Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie Freudenstein (diplom) C. Menge, Th. Punz (students) + N.N. Irradiation Wim de Boer Alexander Dierlamm (PhD) Alexander Furgeri (PhD) Bonding & test center Hans Jürgen Simonis Tobias Barvich (techn.) 50% Pia Steck (techn.) NN Module qualification & diagnostic Guido Dirkes (PhD) Stefan Heier (PhD) Manuel Fahrer (PhD) Thomas Weiler (PhD) M. Waldschmitt (diplom) B. Atz (techn.) Group leader: Th. Müller Technical coordinator: P. Blüm Integration & long-term test Stefan Heier (PhD) Valery Zhukov Tobias Barvich (techn.) 50% NNs
14
Embed
Apr 03, Frank HartmannInstitut für Experimentelle Kernphysik1 Organigram of the CMS hardware group in Karlsruhe Sensor quality test Frank Hartmann Stefanie.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 1
Organigram of the CMS hardware group in Karlsruhe
Sensor quality test
Frank HartmannStefanie Freudenstein (diplom)C. Menge, Th. Punz (students) + N.N.
Irradiation Wim de BoerAlexander Dierlamm (PhD) Alexander Furgeri (PhD)
Bonding & test center
Hans Jürgen SimonisTobias Barvich (techn.) 50%Pia Steck (techn.)
NN
Module qualification & diagnostic Guido Dirkes (PhD) Stefan Heier (PhD)Manuel Fahrer (PhD) Thomas Weiler (PhD) M. Waldschmitt (diplom)B. Atz (techn.)
Group leader: Th. Müller
Technical coordinator: P. Blüm
Integration & long-term test
Stefan Heier (PhD)Valery ZhukovTobias Barvich (techn.) 50%NNs
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 2
1) Readiness of the testing rooms and storage spaces
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 4
2.) Readiness of Readout I (ARC)
• Aachen LED array and high voltage card ordered for full cross calibration with KA (FED-based) readout systems.
Purpose: reception and testing of hybrids!
• hyb tested: 2• reprod: fine• x-calib: waiting for calib. module • Db integration: yes• LED: Ac LEDs ordered for x-calib• software ver: 6.0b
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 5
2.) Readiness of Readout II FASTTEST (FED-based)
Purpose: fast testing after bondingmodules tested: ~15 modules tested
(prototype, expressline 1, expressline 2) reprod: fineX-calib I: see aboveX-calib II: Officially waiting for calib. module Db integration: Done, … to be commissionedLED: 4 LED arrays includedCooling: active cooling with Peltiers
possible LED readout at -10°Cpossible cosmics calibration
Fasttest IIFasttest II
Bonder
• ESD• Facemask
Already moved to final area (bonding lab)!
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 7Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 1
2/3.) Readiness of Readout III Diagnose (FED-based)
reprod, X-calib I, X-calib II, Db integration: same state as fasttest (II)LED array: (1050nm and 950nm)Movable LASER:for single strip/pitch
scans (1050/650 nm)• possibility to set probe needles,• tests with a 90Sr source• cosmics• high resolution IV• possibility to introduce CV.
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 8
2/3.) Readiness of Readout DAQ CMS-System
Purpose: Module testing
• development towards petal readout systemmodules tested: ~1 module tested reprod: fineX-calib: Not yetDb integration: YES
software ver: Lt_v.82 installed and tested with Db for one 'old' module. Update to v.90 and x-calibration is foreseen
(responsibility of V. Zhukov)
This setup will be finally used for the petal assembly!We need another one for the petal longterm testing!
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 9
4) Readiness of the LT single module set-up!
• We have NO dedicated SINGLE LT teststation!
• KA LT Plan! Use of the Fastteststation (II) with active cooling!– 1/ day: last bonded module for LT over night
– 1/week: last bonded module for LT over weekend
• 4.1) General comments on software! Fastteststation soft
• 4.2) is the LT single module set-up commissioned? FASTTEST YES
• 4.3) number of hour of running for the longest run performed 20h
• 4.4) list of missing equipment to enter into production! Ready
• 4.5) Are results obtained with ARC and LT in your lab in agreement?– Basically YES,
– final x-calibration still to be done!
• The final production LT will be done on petal basis.
Stability: Stability: Calibrated with cosmicsCalibrated with cosmics
HITMAP:
~ 20 hours run (7000 events @ 0.1 Hz)
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 11
Add. Comments on Cross CalibrationARCS <=> Karlsruhe (for all stations!)
• Several modules tested in Aachen and Karlsruhe.• Full comparison with TEC Expressline I, already presented in several
prior meetings (and partially by analysing Expressline II modules) • Many basic and analysis results already shown in several meetings!
1. pinhole tests, basic defect analysis2. TEC Expressline I & II3. single shot test beam4. Test of irradiated hybrids --- modules forseen ( active cooling)5. Ongoing scratch and high leakage current tests6. Starting of bond tests in high magnetic field @4T
KarlsruheAachen
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 12
Add. NEEDS for petal assembly and petal LT
• 1 FED
• 1 FEC
• 7+1 OEC
• LV (ordered), HV, LLN cooling plant (ordered)
• actual need for prototype petal: – 4 optical hybrids + 1 OEC (already in house, but requested for X5)
– Optical cables
– Interconnectboard inc. CCUM
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 13
A sse m b ly in K arls ru h e :
R eo rg an isa tio n w ith in th e F o rsch u n g szen tru m --> n ew lab o ra to ry -a rea in a d iffe ren t h a ll
-- ~ 3 0 m ^2 c lean ro o m fo r p e ta l-in teg ra tio n (c la ss 1 0 0 0 0 0 ) av a ilab le ju ly 2 0 0 3
-- b ig ten t (6 m x 9 m ) as a g rey ro o m fo r th e en d cap -a ssem b ly (av a ilab le au tu m n 2 0 0 3 )
In th e m ean tim e th e co m p o n en ts fo r p e ta l in teg ra tio n a re co m p iledin a n o rm al lab in o u r s tan d a rd b u ild in g .
Apr 03, Frank Hartmann Institut für Experimentelle Kernphysik 14