Top Banner
Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 1
18

Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Dec 14, 2015

Download

Documents

Hillary Skinner
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Arc to Straight Matching

In both eRHIC FFAG rings

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 1

Page 2: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

What is the Straight?

• The straight cell is the same as the arc cell but with the following set to zero:– Displacements from reference curve

• “Dipole component” if magnet was combined function

– Bends in reference curve• The magnets have no real bends, they are rectangular

• These are positioning issues only, so actually the straight cell consists of the same ‘part numbers’ as the arc!

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 2

Page 3: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Straight Cell Optics

• Non-offset quadrupoles so all matched beams go straight down the middle– Very little synchrotron radiation

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 3

Max tune difference 0.000011

Max difference y 11.66 vs. 11.64m

Same “optics” as arc

Page 4: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Straight Cell TOF

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 4

Page 5: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Matching Concept

• FFAG matching analogous to trying to move a bunch of pendulums of different lengths from one place to another with minimum disturbance– One pendulum for each orbit– 1/period ~ tune– Sensitive to accelerations (by relativity!)

• Doing it adiabatically will always work– Non-adiabatic solutions hard for many pendulums

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 5

Page 6: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Matching Method

• Used 17 special matching cells (~44m)• Bend angles and quad offsets in each cell are

arc cell’s values multiplied by a function w(u)– u “coordinate” = cell number(1 to 17)/18

• u ≤ 0 in straight, u ≥ 1 in arc

– Want w(0)=0 and w(1)=1 to avoid discontinuities

• Simplest choice: w(u)=u (linear)– Problem: w’’ is effectively infinite at u=0 and 1

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 6

Page 7: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Linear Ramp of Both Rings

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 7

Orbits exaggerated 1000 times

Page 8: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Something Smoother

• The cubic function w(u) = 3u2 − 2u3

– w(0)=0, w(1)=1, w’(0)=w’(1)=0– Makes a nice ramp with w’’ finite

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 8

Page 9: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Cubic Ramp of Both Rings

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 9

Page 10: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Method Used for MAC-10 Match

• Sometimes a linear combination is better than either of the above choices– w(u) = (1 − k) u + k (3u2 − 2u3)

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 10

Optimal values are:k = 0.87 for low-energy ringk = 1.00 for high-energy ring

Page 11: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Optimised Ramp of Both Rings

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 11

Page 12: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Position Errors in Straight

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 12

Maximum optimised errors are:± 0.436 mm in low-energy ring± 0.066 mm in high-energy ring

Page 13: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Full Ring

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 13

Orbits exaggerated 2500 times

Page 14: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Position Errors After Whole Turn

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 14

Full ring is here “optimised” for just one sextant, perhaps should optimise for full ring.

Page 15: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

To-do List Update (stars = difficulty)

• Find vertical gap size required for synchrotron radiation– Feeds into magnet LDRD parameters

• Arc-to-straight matching sections– Similar: detector bypasses

• Splitter/combiner at both ends of linac• 10/15/21GeV septum

– With possible optical bumping etc.

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 15

Have asked Oleg Tchoubar about this but he had vacation last week

Page 16: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

The Tunnel: Working Assumptions?

• Will the proton ring in eRHIC be the blue ring, or an “inner” ring without the DX magnets?– This determines in-tunnel position of eRHIC rings

• Which determines the splitter exit coordinates

• Nick Tsoupas suggests horizontally stacked FFAGs would be easier than vertically stacked– Path length increase (2r) should then also be

compensated in the splitter, if possible– One cell would be very slightly longer for ‘stacking’

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 16

Page 17: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

Scope of February Design Report

• Vadim will/already has clarified • Seems not too hazardous

– Arcs + straights + matching + bypasses = 2 pages– Splitter in another section

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 17

Page 18: Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.

January 13, 2014 Stephen Brooks, eRHIC FFAG meeting 18