ARCH 101: Architectural Design Studio I Section 002: CRN 2: 73879 / Fall 2011 Instructor Jerry W. Lum Final Project Proposal Peter Wyatt Middleton
5

arch 101 final project oct 25

Mar 22, 2016

Download

Documents

peter middleton

week 1 of the final kinetic sculpture project
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: arch 101 final project oct 25

ARCH 101: Architectural Design Studio I

Section 002: CRN 2: 73879 / Fall 2011 Instructor Jerry W. Lum

Final Project Proposal Peter Wyatt Middleton

Page 2: arch 101 final project oct 25

I wish to bridge the buttresses of Batmale Hall bringing a light wind blown horizontal planed wind vail suspended by either steel cable or high test fishing line. I intend to emulate the caissons of Batmale in this shape as well keeping with the elemental forms of the solid un movable

I wish to bridge the buttresses of Batmale Hall installing a horizontal planed wind veil suspended by either steel cable or high test fishing line. I intend to emulate the caissons of Batmale to ensure that my form does not became too out of place. I theorize that the smaller scale of related shapes will create interest in its detail and familiarity.

I intend to use my pieces as extrusions allowing light to pass through them creating intimate spaces to draw attention along with their movement. Also, since the pieces will be suspended it will be possible to view them from underneath looking up to a mobile fluid movement similar to a cloud or from the opposite spectrum viewed from above where the body would appear as another mass of fluid resembling an ocean.

Concept

Page 3: arch 101 final project oct 25

Ideation

Page 4: arch 101 final project oct 25

Inspiration

Page 5: arch 101 final project oct 25

Inspiration