments and one new proposal

• No General Fund FTE; No FTE requests; no General Fund impact

• Currently administering $302.6 million from prior biennia

• Adding $209.5 million from HB 5 & 14, A&E responsibility at $512.1 million

• A&E’s annual budget request to administer the LRBP is 0.9%

Page 16: ARCHITECTURE & ENGINEERING DIVISION

THANK YOU