H:\12-0079 Glenrio\Construction\Changes\ASIs\ASI-005.docx Architect’s Supplemental Instructions A.S.I. No.: 008 Project No.: 12-0079 Project: Glenrio Apartments Date: March 28, 2014 Owner: Glenrio Limited Liability Limited Partnership To: Casey Cameron Pavilion Construction 7820 Pan American East FWY NE, Suite 4 Albuquerque, NM 87109 Copies To: Jacob Tonks, Pavilion Construction Frank Fredrickson, Pavilion Construction Zac Hulme, D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Description: 1. Find attached noted list of questions from F. Fredrickson and related documentation 2. Find attached clarified storefront sheet AE-681. Attachments: AE-1-101 20140328, AE-113 20140328, AE-541 20140328, AE-681 20140328, B4 Foundation Plan Sketch_Walla 20140327, GR_IT and Elec rooms at B2 H. peel 20140325, and Glenrio - 20140328_ZTH Requested By: Frank Fredrickson Dekker/Perich/Sabatini
10

Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

Apr 01, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

H:\12-0079 Glenrio\Construction\Changes\ASIs\ASI-005.docx

Architect’s Supplemental Instructions

A.S.I. No.: 008 Project No.: 12-0079

Project: Glenrio Apartments

Date: March 28, 2014

Owner: Glenrio Limited Liability Limited Partnership

To: Casey Cameron

Pavilion Construction

7820 Pan American East FWY NE, Suite 4

Albuquerque, NM 87109

Copies To: Jacob Tonks, Pavilion Construction

Frank Fredrickson, Pavilion Construction

Zac Hulme, D/P/S

D/P/S File

The Work shall be carried out in accordance with the following instructions issued in accordance with the Contract

Documents without change in Contract Sum or Contract Time.

Description:

1. Find attached noted list of questions from F. Fredrickson and related documentation

2. Find attached clarified storefront sheet AE-681.

Attachments: AE-1-101 20140328, AE-113 20140328, AE-541 20140328, AE-681 20140328, B4 Foundation Plan Sketch_Walla

20140327, GR_IT and Elec rooms at B2 H. peel 20140325, and Glenrio - 20140328_ZTH

Requested By:

Frank Fredrickson

Dekker/Perich/Sabatini

Page 2: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

Glen Rio

Preliminary plan review questions per Superintendent

12/24/13

1. Please provide cross section at the gravel trench that runs through the foundations resolved

2. Where is SD#5 located?(storm drain) resolved 3. AE-3-101 please define the paver system and where it is located. resolved 4. Where all fire extinguisher locations at the community areas? ASI#3.1 5. What are the garage door heights? ASI#8 (AE-113 20140328) 6. A3-222/A1 Clarify beam detail. (recommend blocking on top of beam) See

B5/AE-421- sheathe beam and blocking cont. 7. A3-222/B1 Interior elevations….Provide elevations and dimensions for all ADA

Hardware community areas included. (some dimensions/measurements missing) ASI#3.1

8. Are we required to use off-set sinks at ADA kitchens (if so; specify model?)? ASI#3.1

9. Flooring decision. Per plan? (I heard no carpet) resolved 10. AE-421/A6 is the stucco system design with 1” foam as per plan?/Transition to

foundation foam? resolved 11. AE-421/C5 Dimension the metal detail? Provide front elevation with

dimensions (side to side) ASI#3.1 12. Could we include yellow steel embed tread cap at the CC stair treads? resolved 13. Buy-out elevator design resolved 14. Detail pool drainage piping in pool equipment room resolved

a. Where to locate pipe b. What size?(6”recommended) c. Tie to SWS NE of pool room?

15. Satellite dish detail at the roof/individual piping to units. Did not work like that at SI project. Please clarify piping requirements. ASI#8 (AE-541 20140328)

16. Please provide parapet vent detail. Cross section & elevation (who owns?) ASI#8 (AE-541 20140328)

17. AE-581/A4 exposed wood? Shown at CC transition a. Could we use the adjustable door thresholds? Re: San Isidro project.

Adjustable thresholds are acceptable 18. EE-001. Coordinate switchgear size with the plan location to see if it fits. ASI#8

(AE-1-101 20140328) 19. Please detail from stucco finish to metal siding finish. (include metal at

coping/parapet cap) ASI#3.1 20. Size transformer pads to fit the civil engineer drawing locations resolved 21. Cable contract resolved 22. PNM contract resolved

Page 3: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

23. NM gas contract resolved 24. Property man gates locations/detail (egress requirements?) ASI#3.1 25. What is parking stripe spacing? (ties to carport submittal) ASI#3.1 26. Bldg. 2 electric path to north garage does not follow path to “electrical room”

per plan (is there a reason for this?) ASI#3.1 27. EE-212 Detail where telecom room is per building. Define that all pre-wire

cable runs to that location. (if all three floors are used….define to provide backing/grounding at all locations for cable equipment ASI#8 (GR_IT and Elec rooms at B2 H. peel 20140325)

28. EE-212 clarify design options at light bollard details. 6 foot deep hole does not always work with designs. ASI#3.1

29. MP-001 what trades scope is to provide Base board heaters resolved 30. ME1-001 Gas meter location does not match utility plan. Clarify? resolved 31. ME1-001 SD Drains at building atriums(used? Or not?(no piping detailed)

resolved 32. ME1-001 Elevator room -detail notes 38, 11, 37 resolved 33. Clarify/define ac/heat exchanger soffit height. Provide detail for required fire

blocking at all locations needed. resolved 34. C-101 does NE detention pond over-flow across side-walk and towards parking

lot? Is there ADA concerns with water over accessible sidewalk. Acceptable to have as crusher fines given designed flow rates, if paving is desired a sidewalk culvert will be required, per S. Mcgee.

35. C-101A SE side of building 4 appears to be possible hole/retention for site drainage ASI#8 (G B4 Foundation Plan Sketch_Walla 20140327)

36. Would water/mop sink be advised at the north Maintenance room/garage? resolved

01/01/14Questions

1. Site fencing lay-out? ASI#3.1 2. Phasing plan? These plans specifically show entire project as one phase. If

acceptance of first building for occupancy is desired…..this needs to be addressed ASI#3.1

a. What requirements needed at first phase for occupancy? 3. Clear window/SGD install contract resolved

a. Screen install? b. Final adjustment? c. Hardware install?

4. Electrical contractor/architect needs to be required to provide clear site utility/feeder/ Temp power lay-out (per-construction) plan…it is not productive/effective to field design. resolved

5. Individual unit water meters? ASI#8 (Acceptable per H. Peel 20140326) 6. Is there any colored CC on-site? resolved

Page 4: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

7. Building perimeter flashing details conflict…Clarify (lower patios included) resolved

8. Sump pump at elevator: drain to building exterior or to SWS? resolved 9. Shade structure design/detail? ASI#3.1 10. Civil detail re: city street/sidewalk intersection See Public Work Order 11. Civil detail re: sewer tie-in, SD tie-in, water tie-in(taps available?) See Public

Work Order 12. Clear detail re: unit (vertical) separation requirements. Include all floors,

attic space, penetrations, fire blocking shown on detail(with notes(unit specific if soffits apply)) resolved (ASI#3)

13. Clear plumbing detail at free standing kitchen walls/islands with all utilities noted, routed and defined. ASI#3.1

14. Clear/defined detail at counter-tops where pony-walls/end walls at counter-top ends. Both sides. (elevations with notes) resolved (ASI#3)

15. ADA under-counter pipe wrap detail(include garbage disposal(include community areas)) resolved

16. Detail pre-wire to gates, doors, access, fitness room, pool access to be controlled from single location at community area/office(recommended) resolved

17. Security pre-wire for community areas? (recommended) 18. Stucco color/colors (detail elevations)? resolved 19. Architect to coordinate and detail Stucco control joints at manufacturer

recommended locations. (provide final elevation with details) Stucco Submittal

20. Do tree size/locations encroach upon HUD requirements at mature growth? (REVISE IF CONFLICTING) ASI#3.1

21. Specify tamper switches at hot boxes where required. ASI#3.1 22. Clear stucco detail with cross elevation (which system are we using?(detail

window/door elevation with waterproofing to clarify(specifically window stucco flange depth detail))) resolved

23. Garage door trim/return detail resolved (ASI#3) 24. Is garage roof required to be vented ( are parapets sufficient to

accommodate?(detail)) ASI#8 (AE-541 20140328) 25. Pool room boiler venting route? Coordinate w/ pool sub (submittal) 26. Switches at roof-top/breezeway areas labeled and defined resolved

1.14.14

1. Discrepancy between drawings for extent of gypsum wallboard at breezeway and demising wall. ASI# 3

2. Asphalt at heavy traffic areas – coordinate with geotech? has this been resolved?

Page 5: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

30x48

30x48

30x48

30x48

UPUP

WH

UPUP

D5

AE-1-201

C5

AE-1-201

B5

AE-1-202

Unit 2B

1103Unit 1B

1104

Unit 1B - Type A

1106

Unit 2B

1109

Unit 3A

1110

ELEVATOR

1113

Unit 2B - Type A

1115

Unit 3A

1116

ELEV RM

1117

Unit 2B

1118

Unit 2B

1119

Unit 2B

1120

Unit 2B

1121

Unit 1B

1122

Unit 1B

1123

Unit 1B

1124

Unit 3A

1125

Unit 2B

1126

Unit 2B

1127

13'-5 1/8" 9'-3"3'-8 1/8" 3'-5 3/8"

9'-1 3/8" 13'-5 1/8" 12'-3 1/2" 13'-5 1/8" 9'-1 3/8"3'-8 3/8" 3'-8 3/8"

9'-1 3/8" 13'-5 1/8" 12'-9 1/8" 9'-5"3'-7 3/8" 3'-7 1/4"

9'-5" 12'-9" 9'-1" 3'-10 5/8" 13'-4 1/2"

4' - 6 1/8" 4' - 4 3/8" 4' - 4 7/8" 4' - 4 7/8" 4' - 6"

12' - 2 1/2" 11'-1 3/4" 11'-2" 12'-3 1/2" 11'-2 1/2" 11'-2 1/4" 12' - 3 1/2" 11'-4 3/4"

2'-5 1/2"

12'-2" 11'-4 3/4"

12'-1 3

/4"

9'-9 1

/2"

3'-4 1

/4"

13'-5 3

/4"

25'-5 1

/2"

11'-2 1

/4"

12'-3"

34'-5"

143'-0 1/2"

6'-6 3/4"4'-6 1/4"

4'-6 1/4" 7'-0" 4'-8 1/2" 4'-6" 4'-6" 6'-8 1/2" 4'-6" 7'-0"

13'-5" 9'-2 1/2"

3'-7 3/8" 3'-7 1/8"

9'-2 3/4" 13'-5 1/8" 12'-9" 9'-4"

3'-8 1/4" 3'-8 3/8"

9'-1 1/2" 13'-5" 12'-7" 9'-1 3/4" 3'-5 1/2" 13'-4 1/2"

5'-0"

4'-6"

6'-8"

6'-3 1

/2"

5'-2 3

/4"

4'-5 1

/2"

4'-5 1

/2"

5'-0"

6'-8"

4'-7"

4'-7"

6'-8"

4'-0"

1'-9 1

/2"

9'-8 1

/2" 4'-2 1

/2"

6'-7" 6'-5" 6'-9 1/2" 6'-5 1/2"

4'-2 1

/2"

4'-2 1

/2"

6'-1" 4'-9 1/4" 4'-9" 7'-1"4'-5 3/4" 4'-6"

4'-2 1

/2"

4'-2 1

/2"

4'-2 1

/2"

6'-6"

4'-2 1

/2"

4'-2 1/2"

12'-7"

13'-4 1

/2"

9'-3 1

/2"

3'-6 1

/4"

3'-6 1

/4"

9'-3 5

/8"

13'-5 1

/8"

12'-1 1

/4"

9'-10 1

/8"

3'-10"

3'-5 1

/2"

9'-10"

12'-6 3

/8"

13'-5 1

/8"

6'-0"

43'-4"

10'-5"

17'-9 3/4" 15'-1 1/2"

6'-0"

EQ

EQ

6'-0"

6'-0"

1'-4"

4'-5 1/2"

4'-5 1/2"

4'-2 3/4"

4'-2 3/4"

92'-8"

11'-1 3/4"

EQ EQ

43'-4"

6'-0"

43'-4"

4'-2 1

/2"

AE-451

A5

AE-451

A2

STAIR 01

1128

STAIR 02

1129

AE-451

A3

3'-5 1

/4"

11'-1 3

/4"

11'-2"

6'-8 1

/2"

3'-8"

11'-4 1

/2"

11'-1 3/4"

13'-1 3

/4"

A

C

C

A

A

C

D

D

A A

C

A A

C C

A

D

A

C

C

AA

A

C

C

C

C

EQ

EQ

EQ

EQ

TEL / IT

1468

FIRE RISER

1471

P1

W4

111811171116

1114

1113

1119

1120

1115

1121

P1

W3

W1

W1

W1W1

W1

P1

P1

P1P1

P1

P1

P1

P1

P1

P1

P1

P1

W1W4

W1W1

W1

W1

W1W4

W1

W4W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W4

W1

W4 W4

W1

W1

W4

W1

W1

W1

W1

W1

W1

W1

W1

W1

W4

W1

W1

W1

W1W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1 W4

W1

W4 W1

W1

W1

W1

W1

W1

W4

W1

W1

W1

W1

W1W1

W1

W1

P1

P1

W3

W1

W1

W1

W1

W1

W1 W1

W1

W1

W1

W1

W1

W1

W3

W1

W1

W1

W1

W3

W3

W4

W4

W1

W4

W1

W1

W1

W3

W3

W3 W3

W3

W4W1

W1

W1

W1

W1

W1

W1

W1

W1

W3

W1

W3

W1 W1W1 W1

W1

W1

W3

W1W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1

W1W1

W1

W1

W1

W1

W1

W1

W1

W1

4'-0" 4'-0"

POOL ROOM

POOLMECHANICAL

ELEC.

C

D

C

P3AP3

W4 P3A

P3A

W1

P3

P3A

7'-0"

A

1'-9 1

/2"

EQ

EQ

C

EQ EQ

9'-8 1

/2"

D

9'-7 3

/4"

D

8'-6 1/2"

1"

/ 1

2"

17'-9"

W1

RA

MP

DN

EQ EQ

C

B

11'-0"

PATIO

PATIO

PATIO

PATIO

PATIO PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO

PATIO PATIO PATIO

PATIO

PATIO

PATIO

S105

A4

AE-322

A3

AE-322

A2

AE-322

A1

AE-322

A3

AE-321

Sim

A4

AE-321

Sim

A2

AE-321

Sim

A3

AE-322

Sim

C

C

2'-9 1/4"

2'-0"4'-2 1

/2"1'-8 1

/2"

1

2

1

11

3

4

5

3

4

5

3

5

4

3

4

5

6

6

6

6

AE-451

A5

A1

AE-321

Sim

12'-11 5/8"

21'-11 3

/8"

13'-5 1

/8"

22'-4 3

/8"

7'-2 1/2"

25'-11"

4"

METER BANKS ANDDISCONNECTS, VERIFYLOCATION W/ ARCHITECT

4"

5'-6"

4"

23'-4"

4"

2

Patio Deck andSlab

2

KEY PLAN

NO

RT

H

GENERAL SHEET NOTES

A. DIMENSIONS ARE TO THE FACE OF STUD UNLESS NOTEDOTHERWISE.

B. EXTERIOR WALLS ARE TYPE W1 UNLESS NOTED OTHERWISE.C. SEE CIVIL GRADING PLAN FOR FINISH FLOOR ELEVATIONS.D. REFER TO SHEETS AE-401 THORUGH AE-404 ENLARGED PLANS FOR

DWELLING UNIT DOOR TYPES.E. PROTECT PENETRATIONS OF FIRE-RESISTIVE RATED WALLS,

FLOOR/CEILING, AND ROOF/CEILING ASSEMBLIES PER IBC-2009.F. DWELLING UNITS IN THIS BUILDING ARE TYPE B PER ANSI-A117.1 2006

EXCEPT WHERE NOTED AS TYPE A.

KEYNOTES

LEGENDWALL / PARTITION TYPES

1 4

3 2

EXTERIOR WALL (LOAD-BEARING)1-HR RATED #UL 356PORTLAND CEMENT PLASTER (STUCCO) SYSTEM OVER STRUCTURALSHEATHING ON ONE SIDE OF 2X6 STUDS (SEE STRUCTURAL FOR STUDSPACING) WITH KRAFT FACED GLASS-FIBER BLANKET INSULATION.5/8" TYPE "X" GYPSUM BOARD ON INTERIOR.

1i

1i

W1

W2EXTERIOR WALL (NON-LOAD-BEARING)PORTLAND CEMENT PLASTER (STUCCO) SYSTEM OVER SHEATHINGON ONE SIDE OF 2X4 STUDS.

1iW3EXTERIOR WALL (NON-LOAD-BEARING)PORTLAND CEMENT PLASTER (STUCCO) SYSTEM OVER SHEATHINGON BOTH SIDES OF 2X6 STUDS AT 16" O.C.

INTERIOR PARTITION (DEMISING)1-HR RATED #UL 309ONE LAYER 5/8" TYPE "X" GYPSUM BOARD WITH RESILIENT CHANNEL ONONE SIDE OF STAGGERED 2X4 STUDS (SEE STRUCTURAL FOR STUDSPACING). UNFACED GLASS-FIBER BLANKET INSULATION CONTINUOUS.ONE LAYER 5/8" TYPE "X" GYPSUM BOARD ON OPPOSITE SIDE OF STUDS.

INTERIOR PARTITION (LOAD-BEARING)1-HR RATED #UL 305ONE LAYER 5/8" TYPE "X" GYPSUM BOARD ON EACH SIDE OF 2X6 STUDS AT16" ON CENTER.NOTE: PROVIDE UNFACED GLASS-FIBER BLANKET INSULATION ATBATHROOM WALLS.

INTERIOR PARTITION (NON-LOAD-BEARING)ONE LAYER 5/8" GYPSUM BOARD ON EACH SIDE OF 2X4 WOOD STUDS AT16" ON CENTER.NOTE: PROVIDE UNFACED GLASS-FIBER BLANKET INSULATION ATBATHROOM WALLS.

1i

1i

1i

P1

P2

P3

1iP3A

2X6 WOOD STUDS1iP3B

ONE LAYER OF 5/8" GYPSUM BOARD ON ONE SIDE OF 2X4 STUD

1iW4

EXTERIOR WALL (LOAD-BEARING)PORTLAND CEMENT PLASTER (STUCCO) SYSTEM OVER STRUCTURALSHEATHING ON ONE SIDE OF 2X6 STUDS (SEE STRUCTURAL FOR STUDSPACING) WITH KRAFT FACED GLASS-FIBER BLANKET INSULATION.TWO LAYERS OF 5/8" TYPE "X" GYPSUM BOARD ON INTERIOR.

1iW5

EXTERIOR WALL (LOAD-BEARING)ONE LAYER OF 5/8" TYPE "X" GYPSUM BOARD ON EXTERIOR OF 2X6STUDS (SEE STRUCTURAL FOR STUD SPACING) WITH KRAFT FACEDGLASS-FIBER BLANKET INSULATION. TWO LAYERS OF 5/8" TYPE "X"GYPSUM BOARD ON INTERIOR.

001

DOOR NUMBER

W1WALL/PARTITION TYPE TAG

X WINDOW TAG

S00 STOREFRONT TAG

ROOM NAME

ROOM NUMBERROOM TAG

UNIT TYPE

PAVER SYSTEM

RONAL D A.P

RADE

IGER

ETSR

T

N

WI

o. 52

EH SR

EHC

TI

CT

20

OO N

TS

ENFOETAMW

XE

CO

I

ARCHITECT

ENGINEER

PROJECT

REVISIONS

DRAWN BY

REVIEWED BY

DATE

PROJECT NO.

DRAWING NAME

SHEET NO.

u

@

af x

spd

blA

05 5

uS ti67 10

7 6 1 4 2 22

d sp sed gi

-

. o r gn

reuq Nuq ,e

67 -1 9 7 00

1e 0 0

M 0178 9

J sfe f e r no N E

alp inn ng

gne eni gnire

ha rc

i tn

ti

e r i o rs

uec t re

nal csd epa

DATE DESCRIPTION

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

3/2

8/2

014 1

0:3

3:0

3 A

M

AE-1-101

BUILDING 1 LEVEL1 FLOOR PLAN A

12-0079

07/31/13

RAW

ZTH

GLE

NR

IO A

PA

RT

ME

NT

SG

LE

NR

IO R

D. N

W A

ND

72N

DS

T A

LB

UQ

UE

RQ

UE

NM

87121

CONSTRUCTIONDOCUMENTSFOR REVIEW

07/31/13

1/8" = 1'-0"A1 LEVEL 1 FLOOR PLAN A - BUILDING 1

NO

RT

H

1 CONCRETE WALKWAY, 4" THICK WITH 6X6 W.W.F., SEED4/AE-421

2

3 4" DIAMETER PVC VENT PIPE TO ROOF

4 PERFORATED PVC PIPE

5 10 MIL VAPOR BARRIER

6 4'X2' GRAVEL FILLED TRENCH

1 2.19.14 DIMENSION REV'S

2 3/28/14 ASI#8

1

Page 6: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

GENERAL SHEET NOTES

SHEET KEYNOTES

WALL/PARTITION TYPES

A. ALL DIMENSIONS ARE TO FACE OF STUD UNLESS NOTED OTHERWISE.B. REFER TO SHEET AE-661, AE-681 FOR DOOR, WINDOW, AND FRAMETYPES.C. REFER TO ENLARGED UNIT PLANS ON SHEETS AE-401,402,403, AND 404 FORROOM DIMENSIONS, DOOR TYPES, AND INTERIOR PARTITION TYPES.D. REFER TO CIVIL SHEETS FOR TOP OF SLAB ELEVATIONS.E. PROTECT PENETRATIONS OF FIRE-RATED WALLS AS REQUIRED BY IBC-2009.F. EXTERIOR WALLS ARE TYPE W1 UNLESS NOTED OTHERWISE.

LEGEND

KEY PLAN

6' - 2" 5' - 9 1/2" 6' - 0 1/2" 5' - 9 1/2" 6' - 0" 5' - 9 1/2" 6' - 0" 5' - 9 1/2" 6' - 0" 5' - 9 1/2" 6' - 0"

150' - 0"

5' - 9 1/2" 6' - 1" 5' - 9 1/2" 5' - 11 1/2" 5' - 9 1/2" 6' - 1" 5' - 9 1/2" 6' - 0" 5' - 8 1/2" 6' - 0 1/2" 5' - 9" 8' - 8" 8' - 9" 2' - 3 1/2"

24' -

0"

3 TYP.

GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE MAINTENANCEROOM

C3

AE-323

D2

AE-323

Sim

118' - 6 1/2"

5' - 8 1/2"6' - 1"5' - 9"6' - 0 1/2"5' - 9"6' - 0 1/2"5' - 9"6' - 0 1/2"5' - 9"6' - 2 1/2"5' - 9"5' - 10 1/2"5' - 9"6' - 0 1/2"5' - 9"6' - 1"5' - 9"6' - 0 1/2"5' - 9"6' - 2 1/2"

23' -

6 1

/2"

GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE

3

D2

AE-323

Sim

102' - 3 1/2"

5' - 8 1/2" 6' - 1" 5' - 9" 6' - 0 1/2" 5' - 9" 6' - 0 1/2" 5' - 9" 6' - 0 1/2" 5' - 9" 6' - 0 1/2" 5' - 9" 6' - 0 1/2" 7' - 6" 6' - 9 1/2" 6' - 6" 10' - 4"1A

AE

-113

GARAGE GARAGE GARAGE GARAGE GARAGE GARAGE GARAGEH.C.

ACCESSIBLE

GARAGEH.C. VAN

ACCESSIBLE

C1

AE-323

D5

AE-323

SimD2

AE-323

Sim

31' - 3"

23' -

6 1

/2"

8' - 10 1/2"5' - 0" 5' - 0"11' - 3"

3

LEVEL 1100' - 0"

GARAGE PARAPET111' - 3"

8' -

2"

MIN

. V

ER

TIC

AL

CE

LA

RA

NC

E A

T H

/C

GA

RA

GE

S

7' -

0"

ST

AN

DA

RD

GA

RA

GE

S

3

1/4

" / 12"

12

33

C1

AE-323

1/4

" / 12"

150' - 1"

3 2 4

24' -

2"

C3

AE-323

1/4

" / 12"

118' - 8 1/2"

24' -

2"

3

4

RONAL D A.P

RADE

IGER

ETSR

T

N

WI

o. 52

EH SR

EHC

TI

CT

20

OO N

TS

ENFOETAMW

XE

CO

I

ARCHITECT

ENGINEER

PROJECT

REVISIONS

DRAWN BY

REVIEWED BY

DATE

PROJECT NO.

DRAWING NAME

SHEET NO.

u

@

af x

spd

blA

05 5

uS ti67 10

7 6 1 4 2 22

d sp sed gi

-

. o r gn

reuq Nuq ,e

67 -1 9 7 00

1e 0 0

M 0178 9

J sfe f e r no N E

alp inn ng

gne eni gnire

ha rc

i tn

ti

e r i o rs

uec t re

nal csd epa

DATE DESCRIPTION

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

7.31.13

3/2

8/2

014 1

1:4

9:0

6 A

M

AE-113

GARAGE FLOORPLANS

12-0099

5.1.2013

Approver

Author

GLE

NR

IO A

PA

RT

ME

NT

SG

LE

NR

IO R

D. N

W A

ND

72N

DS

T A

LB

UQ

UE

RQ

UE

NM

87121

CONSTRUCTIONDOCUMENTSFOR REVIEW

1/8" = 1'-0"D5 GARAGE 1 - 11 GARAGES & MAINTENANCE

1/8" = 1'-0"5D GARAGE 2 - 10 GARAGES

1/8" = 1'-0"5B GARAGE 3 - 8 GARAGES (2 HC)

1 GALVANIZED STEEL GUTTER

2 TPO ROOFING; SLOPE 1/4" PER FOOT TOSCUPPER.

3 GALVANIZED SHEET METAL DOWNSPOUT

4 WOOD FRAMED CRICKET; SLOPE 1/4" PERFOOT MINIMUM.

1/8" = 1'-0"1A TYP. GARAGE ELEVATION

1/8" = 1'-0"5A ROOF G3 - 8 GARAGES (2 HC)

1/8" = 1'-0"5E ROOF GARAGE 1 - 11 GARAGES & MAINTENANCE

1/8" = 1'-0"5C ROOF GARAGE 2 - 10 GARAGES

3 3.28.14 ASI#8

Page 7: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

TPO BONDING ADHESIVE

TPO MEMBRANE

CONTINUOUS BEAD OFTPO GP SEALANT (TYP.)

TPO PRIMER

5" FLEXIBLE FLASHING CENTEREDOVER EDGE OF SCUPPER FLANGE

CONTINUOUS BEAD OFWATERBLOCK

APPROPRIATE FASTENER 4" O.C.MAX

WELDED METAL SCUPPER SLEEVE

CONTINUOUS BEAD OFTPOGP SEALANT ORHIGH-GRADEURETHANE SEALANT ALLAROUND

9" FLEXIBLE FLASHINGCENTERED OVER 5"FLASHING ATBASE OF SCUPPER ONLY

1-1/4" HOT DIPPEDGALVANIZEDROOF NAILS 4" O.C. MAX

5" FLASHING CENTEREDOVEREDGE OF SCUPPER SLEEVE

DECKING

TPO MEMBRANE

TPO BONDINGADHESIVE

WALL SYSTEM

FRONTVIEW

SIDEVIEW

ATTACH TO CONC FLOORw/ 3/8" DIA x 4" EXPANCHORS w/ WASHERS

WIT

HO

UT

INT

ER

ME

DIA

TE

SU

PP

OR

T

1'-6"

ROOF

1/8" MOLDEDPOLYURETHANE SAFETYCAPS

EQUALLY SPACED RUNGS,TYP.

1'-6" WIDE STL. LADDER WITH4" X 3/8" RAILS WITH 3/4"RUNGS WITH ANTI-SLIPCOATING, GRIND ALL WELDSSMOOTH. PRIME AND PAINT.

METAL STUD WALL

2x6 BLOCKING @INTERMEDIATE SUPPORTBRACKETS TYP.

10"MAX

AS

NE

ED

ED

15'-0"

MA

X

12"

MA

X

12"

MA

X.

ROOF

-

CONTINUOUS BEAD OF

1-1/4" HOT DIPPED GALVANIZEDROOF NAILS 4" (101.6 mm) O.C. MAX

FIRESTONE INSULATION

WALL

SUBSTRATE

4" (101.6 mm) O.C. MAX

FIRESTONE WATERBLOCK(SEE NOTES)

ULTRAPLY TPO MEMBRANE

SCUPPER SLEEVE

STEP #1

STEP #2

APPROPRIATE FASTENER

USE APPROP.BASE TIE-INDETAIL

(SEE NOTES)

USE APPROPRIATETERMINATION

WELDED METAL

5" QUICKSEAMFLASHING

(SEE NOTES)

WOOD NAILER

FIRESTONE INSULATION

WALL

SUBSTRATE

SECOND PLY

FIRST PLY

SECOND PLY

CENTERED OVEREDGE OF METALFLANGE

2" (50.4 mm)

2" (50.4 mm)

CENTERED UNDER NAILS. FASTEN METAL SCUPPER WITHAPPROPRIATE FASTENERS AND ROUND ALL CORNERS OF SCUPPER.

3.

STEP #2 - STRIP IN ALL EXPOSED EDGES OF SCUPPER AS INDICATED2.WITH 5" QUICKSEAM FLASHING STARTING WITH SIDES OF SCUPPER.

USE ULTRAPLY TPO QUICKPRIME TO CLEAN AND PRIME TPO MATINGSURFACES PRIOR TO INSTALLATION OF QUICKSEAM PRODUCTS.

1. STEP #1 - APPLY CONTINUOUS BEAD OF FIRESTONE WATERBLOCK

4. SCUPPER MUST BE WELDED METAL SLEEVE WITH3" (76.2 mm) FLANGE.

8"

8"

DOWNSPOUT

ATTACH WITH #10 x 1/2"SHT MTL SCREWS

SEAL ALL JUNCTURES

8" WIDE x 24 GAGEGALV SHEET METALDOWNSPOUTLEADER, SOLDER ALLJOINTS & PAINT

SEALANT, ALLAROUND, TYPICAL

SINGLE-PLYMEMBRANEROOFINGSYSTEM

LAP ROOF MEMBRANE

RE: STRUCTURAL

REFER TOBUILDINGPLANS FORWALL TYPE

2"

2"

2"

OVERFLOW HOLE

T.O. PARAPET

RE; BUILDING ELEVATIONS

3/4"

8" M

INIM

UM

WRAP BEAM BOTTOM WITH 26GAUGE GALVANIZED SHEETMETAL EXTEND 2" VERTICALON EACH SIDE

STUCCO STOP WEEP SCREED

BEAM; REF. STRUCTURAL

STUCCO FINISH OVERO.S.B. SHEATHING

ROOFING SURFACE

MAINTAIN MINIMUM CLEAR OPENING BELOWPARAPET TO ALLOW FREE DISCHARGE OFROOF DRAINAGE TO DESIGNATED SCUPPERLOCATIONS; RE. ROOF PLAN

TIE WALL TO BEAM WITH FULLPANEL OF SHEATHING

REAR FACE FASTENERS, 12" (304.8mm)O.C.

UNA-EDGE COPING ANCHOR CLIP

WOOD NAILER

SINGLE-PLY MEMBRANE ROOFING

(SEE NOTES)

1-3/4" 5d STAINLESS STEEL RING SHANKNAILS AT 8" (101.6 mm) O.C. MAX.

1-3/4" 5d STAINLESS STEEL RING SHANKNAILS AT 24" (304.8 mm) O.C. MAX.

UNA-EDGE COPING SYSTEM6" MAX FACE (SEE NOTES)

6" M

AX

3" F

IXE

D

COUNTERFLASHING

ROOFING MEMBRANE OVERTREATED WOOD NAILER,FASTENED AT 12" OC

STEEL ANGLE, RE: STRUCT

ROOF LADDER,RE: DETAIL C2/AE-541-D

GASKET (ALL AROUND COVER)

SLAM HATCH

COVER LINER

ARM GUIDE BRACKET

69.9

97°

HOLD OPEN ARM WITHNYLON ROLLER

LOCK STRIKE ANDPADLOCK HASP

ROOF SYSTEM

HINGE

VINYL GRIP

FIBERGLASS COVERINSULATION

COVER

INSIDE & OUTSIDE HANDLESWITH PADLOCK HASPS

NEOPRENE GASKET

(CORNERS FULL WELDED)

FLASHING

SIDE VIEWPLAN

AS SPECIFIED

AS

SP

EC

IFIE

D

NOTE: COORDINATE JOISTSPACING TO CLEAR LADDERAND ROOF HATCH

11

"

5"

ROOF FLASHING SYSTEM

PIPE PORTAL CURB

PIPE PORTAL COVER

EPDM RUBBER PORTAL CAP

MECHANICAL UNIT LINESSTAINLESS STEELCLAMPING RING

SEALANT

SEALANT

SINGLE PLY ROOFMEMBRANE SYSTEM

RECOVERY BOARD

ROOF DECK; REFERTO STRUCTURAL

2X BLOCKINGBEETWEENROOF TRUSSES.

4" IMCWEATHER HEAD

FLASHING

4" IMC

4" CONDUIT STRAP SECUREDTO 2X BLOCKING

NOTE: ROUTE CABLESFROM SATELLITE DISHESMOUNTED ON BALLASTEDSYSTEM, BY OTHERS

ROUTE CONDUIT TOIT ROOM, (1)CONDUIT, TYP. EACHFLOOR OF BUILDIUNG

FIELD FABRICATED

PRE-MOLDED QUICKSEAM PIPE FLASHING

METAL HOOD BY

SUBSTRATE SUBSTRATE

RO

UN

D P

EN

ET

RA

TIO

N

ULTRAPLY TPO QUICKPRIME

STAINLESS STEELCLAMPING RING

3" (76.2mm)

OTHERS (OPTIONAL) (SEE NOTES)

CONTINUOUS BEADOF ULTRAPLY TPOGP SEALANT

CONTINUOUS BEAD OFULTRAPLY TPO GP SEALANT

FASTENER AND PLUS SEAM PLATE AT 12"

CONTINUOUS BEAD OFAP SEALANT OR HIGH

GRADE SEALANT

WELDED SPLICE2" MIN.

TPO FLASHING

FASTENER AND HD PLUSSEAM PLATE AT 12" O.C. MAX

TPO FLASHING(UNSUPPORTED)

TPO BONDING ADHESIVE

STAINLESS STEEL CLAMPING RING

CONTINUOUS BEAD OFTPO GP SEALANT

1/2" - 3/4" TPO BONDINGADHESIVE

TPOMEMBRANE

1/2"

- 1

"

RO

UN

D P

EN

ET

RA

TIO

N

8" MIN

.

SUBSTRATE SUBSTRATE

ATTIC VENT, SEE ROOF PLANSAND MECHANICAL DRAWINGSFOR TYPE AND LOCATION

SLEEVE WITH INTEGRATEDDECK FLANGE ANDFLASHING SET I BED OFMASTIC

ROOFING

ROOF SHEATHINGPER STRUCTURAL

TAPERED EXPANDEDPOLYSTYRENE CAP.

SELF ADHERING FLEXIBLEFLASHING. LAP OVER WEATHERRESISTIVE BARRIER BEYOND ANDNAILING FIN AT THIS LOACTION

6"X14" PARAPET VENT WITH BUG SCREEN

SCREED STUCCO TO VENT EDGE

WEATHER RESISITVE BARRIER,TUCK UNDER NAILING FIN

MAINTAIN CLEAR AREAFOR FREE AIR FLOW

RONAL D A.P

RADE

IGER

ETSR

T

N

WI

o. 52

EH SR

EHC

TI

CT

20

OO N

TS

ENFOETAMW

XE

CO

I

ARCHITECT

ENGINEER

PROJECT

REVISIONS

DRAWN BY

REVIEWED BY

DATE

PROJECT NO.

DRAWING NAME

SHEET NO.

u

@

af x

spd

blA

05 5

uS ti67 10

7 6 1 4 2 22

d sp sed gi

-

. o r gn

reuq Nuq ,e

67 -1 9 7 00

1e 0 0

M 0178 9

J sfe f e r no N E

alp inn ng

gne eni gnire

ha rc

i tn

ti

e r i o rs

uec t re

nal csd epa

DATE DESCRIPTION

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

3/2

8/2

014 1

0:3

3:1

1 A

M

AE-541

ROOF DETAILS

12-0079

07/31/13

RAW

AAA

GLE

NR

IO A

PA

RT

ME

NT

SG

LE

NR

IO R

D. N

W A

ND

72N

DS

T A

LB

UQ

UE

RQ

UE

NM

87121

CONSTRUCTIONDOCUMENTSFOR REVIEW

07/31/13

3" = 1'-0"B5 DETAIL @ SCUPPER

1 1/2" = 1'-0"D5 ROOF LADDER

6" = 1'-0"A5 ROOF DETAIL

1 1/2" = 1'-0"B4 DOWNSPPOUT

1 1/2" = 1'-0"D1 FLOW THROUGH DETAIL

6" = 1'-0"B2 PARAPET CAP DETAIL

1" = 1'-0"D4 ROOF ACCESS HATCH

1 1/2" = 1'-0"A2 ROOF TOP UNIT PENETRATION

3/4" = 1'-0"D2 SATELLITE DISH DETAIL

6" = 1'-0"A3 TYPICAL ROOF PENETRATION 3" = 1'-0"A1 VENT FLASHING ROOF DETAIL

1 3/28/14 ASI#8

1

3" = 1'-0"E1 DETAIL - ROOF VENT

3" = 1'-0"B1 DETAIL - PARAPET VENT

1

1

Page 8: Architect’s Supplemental Instructionss/ASI-008.pdfZac Hulme , D/P/S D/P/S File The Work shall be carried out in accordance with the following instructions issued in accordance with

GENERAL SHEET NOTES

A. XXXX

SHEET KEYNOTES

1. XXXX

LEGEND

GLAZING LEGEND

3'-3" 4'-3"

12'-0"

3'-7"

3'-6"

2'-8"

2'-3"

7'-6"

SF

EQ EQ EQ

11'-7"

2'-0"

8"

2'-3"

7'-1"

12'-0"

EQ EQ

8'-5 1/2"

2'-0"

8"

2'-3"

7'-1"

12'-0"

3'-3"

9 3/4"

1'-1 3/4"

5'-2 1/2"

2'-0"

8"

2'-3"

7'-1"

12'-0"

7'-1"

1'-11"

2'-11" 3'-3"

2'-0"

6'-0"

3'-8"

2'-0"

8'-0"

1'-8"

7'-10"

2'-0"

5'-0"

1'-8"7'-2"

S105

8'-0"

8'-0"

RONAL D A.P

RADE

IGER

ETSR

T

N

WI

o. 52

EH SR

EHC

TI

CT

20

OO N

TS

ENFOETAMW

XE

CO

I

ARCHITECT

ENGINEER

PROJECT

REVISIONS

DRAWN BY

REVIEWED BY

DATE

PROJECT NO.

DRAWING NAME

SHEET NO.

u

@

af x

spd

blA

05 5

uS ti67 10

7 6 1 4 2 22

d sp sed gi

-

. o r gn

reuq Nuq ,e

67 -1 9 7 00

1e 0 0

M 0178 9

J sfe f e r no N E

alp inn ng

gne eni gnire

ha rc

i tn

ti

e r i o rs

uec t re

nal csd epa

DATE DESCRIPTION

1

A

2 3 4 5 6

B

C

D

E

1 2 3 4 5 6

3/2

8/2

014 1

0:3

3:1

2 A

M

AE-681

STOREFRONTFRAMES & DOORS

12-0079

07/31/13

RAW

MRM

GLE

NR

IO A

PA

RT

ME

NT

SG

LE

NR

IO R

D. N

W A

ND

72N

DS

T A

LB

UQ

UE

RQ

UE

NM

87121

CONSTRUCTIONDOCUMENTSFOR REVIEW

07/31/13

1/4" = 1'-0"SF STOREFRONT TYPES

1/4" = 1'-0"A STOREFRONT ELEVATION

S1 S5S4S2 S6S7

S8 S9

B2

AE-581

A1AE-581

AE-581

C3AE-581

C3

S3

B3AE-581

C3AE-581

AE-581C3

B2AE-581

C3AE-581

AE-581C3

AE-581C3

B2AE-581

C3AE-581

B3AE-581

C3AE-581

AE-581C3

AE-581C3

B3AE-581

C3AE-581

A1AE-581

B3AE-581

C3AE-581

AE-581C3

AE-581C2

C2AE-581

A3AE-581

A2AE-581

AE-581C2

C2AE-581

A2AE-581

Door Schedule - Storefront

Mark Width Height DR ELEV DR MATLFrame

Material FR ELEV HEAD JAMB SILL Comments

S101 3' - 0" 7' - 0" SF AL AL S7

S102 3' - 0" 7' - 0" SF AL AL S1

S103 3' - 0" 7' - 0" SF AL AL S8 INTERIOR

S104 3' - 0" 7' - 0" SF AL AL S8 INTERIOR

S105 8' - 0" 8' - 0" RU AL AL - ROLL UP STOREFRONT

1 3/28/14 ASI#8

TYP. (2) PLACES

1