Top Banner
INSTITUTIONAL PRESENTATION 1Q20 | RESULTS
31

Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

Oct 13, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

INSTITUTIONALPRESENTATION1 Q 2 0 | R E S U L T S

Page 2: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

Visãogeral

ISA CTEEP in the Transmission Sector

SustainableValue

Financial Highlights

ISACTEEP

Page 3: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

WHY INVEST IN

ISA CTEEP

No demand risk and low default

risk

Strong Cash Generation

Minimum payout of 75% (regulatory

net income)

Dividends

Reference Company in

quality and O&M

Benchmark

ValuationAttractive valuation

Fitch: AAA(bra)

Investment Grade

Sustainable value creation

Profitability

Opportunities in retrofitting, greenfield projects and M&A

Growth

Page 4: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

WHY INVEST IN

ISA CTEEP

Management of existing assets

▪ Tariff Reset

▪ RBSE (financial component remuneration)

▪ Law 4819 / SEFAZ

▪ Basic network access –“Connection Plus”

▪ Real Estate

▪ Biodiversity conservation and climate change mitigation program - 1st Jaguar Connection Project in Brazil

▪ Digitalization

▪ Asset Renewal

Operational excellence

and efficiency

New energy businesses

Social and environmental impact

Growth with sustainable value creation

▪ Auctions / M&A

▪ Retrofitting Projects

Page 5: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

51%IE Madeira

Revenue² 2019/2020 cycle BRL 260 million

100%IENNE

Revenue 2019/2020 cycle BRL 46 million

ISA CTEEP

Revenue 2019/2020 cycle BRL 2,579 million

IE Serra do Japi 100%

Revenue 2019/2020 cycle BRL 58 million

100%IE Pinheiros

Revenue 2019/2020 cycle BRL 57 million

100%Evrecy

Revenue 2019/2020 cycle BRL 10 million

100%IE Sul

Revenue 2019/2020 cycle BRL 18 million

51%IE Garanhuns

Revenue² 2019/2020 cycle R$ 46 million

100%IEMG

Revenue 2019/2020 cycle

BRL 19 million

Largest publicy traded pure transmission utility in Brazil

▪ Transmission of 33% of Brazil’s energy generation and 94% of the energy in the State of São Paulo

▪ Benchmark player in costs and quality

▪ Capacity in operation¹

▪ 18.6 thousand km of transmission lines

▪ 65.9 thousand MVA of transformation capacity

▪ 126 substations

▪ ISA CTEEP Revenue 2019/2020 cycle:BRL 3.1 billion2

Nota: ¹ Considers the full capacity of IE Madeira and IE Garanhuns² 2019/2020 Revenue Cycle proportional to ISA CTEEP’s participation

IE Itapura Bauru 100%

Revenue 2019/2020 cycle BRL 12 million

Page 6: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

100%IE Itaúnas

Revenue2019/2020 cycle BRL 52 million

100%IE Biguaçú

Revenue2019/2020 cycle BRL 40 million

50%IE Paraguaçu

Revenue²2019/2020 cycle BRL 59 million

Largest publicly traded pure transmission utility in Brazil

▪ Growth with sustainable value creation

▪ Construction capacity

▪ 7.6 thousand km of transmission lines

▪ 1.7 thousand MVA of transformation capacity

▪ Organic growth¹: CapEx of BRL180 million/year with Revenue of BRL50 million/year

▪ Greenfield projects: ANEEL capex BRL5 billion with Revenue 2019/2020 cycle of BRL567 million

50%IE Aimorés

Revenue²2019/2020 cycle BRL 40 million

50%IE Ivaí

Revenue²2019/2020 cycle BRL 147 million

100%IE Tibagi

Revenue2019/2020 cycle BRL 25 million

100%IE Itapura Lorena

Revenue2019/2020 cycle BRL 11 million

100%IE Aguapeí

100%IE Itaquerê

Revenue2019/2020 cycle BRL 51 million

Revenue2019/2020 cycle BRL 59 million

Nota: ¹ Last 5 years average² Considers 2019/2020 Revenue Cycle adjusted to ISA CTEEP’s participation

100%IEMG

Revenue auction BRL 33 million

100%

100%Evrecy

Revenue auction BRL 38 million

Page 7: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

A successful story of growth, resilience and performance

1999 20132001 20122006 2007 20172016

‘000 km¹ of transmission lines

Consolidated regulatory EBITDA

ICVM 527 in BRL billion

TransmissãoPaulistamerger with EPTE

CESP spin off creates TransmissãoPaulista

Set up of RBSE compensation

(Ordinance 120 Ministry of Mining

and Energy

Winner bid for 3 lots in October

auction

Expansion to 17 Brazilian states through greenfield projects and acquisitions

ISA acquires CTEEP and

becomes the controlling

shareholder

Winner bid for 5 lots in April auction

Extension of Main Concession Contract (059/2001) for 30 years

2018

Winner bid for 2 lots in June auction

2019

0.1 0.71.1

1.6 0.2 0.7 1.6

11.5 12.3 15.4 17.7 18.6 18.6

2.5 2.3

18.6

Note: ¹ Information considers 100% of the projects

IE Itapura(Bauru) startup and winner bid for 3 lots in December auction

Page 8: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

▪ Tickers: TRPL3¹ and TRPL4²

▪ Corporate Governance: Level 1 at B3

▪ Average daily volume in 1Q20:BRL 49 million

▪ Market cap³: BRL 14 billion

▪ Distribution of capital: 51% of Brazilian investors49% of foreign investors

▪ ADRs: “CTPTY” e “CTPZY”

▪ Coverage of 14 institutions :

Common shares: 89.5% Preferred shares: 1.3%

ISA35.8%

Common shares: 10.5%Preferred shares: 98.7%

Free Float

64.2%

Common shares: 9.7% Preferred shares: 53%

Eletrobras36%

Common shares: 0.7% Preferred shares: 45.8%

Others28%

64% Hold

22% Buy

14% Sell

Common shares: 257,937,732 Preferred shares: 400,945,572 Total: 658,883,304

CONTROLLED BY ISAFREE FLOAT OF 64%

ISA CTEEP

Notes: ¹ Common share l ² Preferred share l ³On 03/31/2020

Shareholder Structure on 03/31/2019

Page 9: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

Note: ¹On 12/31/2019

América Central

Brasil20% of participation in the Transmission market in 2019

Bolivia

Argentina

Peru70% of participation in

the Transmission market in 2019

Colombia70% of participation in the Transmission market in 2019

Chile12% of participation in the Transmission market

in 2019

▪ Largest high-tension electric transmission network in Latin America

INTERCONEXIÓN ELÉCTRICA, S.A.E.S.P.

A multilatina company recognized for the excellence of its operations

Solid Presence in Latin America:7 countries, 3 sectors, 43 companies

ISAOperational:

▪ 46,374 km of transmission lines

▪ 92,600 MVA in power capacity

Under construction :

▪ 7,431 km of transmission lines

▪ 15,482 MVA in power capacity

▪ Businesses in:

▪ Energy transmission

▪ Highway concessions

▪ Information Technology/Telecom

▪ Controlled by the Colombian government (51% of shares)

▪ Market cap: USD 6 billion¹

Page 10: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

CORPORATE STRUCTURE

ISA CTEEP and its subsidiaries Assured Annual Revenue (RAP) 2019/2020 Cycle of BRL 3.7 billion

12019/2020 revenue cycle includes adjustment parcel (“PA”), net of PIS and COFINS2 Presumed Profit: tax regime where the income tax is 25% on the presumed 8% of operating income and social contribution tax is 9% over the presumed 12% on operating income. Real Profit: tax regime where Income Tax and Social Security Contribution totals 34% on income

RAP ISA CTEEP

Cycle 2019/2020

(BRL million)

ISA CTEEP Operational São Paulo 2,579 2,579 Real Profit ISA CTEEP 100% Fully consolidated

IE Madeira Operational Rondônia / SP 511 260 Real Profit ISA CTEEP 51% / Furnas 24,5% / Chesf 24,5% Equity method

IE Ivaí Under construction Paraná 294 147 Real Profit ISA CTEEP 50% / TAESA 50% Equity method

IE Paraguaçu Under construction Bahia / MG 118 59 Real Profit ISA CTEEP 50% / TAESA 50% Equity method

IE Garanhuns Operational Pernambuco 91 46 Real Profit ISA CTEEP 51% / Chesf 49% Equity method

IE Aimorés Under construction Minas Gerais 79 40 Real Profit ISA CTEEP 50% / TAESA 50% Equity method

IE Aguapeí Under construction São Paulo 59 59 Presumed Profit ISA CTEEP 100% Fully consolidated

IE Serra do Japi Operational São Paulo 58 58 Presumed Profit ISA CTEEP 100% Fully consolidated

IE Pinheiros Operational São Paulo 57 57 Presumed Profit ISA CTEEP 100% Fully consolidated

IE Itaúnas Under construction Espírito Santo 52 52 Presumed Profit ISA CTEEP 100% Fully consolidated

Operational Minas Gerais 19 19

Under construction Minas Gerais 33 33

IE Itaquerê Under construction São Paulo 51 51 Presumed Profit ISA CTEEP 100% Fully consolidated

Operational Espírito Santo 10 10

Under construction Rio Grande do Sul 38 38

IENNE Operational Tocantins 46 46 Presumed Profit ISA CTEEP 100% Fully consolidated

IE Biguaçu Under construction Santa Catarina 40 40 Presumed Profit ISA CTEEP 100% Fully consolidated

Under construction SP / Paraná 20 20

Under construction Mato Grosso do Sul / SP 5 5

IE Itapura - Bauru Operational São Paulo 12 12 Presumed Profit ISA CTEEP 100% Fully consolidated

IE Itapura - Lorena Under construction São Paulo 11 11 Presumed Profit ISA CTEEP 100% Fully consolidated

IE Sul Operational Rio Grande do Sul 18 18 Presumed Profit ISA CTEEP 100% Fully consolidated

Total 4,203 3,662

IEMG

IE Tibagi

Presumed Profit ISA CTEEP 100% Fully consolidated

Presumed Profit ISA CTEEP 100%

ConsolidationLocation

RAP Cycle

2019/2020¹

(BRL million)

Share (%)Profit Regime²

Fully consolidated

Presumed Profit ISA CTEEP 100% Fully consolidated

Evrecy

Page 11: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

Corporate Governance Structure

Human ResourcesCommittee

AuditCommittee

Fiscal Council8 effective members, of which 2 are independent and one is elected by the

employees

5 effective members

and 4 substitute members

Board of Directors

Rui Chammas

CEO

Ethics and Transparencyrecognized at ISA and at ISA CTEEP level

2019 Transparency Trophy from ANEFAC

Experienced Management team focused on value creation

Shareholders

CFO and IRO COOInstitutional Relations Officer

Alessandro Gregori FilhoCarlos Ribeiro

Carlos Ribeiro(interim)

Chief Project Officer

Rui Chammas(interim)

Page 12: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

CONNECTIONS THAT CREATE VALUE THROUGH

ACTIONS

▪ Forest projects that reduce the impact of greenhouse gases

▪ Climate change mitigation

▪ Conservation of biodiversity in jaguar’s habitat

JAGUAR CONNECTION:

▪ ~BRL 8 million in investments in 2019

▪ Projects related to Youth Leadership, Local Development, and the Environment

▪ Educational Focus

SOCIAL RESPONSIBILITY:Sponsorship with tax benefit

CONEXIONS THAT INSPIRE

Page 13: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

C O N N E C T I O N S T O G E N E R A T E S U S T A I N A B L E V A L U E

DigitalizationReal Estate

OpportunitiesEnergy Storage

Operational safety optimization with cost reduction through substation

teleassistance and retrofitting

Ancillary Services

“Conexão Plus”

NEW BUSINESSESEFFICIENCY

Page 14: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

A ISA CTEEP no Setor detransmissão

SustainableValue

Financial Highlights

ISA CTEEP in the Transmission Sector

ISA CTEEP

Page 15: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

T r a n s m i s s i o n R e v e n u e s ¹

( 2019 /2020 c y c l e )

36%

10%7%

9%

34%

4%

TAESAEletrobras AluparISA CTEEP State Grid Outros

Total:BRL 37 billion

IS THE PURE TRANSMISSION COMPANY IN THE SECTOR IN BRAZIL

Notes: ¹ Considers auctions held until December of 2018 | ² Interconnected National System| ³ National Electric Energy Agency | 4 National Operator of the Electric System

SIN² is composed of 142 thousand km of transmission lines and serves 98% of the market

The transmission sector is regulated and monitored by ANEEL³ and coordinated and controlled by ONS4

Transmission companies are remunerated by the availability of its assets. There is no demand risk and no default risk.

Source: ANEEL

Page 16: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

Concessions prior to 1998

Concessions between 1999 and 2006

Concessions after November 2006

THE COMPANY’S MAIN IS IN

▪ Revenue (RAP) annually adjusted by IPCA

▪ Contracts renewed in 2013 (Provisional Measure 579/2012)

▪ Tariff Reset every 5 years (O&M, WACC and RAB¹)

▪ RAP annually adjusted by IGP-M

▪ 50% RAP reduction on the 16th year of operation

▪ No tariff reset

▪ Reset of reinforcements and improvements, starting in July 2019 every 5 years

▪ RAP annually adjusted by IPCA

▪ 30-year-contract, with 3 tariff resets (cost of debt applied at WACC)

▪ Reset of reinforcements and improvements every 5 years

RAP in operation: 70%

RAP in operation: 1%

RAP in operation: 14%

RAP under construction: 15%

Note: ¹ Regulatory Asset Base

Page 17: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

▪ Revenue (RAP) approved by ANEEL with periodic tariff reset (“PTR”)

▪ RBSEReceivables related to the non depreciated assets in operation in May/2000 (Contract 059/2001)

▪ O&MPart of revenues that reimburses operational costs of concessionaires partially or fully. Defined in the PTR process and annually adjusted by inflation

▪ New Investments (NI)Organic growth with execution of authorized reinforcements and improvements

▪ Variable Parcel (PV)Revenue reduction due to unavailability

▪ Adjustment Parcel (PA)Compensates excess or deficit of revenues in the previews tariff cycle

Annual Costs of

Electric Assets

(CAAE)

O&M Revenue

(AOM)

Gross Investment x

%O&M

+Gross Investment x

Depreciation Rate

Net Investment x

Regulatory WACC

ISA CTEEP

Annual Allowed Revenue (RAP) Breakdown

DEMAND DOES NOT IMPACT TRANSCO’S REVENUE

PV

RBSE

(CAAE)

O&M

(AOM)

NI

(CAAE e AOM)

PA

PV

OTHERS¹

Note: ¹Other revenues consider bilateral and sharing contracts

Page 18: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

ISA CTEEP in the Transmission Sector

Estratégiae gestão

Financial Highlights

SustainableValue

ISA CTEEP

Page 19: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

P E S S O A S

Regulação

Valor Justo

Jurídico

Gestãode Litígios

Crescimento

Disciplinade Capital

Integração

Subsidiárias

Projetos

CrescimentoOrgânico

Operação eManutenção

Eficiência, Qualidade,Segurança

REMUNERATION FROM ASSET AVAILABILITY

Note: ¹ Considers revenue proportional to ISA CTEEP’s participation in assets with partnerships

BRL 3,585 million

RAP

Composition

of Contract

059

Contract 059

Subsidiaries in Operation

Subsidiaries in Construction

RBSE

O&M

New Investments

Assured Annual Revenue (RAP) - 2019/2020 Cycle¹

Page 20: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

Focus in cost efficiency, service quality and operational safety to maximize results

0,0031%

0,0056%

0,0020%

0,0025%

0,007%

0,0010%

12,95

16,37

7,69

7,06

2,16

2,67

0,55

0,35

0,2

0,17

0,07

0,11ISA CTEEP

South

Southeast/Midwest

SIN

Northeast

North

FREQ (times)Equivalent Frequency of Interruption

DREQ (minutes)Equivalent Duration of Interruption

ISA CTEEP

South

Southeast/Midwest

SIN

Northeast

North

IENS (%)Index of Non-Supplied Energy

ISA CTEEP

South

Southeast/Midwest

SIN

Northeast

North e

December 2019 figures

Page 21: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

OPERATIONALASSETS

▪ 18.6 thousand km of transmission lines

▪ 65.9 thousand MVA of power transformation capacity

▪ Revenue (RAP) of BRL3.1 million¹

Note: ¹ 2019/2020 RAP Cycle weighted by ISA CTEEP’s participation

IENNE (100%) TL: 710 kmSubstation: noneRevenue: BRL 46 million

IE Garanhuns (51%)TL: 633 kmSubstation: 2,100 MVARevenue¹: BRL 46 million

IE SUL (100%) TL: 167 km Substation: 900 MVA Revenue: BRL 18 million

IE Madeira (51%)TL: 2.4 thousand km Substation: 7.5 MVA Revenue¹: BRL 260 million

ISA CTEEPLT: 14.3 thousand km Substation: 48,800 MVA RAP: R$ 2.6 billion

IE Serra do Japi (100%) TL: 137 km Substation: 2,000 MVA Revenue: BRL 58 million

IEMG (100%) TL: 173 km Substation: noneRevenue: BRL 19 million

Evrecy (100%)TL: 154 kmSubstation: 450 MVA Revenue: BRL 10 million

Substation

Line Entrance

TransmissionLine (TL)

In operation

IE Itapura – Bauru (100%)1 Static Component (Bauru Substation) Revenue: BRL 12 million

IE Pinheiros (100%) TL: 1 km Substation: 4,200 MVA Revenue: BRL 57 million

Page 22: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

RBSE (BASIC NETWORK OF EXISTING SERVICE) CASH FLOW BOOSTS CASH GENERATION FOR THE NEXT YEARS

▪ RBSE: receivables related to the non depreciated assets in operation before May/2000

▪ In April/2017 injunction determined temporary exclusion of Ke

▪ In November/2019, the judiciary dismissed some lawsuits, which led to the exclusion of Ke from the financial component, consequently the respective injunctions were no longer effective.

▪ In October of 2019 Bill 4,636/19 that proposes the exchange of Ke to WACC was approved in the House of Mines and Energy Commission. This Bill is in discussion at the Finance and Taxation Committee (CFT) and will later follow to the CCJC and then to the Upper House.

Note: ¹ Net of PIS/COFINS. Amounts represent what was established for cycles 2017/2018 (REH ANEEL 2,258), 2018/2019 (REH ANEEL 2,408) and 2019/2020 (REH ANEEL 2,565). Premises for future cycle according to REN ANEEL 762/2017 and based on REH ANEEL 2,565. Regulatory WACC of 6.64%, that will be updated in the tariff review. Asset base is subject to write-offs in the tariff reset process.

RBSE Receivables Schedule1 (BRL million)

PROCEEDINGS

LOWER HOUSE UPPER HOUSE EXECUTIVE

CME CFT CCJC COMMITTEES PLENARYSANCTION

VETOS

837711 747 747 747 747

347

785

729

750785 785 785 785

785

2018/2019

1,566

2019/20202017/2018 2020/2021 2022/20232021/2022 2023/2024 2024/2025

1,4611,532 1,532 1,532 1,532

1,132

785

246 253 264 264 264 264 264 264Ke 246 253 264 264 264 264 264 264

246 253 264 264 264 264 264 264WACC 151 156 163 163 163 163 163 163

Financial Component Economic Component

Page 23: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

GUARANTEE ANADEQUATE

TARIFF RESET

▪ Transmission concession contracts renewed in 2013 are subject to a periodic tariff reset (“PTR”) every five years

▪ PTR was postponed to Cycle 2020/2021, with retroactive effects to 2018

▪ Public Consultation to obtain inputs for the periodic tariff reset of contract 059. The period for submitting the contributions ends on May 15, 2020.

Regulatory Operational Costs (O&M

Cost of Capital(WACC)

Regulatory Asset Base & Regulatory Price Reference

Improvements in small scale

Page 24: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

GUARANTEE ADEQUATETARIFF RESET FOR

CONTRACT 059

RegulatoryOperationalCosts

WACC Regulatory Asset Base & Price Reference

▪ 17% O&M revenue reduction over the cycle (5 years), from BRL750 million (2017/2018 cycle) to BRL620 million (2022/2023 cycle). O&M revenue considers a 34% efficiency premium.

▪ Value does not consider the margin

▪ New Price Reference approved by Resolution 2,514/2019

▪ Price Reference based on sector investments between 2013 and 2017

▪ Evaluation report of assets presented to ANEEL in July of 2019 (ANEEL dispatch 1,140/2019)

▪ ANEEL auditing of the report started late 1Q20

▪ WACC increase from 6.64% to 7.71% has a positive impact on the 2018/2019 revenue cycle of about BRL80 million¹

▪ Technical Note 215/2018

▪ Fixed revenue throughout the tariff cycle

▪ ANEEL proposal based on last 5-year investments

Minor improvements

1Resulting from the higher remuneration of the Company's asset base (RBNI and RBSE) according to the report presented in the PTR process (filed in Jul/19). Amount does not consider possible effects of

the new WACC on the Financial Component of RBSE. Base date: Jan/20. Non-linearized RAP.

Page 25: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

Nota: ¹ Considers project information (100%)² 2019/2020 RAP Cycle weighted by ISA CTEEP’s participation

IE Itaquerê (100%)3 Comp. Synchronous (Araraquara Substation) CAPEX ANEEL: BRL 398 millionRAP19/20 cycle : BRL 51 million ANEEL Term: Aug/21

IE Aguapeí (100%)TL: : 111 kmSubstation: 1.4 thousand MVA ANEEL CAPEX: BRL 602 millionRAP19/20 cycle: BRL 59 millionANEEL term: Aug/21

IE Paraguaçu (50%)²TL: 338 kmSubstation: none ANEEL CAPEX: BRL 510 millionRAP19/20 cycle : BRL 118 millionANEEL term: Feb/22

IE Itaúnas (100%)TL: 79 km Substation: 1,200 MVA1 Static Comp. ANEEL CAPEXc: BRL 298 millionRAP19/20 cycle : : BRL 52 million ANEEL term: Feb/22

IE Aimorés (50%)²TL: 208 km Substation: noneANEEL CAPEX: BRL 341 million

RAP19/20 cycle : BRL 79 millionANEEL term: Feb/22

IE Tibagi (100%)TL: : 18 km on double circuitSubstation: 500 MVA ANEEL CAPEX: BRL 135 millionRAP19/20 cycle : BRL 20 millionANEEL term: Aug/21

IE Ivaí (50%)²TL: 599 km (230/500 kV) in double circuitSubstation: 3 thousand MVA CAPEX ANEEL: BRL 2 billionRAP19/20 cycle : BRL 294 million ANEEL term: Aug/22

Under construction

Substation

Line Entrance

TransmissionLine (TL)

IE Itapura – Lorena (100%)TL: 6 km of double circuit Substation: 1,200 MVA CAPEX ANEEL: BRL 238 millionRAP19/20 cycle : BRL 11 millionANEEL term: Sep/22

IE Biguaçú(100%)TL:: 57 km Substation: 300 MVA ANEEL CAPEX: BRL 641 millionRAP19/20 cycle : BRL 40 millionANEEL term: Sep/23

ASSETS UNDER CONSTRUTION

▪ 2 thousand km of transmission lines1

▪ 12 thousand MVA of power transformation capacity1

▪ Revenue (RAP) of BRL 556 million²

Evrecy (100%) MinuanoTL: 169 kmSubstation: 2.7 thousand MVA CAPEX ANEEL : BRL 682 millionRAPauction: BRL 38 millionANEEL term: Dec/24

Três LagoasTL: 37 kmSubstation: noneCAPEX ANEEL: BRL 99 millionRAP19/20 cycle : BRL 5 millionANEEL term: Jun/23

IEMG (100%) Triângulo MineiroTL: 173 kmSubstation: 1.6 thousand MVACAPEX ANEEL: BRL 554 millionRAPauction: BRL 33 million ANEEL term: Dec/24

Page 26: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

GROWTH OPPORTUNITIES

TO CREATE VALUE GREENFIELD PROJECTS AND RETROFITTING

M&AConstantly evaluating market opportunities for consolidation

2029 Decennial Energy Plan

▪ BRL 104 billion of investments in transmission estimated for 2020-2029

▪ 70% in retrofitting projects

▪ 30% in greenfield projects

Page 27: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

ISA CTEEP in theTransmission Sector

SustainableValue

DestaquesfinanceirosFinancialHighlights

ISACTEEP

Page 28: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

51% 76% 83% 82%

NET REVENUE (BRL MILLION)

2,815

2017 2018

2,767

2019

1,778

LTM

2,775

2,300

2017 2018

2,287

1,351

2019 LTM

2,254

615

20182017 2019 LTM

1,276 1,222 1,300

Notes: LTM considers the last 12-month results ending on March 31, 2020

¹ Excluding depreciation and contingencies² Net income adjusted for non-controlling interest

The figures for Net Revenue and EBITDA do not consider results of affiliates, which are accounted for as equity income

O&M COSTS¹ (BRL MILLION)

EBITDA ICVM 527 (BRL MILLION) NET INCOME (BRL MILLION)²

EBITDAMargin

REGULATORY RESULTS HIGHLIGHTS

STRONG CASH GENERATION BOOSTED BYRBSE

509 538594 594

2017 2018 2019 LTM

Page 29: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

SOLID DEBT PROFILE WITH

▪ Debt Amortization Schedule (BRL million) Debt Breakdown

Debt Profileon 03/31/2020

▪ Gross Debt: BRL 3.4 billion

▪ Average cost: 6.4% p.a

▪ Average term: 3.8 years

▪ Net Debt / EBITDA: 1.1x

Investment Grade by Fitch: AAA(bra)

250

82 78

396

725613

51

2026+20259M20 2021 20242022 2023 2030+

1,23716%

56%

23%

5%

Local Bonds

BNDES - TJLP Law 4.131

Others

Page 30: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

▪ Minimum payout of 75% of regulatory net income limited to the financial covenant of 3.0x Net Debt/EBITDA

▪ Proceeds via interest on capital and dividends payments

▪ 2020 estimated dividends calendar: April, July, October, and December (payment in 2021).

Strong cash generation allows higher dividends

(R$ million)

RegulatoryPayout

136% 101% 92% 154% 81%

335 247

585

995

150

1,985

20172015 20192016 2018 1Q20

49%

Page 31: Apresentação do PowerPointstatic.cteep.mediagroup.com.br/...Institutional-Presentation-vfinal.pdf · IE Madeira 51% Revenue² 2019/2020 cycle BRL 260 million IENNE 100% Revenue

e-mail: [email protected]: +55 11 3138-7407

www.isacteep.com.br/ir

INVESTORRELATIONS