Lake Constance 5DConference 2015 Applying BIM to Infrastructure Refurbishment Projects Copyright: Drees&Sommer
20

Applying BIM to Infrastructure Refurbishment Projects · Member of Coordination Circle –BIM Cluster Region Stuttgart Other functions, main areas of expertise Professional career

Oct 20, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • Lake Constance 5D‐Conference 2015

    Applying BIM to Infrastructure Refurbishment Projects

    Copyright: Drees&Sommer

  • Lake Constance 5D‐Conference 2015

    Since 10/2014 Scientific assistantUniversity StuttgartInstitute for Construction Management

    2013 – 2014 Assistant lecturer University of applied sciences Stuttgart 

    2011 ‐ 2014 Project manager and project partner Drees & Sommer Infra Consult und Entwicklungsmanagement GmbH

    2009 ‐ 2010 Trainee, student trainee und diploma studentPorsche Consulting GmbH

    2004 – 2010  University Stuttgart – industrial engineer1999 – 2002  Joiner; cabinet maker

    Professional career

    Personal reference projects (selection)

    Project management new Central Omnibus Station in Pforzheim

    Organization and project management – Consultation on decommissioning of nuclear power plants

    Project management consultancy on the construction of a nuclear waste repository

    Technical consultancy on the procurement of 4 PPP motorway sections

    University StuttgartInstitut für Baubetriebslehre(Institute for Construction Management)

    Tel. +49 711 685 66143Fax +49 711 685 [email protected]‐stuttgart.de

    Jakob von Heyl

    Dipl.‐Wirt.‐Ing.Scientific assistant

    Main areas of expertise Project organization and project management Building Information Modeling Lean Construction Public Private Partnerships 

  • Lake Constance 5D‐Conference 2015

    Member of Coordination Circle – BIM Cluster Region StuttgartOther functions, main areas of expertise

    Professional career

    Personal reference projects (selection)

    Project manager– BIM pilot project station airport Deputy project manager– Stuttgart Airport underground 

    station Deputy project manager– SFSU underground stations 

    Stuttgart Cost and schedule control – Stuttgart 21 Team (megaproject)

    Drees & Sommer Infra Consult und Entwicklungsmanagement GmbHUntere Waldplätze 37 70569 Stuttgart

    Tel. +49 711 222933‐4263Fax +49 711 222933‐[email protected]

    Markus Eiberger

    M. Eng. – International Project ManagementB. Eng. – Infrastructure Management

    Project Manager

    since 2012 Project manager at Drees & Sommer Infra Consult und Entwicklungsmanagement GmbH

    2009 ‐ 2012 Student trainee at Drees & Sommer Infra Consult und Entwicklungsmanagement GmbH

    2009  Trainee at Drees & Sommer GmbH1997 ‐ 2003 Joiner; interior finishing

  • Lake Constance 5D‐Conference 2015

    Project description

    Top view

    Location

  • Lake Constance 5D‐Conference 2015

    Project organization

  • Lake Constance 5D‐Conference 2015

    Project scope

    Stairway – Ostkopf (East entrance)Station platform – Track 1

    Intermediate level – Ostkopf (East entrance)Intermediate level – Westkopf (West entrance) 

  • Lake Constance 5D‐Conference 2015

    BIM motivation

    Project goals 

    Planning

    Projectmanagement

    BIM

    Pilot project

    Construction

    Learning AdaptingIdentifying

  • Lake Constance 5D‐Conference 2015

    Primary workshop results

    1. Aims of the project participants: Learning about BIM, applying BIM, 2. Defining scope of project and collaboration3. Definitions and requirements:

    – Software, formats  and interfaces– General level of detail– Content and project segments– Required resources– Tasks and milestones

    1 2 3

  • Lake Constance 5D‐Conference 2015

    Project schedule

  • Lake Constance 5D‐Conference 2015

    Collection of information

    Inventory model

  • Lake Constance 5D‐Conference 2015

    Software landscape

    Primary information Secondary information

    Process management 

    Process management 

    Applications

  • Lake Constance 5D‐Conference 2015

    Work Breakdown Structure

  • Lake Constance 5D‐Conference 2015

    Work Breakdown Structure – Link to objects

    • Geometrical elements are linked to the relevant work packages• Information contained in the individual work packages is also integrated into the model• The execution of a work package or a set of work packages is contractually assigned to 

    one of the project participants

  • Lake Constance 5D‐Conference 2015

    Work Breakdown Structure and Scheduling

    • The project phases and individual work steps and content are defined via the WBS.• Scheduling is undertaken by assigning defined times.• Further detail is added as more information becomes available.

  • Lake Constance 5D‐Conference 2015

    Object‐oriented Time Management

    • Actual progress is compared to planned progress for individual work packages. • Project progress can be represented visually by different colors.• The current status of the project can be seen at a glance. 

    Legend:‐ Ready for inspection ‐ On schedule‐ Within tolerance ‐ Delayed

  • Lake Constance 5D‐Conference 2015

    Level of detail

    Phases

    Initiation Planning Project supervision Closing

    Develop

    project o

    rder

    Data sourcing

    Prelim

    ary de

    sign

    Build

    ing pe

    rmission

     ap

    plication

    Execution draw

    ings

    Prep

    arationof 

    contract award

    Supp

    ort con

    tract 

    award process

    Projectcon

    struction 

    supe

    rvision

    Docum

    entatio

    n

    Build

    ing inspectio

    n

    As‐built

    Mod

    el han

    dover

    Level ofdetail 500 Model refurbishment

    400

    300

    200

    100 New construction

    • The current status is to be reflected in the model at the start of planning. This represents as‐built documentation.

    • The level of detail increases during the course of the project.

  • Lake Constance 5D‐Conference 2015

    Planning and model coordination

    Phases Initiation Preliminary design Final design  Building permission application Execution drawings

    Milestones

    Level of detail

    Coordination

    Coordination part

    Coordination detail

    Planner 1: Structural engineer

    Planner 2: Architect

    Planner 3: Planner technical building servies  

    Information

    LOD

  • Lake Constance 5D‐Conference 2015

    Project Procurement Management

    Expected advantages:• BIM enables automatic calculation of quantities• Work packages are aggregated to procurement units• The various bidders and bids are captured digitally• Price comparisons and comparative lists are generated for key items• Various execution scenarios can be simulated to identify the best possible tender • Current contract award status (prices and items) can be represented in the model 

    Model

    Σ … m³ Σ … €

    Detailed estimate• …..   • ….. • …..   • …..• ..…   • …..• ..…   • ..…• ..…   • …..• ..…   • ….. …….

    n3

    2

    n32

    n32

    n32

    Quantity Take Off

    Calculation Procurementunits

    Bids Contract

  • Lake Constance 5D‐Conference 2015

    Conclusion

    Lessons learned:• BIM can be used for established properties.• BIM requires clear structures and specifications.• Disciplined and structured work and good methods 

    and software skills are basic requirements for BIM projects. 

    • Appropriate qualification of project participants must be ensured through systematic training measures.

    Outlook:• The procedure (from client perspective) used during 

    the pilot project is a good starting point for future projects.

    • Further progress towards a holistic approach can be made if other project participants’ perspectives and experiences are examined as well.

    • A perceptible improvement is expected in the areas of communication and management as the result of using BIM. 

  • Lake Constance 5D‐Conference 2015

    Copyright: Drees&Sommer