part 5 of 7 part Case Study 1 Product development
140

Archetypes case study part 5 june 21, 2013

Jan 15, 2015

Download

Business

Max Ruckman

Product Development Case Study & Process Part 5
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Archetypes case study part 5 june 21, 2013

part 5 of 7 part Case Study

1 Product development

Page 2: Archetypes case study part 5 june 21, 2013

Luxury brand Case Study

2

Page 3: Archetypes case study part 5 june 21, 2013

Notes

3

Page 4: Archetypes case study part 5 june 21, 2013

November 2012

Max Ruckman, Black & Decker HHI

Project Team

Luxury Brand

Business

Development

Case Study Part 5

www.maxruckman.com

4

Page 5: Archetypes case study part 5 june 21, 2013

Agency certification

involves sample submittal, documentation, to ensure certification

Definition

leads to certification by all appropriate standards agencies

5

Page 6: Archetypes case study part 5 june 21, 2013

Agency certification

documentation

Inputs

product samples

labeling

inspections

instruction manuals

6

Page 7: Archetypes case study part 5 june 21, 2013

Agency certification

determine which certifications are needed

notify agencies of new product plans

perform required test

submit product samples and documentation

follow up as necessary to secure certification

Actions

7

Page 8: Archetypes case study part 5 june 21, 2013

Agency certification

certification by all appropriate agencies

Deliverables

provide approval agency with prewritten report and certified test date

8

Page 9: Archetypes case study part 5 june 21, 2013

Service center training

statement of the anticipated product training needs of service centers

Definition

9

Page 10: Archetypes case study part 5 june 21, 2013

Service center training

sample product from engineering sample lot

existing service repair instructions and training manuals

Inputs

10

Page 11: Archetypes case study part 5 june 21, 2013

Service center training

input from project team to identify any need for product training

develop a training package

obtain product sample

Actions

11

Page 12: Archetypes case study part 5 june 21, 2013

Service center training

distribute a complete training package to service centers

Deliverables

12

Page 13: Archetypes case study part 5 june 21, 2013

Complete engineering check

approval that the design

meets all product

specifications

Definition

13

Page 14: Archetypes case study part 5 june 21, 2013

Complete engineering check

review of prototype testing verify component dimensions and assembly clearances

verify critical component dimensions and specifications are consistent with capabilities review loads, stresses, results of impact and material selection review use of standard components

verify compliance with regulatory agency specifications and other standards verification of assembly, disassembly and serviceability requirements

Definition

14

Page 15: Archetypes case study part 5 june 21, 2013

Complete engineering check

drawings

tolerance studies

calculations

Inputs

15

Page 16: Archetypes case study part 5 june 21, 2013

Complete engineering check

conduct review

Actions

16

Page 17: Archetypes case study part 5 june 21, 2013

Complete engineering check

engineering and manufacturing approval

Deliverables

17

Page 18: Archetypes case study part 5 june 21, 2013

Final component drawings

check drawings for accuracy and completeness

project engineer is responsible for obtaining sign

off on drawings by the technical and

manufacturing engineer

Definition

18

Page 19: Archetypes case study part 5 june 21, 2013

Final component drawings

drawings

Inputs

19

Page 20: Archetypes case study part 5 june 21, 2013

Final component drawings

review drawings

Actions

20

Page 21: Archetypes case study part 5 june 21, 2013

Final component drawings

engineering & manufacturing approval

Deliverables

21

Page 22: Archetypes case study part 5 june 21, 2013

Manufacturing service equipment

ensure that special equipment is available to support the service centers

Definition

22

Page 23: Archetypes case study part 5 june 21, 2013

Manufacturing service equipment

recommended equipment supplier

earliest possible communication of the need for such equipment

drawings and/or samples of the proposed equipment

Inputs

23

Page 24: Archetypes case study part 5 june 21, 2013

Manufacturing service equipment

identify need for the equipment

identify the supplier and contact for price & availability

receive and inspect equipment

prepare instructions for use

notify service center managers of availability

Actions

24

Page 25: Archetypes case study part 5 june 21, 2013

Manufacturing service equipment

readily and available repair equipment

Deliverables

25

Page 26: Archetypes case study part 5 june 21, 2013

Proof artwork

artwork approval prior to production

Definition

26

Page 27: Archetypes case study part 5 june 21, 2013

Proof artwork

complete artwork

special instructions packaging purchase order

Inputs

27

Page 28: Archetypes case study part 5 june 21, 2013

Proof artwork

output a final proof

review and markup of proof

sign proof

Actions

28

Page 29: Archetypes case study part 5 june 21, 2013

Proof artwork

approved

proof

Deliverables

29

Page 30: Archetypes case study part 5 june 21, 2013

Order QA equipment

agreement with a supplier

equipment specifications

completion dates

costs

payment plans

equipment approval plans

Definition

30

Page 31: Archetypes case study part 5 june 21, 2013

Order QA equipment

approved car

new product schedule

complete equipment specifications

equipment approval plan

equipment cost

Inputs

31

Page 32: Archetypes case study part 5 june 21, 2013

Order QA equipment

determine the date of equipment requirement

reach agreement on specification with supplier

reach agreement on approval plan with supplier

negotiate contract agreement with supplier

Actions

32

Page 33: Archetypes case study part 5 june 21, 2013

Order QA equipment

agreed contract completion date

approved plan

cost penalties

Deliverables

33

Page 34: Archetypes case study part 5 june 21, 2013

Test prototypes in the market

prototype testing

Definition

34

Page 35: Archetypes case study part 5 june 21, 2013

Test prototypes in the market

test plan objectives

reliability goals

Inputs

35

Page 36: Archetypes case study part 5 june 21, 2013

Test prototypes in the market

project team determines unit quantities based on statistic samples

end user prototype test

Actions

36

Page 37: Archetypes case study part 5 june 21, 2013

Test prototypes in the market

results from market testing to be reviewed by project team

Deliverables

37

Page 38: Archetypes case study part 5 june 21, 2013

Commit all tools

committal of all supplier tooled

components in line with the new

product introduction

Definition

38

Page 39: Archetypes case study part 5 june 21, 2013

Commit all tools

complete engineering release of component designs to supplier

individual timing plans related to overall project

Inputs

39

Page 40: Archetypes case study part 5 june 21, 2013

Commit all tools

organization of all funding to cover tooling design and

manufacturing of all remaining supplier tooled items

plan sampling of all tooling with regular progress reports

inspection reports supplied with all samples

Actions

40

Page 41: Archetypes case study part 5 june 21, 2013

Commit all tools

components supplied within the shortest possible time in line with the project introduction program

Deliverables

41

Page 42: Archetypes case study part 5 june 21, 2013

Finalize costs

review of pilot lot

cost and resolution of

deviations from the

reviewed cost in

milestone four

Definition

42

Page 43: Archetypes case study part 5 june 21, 2013

Finalize costs

review cost estimate in milestone four

new information

pilot lot cost

Inputs

43

Page 44: Archetypes case study part 5 june 21, 2013

Finalize costs

review actual pilot lot cost

resolve deviations

compare pilot lot and finalized estimate

Actions

44

Page 45: Archetypes case study part 5 june 21, 2013

Finalize costs

frozen cost

Deliverables

45

Page 46: Archetypes case study part 5 june 21, 2013

Complete prototype testing

market

tests of

the

prototype

are

complete

and results

are

compiled

Definition

46

Page 47: Archetypes case study part 5 june 21, 2013

Complete prototype testing

test data

agree and approved test standard

Inputs

47

Page 48: Archetypes case study part 5 june 21, 2013

Complete prototype testing

develop report

Actions

48

Page 49: Archetypes case study part 5 june 21, 2013

Complete prototype testing

confirm process key variable controllability

confirm design accuracy and integrity

complete test report

Deliverables

49

Page 50: Archetypes case study part 5 june 21, 2013

Complete all drawings

component,

assembly and

process drawings

should be

completed and

released

design freeze is in place

Definition

50

Page 51: Archetypes case study part 5 june 21, 2013

Complete all drawings

drawings

Inputs

51

Page 52: Archetypes case study part 5 june 21, 2013

Complete all drawings

engineering and manufacturing review

Actions

52

Page 53: Archetypes case study part 5 june 21, 2013

Complete all drawings

engineering and

manufacturing

approval of all

drawings

Deliverables

53

Page 54: Archetypes case study part 5 june 21, 2013

Service drawings bill of materials

illustrated parts list merges

the actions of creating the

service drawing, the service

bill of material, and

documenting relevant

repair information. it’s the

primary communication

document used in the repair

process

Definition

54

Page 55: Archetypes case study part 5 june 21, 2013

Service drawings bill of materials

technical specifications, test

bench specifications, etc.

plant order for illustrated parts list,

allowing 8 weeks lead time

product sample from

engineering sample lot

completed bill of material and

associated parts drawings

Inputs

55

Page 56: Archetypes case study part 5 june 21, 2013

Service drawings bill of materials

distribute ipl to repair centers

create service bom and technical repair information

produce service drawing (exploded view)

Actions

56

Page 57: Archetypes case study part 5 june 21, 2013

Service drawings bill of materials

other part requirements

ipl that identifies the replacement parts for the product and documents pertinent repair information

Deliverables

57

Page 58: Archetypes case study part 5 june 21, 2013

Confirm design FMEA’s

confirmation of the failure modes predicted by design

fmea should be confirmed by testing the product

testing to determine if the fmea was accurate

Definition

58

Page 59: Archetypes case study part 5 june 21, 2013

Confirm design FMEA’s

test plan

design fmea predictions

Inputs

59

Page 60: Archetypes case study part 5 june 21, 2013

Confirm design FMEA’s

test product samples to failure

Actions

60

Page 61: Archetypes case study part 5 june 21, 2013

Confirm design FMEA’s

confirm ability to

meet reliability (in-

warranty) targets

expected failure mode

prediction of

normal, useful life

of the product

Deliverables

61

Page 62: Archetypes case study part 5 june 21, 2013

Engineering testing

analysis techniques will be applied to the final engineering lot

Definition

units will be tested to failure

62

Page 63: Archetypes case study part 5 june 21, 2013

Engineering testing

quantities

test types

test plan

Inputs

63

Page 64: Archetypes case study part 5 june 21, 2013

Engineering testing

complete analysis to test

Actions

64

Page 65: Archetypes case study part 5 june 21, 2013

Engineering testing

analysis to yield

reliability statistics to

be applied during

ongoing quality

assurance testing of

production built units

Deliverables

65

Page 66: Archetypes case study part 5 june 21, 2013

First samples

project

management of

supply base

provides usable

parts for first build

from production

process within

project timing

Definition

66

Page 67: Archetypes case study part 5 june 21, 2013

First samples

minimum design

changes

managed to

minimize effect

supplier timing plans

Inputs

67

Page 68: Archetypes case study part 5 june 21, 2013

First samples

coordination of raw material procurement

management of communication, changes etc.

preparing suppliers

Actions

68

Page 69: Archetypes case study part 5 june 21, 2013

First samples

activity timing plan to achieve part and process approval

details for critical dimensions

parts sampled on

time and suitable

for initial test work

Deliverables

69

Page 70: Archetypes case study part 5 june 21, 2013

Critical & full FPL’s

insure piece

inspections are

complete and all

deviations are

satisfactorily

resolved

Definition

70

Page 71: Archetypes case study part 5 june 21, 2013

Critical & full FPL’s

first piece inspections

Inputs

71

Page 72: Archetypes case study part 5 june 21, 2013

Critical & full FPL’s

resolve all deviations - implement drawing, tooling or equipment changes as required

Actions

72

Page 73: Archetypes case study part 5 june 21, 2013

Critical & full FPL’s

all engineering dispositions resolved before project team is dissolved

acceptable accurate drawings

acceptable accurate components

Deliverables

73

Page 74: Archetypes case study part 5 june 21, 2013

Engineering build & test

engineering

built samples

to be tested

according to

predetermined

test plan

Definition

74

Page 75: Archetypes case study part 5 june 21, 2013

Engineering build & test

description of sample’s construction

engineering build samples

test plan

Inputs

75

Page 76: Archetypes case study part 5 june 21, 2013

Engineering build & test

comprehensive

feedback to the project

team on test results

test samples

Actions

76

Page 77: Archetypes case study part 5 june 21, 2013

Engineering build & test

test report

Deliverables

77

Page 78: Archetypes case study part 5 june 21, 2013

Deliver equipment

physical location

may be a

company facility

or an outside

supplier’s site

transfer of

equipment

ownership from

supplier to

manufacturer

Definition

78

Page 79: Archetypes case study part 5 june 21, 2013

Deliver equipment

acceptable components with full fpl’s

completed equipment approval plan

equipment approval plan

Inputs

79

Page 80: Archetypes case study part 5 june 21, 2013

Deliver equipment

approval of

final destination

physical relocation

to production site

take possession

of equipment

Actions

80

Page 81: Archetypes case study part 5 june 21, 2013

Deliver equipment

a sustainable process

ready to run equipment

Deliverables

81

Page 82: Archetypes case study part 5 june 21, 2013

Field testing

conduct field

testing on final

sample lot

Definition

82

Page 83: Archetypes case study part 5 june 21, 2013

Field testing

reliability targets

project team to

determine unit

quantities and test

results to be

available by pilot

lot testing

completion

Inputs

83

Page 84: Archetypes case study part 5 june 21, 2013

Field testing

conduct field testing

Actions

84

Page 85: Archetypes case study part 5 june 21, 2013

Field testing

results from market testing to be appraised by

statistical methods the project team in conjunction

with the pilot lot results to confirm bulk release

Deliverables

85

Page 86: Archetypes case study part 5 june 21, 2013

Patent review

detailed review to

indentify any

infringement risk

and to identify any

patentable

features resulting

from changes in

design features

Definition

86

Page 87: Archetypes case study part 5 june 21, 2013

Patent review

engineering built units

all engineering drawings

Inputs

87

Page 88: Archetypes case study part 5 june 21, 2013

Patent review

review by legal and engineering

Actions

88

Page 89: Archetypes case study part 5 june 21, 2013

Patent review

patent filings

written opinion by legal

Deliverables

89

Page 90: Archetypes case study part 5 june 21, 2013

All quality plans complete

all quality plans

must be complete

and available for

use in

manufacturing

Definition

90

Page 91: Archetypes case study part 5 june 21, 2013

All quality plans complete

component quality plans

unit quality plan

audit quality plan

pilot lot test plan

lot 2 test plan

feasibility test plan Inputs

91

Page 92: Archetypes case study part 5 june 21, 2013

All quality plans complete

determine all quality plans are complete and accurate

Actions

92

Page 93: Archetypes case study part 5 june 21, 2013

All quality plans complete

working

documents

ready for use

Deliverables

93

Page 94: Archetypes case study part 5 june 21, 2013

Sample lot one & test

sample lots will be built using production processes and controls

manufacturing is responsible for preparing and ordering material

sample lot build is the first evaluation of production capability

Definition

94

Page 95: Archetypes case study part 5 june 21, 2013

Sample lot one & test

sample testing includes test compliance evaluation and submittals

determine if changes after engineering build affected performance

quantity should be 60 to 100 units

Definition

95

Page 96: Archetypes case study part 5 june 21, 2013

Sample lot one & test

material

fixtures

test plan

Inputs

96

Page 97: Archetypes case study part 5 june 21, 2013

Sample lot one & test

test sample lots

Actions

97

Page 98: Archetypes case study part 5 june 21, 2013

Sample lot one & test

functional product, test results

Deliverables

98

Page 99: Archetypes case study part 5 june 21, 2013

Order long lead material

manufacturing is

responsible for

ordering long lead

parts and

materials for

additional samples

Definition

99

Page 100: Archetypes case study part 5 june 21, 2013

Order long lead material

bill of material

capital

expense funding

Inputs

100

Page 101: Archetypes case study part 5 june 21, 2013

Order long lead material

comprehensive test result

feedback to the project team

test samples

Actions

101

Page 102: Archetypes case study part 5 june 21, 2013

Order long lead material

purchase orders

Deliverables

102

Page 103: Archetypes case study part 5 june 21, 2013

Tool s & modifications

alignment of

manufacturing

process to design

needs as a result of

part measurement

and product testing

Definition

103

Page 104: Archetypes case study part 5 june 21, 2013

Tool s & modifications

measurement

resource supplier

resource to

progress activity

ecn’s

fpl reports

Inputs

104

Page 105: Archetypes case study part 5 june 21, 2013

Tool s & modifications

effective implementation of approved design changes

analysis of proposed design changes

analysis of report and coordination of tool/process correction activity

Actions

105

Page 106: Archetypes case study part 5 june 21, 2013

Tool s & modifications

all processes capable of producing to predetermined tolerances

appropriate standards in place

all parts approved

Deliverables

106

Page 107: Archetypes case study part 5 june 21, 2013

Confirm cost

review of production costs and resolution

of deviations from the final cost

Definition

107

Page 108: Archetypes case study part 5 june 21, 2013

Confirm cost

new information

pilot lot costs

finalized cost estimate

Inputs

108

Page 109: Archetypes case study part 5 june 21, 2013

Confirm cost

resolve deviations from initial processing assumption

compare pilot lot and finalized estimate of processing cost

review actual pilot lot product costs

Actions

109

Page 110: Archetypes case study part 5 june 21, 2013

Confirm cost

frozen cost entered in standards

Deliverables

110

Page 111: Archetypes case study part 5 june 21, 2013

Packaging available

delivery of

packaging

that meets all

quality and

delivery

expectations

Definition

111

Page 112: Archetypes case study part 5 june 21, 2013

Packaging available

purchase order

approved final proof

Inputs

112

Page 113: Archetypes case study part 5 june 21, 2013

Packaging available

produce packaging boards

deliver to manufacturing plant

Actions

113

Page 114: Archetypes case study part 5 june 21, 2013

Packaging available

finished

packaging

delivered

on schedule

Deliverables

114

Page 115: Archetypes case study part 5 june 21, 2013

Safety hazard reviews complete

safety issues identified during the safety reviews must have been corrected. “no safety issues remain

Definition

115

Page 116: Archetypes case study part 5 june 21, 2013

Safety hazard reviews complete

Inputs

product design

safety reviews

accident reports

customer complaints

field failures

review possible product misuse that could result in safety issues

116

Page 117: Archetypes case study part 5 june 21, 2013

Safety hazard reviews complete

determine if any safety issues remain

Actions

117

Page 118: Archetypes case study part 5 june 21, 2013

Safety hazard reviews complete

a safe product – all safety issues eliminated

Deliverables

118

Page 119: Archetypes case study part 5 june 21, 2013

Final sample lot & test

additional sample lots should be built and tested if significant changes are

made in the production process or if tests indicates that changes in

production process have affected production performance or reliability

Definition

119

Page 120: Archetypes case study part 5 june 21, 2013

Final sample lot & test

confirm analysis from previous sample lots

sample lot build and testing is complete when no additional design

changes, process changes, or tooling modifications are required

Definition

120

Page 121: Archetypes case study part 5 june 21, 2013

Final sample lot & test

materials

fixtures

test plan

Inputs

121

Page 122: Archetypes case study part 5 june 21, 2013

Final sample lot & test

provide comprehensive feedback on test results to the project team

Actions

122

Page 123: Archetypes case study part 5 june 21, 2013

Final sample lot & test

functional product

test results

Deliverables

123

Page 124: Archetypes case study part 5 june 21, 2013

Approve & order parts

management of

supply base of

components from

start-up to full

production

Definition

124

Page 125: Archetypes case study part 5 june 21, 2013

Approve & order parts

supplier confirmation of capacity for bulk production

released engineering structure and all parts approved for construction

detailed component and raw material lead times

demand & ramp-up profile

Inputs

125

Page 126: Archetypes case study part 5 june 21, 2013

Approve & order parts

commit to production schedule

Actions

126

Page 127: Archetypes case study part 5 june 21, 2013

Approve & order parts

flexibility to

respond to

changes in

demand

parts to specification in-line with production plan

Deliverables

127

Page 128: Archetypes case study part 5 june 21, 2013

Approve capital equipment

complete approval plan to verify that

equipment meets all specifications

Definition

128

Page 129: Archetypes case study part 5 june 21, 2013

Approve capital equipment

safety approval – safety engineering

results of complete plan runoff - acceptable components with full fpl’s if required

equipment approval plan

Inputs

129

Page 130: Archetypes case study part 5 june 21, 2013

Approve capital equipment

resolve any deviations

process control capacity/cycle time

capability fpl’s

Cost

fpl’s

Actions

agree equipment meets all specifications

130

Page 131: Archetypes case study part 5 june 21, 2013

Approve capital equipment

acceptance or rejection of equipment

Deliverables

131

Page 132: Archetypes case study part 5 june 21, 2013

Confirm process fmea’s

test the product to failure – determine if fmea was accurate

confirmation of the failure modes predicted by the fmea

Definition

132

Page 133: Archetypes case study part 5 june 21, 2013

Confirm process fmea’s

test plan

fmea predictions

Inputs

133

Page 134: Archetypes case study part 5 june 21, 2013

Confirm process fmea’s

test product

samples to failure

Actions

134

Page 135: Archetypes case study part 5 june 21, 2013

Confirm process fmea’s

production test rate, test

method and production

shut down criteria

expected process problems

a prediction of the

reliability and

capability of the

process used

Deliverables

135

Page 136: Archetypes case study part 5 june 21, 2013

Pilot lot & test

pilot lot production is a verification of the capability of the production process

pilot production must be run through only production process, components that have

acceptable fpl’s, scheduling, controls, fixtures, gauging and personnel

all production must be saleable product and sufficient quantity (80% of full planned production per shift)

must be run to verify process capabilities and meet testing and test market requirements

Definition

136

Page 137: Archetypes case study part 5 june 21, 2013

Pilot lot & test

pilot lot test is a verification that production processes have not adversely affected the performance and

reliability of the product

the pilot production must be tested to the same standards as the sample lot production and

comparable test results must be obtained

Definition

137

Page 138: Archetypes case study part 5 june 21, 2013

Inputs

Pilot lot & test

successful sample lot test results

no design changes no tooling changes no process changes final packaging pilot lot level components final tooling and manufacturing

equipment material, fixtures test plan agency certification final cost

clean sample lot

138

Page 139: Archetypes case study part 5 june 21, 2013

Pilot lot & test

saleable product that is not committed to a customer

Deliverables

139

Page 140: Archetypes case study part 5 june 21, 2013

November 2012

Max Ruckman, Black & Decker HHI

Project Team

Luxury Brand

Business

Development

Case Study Part 5

www.maxruckman.com

140