A Dissertation Submitted in Partial Fulfilment of the Requirements for the Degree of BSc. (Hons) in Architectural Technology By Stephen Donoghue Word Count: 8940 April 2015 Department of Built Environment and Extended Campus, IT Carlow “Except where stated otherwise, this dissertation is based entirely on the author’s own work” ROLE OF AN ARCHITECTURAL TECHNOLOGIST AS A BIM INFORMATION MANAGER IN A DESIGN TEAM: A STUDY IN AN IRISH CONTEXT
59
Embed
Architectural Technologist as a BIM Information Manager
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A Dissertation Submitted in Partial Fulfilment of the Requirements for
the
Degree of
BSc. (Hons) in Architectural Technology
By
Stephen Donoghue
Word Count: 8940
April 2015
Department of Built Environment and Extended Campus,
IT Carlow
“Except where stated otherwise, this dissertation is based entirely on the author’s own work”
ROLE OF AN ARCHITECTURAL TECHNOLOGIST AS A BIM INFORMATION MANAGER IN A DESIGN TEAM: A
STUDY IN AN IRISH CONTEXT
i
DECLARATION OF AUTHORSHIP
I declare that all material in this dissertation is entirely my own work except where
duly acknowledged.
I have citied the sources of all quotations, paraphrases, summaries of information,
tables, diagrams or other materials; including software and other electronic media in
which intellectual property rights may reside.
I have provided a complete bibliography of all works and sources used in the
preparation of this submission.
I understand that failure to comply with the Institution's regulations governing
plagiarism constitutes a serious offence.
Student Name (Printed): ________________________________________
I would like to take this opportunity to thank the people that have made this dissertation
possible, a particular thanks to my supervisor Sujana Sudhir whose guidance,
encouragement and support enabled me to develop a greater understanding of this topic.
I wish to extend my sincerest gratitude to all the lecturers within the Built Environment at the
Institute of Technology Carlow, for their continuing support during the course of my studies.
In particular I would like to thank Noel Dunne whose expertise and involvement has been
invaluable, Martin O’Neill, Dan O’Sullivan, Margaret Doyle Hughes and Jer Keohane, who all
made contributions towards this dissertation.
I would also like to express my appreciation to Malachy Matthews from Dublin Institute of
Technology, Robin Stubbs from Waterford Institute of Technology and Katherine Keane from
Cork Institute of Technology for providing information from their respective Institutions.
I wish to thank Ralph Montague, Chair of the RIAI committee on BIM and Rich DePalma,
Chair of the CITA BIM Education Forum for freely giving their time, experience and
knowledge during the course of my studies.
I would also like to take this opportunity to thank my fellow classmates who have been a
welcome source of laughter and distraction on many occasions during the more challenging
periods of this dissertation and course in general.
Finally I would like to take this opportunity to thank my family, friends and in particular my
gorgeous wife, for their patience, love and words of encouragement during the long hours
spent researching and developing this dissertation.
iii
ABSTRACT This dissertation was undertaken to establish what additional skills an Architectural Technology graduates in Ireland needs to become a BIM Information Manager. Irish based practices are implementing BIM at a greater rate and it has become increasingly important to investigate the ability of Architectural Technologists to fulfil some of the additional roles and responsibilities associated with BIM.
A national matrix of BIM learning outcomes for graduating Architectural Technologists was essential for this study. In order to establish a list of capabilities expected of graduates, a national matrix of BIM learning outcomes for graduate Architectural Technologists needed to be complied. Therefore, the BIM learning outcomes were collected, compared and combined, from four of the Institutions currently providing level 8 Architectural Technology in Ireland to create a single list of BIM skills expected from graduates. To investigate if these were the skills expected or experienced by the Irish construction industry a leading industry expert was interviewed.
Irish based design firms are having to adopt UK standards and guidelines, along with the roles and responsibilities associated with them due to the lack of guidance from Irish Government and construction federations. To ascertain the relevance of the roles and responsibilities associated with BIM Information Manager in an Irish context, the experiences of the aforementioned BIM expert were reviewed.
The study has revealed that Irish based design teams are adopting UK standards and guidelines as previously mentioned, however, the learning outcomes gained by graduates in Irish Institutions are significantly different to those gained by their UK counterparts. Whilst this dissertation created the first national matrix of the current BIM learning outcomes in Ireland it is extremely important at this point that the Institutions, along with industry experts come together to establish a standard set of relevant, up-to-date BIM learning outcomes that will be adopted across the country.
Ireland has an opportunity to learn from the mistakes of others and ensure that future graduates are recognised as world leaders in BIM.
iv
Table of Contents DECLARATION OF AUTHORSHIP .................................................................................... i
changing information amongst stakeholders. The construction industry is jam-packed of in-
efficiencies with regard to information exchange, i.e. the right people having the right
information at the right time or information duplication.
1.1.1 What is BIM BIM is widely used as an acronym for ‘Building Information Modelling’ which is commonly
defined using the Construction Project Information Committee (CPIC) definition as:
‘…digital representation of physical and functional characteristics of a facility creating a
shared knowledge resource for information about it forming a reliable basis for decisions
during its life cycle, from the earliest conception to demolition.’ (RIBA, 2012, p. 3)
Table 1 on the following page is a summary report associated with an Architect / Designer
which outlines the various stages of a construction project. It also shows the activities, tools,
benefits, costs and education associated with those phases, and puts into prospective what
is required to make BIM as beneficial as possible and why it should be implemented into
Architectural practices as soon as possible.
2
Example summary report: Architect / Designer
Work Stage Preparation Design Pre-Construction Construction Use
Activities Agree responsibilities and implement BIM specification/execution plan. Attend BIM Kick Off Meeting. Modelling existing conditions/ Site analysis. Produce COBie Drop 1
Build a concept model with a PAS1192:2 based change control process. 3D coordination & Design Review. Prepare project brief
Finalise the BIM and process model to be adopted. COBie Drop 3. 3D coordination drawing production
Monitor and manage process of BIM, changes & RFI's where relevant
Monitor model performance in use. Attend post project evaluation
BIM Task Information Manager and finally BIM Information Manager, (BSI, 2013, p. 19).
"There is a lack of clarity regarding the role of a BIM Information Manager, but if the lead
designer role remains, it is clear that the information manager’s role cannot conflict with the
design responsibilities of this role. A sensible interpretation is that the information manager
becomes responsible for managing the inputs of each designer into the project model and
for ensuring that the right party is working on the right aspect of the design at a given time by
managing the design programme that dictates when each party enters their shared
information into the project model" (RIBA, 2012, p. 13).
The information manager has no design related duties. Clash detection and model
coordination activities associated with a ‘BIM Coordinator’ remain the responsibilities of the
design lead.
"The BIM Information Manager is not just nice to have but rather a fundamental member of a
model-based design process. The BIM Information Manager's multi-faceted skills have a
direct effect on the quality of projects and the reduction of overall project execution time.
This streamlined workflow provides architects more time for design, more value for clients
and more profit", (Gallello, 2008)
2.4.2 Roles and Responsibilities of a BIM Informati on Manager The Construction Industry Council (CIC) have prepared a couple of documents, "Building
Information Model Protocol” & “Outline Scope of Services for the Role of Information
Management (2013)", which outline the different roles & responsibilities of BIM Information
Managers and are accepted as the industry benchmark.
13
The (Council (b), 2013, p. 1) document defines the role of a BIM Information Manager as
"the person appointed, initially by the employer, to perform the BIM Information Management
role". The document goes to describe that position as "a role in connection with the project
which includes, inter alia, the establishment and management of the processes, protocols
and procedures set out in the employer’s information requirements (EIR), which can be
found in Appendix 2 of the same document".
The principle responsibilities of the BIM Information Manager as listed in (Council (b), 2013,
p. vii) can be summarised as follows:
(i) Managing the processes and procedures for information exchange on projects;
(ii) Initiating and implementing the project information plan and asset information plan;
(iii) Assisting in the preparation of project outputs, such as data drops; and
(iv) Implementation of the BIM protocol, including the updating of the Model Production
and Delivery Time (MPDT).
While (BSI, 2013, p. 19) list these responsibilities as follows;
(i) Enable reliable information exchange through a common data environment (CDE)
(ii) Maintain and receive information into the Information Model
(iii) Enable integration and co-ordination within Information Model
(iv) Configure information for Project Outputs
(v) Populate the information exchange format for the Information Model
(vi) Accept, reject information exchanges within the common data environment
(vii) No design responsibility or right to issue instructions
It is the responsibility of the BIM Information Manager to agree and issue the information
requirements, which should be prepared before the agreements are concluded, as otherwise
the parties will have to rely on the other contractual arrangements, which may not address
the items covered by the information requirements (Council (b), 2013, p. vii).
Working in a design firm, the BIM Information Manager will be responsible for implementing
BIM, for the coordination of project teams and for establishing the connections necessary for
communication between multiple offices, (Eastman, et al., 2011). Other duties include
planning training for employees to keep them updated on current and future versions of BIM
software. For this, the BIM Information Manager should remain constantly informed about
BIM trends and make themselves aware of the vision of other companies, attend
conferences and participate in industry organisations. The BIM Information Manager should
14
also develop marketing materials to inform customers of the company's BIM capabilities,
evaluation of new products and verification of technical problems and deficiencies in
hardware, software and the internet. Finally the BIM Information Manager should ensure the
commitment of everyone on the project by creating a procurement system so that each
stakeholder takes its responsibilities. (Barison & Toledo Santos, 2011, p. 5).
2.5 CONCLUSION
2.5.1 Conclusion The definition of the role of Architectural Technologist in Ireland as defined by the governing
bodies is out-dated as identified by the literature review and could better represent the
current demands and practises of the profession. The BIM capabilities / competencies
expected of level 8 Architectural Technologists has never been defined at a national level
which is constraining both academia and industry to plan for the future, certainly in any
coherent manner.
The UK governments strategy for May 2016, has exasperated the situation and this is
changing the methods of procurement using BIM beyond recognition at an alarming pace
and the new roles / responsibilities created along with the strengths / weaknesses of the
people expected to fulfil these roles need to be investigated.
The role of Information Management is expected to be delivered as part of an existing
appointment by a capable resource, with additional obligations added to that appointment
(Council (a), 2013, p. iv). However, to-date it is not clear what profession is going to fulfil this
additional role, with the only indication coming in (Council (b), 2013, p. vi) where it’s stated
that they “ likely to be performed either by the Design Lead or the Project Lead, which could
be a consultant or contractor at different stages of the project”. This needs further definition
quickly to prevent the industry fulfilling the roles in an ad hoc fashion.
15
CHAPTER 3.0: METHODOLOGY
3.1 INTRODUCTION
Figure 3: Methodology Framework – (By Author)
3.2 ARCHITECTURAL TECHNOLOGY GRADUATES
3.2.1 UK Reference Benchmark As previously mentioned, the UK construction and educational sectors are considerably
further advanced than Ireland when it comes to BIM. During the course of my research, a
preliminary BIM learning outcome framework (2012), which was established by the BIM
Academic Forum (BAF) was scrutinised. This framework was then used to analysis what is
expected from UK graduates in relation to BIM compared with expectations of Irish
graduates and what have the Irish industry experts experienced from graduates.
16
3.2.2 BIM Learning Outcomes in IT's The research method applied in this study is qualitative, both desk based research and an
interview have been carried out to corroborate the study.
Contact was made with the relevant course leaders associated with administering BIM
learning in the five institutions, four of whom have furnished the BIM learning outcomes from
their individual Institutions, as a result. After receiving the learning outcomes from four of the
five Institutions currently providing level 8 Architectural Technology in Ireland, all of the
information was combined. From this, a comprehensive matrix of BIM-related learning
outcomes for level 8 undergraduate Architectural Technology programmes was developed.
The information / language and focus of the individual institutions varied to some degree on
smaller issues, however, whilst worded slightly differently in the course literature in the
respective institutions, the core aspects were similar in the most part. This information was
collectively compiled and thoroughly assessed. All the learning outcomes were matched /
combined where possible and along with the remaining outcomes were added to the final
matrix. This resulted in a substantial list of BIM capabilities / competencies expected from all
Architectural Technologists in Ireland at the time of graduation.
In order to verify that no important items were misrepresented and to ensure the individual
institutions were satisfied, the completed matrix was circulated to the course leaders for
ultimate approval. Final changes were then carried out on these recommendations to
ensure the most comprehensive matrix of BIM learning outcomes were established, defining
a single standard of BIM capabilities / competencies currently expected of level 8
Architectural Technology graduates throughout the Republic of Ireland for the first time.
For some reason this hasn’t been previously established between the institutions currently
offering this course. This may be due to the fact that BIM is relatively new or more likely due
to the fact the institutions believe that they are best served working independently.
3.2.3 Irish Industry Experiences It was deemed necessary to confirm the level of capabilities / competences experienced by
the industry, to this end, Ralph Montague was interviewed. Mr Montague is a founding
partner of Arcdox. Arcdox was established in 2009 and is a specialist architectural practice,
providing professionally managed BIM services to the construction industry. He is also the
Chairman of a special practice committee group within the RIAI, set up to investigate the
benefits of BIM and ideas for the general advancement of BIM amongst RIAI members and
within the Irish Construction Industry. Along with these, he is also the Coordinator of a
17
special interest group for CITA and for the Revit Users Ireland Group. All of this highlights
his expertise within the field and shows the respect of his peers, making him the ideal
candidate for the interview.
The interview questions followed the objectives as set out in this study, i.e. BIM capabilities
of Architectural Technologists, which he has experienced? Graduates understanding of the
strategic / management sides of BIM, etc. Mr Montague is at the forefront of all things BIM
related in Ireland and is the best proponent to the pertinence of the UK documents in Ireland.
While the views of a one individual are accepted as a poor representation of the Irish
construction industry as a whole, the decision was taken to accept the expertise of the
market leader as reliable, due to the limited resources and time available.
3.2.4 Comparison Table 2 (on page 21) was drawn up at this point, which consisted of the Preliminary BIM
learning outcomes framework (2012) in one column, the BIM learning outcomes expected by
Irish industry in a second column and the previously established national matrix was in a
third and final column. As previously mentioned different descriptions / language had been
used throughout all of the collected information, therefore, comparing the learning outcomes
from the UK and Ireland in a comprehensive way proved extremely difficult. However, the
interview carried out identified synergies / conflicts between both sets of learning outcomes.
Once completed the findings gave a clearer appreciation of what was expected from
graduates in the UK versus what was being attained by Irish graduates and what the Irish
industry has experienced.
3.3 BIM INFORMATION MANAGER
3.3.1 UK Reference Benchmark The skills required to become a competent BIM Information Manager are outlined in the
publications - Outline Scope of Services in the Role of Information Management (2013) by
the Construction Industry Council and in PAS 1192-2:2013. Whilst these publications may
be comprehensive and accepted as the established industry standard, they were
nonetheless developed for the UK environment.
18
3.3.2 Irish Industry Experiences In order to verify if a BIM Information Manager in the Irish construction industry is expected
to provide a similar scope of services as defined in UK documentation, additional information
was required. For this reason, Ralph Montague, Chair on the RIAI committee on BIM but
who is also the managing partner in Arcdox was once again interviewed. Arcdox are the
industry leaders in Ireland in terms of BIM, providing consultancy advice, production
resources, implementation support and training.
3.3.3 Comparison The information compiled from the interview with Mr Montague was analysed against the UK
reference benchmark and the results of which have been accepted as the scope of services
required of a BIM Information Manager in an Irish based design team.
3.4 CONCLUSION The skill sets of a level 8 Architectural Technology Graduate which have been established in
the National Matrix were then compared with the skills required by a BIM Information
Manager in an Irish based design team to identify any synergies and gaps. This highlighted
what additional skills an Architectural Technology graduates would need to acquire to
become competent BIM Information Managers in the future.
19
CHAPTER 4.0: FINDINGS / DISCUSSIONS
4.1 INTRODUCTION Architectural Technology is currently being taught to FETAC level 8 in five Institutions of
Technology in the Republic of Ireland, IT Carlow, DIT, WIT, CIT and GMIT. While the
Institutes have drawn up their individual set of targets for BIM learning, there has been no
joined up thinking or guidance from the governing bodies. For this reason the individual set
of BIM learning outcomes have been collected from the varies institutions, examined and
amalgamated in the most thorough fashion possible to define a single national matrix of the
current learning outcomes.
4.2 BIM CAPABILITIES / COMPETENCIES OF ARCHITECTURA L
TECHNOLOGISTS The BIM capabilities and competencies which Institutions from the UK & Ireland expect from
their Architectural Technology graduates have been divided in table 2 below, along with the
skills that the Irish industry would like to see from graduates. The fundamental problem
when trying to compare the various learning outcomes is the different descriptors used along
with cross over's from one list to the next. Whilst ever effort has be made to compare the
lists in a comprehensive fashion, this proven exceptionally difficult in some instances.
4.2.1 Irish Graduates compared to UK Graduates While the lists are difficult to compare, the significance of the first national matrix of BIM
learning outcomes needs to be recognised. This should be the first step for Institutions to
incorporate a standard set of learning outcomes in their course curriculum. The skills listed
below and gained by Irish graduates would allow them to carry out any one of the duties
described in the ‘technical’ section of the UK – Preliminary Learning Outcomes (2012).
However, it is also clear that this section is given a far greatest emphasis by Irish Institutions,
with little or no importance given to the ‘strategic’ or ‘management’ aspects as outlined by
BAF, i.e. value proposition or legal implications. Very few learning outcome between the
four Irish Institutions that took part in this study focused on the ‘strategic’ and ‘management’
aspects of BIM. When you consider that many Irish based design companies currently using
BIM in their practices, use UK standards as guidelines, then you would expect our learning
outcomes to be very similar. Below is an investigation as to what Irish industry expects from
new Architectural Technology graduates.
20
4.2.2 Irish Graduates compared to Irish Industry ex pectations The future is currently looking bright for graduates, as the economy is growing there are
more and more Architectural Technology jobs being created. There is a lot more expected
from graduates today than a few years ago, as Irish companies can’t afford to spend
valuable time “training” new employees. Their work load has increased dramatically over the
years, while their fees haven’t increased. The good news is that by and large, graduates are
delivering for their new employers especially those that leave third level education with a
good knowledge of BIM.
BIM is about creating, up-dating, sharing and using digital data, which can take many forms.
The construction industry expects that graduates would be able to input this information
correctly, in a standard format which is critical so that computers can understand the
information, ensuring interoperability. However, only one of the current learning outcomes
mentions interoperability and none of them stipulate that industry standards should be
incorporated into projects. Industry experts have also expressed concern that while
graduates have a certain level of proficiency in using the software, they tend not to know
why they are modelling an object or building. They feel that graduates aren’t being taught
the advantages of the BIM process and therefore don’t appreciate its true value.
Industry experts have also flagged graduates inability to set-up, work in and maintain work
sets and collaborative environments and also believe the Institutions should incorporate
more multi-discipline collaboration within their programs. The interviewee was informed that
this is currently a learning outcome from the Institutions however, it was his opinion that both
graduates and industry would greatly benefit if more was done in this area. Exposing
students to an environment where they have to deal with data standards, work-sets,
federated models and data drops on a more regular basis would be beneficial.
Project review software was another area that the industry highlighted for more attention.
The use of federated models would encourage graduates to use Navisworks or other similar
software to bring three or four models together, checking that they are in the correct location
and running clash test analysis on projects.
Below is a list of the findings in relation to the BIM learning outcomes of Architectural
Technology graduates.
21
The UK BIM Academic Forum – Preliminary Learning Outcomes (2012) are divided into three categories; Strategic (S), Management (M) and
Technical (T). These categories have been used to compare all of the learning outcomes as indicated by the letter (S), (M) or (T). Numerous letters
appear next to learning outcomes which are relevant to more than one category.
NOTE: The category headings only of the BIM Academic Forum - Preliminary Learning Outcomes (July 2012) are listed below; the full list relevant to
Architectural Technologists is included in Appendix A
BIM Academic Forum – Preliminary
Learning Outcomes (July 2012)
BIM skills expec ted from graduates by
the Irish construction industry
BIM learning Outcomes currently provided by
Institutions of Technology
STRATEGIC
In relation to each of the learning outcomes
below, as a result of following this course,
individuals will be expected to:
What is BIM
BIM Value proposition (context relevant, e.g.
client and contractor)
What is the UK Government requirements
from BIM
Greater emphasis needs to be put on data
software such as Excel, Datasheet, Access,
Sequel Pro, etc.
Students should understand that it is
extremely important that you input the
correct information so the computer can
understand it
Ability to understanding and use BIM
enabling tools (Revit)
Conduct research, select and apply solutions for the
technical design of the principle construction junctions
of domestic (cavity wall & timber frame), retrofit
projects, a medium scale concrete framed building
and an urban context mixed use development (T)
Download and install BIM applications for home use
(M)
Select an appropriate application template to begin a
building project (M)
22
Industry context of BIM adoption (e.g. peer
firms)
Impact to client and supply chain
relationships (collaborative and coordinated)
Strategic Considerations
Strategic issues associated with starting BIM
Information deliverables; impact on
procurement conditions and skills demands
Investment model (up-skilling, systems and
process management)
Organisation stakeholder engagement
Graduates should understand that BIM is a
process and not a software, (Revit or similar
software merely enable the process)
Graduates need the ability to set up and
maintain work-sets and federated models
on multi-discipline collaborative projects
within Institutions to replicate working
environments
Digital data standards such as COBie,
Uniclass, IFC’s should be compulsory to
provide interoperability
Graduates should have an understanding
and appreciation of how important BIM is
from a strategic / management point of view
Ability to navigate Navisworks or other
similar software
Import sketch and CAD designs for creation of a BIM
project (T)
Set up grids and levels for precise 3D elements
drawing (T)
Design, modify and style structural members, walls,
doors, windows, window/door assemblies, curtain
walls, slabs, roofs, stairs, railings and use the power
of groups, phasing, links and design options (M), (T)
Create REVIT materials and apply their thermal /
Physical properties (T)
Create and develop parametric content utilizing REVIT
Architecture (T)
Create complex shapes with surface modelling tools
(T)
Combine solids and voids to create complex and
intriguing forms (T)
MANAGEMENT
In relation to each of the learning outcomes
below, as a result of following this course,
individuals will be expected to:
What is BIM
23
Acquiring internal resources
Organisation and project applications, and
benefits of BIM
Visualisation benefits and spatial
coordination
Productivity / Efficiency improvements
Sustainable design
Scheduling, Estimating
Facilities management
Developing Organisational Business Plan
Engaging business stakeholders
Gaining commitment
Managing external requirements
Apply an understanding of the different types of
parameters and their uses (T)
Understand form making and rationalization (T)
Create simple Topology for a building project (T)
Use the toolset to create facade patterns, massing
and adaptive geometry (T)
Open Revit Conceptual Massing Environment and
connect the massing to data schedules (T)
Project design, conceptual topics including designing
with massing tools, using mass elements and mass
groups, making site models (T)
Display introductory principles of graphic
representation, drafting, lettering, sketching,
development of 2D/3D drawing skills (T)
Understand sketch based design (T)
24
Legal implications and requirements - FOC's,
agreements, appointments, SLA's etc.
Ownership, IP, copyright, design rights,
insurances, PII, etc.
Risk - identifying and managing (risk
registers, etc.)
Managing people
Data deliverables to supply chain; and to
clients
Impact to internal and external roles
Internal stakeholders engagement -
strategic, management and technical
Collaboration - management of people,
communication skills, team working, etc.
Use conceptual design tools to quickly build and
rationalise complex geometry (T)
Create design options and organise timing schedules
to construction within the Revit model (T)
Setup a digital folder system to store projects and
information (T)
Actively engage in interoperability in the design
process (M)
Use digital model to co-ordinate design (T)
Organise the project browser for complex projects (T)
Apply the theory of collaborative working in the
development of a group project (S)
25
Communicating the impact and relevance of
BIM
Discuss issues associated with starting BIM
Managing Process
Defining common language; BIM technology
Governance of Information and Process
management
Standards (data and process) - knowledge of
and implementation
Managing technical infrastructure
Interoperability - adherence to standards,
managing compliance
Hardware, Software, Network infrastructure
requirements (organisation specific)
Create a central BIM file and set work sets for
collaborative working (M)
Utilise the BIM model as a collaborative tool for the
AEC stakeholders through a “live” project (T)
Engage in the use of a Federated Model with BIM
Level 2 Maturity (T)
Engage in group work using the Revit collaborative
toolset (T)
Develop and demonstrate an ability to work
collaboratively in a design team (S), (M), (T)
Display an ability to lead an integrated AEC team in
the context of a comprehensive design project (M)
Demonstrate a detailed understanding of the skills
required to manage/co-ordination a BIM model (M)
26
Software / technology evaluation and
selection process
Integrate various parametric models and co-ordinate
information (M), (T)
Identify and solve the principle construction junctions,
utilising a collaborative BIM approach (M), (T)
Integrate Revit into workflows and schedules (T)
Improve your workflow, work sharing and collaboration
(M), (T)
Take significant responsibility for the work of
individuals and groups in the role of a BIM co-
ordinator suitable for practice (M)
Take significant responsibility for the work of
individuals and groups in the implementation of
emerging analytical software suitable for practice (M)
Apply a systematic understanding and critical
awareness of BIM theory & management (M)
TECHNICAL
In relation to each of the learning outcomes
below, as a result of following this course,
individuals will be expected to:
What is BIM
Identifying project requirements
Assessing contextual data affecting
potential developments
Developing design solutions
Managing design information
Implementing procurement processes
Analysing and planning construction and
installation work processes and resources
27
Coordinating and controlling construction
and installations operations
Managing project handover and facilities
information
Assessing the condition of existing assets
Assessing the energy performance of
buildings
Managing the use and maintenance of
facilities
Managing the operating technical
information systems
Create energy analysis report for conceptual building
model and final model (T)
Engage new analytical skills to evaluate critically and
innovatively sustainable and retrofit solutions (T)
Identify and investigate the energy parameters
associated with retrofit design principles (T)
Address topics, including solar geometry and day
lighting, passive heating and cooling, rainwater
harvesting and on-site energy systems (T)
Utilise iSBEM to indicate compliance with Building
Regulations (T)
Display a critical awareness of environmental, energy,
ventilation and heating issues through performing
NEAP & DEAP calculations (T)
Utilise thermal bridging analysis of standard and
specialised construction types (T)
28
Use & integration of Revit MEP for mechanical and
electrical design, including ductwork, piping, lighting,
circuits and panels (T)
Use Photoshop, Revit Architecture and 3ds Max
Design to create hyper-realistic 3D visualizations of
their designs (T)
Use Ecotect Analysis 2011 to create detailed site &
building energy analysis reports (T)
Use Navisworks to create material take-offs, clash
detection and interactive walk-throughs (T)
Table 2: Comparisons in BIM Learning Outcomes
When the BIM learning outcomes from the Irish national matrix are divided into the three categories as listed in the “Preliminary BIM Learning
Outcomes Framework (July 2012)”, i.e. Strategic, Management and Technical, the results are very interesting. Only two of the currently
learning outcomes fall into the ‘Strategic’ category, while a further 14 are in the ‘Management’ category, with an over whelming 40 learning
outcomes in the ‘Technical’ category. This highlights the emphasis that Irish Institutions are currently putting on the technical aspects of BIM
without fully implementing the associated strategic or management elements.
29
4.3 BIM INFORMATION MANAGER The roles and responsibilities which are accepted as the industry standard in the UK have
already been outlined in section "2.4.2 - Roles and Responsibilities of a BIM Information
Manager". This study however, investigated if these were relevant in Ireland. No BIM
standards have been developed by the Irish Government or any Irish construction industry
federation to-date. This has forced the practices currently using BIM in Ireland to look for
relevant standards elsewhere and because the UK are our nearest neighbours and are
making great strides in BIM working processes it made sense to apply their standards. Also,
by adopting these standards, it provides opportunities for many Irish companies to carry out
work in the UK.
4.3.1 Roles and Responsibilities in Ireland versus the UK The BIM experts that participated in this study have indicated that a BIM Information
Manager in an Irish based design team would have the exact same roles and responsibilities
as those outlined in section 2.4.2, which makes sense considering we have incorporated the
UK standards.
4.3.2 Architectural Technologists as BIM Informatio n Managers We have already seen that Irish Architectural Technology graduates leaving Institutions
today, don’t have as wide a range of knowledge as their UK counterparts and don’t have all
the skills that the Irish industry would like in relation to BIM, nevertheless is not all doom and
gloom. The graduates from the last number of years have the luxury of having the BIM
process incorporated into their studies which gives them a significant advantage over
graduates from a number of years ago, before BIM was included in the curriculums.
All of the information collected during the course of this dissertation has been reviewed to
assess what additional skills an Architectural Technology graduate needed to become BIM
Information Manager in an Irish based design team. The research and interview with an
industry expert has highlighted the need for graduates to experience working in and
managing a collaborative environment for a period of time.
This in turn demands that graduates know and understand federated models and know what
Common Data Environments (CDE) are and how they work. They need to understand how
CDE’s are structured and what are the associated workflows and the procedures. They also
30
to understand the processes you have to go through to get information from Work In
Progress (WIP) to shared or from shared to published.
Managing the processes and procedures for information exchange on projects is a
fundamental requirement for an Information Manager. Standards and protocols such as
COBie, Uniclass and IFC, introduced to students during their studies need to be further
developed, most likely in a work environment, to ensure that they have a comprehensive
understanding of these standards and have an ability to enforce them. Ensuring that
checklists, sign-off sheets, etc. are all in place.
Another item that BIM Information Managers need to be proficient in, which will require
additional training for graduates is a design review package for example, Navisworks, to
view and assess the federated model, make sure models are importing into the correct
locations and flagging any clashes that may occur.
Architectural Technologists will also need to learn how to prepare Pre-Qualification
Questionnaires (PQQ), Employers Information Requirements (EIR), BIM Execution Plans
(BEP) and Master Information Delivery Plan (MIDP) before they can become BIM
Information Managers. They also need to understand who will produce what information, at
what stage, to what level of development, what Level of Information (LOI) and to what Level
of Detail (LOD). All of these aspects will be new to graduating Architectural Technologists
but will certainly be required before considering the role of BIM Information Manager.
4.4 CONCLUSION Architectural Technologists, as previously mentioned are likely to fulfil many of the new roles
and take on the additional responsibilities on behalf of the design team associated with
procuring projects using BIM. Irish design companies are using UK standards such as
PAS:1192 for guidance on the BIM process from beginning to end and because of this the
roles and responsibilities of a BIM Information Manager in an Irish based design team are
the exact same as in the UK. However, the BIM learning outcomes currently expected from
Irish Architectural Technology graduates are drastically different from those of the UK as
previously investigated. This highlights an urgent need for better alignment between the
skills that these new roles demand, such as interoperability, and what is currently being
offered by Architectural Technologists graduates from level 8 programs.
Currently a situation exists where graduates are expected to fulfil roles and work to
standards originally from the UK, while all the time they are developing valuable but very
31
different BIM learning outcomes from their UK counterparts. This doesn’t make any sense,
surely if the Irish construction industry has adopted UK working methods then Irish
Institutions need to follow suit and either adopt UK learning outcomes or quickly develop and
incorporate their own, which would better educate graduates to work to these standards. I’m
aware that CITA previously tried to set-up an education forum, to create common guidelines
and they invited all of the Institutions and Universities to participate. Unfortunately this was
never completed, but this study has highlighted the urgent need for this issue to be re-
visited.
Institutions and Universities need to work together to develop and incorporate a national
matrix of BIM learning outcomes which are fit for purpose. Ireland is in a fantastic position
due to the current economic recovery, to build on the knowledge gained by other countries,
such as the UK and Finland to become world leaders in the use of BIM. This would provide
a global market for Irish based design teams, allowing them to export their knowledge but
retain their people.
32
CHAPTER 5.0: RECOMMENDATIONS
5.1 Recommendations In my opinion, an education forum which include all Institutions and Universities needs to be
re-visited and the sooner this is done the better. Standards are not standards if they only
apply to the individual Institution or University. Up-to-date national BIM learning outcome
standards which deal with all of the issues associated with BIM need to be compiled and
adopted by all. This can only happen if Industry experts with real world experience
collaborate with all the course directors across the Built Environment to guarantee universal
acceptance and cohesion. Accreditation bodies such as the RIAI and CIAT also need to
accept these standards, as they would be required to enforce the new curriculums.
It is recommended that the work carried out during this dissertation should be built upon by
investigating how graduating Architectural Technologists are equipped to fulfil the other roles
and responsibilities associated with BIM. Along with this, only studies need to be carried out
to examine how other programs associated with the construction industry, i.e. Architecture,
Civic & Structural Engineering, Quantity Surveying, etc. are incorporating BIM into the
curriculum.
REFERENCES
Architects, R. I. o. B., 2012. BIM Overlay to the RIBA Outline Plan of Work, London: RIBA
Publishing.
BAF, 2013. Embedding Building Information Modelling (BIM) within the taught curriculum.
York: The Higher Education Academy.
Barison, M. B. & Toledo Santos, E., 2011. An Overview of BIM Specialists, s.l.: Nottingham
University Press.
BSI, 2013. PAS 1192-2:2013 - Specification for information management for the
capital/delivery phase of construction projects using building information modelling. s.l.:BSI.
Council (a), C. I., 2013. Outline scope of services for the role of Information Management.
Great Britain: CIC.
Council (b), C. I., 2013. Building Information Model (BIM) Protocol - Standard Protocol for
use in projects using Building Information Models. Great Britain: CIC.
DePalma, R., 2014. An Education in BIM. Irish Building Magazine, Issue 3.
Earley, M., 2014. Building Information Modelling - Boom, Bang, BIM. Irish Building
Magazine, Issue 2.
Eastman, C., Teicholz, P., Sacks, R. & Liston, K., 2011. BIM Handbook: A Guide to Building
Information Modelling for Owners, Managers, Designers, Engineers and Contractors. 2nd
ed. New Jersey: Wiley.
Gallello, D., 2008. AECbytes. [Online]
Available at: http://www.AECbytes.com
[Accessed 04` November 2014].
Magazine, I. B., 2014. An Education in BIM. Irish Building Magazine, Issue 3.
McKenna, T., 2014. An Education in BIM. Irish Building Magazine, Issue 3.
Philp, D., 2011. Getting Government BIM-Ready [Interview] (December 2011).
RIAI, A. T. T. G., 2010. Standard of Knowledge, Skill and Competence for Practice as an
Architectural Technologist. Dublin: RIAI.
RIBA, 2012. BIM Overlay to the RIBA Outline Plan of Work. London: RIBA.
Technologists, C. I. o. A., 2010. Architectural Technician, TCIAT - Professional and
Occupational Performance (POP) Record - Competencies. London: CIAT.
Thomas, K., 2014. An Education in BIM. Irish Building Magazine, Issue 3.
Trada, 2012. Building Information Modelling. Construction Briefings, Issue 1.
West, R., 2014. An Education in BIM. Irish Building Magzine, Issue 3.
BIBLIOGRAPHY
Brennan, P., 2014. Building with BIM. Irish Building Magazine, Issue 4, pp. 17-27.
Committee, A. (. I., 2012. AEC (UK) BIM Protocal for Autodesk Revit - Additional detail and
enhancements for implementation of the AEC (UK) BIM Protocal for Autodesk Revit users.
2.0 ed. London: AEC.
Committee, A. (. I., 2012. AEC (UK) BIM Protocol - Implementing UK BIM Standards for the
Architectural, Engineering and Construction industry. 2.0 ed. London: AEC.
DePalma, R., 2014. An Education in BIM. Irish Building Magazine, Issue 3.
Earley, M., 2014. Building Information Modelling - Boom, Bang, BIM. Irish Building
Magazine, Issue 2.
Eastman, C., Teicholz, P., Sacks, R. & Liston, K., 2011. BIM Handbook: A Guide to Building
Information Modelling for Owners, Managers, Designers, Engineers and Contractors. 2nd
ed. New Jersey: Wiley.
Gallello, D., 2008. AECbytes. [Online]
Available at: http://www.AECbytes.com
[Accessed 04` November 2014].
Group, B. T., 2013 (a). Scope of Service for Information Management. [Online]
Available at: www.bimtaskgroup.org/scope-of-services-for-information-management/
[Accessed 09 03 2015].
Group, B. T., 2013 (b). Scope of Services for Information Management FAQs. [Online]
Available at: www.bimtaskgroup.ord/scop-of-services-for-information-management-faqs/
[Accessed 09 03 2015].
Magazine, I. B., 2014. An Education in BIM. Irish Building Magazine, Issue 3.
McKenna, T., 2014. An Education in BIM. Irish Building Magazine, Issue 3.
Montague, R., 2013. Innovation in Construction Modelling. Irish Building Magazine,
Nov_Dec, Volume Nov_Dec, pp. 6-7.
Philp, D., 2011. Getting Government BIM-Ready [Interview] (December 2011).
Singh, V., Gu, N. & Wang, X., 2010. A Theoretical Framework of a BIM-based multi-
disciplinary collaboration platform. Automation in Construction, 05 November, pp. 134-144.
Standards, N. B., 2013 (a). National BIM Report, Newcastle upon Tyne: NBS.
Standards, N. B., 2013 (b). BIM and Project Management, Newcastle-upon-Tyne: NBS.
University, A., 2011. BIM tiltles and job Descriptions: How do they fit in your organizational
NOTE: Some items not related to Architectural Technologists have been deleted from original document
STRATEGIC
Overview In relation to each of the learning outcomes below, as a result of following this course, individuals will be expected to:
O1 What is BIM
Understand the principles of Building Information Modelling and its application to the whole life inter‐disciplinary design, construction and use of building and infrastructure developments
O2 BIM Value proposition (context relevant, e.g. clien t and contractor)
Understand the value proposition that BIM offers enabling adopters to more efficiently:
Identify and evaluate stakeholder, user, community and sustainability project requirements
Prepare project briefs and development programmes Assess and manage project risks and opportunities Prepare and present project design recommendations
Assess, plan, estimate and control proposed development energy, whole life and capital costs
Model and analyse production and installation project design solutions Plan and agree detailed project designs Analyse and plan project resources and work processes Establish project work teams and organisational systems Manage project handover guidance, completion and feedback
O3 What is the UK Government requirements from BIM
Understand the Government's requirements regarding the adoption of BIM on public projects in order to:
Identify, assess and agree project requirements and stakeholder preferences
Establish project team partnering Assess and manage project risks and opportunities Build your organisation’s understanding of its market and customers Manage business processes and improve performance
O4 Industry context of BIM adop tion (e.g. peer firms)
Understand the context in which BIM is being introduced into the industry by being able to:
Establish project team partnering Analyse efficient resource use and work processes Map the environment in which the organisation operates
Identify and resource the research and development of new products and services to meet market needs
Plan the development of organisational products, services and processes to meet market needs
O5 Impact to client and supply chain relationships (co llaborative and coordinated)
Understand the impact of BIM on client and supply chain relationships in order to be able to:
Identify, assess and agree project requirements and stakeholder preferences
Establish project team partnering
Implement strategic sourcing partnerships and supply chain arrangements
Analyse efficient resource use and work processes
Establish and maintain project organisation and communication systems
Build your organisation’s understanding of its market and customers
Plan the development of new and innovative operational processes, methods and techniques to meet market needs
Strategic Considerations S1 Strategic issues associated with starting BIM
Understand the strategic issues associated with starting to adopt BIM in order to be able to:
Establish project team partnering
Implement strategic sourcing partnerships and supply chain arrangements
Identify and resource the research and development of new products and services to meet market needs
Plan the development of new and innovative operational processes, methods and techniques to meet market needs
Lead, plan and implement change
S3 Information deliverables; impact on procurement con ditions and skills demands
Understand the changes required by BIM to information deliverables, procurement conditions and skills demands in order to be able to:
Identify, assess and agree project requirements and stakeholder preferences
Select and agree a procurement method with stakeholders Establish project team partnering
Establish and monitor project team working methods Integrate and evaluate project design information Analyse and plan construction project resources and work processes
Establish and maintain project organisation and communication systems
Provide information to support use and maintenance planning of property, systems and services
Manage business processes
Establish, implement and monitor human resourcing and skills development policy
S5 Investment model (up -skilling, systems and process management)
Understand the investment required for BIM up-skilling, systems and process management in order to be able to:
Plan the development of new and innovative operational processes, methods and techniques to meet market needs
Plan and implement change Manage business processes and improve performances Identify collective learning and development needs Establish and set up technical information systems
S6 Organisation stakeholder engagement
Understand the need for engagement of organisational stakeholders in the adoption of BIM in order to be able to:
Build your organisation's understanding of its market and customers Develop the culture of the organisation
Plan the development of new and innovative operational processes, methods and techniques to meet market needs
MANAGEMENT
Overview In relation to each of the learning outcomes below, as a result of following this course, individuals will be expected to:
O1 What is BIM
Understand the principles of Building Information Modelling and its application to the whole life inter‐disciplinary design, construction and use of building and infrastructure developments
Acquiring internal resources A2 Organisation and project applications, and benefits of BIM
Understand the organisational and project applications and benefits of BIM in order to be able to:
Identify and evaluate stakeholder, user, community and sustainability project requirements
Confirm project energy efficiency and carbon minimisation requirements and strategies
Establish arrangements for procurement and management of sustainable projects
Prepare project briefs and develop programmes Induct and brief a project team Assess and manage project risks and opportunities Select, test and refine sustainable design options Prepare and present project design recommendations Assess and advise on capital, energy, whole life and low carbon costs Model and analyse production and installation project design solutions Prepare and agree production and installation information
Agree and implement alignment of systems with partners and supply chain
Analyse and plan project resources and work processes
Establish and maintain project organisation and communication systems
Manage project handover information, completion and feedback
Plan the development of organisational products, services and processes to meet market needs
Improve organisation performance Target and promote products / services effectively Apply information technology to projects Promote the use of technology within the organisation
A3 Visualisation benefits and spatial coordination
Understand the benefits of BIM for visualisation and spatial coordination in order to be able to:
Establish and monitor project team working methods Analyse and present survey data Assess and present spatial data Select, test and refine sustainable design options Prepare and advise on project design recommendations Model and analyse production and installation project design solutions Plan and agree detailed project designs Advise on and refine integrated conservation solutions Integrate the design of fabric, services and systems Measure quantities from design information
Control the assembly of materials, components, systems and finishes to achieve sound construction
Provide information to support use and maintenance planning of property, systems and services
Allocate space and facilities to meet identified requirements Plan and programme work to existing assets
A4 Productivity / Efficiency improvements
Understand the way in which BIM can be adopted to achieve productivity and efficiency improvements by being able to:
Establish and monitor project team working methods
Identify and assess technical, procurement and production factors affecting resource
Select, test and refine sustainable design options Model and analyse production and installation project design solutions Integrate the design fabric, services and systems Evaluate and select work methods
Plan work activities and efficient use of resources to meet project work requirements
Obtain and evaluate project feedback information and make improvements
Manage business processes and improve performance
A5 Sustainable design
Understand the way in which BIM can be adopted to achieve sustainable design by being able to:
Test the sustainability of planning and development strategy and policy options
Assess the environmental needs and impacts of resources, policies and proposals
Investigate and evaluate sustainable development requirements Establish arrangements for sustainable development
Identify and assess technical, procurement and production factors affecting resources
Select, test and refine sustainable design options Model and analyse production and installation project design solutions
A6 Scheduling, Estimating
Understand the way in BIM can be adopted for scheduling and estimating in order to be able to:
Plan and control proposed capital costs Prepare estimates of proposed capital costs Prepare schedules Prepare bills of measured quantities Obtain estimates, bids and tenders
Assess and select successful estimates, bids and tenders and negotiate changes
Assess the resource requirements and costs with an estimate, bid and tender Finalise and submit an estimate, bid and tender offer
Deploy plant and equipment for construction and installation operations
Organise, monitor, maintain and improve supplies of materials to meet project requirements
Control contract progress against agreed programmes Control contract quantities and costs Prepare and agree interim valuations and final accounts Plan and programme work to existing assets Manage work programmes to existing assets
A8 Facilities management
Understand the way in which BIM can be adopted for facilities management by being able to:
Provide information to support use and maintenance planning of property, systems and services
Obtain and evaluate project feedback information and make improvements
Allocate space and facilities to meet identified requirements
Developing Organisational Business Plan D1 Engaging business stakeholders
Understand the need for engagement of business stakeholders in the adaption of BIM in order to be able to:
Build the organisations understanding of its market and customers Develop a customer focused organisation Build and maintain effective customer relations
D3 Gaining commitment
Understand the need for gaining commitment to BIM adoption in order to:
Develop the culture of the organisation Lead change Plan change Manage business processes and improve performance
Managing external requirements
E1 Legal implications and requirements - FOC's, agreements, appointments, SLA's etc.
Understand the legal implications and requirements posed by the adoption of BIM (e.g. FOC's, agreements, appointments, SLA's, procurement, contracts, briefing, etc.) in order to be able to:
Identify, assess and agree project requirements and stakeholder preferences
Establish arrangements for procurement of sustainable projects Assist clients to meet their legal duties
Prepare and present a proposal for a project brief Identify and assess resource use and environmental impact factors Evaluate the benefits and risks of partnership and strategic sourcing
Agree and implement alignment of systems with partners and supply chains
Implement resource efficient procurement processes Prepare and submit estimates, bids and tenders Prepare, negotiate and source contracts Identify, monitor and respond to legal and statutory requirements
E2 Ownership, IP, copyright, design rights, insurances , PII, etc.
Understand the liability implications posed by the adoption of BIM (e.g. Ownership, IP, copyright, design rights, insurances, PII, etc.) in order to be able to:
Implement strategic sourcing partnerships and supply chain arrangements
Prepare, negotiate and source contracts Identify, monitor and respond to legal and statutory requirements
E3 Risk - identifying and managing (risk registers, etc. )
Understand the implications of identifying and managing the risk in the adoption of BIM in order to be able to:
Assess and manage project risks and opportunities
E4 Data deliverables to supply chain; and to clients
Understand the data deliverables for clients and the supply chain required through the adoption of BIM (e.g. COBie, models, etc.) in order to be able to:
Identify, assess and agree project requirements and stakeholder preferences
Prepare and present a proposal for a project brief Induct and brief a project team Establish and monitor project team working methods Select, test and refine sustainable design options Prepare and advise on project design recommendations Plan and control proposed capital costs Prepare estimates of proposed capital costs
Identify the purpose, methods and techniques for preparing detailed designs
Model and analyse production and installation project design solutions Investigate, develop and integrate detailed design solutions Prepare and process applications to secure statutory consents Specify, integrate and control project design information
Prepare drawings and associated graphical information Prepare technical specifications
Prepare bills of measured quantities Obtain estimates, bids and tenders
Assess the resources requirements and costs within an estimate, bid and tender
Finalise and submit an estimate, bid and tender offers Analyse and plan project resources and work processes
Establish and maintain project organisation and communication systems
Coordinate the logistics for work to existing occupied properties Establish and set out dimensional controls Deploy plant and equipment for construction and installation operations Identify and monitor requirements for material supply
Provide information to support use and maintenance planning of property, systems and services
Obtain and evaluate project feedback information and make improvements
Develop and implement property and facilities management plans Monitor and control the use of property and assets Manage work programmes to existing assets Apply information technology to projects
Managing People P1 Impact to internal and external roles
Understand the impact on internal and external roles posed by the adoption of BIM in order to be able to:
Establish project team partnering Establish and coordinate the project development teams and processes Integrate the design of fabric, services and systems Integrate and evaluate project design information
Implement strategic sourcing partnerships and supply chain arrangements
Establish project work teams and organisational systems Map the environment in which your organisation operates Develop the culture of the organisation
Establish, implement and monitor human resourcing and skills development policy
Identify collective learning and development needs Manage and operate technical information systems
P2 Internal stakeholders engagement - strategic, management and technical
Understand the need for internal stakeholder engagement at strategic, management and delivery levels in the adoption of BIM within an organisation in order to be able to:
Develop the culture of the organisation Manage business processes and improve performance Manage and operate technical information systems Provide leadership for your organisation Develop productive working relationships with colleagues Promote the use of technology within your organisation
P3 Collaboration - management of people, communication skills, team working, etc.
Understand the need for collaboration in the management of people, communications and teams in the adoption of BIM within an organisation in order to be able to:
Establish and coordinate the project development teams and process Prepare and agree production and installation information Integrate the design of fabric, services and systems Specify, integrate and control project design information
Agree and implement alignment of systems with partners and supply chains
Monitor and control arrangements for strategic sourcing and supply chain management
Establish and control arrangements for strategic sourcing and supply chain management
Establish project work teams and organisational systems Coordinate the logistics for work to existing occupied properties Co-ordinate site operations
Provide information to support use and maintenance planning of property, systems and services
Manage business processes and improve performances Allocate and check work in your team
Allocate and monitor the progress and quality of work in your area of responsibility
Build and manage teams Develop, maintain and enhance productive working relationships
P4 Communicating the impact and relevance of BIM
Understand the need to communicate the impact and relevance of BIM in its adoption within an organisation in order to be able to:
Induct and brief a project team Establish and monitor project team working methods
Establish and maintain project organisation and communication systems
Develop the culture of the organisation
Plan the development of new and innovative operational processes, methods and techniques to meet market need
Manage business processes and improve performance Provide leadership in the area of responsibility Provide leadership for the organisation Communicate technical information and advice Enable others to learn and benefit from experience Use IT systems and software
P6 Discuss issues associated with starting BIM
Understand the need to openly discuss issues associated with the adoption of BIM within an organisation in order to be able to:
Implement strategic sourcing partnerships and supply chain arrangements
Plan the development of new and innovative operational processes, methods and techniques to meet the market need
Manage business processes and improve performance
Establish, implement and monitor human resourcing and skills development policy
Identify collective learning and development needs Manage and operate technical information systems Use IT systems and software
Managing Process R1 Defining common language; BIM technology
Understanding the need to define the common language and terminology associated with the adoption of BIM within an organisation in order to be able to :
Identify, assess and agree project requirements and stakeholder preferences
Establish project team partnering Establish and coordinate the project development teams and processes
Implement strategic sourcing partnerships and supply chain arrangements
Select and form a project work team
Provide information to support use and maintenance planning of property, systems and services
Plan the development of new and innovative operational processes, methods and techniques to meet market need
Manage business processes and improve performance Manage and operate technical information systems Use IT systems and software
R2 Governance of Information and Process management
Understand the requirements for governance of information and process management with the adoption of BIM within an organisation in order to be able to:
Identify, assess and agree project requirements and stakeholder preferences
Establish project team partnering Establish and coordinate the project development teams and processes
Implement strategic sourcing partnerships and supply chain arrangements
Select and form a project work team
Provide information to support use and maintenance planning of property, systems and services
Plan the development of new and innovative operational processes, methods and techniques to meet market need
Manage and operate technical information Apply information technology to projects
R3 Standards (data and process) - knowledge of and implementation
Understand the implementation of data and process standards (e.g. BS8541, BS1192.2 & COBie, etc.) in the adoption of BIM within an organisation in order to be able to:
Establish and monitor project team working methods
Agree and implement alignment of systems with partners and supply chains
Plan the development of new and innovative operational processes, methods and techniques to meet market need
Manage business processes and improve performance Manage and operate technical information systems Apply information technology to projects
Understanding the principles of interoperability in terms of adherence to standards and managing compliance in the adoption of BIM within an organisation in order to be able to:
Establish project team partnering Establish and monitor project team working methods
Agree and implement alignment of systems with partners and supply chains
Monitor and control arrangements for strategic sourcing and supply chain management
Provide information to support use and maintenance planning of property, systems and services
Manage business processes and improve performance Manage and operate technical information systems
Understanding the hardware, software and network infrastructure requirements in the adoption of BIM within an organisation in order to be able to:
Plan the development of new and innovative operational processes, methods and techniques to meet market need
Manage physical resources Manage business processes and improve performance Manage and operate technical information systems Apply information technology to projects
T3 Software / technology evaluation and selection process
Understand the processes for evaluation and selection of software and technology in the adoption of BIM within an organisation in order to be able to:
Agree and implement alignment of systems with partners and supply chains
Plan the development of new and innovative operational processes, methods and techniques to meet market need
Manage and operate technical information systems Apply information technology to projects
TECHNICAL
Overview In relation to each of the learning outcomes below, as a result of following this course, individuals will be expected to:
O1 What is BIM
Understand the principles of Building Information Modelling and its application to whole life inter-disciplinary design, construction and use of building and infrastructure developments
Tech 1 Identifying project requirements
Understand how to gather, maintain and use BIM data in order to be able to:
Identify and evaluate stakeholder, user, community and sustainability project requirements
Tech 2 Assessing contextual data affecting potential devel opments
Understand how to gather, maintain and use BIM data in order to be able to:
Investigate and assess contextual factors affecting potential project developments
Identify, assess and take account of resource factors affecting potential sustainable project developments
Investigate and assess regulatory and legal factors affecting potential developments
Tech 3 Developing design solutions
Understand how to gather, maintain and use BIM data in order to be able to:
Assess and develop sustainable project design options Prepare and advise on project design recommendations
Assess, plan, estimate and control proposed development energy, whole life and capital costs
Plan and agree detailed project designs
Analyse and model environmentally sustainable project design solutions
Analyse, advise on and support sustainable solutions for historic and heritage assets
Manage health and safety in design Investigate, develop and integrate detailed design solutions Prepare applications and appeals to secure statutory consent
Tech 4 Managing design information
Understand how to gather, maintain and use BIM data in order to be able to:
Specify, integrate and control project design information Prepare drawings, graphical information and schedules Prepare technical specifications Prepare bills of measured quantities
Tech 5 Implementing procurement processes
Understand how to gather, maintain and use BIM data in order to be able to:
Implement resource efficient procurement processes Prepare and submit estimates, bids and tenders Prepare, negotiate and secure contracts
Tech 6 Analysing and planning construction and installation work processes and resources
Understand how to gather, maintain and use BIM data in order to be able to:
Analyse and plan project resources and work processes
Establish project work teams and organisational systems
Tech 7 Coordinating and controlling construction and installations operations
Understand how to gather, maintain and use BIM data in order to be able to:
Establish, coordinate and control construction and installation operations and resources to efficiently meet project requirements
Deploy plant and equipment for construction and installation operations
Organise, monitor, maintain and improve supplies of materials to meet project requirements
Establish and maintain systems for managing site health, safety and welfare
Control project quality, compliance, progress and cost
Tech 8 Managing project handover and facilities informatio n
Understand how to gather, maintain and use BIM data in order to be able to:
Manage project handover information, completion and feedback
Tech 9 Assessing the condition of existing assets
Understand how to gather, maintain and use BIM data in order to be able to:
Advise on and refine integrate conservation solutions Prepare and present asset condition survey reports and records
Tech 10 Assessing the energy performance of buildings
Understand how to gather, maintain and use BIM data in order to be able to:
Assess and certify the energy performance of buildings
Manage, monitor and identify improvements to the energy performance of buildings
Tech 11 Managing the use and maintenance of facilities
Understand how to gather, maintain and use BIM data in order to be able to:
Coordinate the logistics for work to existing occupied properties Develop and implement property and facilities management plans Manage property and asset use Manage and implement work to existing assets
Tech 12 Managing the operating technical information system s
Understand how to gather, maintain and use BIM data in order to be able to:
Establish and set up technical information storage systems
Operate technical information systems Apply information technology to projects