LIBRARY STUDIO HALL WORKSPACE WORKSPACE WORKSPACE WORKSPACE WORKSPACE AIRLOCK MACHINE WORKSHOP WORKSPACE AMENITIES AMENITIES AMENITIES AMENITIES Masson Road Building Redmond Barry LARGE LECTURE THEATRE LIBRARY B138 B117 B202 G29 G24 G23 SPACE WORKSHOP BENCH 135 132 124 233 221 219 344 329 WORKSPACE 334 437 423 425 WORKSPACE 429 STAIR 3 (EXTERNAL) ENTRY FOYER UFAD / MECH. PLENUM 02 4311 218 RL 65.500 500 900 1000 500 500 3 5 ° 950 450 133 000C R07 PLANT PLANT PLANT R06 R05 500 900 1000 500 500 3 5 ° 950 450 A B C D E F G H 9000 3000 8250 7250 3000 9000 7500 CCC 3502 BBB 3501 AAA 3500 L01 +48.50m L02 +52.50m L03 +56.50m L04 +60.50m L05 +64.50m G01 +43.40m G01 +42.65 G01 +41.30m B01 +38.50m B01 +37.20m B01 +36.00m B02 +34.68m B02 - SSL +34.56m PARAPET +65.50m FCL +63.40m 1000 1100 2900 1100 2900 FCL +59.40m 1100 2900 FCL +55.40m 1100 2900 FCL +51.40m B01 +37.50m B01 +38.00m 980 4450 4000 4000 4000 4000 5100 4900 1300 2520 PARAPET +68.95m PARAPET +69.93m 2242 Project No. Drawing No. FILENAME - $FILE$ Date Drwn Co-Ord Chck Revision Title AND DRAWINGS COPYRIGHT OF THIS DRAWING IS VESTED IN WARDLE DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL RELEVANT CONTRACT, SPECIFICATIONS BY THE CONSULTANT. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED. THIS SHALL NOT COMMENCE PRIOR TO THE RETURN OF UNAMENDED SHOP DRAWINGS SIGNED ALL SHOP DRAWINGS SHALL BE SUBMITTED TO THE SUPERINTENDENT AND MANUFACTURE CONTRACTORS SHALL VERIFY JOB DIMENSIONS BEFORE ANY JOB COMMENCES. Rev Amd Date Revision Description Issue Scale THIS DRAWING IS AN UNCONTROLLED COPY UNLESS STAMPED OTHERWISE +1 617 442 6232 Facsimile +1 888 442 1417 Email Telephone 1920 Washington Street No.2 Boston Massachusetts 02118 USA [email protected] NADAAA 0913 AR Project Client Parkville Campus University of Melbourne Building and Planning Faculty of Architecture Tel : +61 3 8662 0400 www.johnwardlearchitects.com ABN 83 006 814 268 © 2012 John Wardle Architects 25 Rokeby Street, Collingwood, Victoria 3066 Australia FOR CONSTRUCTION General Notes REFER ARCHITECTURAL DRAWINGS: AR6550-AR6554 SCREEN DETAILS AR1552-AR1557 SCREEN SETOUT AR1512-AR1517 PRECAST SETOUT AR1502-AR1507 FACADE SETOUT - - - 3505 A 1:100 @ A0 1:200 @ A2 GENERAL ARRANGEMENT SECTION F Sept 2011 SG - 07.10.11 PRELIMINARY DD 01 SG - PRELIMINARY DD 02 02.11.11 SG - DESIGN DEVELOPMENT ISSUE 22.12.11 03 SG - 20.01.12 DD UPDATE 04 SG - 24.02.12 FINAL DD ISSUE 05 06 SG - 25% CD ISSUE 20.04.12 06 6102 05 6102 03 6114 01 6204 02 6106 03 6204 02 6114 01 6114 05 6114 04 6114 SG - 01.06.12 50% CD ISSUE 07 SIM. SG - 08 08.06.12 50% CD ISSUE - UPDATE 09 SG - 75% CD ISSUE 13.07.12 10 SG 90% CD ISSUE - 10.08.12 09 3554 SG - 07.09.12 100% CD - TENDER ISSUE 11 02 6204 SIM. 06 6104 05 6104 SG - 21.03.13 PRECAST REVIEW 12 SG 13 VALUE MANAGEMENT ISSUE 28.03.13 SG A ISSUED FOR CONSTRUCTION 10.01.14