Top Banner
Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, 2015
119

Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Apr 12, 2018

Download

Documents

dohanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Arapahoe Square Zoning

Technical Task Force

Phase 2, Meeting 2 March 19, 2015

Page 2: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Introductions

Page 3: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Meeting Agenda 3:00 – Opening/Welcome 3:15 – Meeting 1 Recap and Goals for Today 3:20 – Presentation 4:10 – Break 4:20 – Discussion and Feedback 4:20-5:00: Max Building Height 5:00-5:40: Upper Story Mass 5:40-5:50: Key Corridors 5:55 – Wrap-up and Next Steps

Page 4: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Meeting Approach

Beginning of Process

End of Process

Lots of Information

Less Information

Less Discussion

Time

More Discussion Time (and final

recommendations)

Page 5: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Meeting 1 Recap and Goals for Today

Page 6: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Feedback from Mtg 1

• More flexibility in datum approach • Consider lower height for base – only reach

max plan heights with incentives and point towers

• Explore upper story mass reduction, especially for buildings with longer street frontage and taller height

• Building form should respond to key corridors

Page 7: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Meeting 2 Goals

• Task force to provide guidance on three interrelated topics: – Approach for building form on key corridors – Approach for maximum building height – Approach for accomplishing datum/upper

story mass reduction

Page 8: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Key Corridors

Page 9: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Key Corridors

• Focus today on the zoning envelope – height and mass

• In future meetings, opportunity to discuss other elements to tailor by corridor/geography, such as: – Build-to – Pedestrian entrances – Façade design

Page 10: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Broadway

Page 11: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Broadway - Characteristics

• Regional connector • Gateway to downtown • Strong diagonal axis –

connection to State Capitol

• Plan Vision: Grand Boulevard

Page 12: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Broad St Philadelphia

Page 13: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Broadway – Form Approach

• No requirement for upper story stepback or mass reduction

Page 14: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

21st Street

Page 15: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

21st Street - Characteristics

• Plan vision: festival street

• Heart of neighborhood • Intimate, pedestrian-

friendly • View corridor to Coors

field

Page 16: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Festival Street Example

Page 17: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Pecan Street Austin

Page 18: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

21st Street – Form Approach

• Strong datum line through required upper story mass reduction at 2-5 stories for 100% of street frontage

• Frame view of ball field • Ball field entry feature

at 21st street is 5 stories tall

Page 19: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Welton Street

Page 20: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Welton Street - Characteristics

• Major transit corridor • Transit-oriented

development • Key connection to

Downtown • Transition between

Arapahoe Square and neighborhoods to the east

Page 21: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Pearl District Portland

Page 22: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

South Lake Union Seattle

Page 23: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Welton Street – Form Approach

• Consider tailored build-to approach (future meeting)

• Anything unique for upper story mass/datum?

Page 24: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

20th Street

Page 25: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

20th Street- Characteristics

• Downtown edge • Directly abuts D-C

zoning with 400’ max height

Page 26: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

20th Street – Form Approach

• No requirement for upper story stepback or mass reduction

State Street in Chicago

Page 27: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Key Transitions

Page 28: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Feedback for Tonight

• Agree with approach for: – Broadway and 20th: no upper story

stepback or mass reduction – 21st Street: stepback for 100% frontage to

encourage strong pedestrian base – Welton: same as other named streets;

maybe adjust build-to requirements (future discussion)

Page 29: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Max Building Height

Page 30: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Height: Plan Guidance

20 stories

12 stories

Page 31: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Plan Guidance: Max Height 20

th S

t

21st

St

22nd

St

Park

Ave

24th

St

20 stories standard 30 stories point towers

12 stories standard 20 stories point towers

Downtown 400’ max

Page 32: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Base

12 stories

16 stories

Page 33: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Incentives

16 stories

20 stories

Page 34: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Base

12 stories

16 stories

8 stories

Page 35: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Incentives

8 stories – 12 incentives 12 stories – 16 incentives

16 stories – 20 incentives

Page 36: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Proposed: Point Towers 20

th S

t

21st

St

22nd

St

Park

Ave

24th

St

16-20 stories standard 30 stories point towers

12-16 stories standard 20 stories point towers

Downtown 400’ max

Page 37: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Feedback for Tonight

• Agree with concept for taller heights in the block closest to downtown?

• Agree with concept for lower base (12-16 stories) with taller heights (16-20 stories) through incentives?

• Agree with concept for blocks closest to Curtis Park to have reduced height?

Page 38: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Datum and Upper Story Mass

Page 39: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Plan Guidance

• Datum line: require buildings to step back from street at maximum of 5 stories

• Purpose: create a pedestrian-scaled base for buildings taller than 5 stories

Page 40: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Pedestrian Base

• To address in future meetings: – Build-to – Transparency – Ground floor uses – Façade design/articulation

(DSG) – Design of above-grade parking

garages

Page 41: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Datum Approach • Goals

– Accomplish plan guidance for a strong pedestrian base

– Allow for flexibility and variety

– Consider what is buildable and the possibility that the first 1-5 stories could contain parking

– Unique approach for key corridors

Above: graphic from NE Downtown Neighborhoods Plan illustrating datum concept for Arapahoe Square

Page 42: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Approach for typical streets

Page 43: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

0’ Stepback

Page 44: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

15’ Min Stepback

Page 45: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Sugar Cube – 9 stories 100% of frontage on 16th St steps back by 20’ at 6 stories

80% of frontage on Blake St steps back by 20’ at 4 stories

Page 46: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Cadence – 13 stories 75% of façade length on 17th St steps back 7’ at 2 stories

Page 47: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Cadence – 13 stories 50% of façade length on Wewatta steps back 7’ at 2 stories

Page 48: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

1900 16th St – 17 stories

100% of façade length on 16th steps back 1-20 feet at 5 stories (210’ total length)

Page 49: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

1900 16th St – 17 stories

100’ length with no stepback on Wewatta

Page 50: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

The Platform – 21 stories 200’ façade length with no stepback on 17th St

Page 51: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

The Platform – 21 stories 47% of frontage on Wewatta steps back by 45’ at 4 stories

Page 52: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Park Place Portland – 13 stories

Approx. 190’ length with no stepback

Page 53: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional
Page 54: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Park Place Portland – 13 stories

Page 55: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Considerations

• The appropriate upper story stepback/mass reduction is related to: –Building height –The quality of the design of the façade

facing the street –Length of the building on the street

Page 56: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Pearl District Block Size

400’

266’

200’

200’

Page 57: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

South Lake Union Block Size

400’

266’

240’

240’

Page 58: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

2020 Lawrence – 11 stories

Total lot frontage of 350 ft. 57% of frontage on Lawrence St steps back by 40’ at 4 stories.

Page 59: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Approach for Feedback

Page 60: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

1 Total Building Height: 6-16 stories (6-20 stories close to downtown) Length of Lot Frontage: ~200 ft or less

Approach for Feedback • Maximum 150 ft of building frontage that is not stepped back by at least 15 ft. • Stepback occurs at 5 story max (may happen anywhere from 2-5 stories) • Option to exceed 150 ft without stepback with design review process

Page 61: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Corner Lot – 200 ft long

Page 62: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Corner Lot – 200 ft long

Potential FAR: 9.5-14.5 (16 stories) Current D-AS zoning allows max FAR of 7

Page 63: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Corner Lot - Residential Upper Stories

Page 64: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Corner Lot - Residential Upper Stories

Page 65: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Corner Lot - Office Upper Stories

Page 66: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Corner Lot - Office Upper Stories

Page 67: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Interior Lot

Page 68: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Interior Lot

Potential FAR: 9.5-14.5 (16 stories)

Page 69: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Interior Lot

Page 70: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Interior Lot

Page 71: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

University Building -12 stories 130’ 80’

Page 72: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

1601 Wewatta – 10 stories

130’ total façade length 125’ total façade length

Page 73: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

2 Total Building Height: 6-16 stories (6-20 stories close to downtown) Length of Lot Frontage: over ~200 ft

Approach for Feedback • Where on the spectrum?? Longer facades with articulation • Upper story tool -- mass reduction, stepback, etc. -- would occur at 5 story max (may happen anywhere from 2-5 stories)

Shorter facades/mass reduction

Page 74: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Spectrum

Longer Façade with Articulation/Modulation

Shorter Façade/Mass Reduction

Exam

ple

A

Exam

ple

B

Exam

ple

C

Exam

ple

D

Page 75: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Baseline: No Stepback or Mass Reduction

Potential FAR: 11 - 16 (16 stories)

Page 76: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Baseline: No Stepback or Mass Reduction

Page 77: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Baseline: No Stepback or Mass Reduction

Page 78: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Baseline: No Stepback or Mass Reduction

Page 79: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example A

Page 80: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example A

Page 81: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example A Potential FAR: 11 - 16 (16 stories)

Page 82: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example A

Page 83: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example A

Page 84: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example A

Page 85: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Manhattan – 11 stories

60’ 60’

60’

Total façade length = 390 ft

Page 86: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Manhattan – 11 stories

Page 87: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example B

Page 88: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example B Potential FAR: 9.5 -14.5 (16 stories)

Page 89: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example B

Page 90: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example B

Page 91: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example B

Page 92: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

2020 Lawrence – 11 stories

Page 93: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example C

Page 94: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example C Potential FAR: 8.3 -13.3 (16 stories)

Page 95: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example C

Page 96: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example C

Page 97: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example C

Page 98: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Glass House – 23 stories

• 325’ Total Bldg Length

• Approx. 13,000 & 11,500 SF Tower Floor Plates (above 8 stories)

• 60’ Between Towers

Page 99: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Glass House – 23 stories

• 10’ to 35’ stepbackbetween 3 & 7 Stories

Page 100: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example D

Page 101: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example D Potential FAR: 6 - 11 (16 stories)

Page 102: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example D

Page 103: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example D

Page 104: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Example D

Page 105: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

816 Acoma– 17 stories

• 400’ Total Building Length

• Approx. 25,000 SF Tower Floor Plate (above 5 stories)

• 35’ to 75’ stepback above 5 stories

Page 106: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

816 Acoma– 17 stories

Page 107: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

3 Total Building Height (Point Towers): 17-20 (25?) stories and 21-30 stories close to downtown

Approach for Feedback • Maximum floorplate of 10,000 SF above 5 stories • Maximum façade length of 150 ft

Page 108: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Point Tower Potential FAR: 6-8 (20 stories)

Page 109: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Point Tower

Page 110: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Point Tower

Page 111: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Paintbox Point Tower - Toronto Tower floorplate = approximately 8,000 SF 26 stories

Page 112: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Confluence - Denver Tower floorplate = approximately 9,600 SF 34 stories

Page 113: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Pinnacle - Denver Tower floor plates = approximately 9,600 SF each: 120’ x 80’ 22 and 27 stories

Page 114: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Feedback for Tonight • Max façade length with no stepback of

~150 ft? • Agree with concept for longer frontages

without stepback through design alternative?

• Agree with approach to require greater mass reduction for longer lot frontages (longer than ~200 ft)?

• How much additional reduction is desired for lot frontages over 200 ft? – What options do you like? What do you like about

those options?

Page 115: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Break

Page 116: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Topics for Feedback

Page 117: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Datum/Upper Story Mass • Max façade length with no stepback of

~150 ft? • Agree with concept for longer frontages

without stepback through design alternative?

• Agree with approach to require greater mass reduction for longer lot frontages (longer than ~200 ft)?

• How much additional reduction is desired for lot frontages over 200 ft? – What options do you like? What do you like about

those options?

Page 118: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Building Height

• Agree with concept for taller heights in the block closest to downtown?

• Agree with concept for lower base (12-16 stories) with taller heights (16-20 stories) through incentives?

• Agree with concept for blocks closest to Curtis Park to have reduced height?

Page 119: Arapahoe Square Zoning Technical Task Force - Denver€¦ · Arapahoe Square Zoning Technical Task Force Phase 2, Meeting 2 March 19, ... 20 feet at 5 stories ... • How much additional

Key Corridors

• Agree with approach for: – Broadway and 20th: no upper story

stepback or mass reduction – 21st Street: stepback for 100% frontage to

encourage strong pedestrian base – Welton: same as other named streets;