ANALISIS DE PRECIOS UNITARIOS - UPCH
CABLE DE CU DESNUDO - 35mm2
Tuberia de 100mmØ PVC-P - Empotrado
Tuberia de 100mmØ EMT - Empotrado
Tuberia de 50mmØ PVC-P - Empotrado
Tuberia de 40mmØ PVC-P - Empotrado
Tuberia de 25mmØ PVC-P - Empotrado
SAL. ALUMBRADO EN TECHO (CAB. NH80 4MM2 + TUB. EMT 3/4" + C. OCT. 3/4")
SAL. TOMAC. DOBLE C/LT NORMAL - (CAB. NH80 4MM2 + TUB. PVC-P 3/4" + C. REC. 3/4" + TOMAC. MODUS)
SAL. TOMAC. DOBLE C/LT NORMAL EN PISO- (CAB. NH80 4MM2 + TUB. PVC-P 3/4" + C. REC. 3/4" + TOMAC. MODUS)
SAL. RACK DE COMUNICACIONES - (CAB. NH80 4MM2 + TUB. PVC-P 3/4" + C. CUA.. 3/4")
SAL. PARA WIFI - (TUB. PVC-P 3/4" + C. REC. 3/4")
SAL. DETECTOR DE HUMOS - (TUB. EMT 3/4" + C. OCTG. 3/4")
SAL. PARA CAMARA CCTV - (TUB. EMT 3/4" + C. OCTG. 3/4")
SAL. PARA ESTACIÓN MANUAL - (TUB. EMT 3/4" + C. CUAD. 3/4")
SAL. PARA LUZ ESTROBOSCÓPICA - (TUB. EMT 3/4" + C. 150X150X100)
CAJA DE PASE CONDULET (CAJA 100X100X50)
APERT. Y CIERRE DE ZANJA DE 0.50x0.60m (PARA CABLE DE 35MM2/T CU)
APERTURA Y CIERRE DE ZANJA DE 0.50x0.60m (PARA TUB 2-100mm)
ELIMINACION DE DESMONTE-ZANJA DE 0,50x0,60m
PICADO EN PISO Y PARED
MONTAJE DE LUMINARIAS EN TECHO
MONTAJE DE LUMINARIAS EN PARED
MONTAJE DE TABLEROS ELECTRICOS
ALAMBRE GUIA PARA SISTEMAS DE CORRIENTE DEBIL
ML 18.17 744.93
ML 13.78 551.00
ML 7.63 57.23
ML 5.16 162.40
ML 12.66 278.51
ML 46.03 1,012.75
ML 4.53 348.83
ml 3.33 158.19
ml 2.11 164.39
PTO DP = 5.5 42.60 3,620.96
PTO DP = 12 85.07 1,276.09
PTO DP = 5.5 48.47 145.40
PTO DP = 5 46.27 46.27
PTO DP = 7 M 39.31 825.58
PTO DP = 6 M 35.76 2,396.23
PTO DP = 20 M 90.52 90.52
PTO DP = 25 M 153.64 1,229.15
PTO DP = 5.5 M 14.09 338.09
PTO DP = 13.5 M 32.58 130.30
PTO DP = 9.5 M 49.46 791.29
PTO DP = 10 M 54.32 325.93
PTO DP = 2.5 M 15.29 30.57
PTO DP = 8.5 M 46.17 92.35
U 3.91 85.97
M3 105.36 995.66
M3 53.35 504.12
M3 12.87 121.66
GBL 4,375.46
UND 8.49 721.40
UND 7.32 95.22
GLB 290.96 290.96
GLB L= 630.00 142.20
CANT.
41.00
40.00
7.50
31.50
22.00
22.00
77.00
47.50
78.00
85.00
15.00
3.00
1.00
21.00
67.00
1.00
8.00
24.00
4.00
16.00
6.00
2.00
2.00
22.00
9.45 31.61 85.34 <----- PRECIO POR METRO LINEAL
9.45 16.00 43.21 <----- PRECIO POR METRO LINEAL
9.45 3.86 10.43 <----- PRECIO POR METRO LINEAL
11,813.73
85.00
13.00
1.00
383.93
<----- PRECIO POR METRO LINEAL
<----- PRECIO POR METRO LINEAL
<----- PRECIO POR METRO LINEAL
ANALISIS DE PRECIOS UNITARIOS - CCL
proyecto glb
RENDIMIENTO 0.10 MANO DE OBRA Capataz 0.20 ingeniero 2.00 Oficial - Ayudante - SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) 0.05 Conectores IDC 562 Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Octogonal - 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Conectores IDC 562 Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Octogonal - 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Octogonal - 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 3/4" Int. Simple - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00
Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 3/4" Int. Doble - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 3/4" Int. Triple - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES
Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 3/4" Int. Conmutacion Simple - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 3/4" Int. Conmutacion Doble - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2"
Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 3/4" Int. Bipolar - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 3/4" Int. Bipolar - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 4.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial 1.00 Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Tubo IMC - 2 1/2" Plancha de Fierro - 8" x 8" x 3/16" Caja Hermetica - Cuadrada Pintura + Thiner Soldadura SUB TOTAL - MATERIALES EQUIPOS
SAL. BOTONERAS DE INTERRUPTORES - (CAB. NH80 4MM2 + TUB. EMT 3/4" + C. REC. 3/4" + PLACA MAGIC)
SUMINITRO E INSTALACION DE POSTES DE 2 1/2 x 3 MT - (CAB. NH80 4MM2 + TUB. IMC 2 1/2" + C. REC. 3/4" + PLACA MAGIC)
Herramientas Manuales Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Octogonal - 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 1/2" Tomac. Doble c/LT - Magic Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS
SAL. FUE - ESTRACTORES DE SSHH - (CAB. NH80 4MM2 + TUB. EMT 1/2" + C. CUA. 1/2" )
SAL. TOMAC. DOBLE C/LT NORMAL - (CAB. NH80 4MM2 + TUB. PVC-P 1/2" + C. REC. 1/2" + TOMAC. MAGIC)
Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 1/2" Tomac. Doble c/LT - Magic + Idrobox - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 1/2" Tomac. Doble c/LT - Magic Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS
SAL. TOMAC. DOBLE C/LT NORMAL - (CAB. NH80 4MM2 + TUB. PVC-P 3/4" + C. REC. 3/4" + TOMAC. IDROBOX)
SAL. TOMAC. DOBLE C/LT NORMAL - (CAB. NH80 4MM2 + TUB. PVC-P 1/2" + C. REC. 1/2" + TOMAC. MAGIC)
Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Rectangular - 1/2" Tomac. Doble c/LT - Magic - Bticino SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 50mm2 (3F) Cable NH80 - 16mm2 (T) Tubo PVC-P 2" Curva PVC-P 2" Conector PVC-P 2" Union PVC-P 2" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
SAL. TOMAC. DOBLE C/LT NORMAL - (CAB. NH80 4MM2 + TUB. PVC-P 3/4" + C. REC. 3/4" + TOMAC. MAGIC)
SAL. FUER. BOMBA DE AGUA 5.5 HP - (CAB. NH80 6MM2 + 6MM2 + TUB. PVC-P 1")
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 6mm2 (3F) Cable NH80 - 6mm2 (T) Tubo PVC-P 1" Curva PVC-P 1" Conector PVC-P 1" Union PVC-P 1" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Tubo PVC-P 1" Curva PVC-P 1" Conector PVC-P 1" Union PVC-P 1" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 4.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00
SAL. FUER. BOMBA DE SUMIDERO 3/4 HP - (CAB. NH80 6MM2 + 6MM2 + TUB. PVC-P 1")
SAL. FUER. BOMBA CONTRA INCENDIO 50 HP - (CAB. NH80 95MM2 + 25MM2 + TUB. PVC-P 2 1/2")
SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 95mm2 (2F) Cable NH80 - 25mm2 (T) Tubo PVC-P 2 1/2" Curva PVC-P 2 1/2" Conector PVC-P 2 1/2" Union PVC-P 2 1/2" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 4.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 6mm2 (3F) Cable NH80 - 6mm2 (T) Tubo PVC-P 2 1/2" Curva PVC-P 2 1/2" Conector PVC-P 2 1/2" Union PVC-P 2 1/2" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 25mm2 (3F) Cable NH80 - 10mm2 (T) Tubo PVC-P 1 1/2" Curva PVC-P 1 1/2"
Conector PVC-P 1 1/2" Union PVC-P 1 1/2" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 25mm2 (3F) Cable NH80 - 10mm2 (T) Tubo PVC-P 1 1/2" Curva PVC-P 1 1/2" Conector PVC-P 1 1/2" Union PVC-P 1 1/2" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 6.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Cuadrada - 3/4" SUB TOTAL - MATERIALES
SAL. FUER. EXTRACTOR DE MONOXIDO 1.5HP - (CAB. NH80 4MM2 + TUB. PVC-P 3/4" + C. CUA.. 3/4")
EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 12.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (3F) Cable NH80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 12.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (3F) Cable NH80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
SAL. FUER. BOMBA DE AGUA HELADA 20HP - (CAB. NH80 35MM2 + 10MM2 + TUB. PVC-P 2")
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 35mm2 (3F) Cable NH80 - 10mm2 (T) Tubo PVC-P 2" Curva PVC-P 2" Conector PVC-P 2" Union PVC-P 2" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 3.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 3-1x120mm2 (3F) Cable NH80 - 50mm2 (T) Tubo PVC-P 3" Curva PVC-P 3" Conector PVC-P 3" Union PVC-P 3" Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00
SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Cuadrada- 1/2"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Cuadrada- 1/2"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES
Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Cuadrada- 1/2" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
SAL. DETECTOR DE MONOXIDO - (TUB. PVC-P 3/4" + C. CUA. 3/4") PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Cuadrada- 1/2" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Cuadrada- 1/2" SUB TOTAL - MATERIALES EQUIPOS
SAL. ALARMA DE AUDIO y SEÑAL LUMINOSA - DETECTOR DE MONOXIDO - (TUB. PVC-P 3/4" + C. CUA. 3/4")
Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Cuadrada- 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Cuadrada- 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20
SAL. PULSADOR DE ARRANQUE Y PARADA - (TUB. PVC-P 3/4" + C. CUA. 3/4")
SAL. SENSOR DE PRESION ESCALERA PRESURIZADA - (TUB. PVC-P 3/4" + C. CUA. 3/4")
SAL. PARA ITM EN CAJA PVC AUTOEXTINGUIBLE - (TUB. PVC-P 3/4" + C. CUA. 3/4")
Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES ITM 2x20A Caja para ITM Riel Din c/BT SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES ITM 3x20A Caja para ITM Riel Din c/BT SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 2.5mm2 (2F) Cable NH80 - 2.5mm2 (T) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Cuadrada- 1/2" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales
SAL. PARA ITM EN CAJA PVC AUTOEXTINGUIBLE - (TUB. PVC-P 3/4" + C. CUA. 3/4")
SAL. CONTROL DE NIVEL CISTERNA - (CAB. NH80 4MM2 + 4MM2 + TUB. PVC-P 1/2")
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Cuadrada- 1/2" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Tubo PVC-P 1/2" Curva PVC-P 1/2" Conector PVC-P 1/2" Union PVC-P 1/2" Hoja de sierra Caja Cuadrada- 1/2" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
BANDEJA RANURADA 600X150MM. E=1/16" ML
RENDIMIENTO 10.00 MANO DE OBRA
Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES BPC 600x150mm. e=1/16" Tapa 600. e = 1/16" Riel Strut - Bajo 20x20x2400mm. E=2mm Varilla Roscada - 3/8"x1.80mt Tacos Metalicos - 3/8" Perno Partido - 1/4" Cable Cu Desnudo - 35mm2 SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
BANDEJA RANURADA 400X150MM. E=1/16" ML
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES BPC 400x150mm. e=1/16" Tapa 400. e = 1/16" Riel Strut - Bajo 20x20x2400mm. E=2mm Varilla Roscada - 3/8"x1.80mt Tacos Metalicos - 3/8" Perno Partido - 1/4" Cable Cu Desnudo - 35mm2 SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
BANDEJA RANURADA 600X100MM. E=1/16". 04 VIAS DE SEPARACION. ML
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES
BPC 600x100mm. e=1/16" Tapa 600. e = 1/16" Separadores 1/20" Riel Strut - Bajo 20x20x2400mm. E=2mm Varilla Roscada - 3/8"x1.80mt Tacos Metalicos - 3/8" Perno Partido - 1/4" Cable Cu Desnudo - 35mm2 SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
SAL. DATA / VOZ - (TUB. PVC-P 1" + C. CUA 1" + TAPA GANG) PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 1" Curva PVC-P 1" Conector PVC-P 1" Union PVC-P 1" Caja Cuadrada - 100x100x50 Tapa Gang SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - OCTOGONAL U
RENDIMIENTO 60.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja Octogonal - 3/4"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS
Total
CAJA DE PASE - 100X100X50 U
RENDIMIENTO 35.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 100x100Xx50
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 150x150x100 U
RENDIMIENTO 25.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 150x150x100
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 200x200x100 U
RENDIMIENTO 20.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 200x200x100
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales
SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 250x250x100 U
RENDIMIENTO 20.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 250x250x100
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 300x300x150 U
RENDIMIENTO 15.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 300x300x150
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 350x350x150 U
RENDIMIENTO 15.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 350x350x150
SUB TOTAL - MATERIALES EQUIPOS
Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 400x400x150 U
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 400x400x150
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 400x400x200 U
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 400x400x200
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 500x500x150 U
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 500x500x150
SUB TOTAL - MATERIALES
EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 500x500x200 U
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 500x500x200
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 600x600x200 U
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 600x600x200
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 600x600x300 U
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 600x600x300
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - 800x800x200 U
RENDIMIENTO 5.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - 800x800x200
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - TIPO C U
RENDIMIENTO 3.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - TIPO C
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
CAJA DE PASE - TIPO D U
RENDIMIENTO 3.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja de Pase - TIPO D
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
Apertura y Cierre de Zanja de 0.50x0.60m M3
RENDIMIENTO 2.00 MANO DE OBRA Capataz 0.25 Operario - Oficial - Ayudante 3.00 SUB TOTAL - MANO DE OBRA MATERIALES Tierra de Chacra Thor Gel SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
Soldadura - CadWeld U
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.25 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Soldadura - CadWeld SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
Cable de Cu Desnudo - 70mm2 ML
RENDIMIENTO 20.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable de Cu Desnudo - 70mm2
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
MONTAJE DE TABLEROS ELECTRICOS GLB
RENDIMIENTO 0.10 MANO DE OBRA Capataz 0.20 Operario 2.00 Oficial - Ayudante 2.00 SUB TOTAL - MANO DE OBRA MATERIALES
10.00
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PRUEBAS ELECTRICAS GLB
RENDIMIENTO 0.20 MANO DE OBRA Capataz 1.00 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES
5.00
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES
Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tomac. Leviton c/LT - Naranja SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos Tomac. Leviton c/LT - Naranja SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562
SAL. TOMAC. NORMAL DOBLE C/LT - (CAB. NH80 4MM2 + TUB. EMT 3/4" + C. REC. 3/4" + TOMAC. LEVITON)
Tomac. Leviton c/LT - Beige SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos Tomac. Leviton c/LT - Beige SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL
SAL. ALUMB. SUPER EMERGENCIA - (CAB. NH80 4MM2 + TUB. EMT 3/4" + C. REC. 3/4" + TOMAC. LEVITON)
Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F)
SAL. FUERZA FAN COIL - (CAB. NH80 4MM2 + TUB. EMT 3/4" + C. ITM + ITM 2X20A)
Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Octogonal - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos Caja para ITM Riel Din c/BT ITM 2x20A SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Octogonal - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos Caja para ITM Riel Din c/BT ITM 2x20A SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Octogonal - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos Caja para ITM Riel Din c/BT ITM 2x20A SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Bandeja 200x50mm - E=1/16" Riel Strut - Bajo 20x20x2400mm Varilla Roscada - 3/8"x1.80mt Cu Desnudo - 35mm2 Perno Partido - 1/4"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
CAJA DE PASE - CUADRADA PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Caja Cuadrada - 3/4"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Bandeja 300x100mm - E=1/16" Riel Strut - Bajo 20x20x2400mm Varilla Roscada - 3/8"x1.80mt Cu Desnudo - 35mm2 Perno Partido - 1/4"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
CANALIZACION DE PUESTOS DE TRABAJO - ENERGIA + DATOS PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00
SUB TOTAL - MANO DE OBRA MATERIALES Bandeja 300x100mm - E=1/16" Riel Strut - Bajo 20x20x2400mm Varilla Roscada - 3/8"x1.80mt Cu Desnudo - 35mm2 Perno Partido - 1/4"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
CANALIZACION DE PUESTOS DE TRABAJO - BANDEJA DE 100X50MM PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Bandeja 300x100mm - E=1/16" Riel Strut - Bajo 20x20x2400mm Varilla Roscada - 3/8"x1.80mt Cu Desnudo - 35mm2 Perno Partido - 1/4"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Bandeja 300x100mm - E=1/16" Riel Strut - Bajo 20x20x2400mm Varilla Roscada - 3/8"x1.80mt Cu Desnudo - 35mm2
PICADO DE CANALIZACION DE PUESTOS DE TRABAJO - ENERGIA + DATOS
Perno Partido - 1/4"
SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 8.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Octogonal - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos Caja para ITM Riel Din c/BT ITM 2x20A SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
SAL. HUMO - (TUB. EMT 3/4" + C. OCT. 3/4") PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562
Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
SAL. CCTV - (TUB. EMT 3/4" + C. OCT. 3/4") PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA
MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
SAL. LECTORA DE TARJETAS - (TUB. EMT 3/4" + C. CUA. 3/4") PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20
SAL. DISPOSITIVOS DE CONTROL DE ACCESO - (TUB. EMT 3/4" + C. CUA. 3/4")
Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
SAL. SENSOR DE ANIEGO - (TUB. EMT 3/4" + C. REC. 3/4") PTO
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
RENDIMIENTO 10.00 MANO DE OBRA Capataz 0.20 Operario 1.00 Oficial - Ayudante 1.00 SUB TOTAL - MANO DE OBRA MATERIALES Cable NH80 - 4mm2 (2F) Cable NH80 - 4mm2 (T) Conectores IDC 562 Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Rectangular - 3/4" Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Herramientas Electricas SUBTOTAL - EQUIPOS Total
SAL. SALIDA PARA LUZ DE EMERGENCIA.- (CAB. THW 4MM2 + TUB. EMT 3/4" + C. REC. 3/4" + TOMAC. MAGIC)
PTO DP = 6.5 45.78 549.38
PTO DP = 4 M 30.09 361.02
PTO DP = 9.5M 74.23 445.36
PTO DP = 7.5 66.48 66.48
U 6.54 6.54
U 3.17 38.09
UND 19.22 230.65
UND 7.22 43.31
GBL 205.99
ML L 48.00 4.29 205.99
CANT.
12.00
12.00
6.00
1.00
1.00
12.00
12.00 h=6.5m
6.00 h=2.4m
556.17
48.00
ANALISIS DE PRECIOS UNITARIOS - CC CERRO COLORADO
TOMACORRIENTES E INTERRUPTORES
BANDEJAS RANURADA
BANDEJAS TIPO ESCALERILLA
BANDEJA REJILLA
CABLE DE COBRE DESNUDO - CON CONECTOR PARA BANDEJA (+ 3%)
TUBERÍA METÁLICA EMT (+ 15%)
TUBERÍA PLÁSTICA PVC-P (+ 15%)
CAJAS DE PASO
SISTEMA DE PUESTA A TIERRA
FIBRA OPTICA
Pase de 405x105mm en perfil metálico cuadrado
Perfil Metálico cuadrado 100x100x3mm
MONTAJE DE LUMINARIAS EN TECHO
MONTAJE DE LUMINARIAS EN TECHO (h=12.5)
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable Vulcanizado 3x16mm2 Conectores IDC 562 Soporteria - Cable de Acero + Clavo + Candado SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Cinta Pasacable - 20 mt Utilizacion de Andamio Certificado - 01 Cuerpo SUBTOTAL - EQUIPOS
Total
MONTAJE DE LUMINARIAS EN TECHO (h=6.5)
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable Vulcanizado 3x16mm2 Conectores IDC 562 Soporteria - Cable de Acero + Clavo + Candado SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Cinta Pasacable - 20 mt Utilizacion de Andamio Certificado - 01 Cuerpo SUBTOTAL - EQUIPOS Total
MONTAJE DE LUMINARIAS EN TECHO (h=4)
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable Vulcanizado 3x16mm2 Conectores IDC 562 Soporteria - Cable de Acero + Clavo + Candado SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Cinta Pasacable - 20 mt Utilizacion de Andamio Certificado - 01 Cuerpo SUBTOTAL - EQUIPOS Total
MONTAJE DE LUMINARIAS EN POSTE (h=10)
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA
MATERIALES Cable Vulcanizado 3x16mm2 Conectores IDC 562 Soporteria - Cable de Acero + Clavo + Candado SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Cinta Pasacable - 20 mt Utilizacion de Andamio Certificado - 01 Cuerpo SUBTOTAL - EQUIPOS Total
MONTAJE DE LUMINARIAS EN PARED
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable Vulcanizado 3x16mm2 Conectores IDC 562 Soporteria - Cable de Acero + Clavo + Candado SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales Cinta Pasacable - 20 mt Utilizacion de Andamio Certificado - 01 Cuerpo SUBTOTAL - EQUIPOS Total
10.00 min subiuda 20.00 min colocacion por luminiaria 10.00 min bajada
12.00 SE CONSIDERO EN ITEMIZADO EN METROS LINEALES
SE CONSIDERO EN ITEMIZADO EN METROS LINEALES
SE CONSIDERO EN ITEMIZADO EN METROS LINEALES
15.00 min subiuda 20.00 min colocacion por luminiaria 15.00 min bajada
9.60
Faltaria colocar el precio alquiler de una grua con canastilla
ANALISIS DE PRECIOS UNITARIOS - SHOWROOM
ALUMBRADO
TOMACORRIENTES
FUERZAS Y OTROS
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 4mm2 (2F) Cable NH-80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Caja Cuadrada - 100x100x50 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
SAL. PARA CONTROL DE NIVEL (PVC-20mmØ + Caja rectangular)
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Rectangular - 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 4mm2 (2F) Cable NH-80 - 4mm2 (T) Tubo EMT 3/4" - UL Curva EMT 3/4" - UL Conector EMT 3/4" - UL Union EMT 3/4" - UL Hoja de sierra Caja Cuadrada - 100x100x50 Abrazadera - 3/4" Caja - Fulminante + Clavos SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 4mm2 (2F) Cable NH-80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Caja Cuadrada - 100x100x50 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante
SAL. FUER. BOMBA DE AGUA - (3-1x4.0mm2 (2F) NH80+1x4.0mm2 NH80 (T)/20mmØ PVC-P + CAJA CUADRADA)
SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 4mm2 (2F) Cable NH-80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Caja Cuadrada - 100x100x50 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 4mm2 (2F) Cable NH-80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Caja Cuadrada - 100x100x50 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 4mm2 (2F) Cable NH-80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4"
Caja Cuadrada - 100x100x50 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 4mm2 (2F) Cable NH-80 - 4mm2 (T) Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Caja Cuadrada - 100x100x50 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 10mm2 (2F) Cable NH-80 - 10mm2 (T) Tubo PVC-P 1 1/2" Curva PVC-P 1 1/2" Conector PVC-P 1 1/2" Union PVC-P 1 1/2" Caja Cuadrada - 150X150X100 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Cable NH-80 - 16mm2 (2F) Cable NH-80 - 16mm2 (T) Tubo PVC-P 1 1/2" Curva PVC-P 1 1/2" Conector PVC-P 1 1/2" Union PVC-P 1 1/2" Caja Cuadrada - 150X150X100 Hoja de sierra SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
SAL. PARA SENSOR DE MONÓXIDO (PVC-20mmØ + Caja rectangular)
RENDIMIENTO MANO DE OBRA Capataz Operario Oficial Ayudante SUB TOTAL - MANO DE OBRA MATERIALES Tubo PVC-P 3/4" Curva PVC-P 3/4" Conector PVC-P 3/4" Union PVC-P 3/4" Hoja de sierra Caja Rectangular - 3/4" SUB TOTAL - MATERIALES EQUIPOS Herramientas Manuales SUBTOTAL - EQUIPOS Total
ML 82.00 0.57 46.73 ML 41.00 0.57 23.37 ML 47.15 1.97 93.02 ML 11.79 1.24 14.63 ML 15.72 0.57 9.02 ML 15.72 0.57 9.02 U 0.10 1.70 0.17 U 1.00 1.53 1.53
ML 25.00 0.37 9.33 ML 6.25 0.19 1.19 ML 8.33 0.07 0.58 ML 8.33 0.10 0.83 U 0.10 1.70 0.17 U 1.03 1.51 1.56
13.66
% 10.00 30.83 3.08 3.08 47.58
CANT.
REVISAR PRECIO DE PLACAS / PIDEN TOMAC. DOBLE TIPO SCHUKO Y SIMPLE SCHUKO PARA EMERGENCIA
-
12.00 60.00 - 60.00
-
13.71 68.57 - 68.57
-
48.00 240.00 - 240.00
-
16.00 80.00 - 80.00
-
8.00 40.00 - 40.00
-
8.00 40.00 - 40.00
-
6.86 34.29 - 34.29
-
32.00 160.00 - 160.00
-
6.86 34.29 - 34.29
-
24.00 120.00 - 120.00
-
32.00 160.00 - 160.00
VERIFICAR PRECIO DE TUBERÍA FELXIBLE METÁLICA
VERIFICAR PRECIO DE TAPA GANG
REVISAR
REVISAR BUZONES, SON DEMASIADO GRANDES
REVISAR
REVISAR PRECIO DE PLACAS / PIDEN TOMAC. DOBLE TIPO SCHUKO Y SIMPLE SCHUKO PARA EMERGENCIA
ANALISIS DE PRECIOS UNITARIOS - HISPANIA
TUBERÍA PLÁSTICA PVC-P - ADOSADO
TOMACORRIENTES
SALIDA A EQUIPOS DPTOS
SALIDA EQUIPOS DIVERSOS
SISTEMA DE TIERRAS
CORRIENTES DEBILES
SOPORTERIAS
SALIDAS DE ALUMBRADO
SALIDAS PARA INTERRUPTORES
MONTAJE DE LUMINARIAS
BANDEJAS ESCALERILLAS / CABLE DE COBRE DESNUDO
CAJAS DE PASO
CAJAS DE PASO CON TAPA Y CERRADURA -CORRIENTES DÉBILES
SALIDAS DEL SISTEMA ACI
ALAMBRES GUIAS
REVISAR MONTAJE DE PROYECTORES EN LOS PISOS (2PISO, 8PISO, 14PISO, 20PISO )
REVISAR PRECIO DE CAJAS
CANT.
REVISAR MONTAJE DE PROYECTORES EN LOS PISOS (2PISO, 8PISO, 14PISO, 20PISO )
TUBERÍAS PVC-P
CAJAS DE PASO
ALUMBRADO
TOMACORRIENTES
SALIDAS DE FUERZA
SALIDAS DEL SISTEMA ACI
SALIDAS DE SEGURIDAD Y CCTV
PRUEBAS Y SALIDAS VARIAS
MONTAJE DE LUMINARIAS
ITEM CANTIDAD DESCRIPCION DEL PRODUCTO MEDIDA 01 800.00 TUBOS CONDUIT EMT DE 3/4" UND 02 150.00 TUBOS CONDUIT EMT DE 1" UND 03 75.00 CURVAS CONDUIT EMT 1" UND 04 300.00 CURVAS CONDUIT EMT 3/4" UND 05 800.00 CONECTOR CONDUIT EMT 3/4" UND 06 500.00 UNION CONDUIT EMT DE 3/4" UND 07 100.00 CONECTOR EMT DE 1" UND 08 100.00 UNION EMT DE 1" UND