A-1 Financial Compliance Each year the Department provides to the Governor and the Legislature summary financial information and a statement of assurance that the Department has prepared a comprehensive financial report of all funds for the preceding year. The financial report must include a report by independent public accountants attesting that the financial statements present fairly the financial position of the Department in conformity with generally accepted accounting principles (GAAP). The Department has prepared a Comprehensive Annual Financial Report (CAFR) for Fiscal Year (FY) 2012. Included in the CAFR will be a report of the independent public accountants, Rubin Brown, LLP, once all outstanding State of Kansas audits are complete. Also included is a certificate of achievement awarded to the Department for excellence in financial reporting for the 2012 CAFR. The award marks the 24th consecutive year the Department has received the award for excellence in financial reporting. The complete CAFR will be available by contacting KDOT’s Bureau of Transportation Information at 785-296-3585 (Voice)/ (TTY). The CAFR will also be available on KDOT’s Website at http://www.ksdot.org/burFiscal/default.asp, under KDOT Financial Disclosures. This appendix contains additional transportation information including: •Financial Compliance •Project Selection Criteria •Project list detailing projects scheduled for improvement during FY 2013-2020, projects completed in FY 2012 and projects under construction as of November 2012. Also list of aviation, rail and public transit projects. •Transportation Revolving Fund •Modal Information •Federal Fund Exchange Program APPENDIX 2013 Annual Report KANSAS DEPARTMENT OF TRANSPORTATION’S to the Section A
80
Embed
APPENDIX - Kansas Department of Transportation · 2020. 8. 19. · A-3 Project Selection Criteria In May 2010, the Kansas Legislature passed the transportation program, Transportation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
A-1
Financial Compliance Each year the Department provides to the Governor and the
Legislature summary financial information and a statement of assurance that the Department has prepared a comprehensive financial report of all funds for the preceding year. The financial report must include a report by independent public accountants attesting that the financial statements present fairly the financial position of the Department in conformity with generally accepted accounting principles (GAAP).
The Department has prepared a Comprehensive Annual Financial Report (CAFR) for Fiscal Year (FY) 2012. Included in the CAFR will be a report of the independent public accountants,
Rubin Brown, LLP, once all outstanding State of Kansas audits are complete. Also included is a certificate of achievement awarded to the Department for excellence in financial reporting for the 2012 CAFR. The award marks the 24th consecutive year the Department has received the award for excellence in financial reporting.
The complete CAFR will be available by contacting KDOT’s Bureau of Transportation Information at 785-296-3585 (Voice)/(TTY). The CAFR will also be available on KDOT’s Website at http://www.ksdot.org/burFiscal/default.asp, under KDOT Financial Disclosures.
This appendix contains additional transportation information including:•FinancialCompliance•ProjectSelectionCriteria•ProjectlistdetailingprojectsscheduledforimprovementduringFY2013-2020, projectscompletedinFY2012andprojectsunderconstructionasof November2012.Alsolistofaviation,railandpublictransitprojects.•TransportationRevolvingFund•ModalInformation•FederalFundExchangeProgram
APPENDIX
2013AnnualReportKansas Department of transportation’s
to the
Section A
A-2
FY 2012 Financial inFormation
The following schedule is a summary of revenues and expenditures for all funds for FY 2012. All amounts are in thousands.
Percent 2012 of Total
REVENUES Motor Fuel Taxes Vehicle Registrations and Permits Intergovernmental Sales and Use Taxes Investment Earnings Motor Carrier Property Taxes Other Transfers from Other State Funds
Total revenues
$ 431,280
177,649 492,615 312,934
4,656 0
13,415
3,665
1,436,214
31
1234220
01
0
100
130,123 365,988 115,293
258,498
11,307 258,038 43,050 64,021
65,145 74,008
313,402
1,698,873
0 0
(262,659)
7 22 7
15 1
15 3 4
4 4
18 100
00
100
EXPENDITURES Current Operating Maintenance Preservation Modernization Expansion and enhancement Communications system Local Support Rail, Air and Public Trans. Management Debt Service Principal Interest and fees Transfers to Other State Funds Total expenditures
OTHER SOURCES (uses)Revenue Bond Proceeds Total other Excess (Deficiency) of Revenues and Other Sources Over Expenditures
%
%
%
%
%
%
Percent 2012 of Total
A-3
Project Selection CriteriaIn May 2010, the Kansas Legislature passed the transportation
program, Transportation Works for Kansas (T-WORKS) which covers a 10- year period that began in FY 2011. In T-WORKS, the Kansas Department of Transportation (KDOT) was directed to develop a strategic approach to highway project selection that al-lowed for greater stakeholder input and flexibility. KDOT is pilot-ing this new process when selecting the construction projects for this program.
Under T-WORKS, construction projects are categorized into four core programs: Preservation, Modernization, Expansion and Local Construction. The four core programs group construction projects with similar work types and scopes together. Projects within each of these major programs are further grouped together based upon similar funding sources or project-types into more spe-cific groups or subcategories.
For the Preservation program, engineering factors continue to be an effective method for project selection. However, in the Mod-ernization and Expansion programs, engineering factors were aug-mented with other factors. In the Modernization program, project selection combined historically strong engineering-based formulas with regional priorities and in the Expansion program, project selections combined engineer-ing factors with regional priorities and econom-ic impacts. In each of the programs, proposed projects are scored and ranked based upon how well the proposed projects address the relevant criteria. Then, selections are made based upon the combined information. Project selection
for the fourth core program, Local Construction, is unchanged and is determined at the local level by local entities throughout the state with the coordination of KDOT’s Bureau of Local Projects.
Engineering factors for the preservation, modernization and expansion programs were evaluated using the engineering based formulas KDOT already has established. Regional priorities are determined through local-consult meetings held periodically throughout the state. To date, KDOT has conducted local consult meetings twice- once in late 2010 and again in late 2012. Through these meetings and through the continued interaction between the area and district engineers with local entities, KDOT maintains a dialogue with stakeholders throughout the state concerning regional focus and priorities. Potential economic impact was assessed by the agency through the piloting of the computer modeling package-Transportation Economic Development Impact System (TREDIS). TREDIS estimates the increase in jobs, income and economic out-put for a region due to a transportation improvement.
The chart below outlines the selection criteria applied to T-WORKS projects in each of the four core programs and the weight given to each criterion.
The Preservation program protects the public’s investment in its highway system by maintaining the “as built” condition of roads and bridges. Projects in this group range from roadway surfacing rehabilitation and bridge repairs to pavement and bridge replacement.
The engineering factors used when selecting preservation proj-ects relate to the pavement and bridge conditions, like remaining pavement life, rutting, and cracking for roads and joint or bridge deck condition and/or load ratings for bridges. Roads and bridges are evaluated on an annual basis and projects are selected based upon this annual review. Additionally, within the Preservation program, are smaller scale set-aside projects that address such is-sues as signing, pavement markings and railroad crossing surfaces. These set-aside projects are so named because the funds to per-form the work is “set aside” or reserved specifically for the type of work designated by the set-aside category. The set-aside group of projects is selected on an annual basis like the other preservation projects. Since the Preservation program of projects is selected a year at a time, the majority of the preservation projects listed in this report are for work to be performed in fiscal year 2013 or early 2014. Selecting and programming projects on an annual basis allows KDOT to maintain flexibility and responsiveness in their project selection during the remainder of the T-WORKS program.
The second core program, Modernization, focuses on improve-ments to the existing system. Projects under this program are designed to enhance safety and/or improve roadways by adding shoulders, flattening hills, straightening curves and upgrading intersections on already existing roadways. In May 2011, the final selection of the major modernization projects to be completed under T-WORKS was made. These projects were then jointly announced in late May and June 2011 by the Governor and Sec-retary of Transportation. With the majority of the modernization program already selected, the projects to be undertaken during
T-WORKS appear in this report. In contrast to the majority of the modernization program,
the practical improvement group of modernization projects is selected on a need basis and is developed out of the preservation annual review of the roads and bridges. The projects within the practical improvement group are hybrids with elements of both the preservation and modernization program. In general, practical im-provement projects have greater complexity than preservation type projects making them a better fit within the Modernization program. Project scope pertaining to shoulder improvement is an example of the type of work that is a good candidate for the practical improve-ment approach. By employing the practical improvement approach, a project may be completed in the most cost-efficient manner feasible. The implementation of this approach enables KDOT to stretch construction dollars and provide the greatest benefit possible for the dollars spent. While most of the funds for Modernization have been programmed and projects have been selected, a small portion of funding has been reserved to fund the practical improve-ment projects as they are identified as the T-WORKS progresses. In this way, flexibility in scheduling is balanced with the need to select major modernization projects because of their complexity early in a program to ensure that sufficient time is provided for completion.
The Expansion program, the third principal group under T-WORKS, is intended for projects that expand and enhance the transportation system. Projects in this program concentrate on im-proving access by adding new lanes or interchanges, reducing com-mute time and improving air quality by relieving congestion and enhancing economic development in a region by selecting projects with high economic impact. The expansion program with the ex-ception of the economic development portion was selected in early FY 2011 and announced by the Governor and Secretary of Trans-portation in May and June 2011. The expansion projects selected to be completed under T-WORKS appear in this report- including
A-5
all economic development projects selected to date. Because of the complex nature of the Expansion program of projects, early selec-tion is crucial to allow sufficient planning, design and construction time.
However, in order to maintain some flexibility in scheduling, the economic development projects have been partially selected. The remaining economic development projects will be selected on an ongoing basis throughout T-WORKS as viable projects surface. In this way, the agency maintains some flexibility to respond to new opportunities as they arise throughout the remainder of the T-WORKS program.
The fourth program, Local Construction, focuses on improve-ments to city or county roads. The work encompassed by this program is varied in nature ranging from safety oriented, to main-tenance of existing roadway, to small-scale expansion type projects but regardless of the project focus, the common denominator is that the work is always on a city or county road. Many of the subcat-egories within the Local Construction program like the City Con-necting Link Resurfacing Program (KLINK) and Transportation Enhancement (TE) to name only two are partnership programs in which KDOT or the federal government partner with local enti-ties to share the costs and enable local dollars to stretch further. To generate candidate projects, many partnership programs employ a solicitation process in which prospective projects are solicited through an application. The pool of project applications is priori-tized based on program specific criteria. Then projects are selected in order of priority and programmed until the available funds are expended. The schedule for project solicitation varies but most of the partnership programs solicit projects on an annual basis. In oth-er subcategories within the local construction program, the locals are solely responsible for project selection and development. To as-sist local entities in their selection process KDOT makes available bridge inspection data, traffic accident data and traffic count data
among other resources. For local construction, the Bureau of Local Projects is the primary point of contact within KDOT. For detailed information concerning the local construction program and specifi-cally the partnership programs visit the T-WORKS website, the link is provided below.
For an in depth look at the projects selected and undertaken during T-WORKS- including those projects in the core programs, KDOT has established a website that provides information about the entire T-WORKS program. This website is a continued effort on KDOT’s part to gain greater stakeholder input. To accomplish this goal, the website is not only a source of more information but is interactive with sites throughout that provide opportunities to submit questions, opportunities for participation in discussions and opportunities for comment submission. The T-WORKS website is located at the following link http://kdotapp.ksdot.org/TWorks/ .
Project ListingsThe project listings can be found starting on page B-1.
Transportation Revolving FundThe Transportation Revolving Fund is a statewide revolving
loan fund that provides low-cost loans to local units of government for financing road and bridge improvements.
The improvement may be on or off the State Highway System. Since the first loan in August of 2004, the fund has provided 112 loans to 56 cities and counties. The fund has $135.5 million in executed loans with interest rates ranging from 3.25 percent to 4.36 percent.
A-6
Modal InformationPublic Transportation
Public transportation in Kansas is supported by one state program and five Federal Transit Administration (FTA) funding programs. These funding programs, which are augmented by local match, provide the funding for the 84 general public transit service providers and the 59 transit providers that service elderly persons and persons with disabilities throughout the state. Without these programs, many citizens would have no access to public transportation.
The FTA 49 U.S.C. 5311 program provides funding to support rural and small urban (under 50,000 population) transportation projects that serve the general public. Funds are available for both capital and operating assistance. For Federal Fiscal Year 2012, the 5311 program for the state of Kansas was funded in the amount of $9,435,575.00.
FTA 49 U.S.C. 5310 provides federal funds to private nonprofit entities or public agencies approved by the state to purchase vehicles and related equipment that meet the special needs transportation specifically for elderly persons and persons with disabilities. Urbanized areas and nonurban areas with populations under 50,000 are eligible for 5310 funds. For Federal Fiscal Year 2012, the 5310 program for the state of Kansas was funded in the amount of $1,269,778.00.
FTA 49 U.S.C. 5316 provides federal funds to local governmental agencies and nonprofit entities for capital and operating expenses of equipment, facilities, and associated capital maintenance items related to providing access to jobs. For Federal Fiscal Year 2012, the 5316 program for the state of Kansas was funded in the amount of $744,770.00.
FTA 49 U.S.C. 5317 provides federal funds to encourage services and facility improvements to address the transportation needs of persons with disabilities that go beyond those required by the Americans with Disabilities Act. Funding may be used for
associated capital and operating cost. For Federal Fiscal Year 2012, the 5317 program for the state of Kansas was funded in the amount of $436,244.00.
FTA 49 U.S.C. 5309 is a capital investment program with annual funding depending on Congressional earmarks. Assistance is available for the purchase of vehicles and vehicle related equipment and/or facility construction and/or renovation.
Funding for the state program is available from the Coordinated Public Transportation Assistance Fund. The State Highway Fund provides $6 million annually for needed transportation services in areas of the state lacking public transit services and to expand, improve and enhance existing services.
Rail Service Improvement FundMany areas of the state no longer have service from Class I
railroads. Short line railroads provide rail service to such areas, provide an alternative to trucks for freight (primarily grain) shippers, and keep rural areas of the state connected to the national rail network as well as national and international markets for Kansas grains and products. This alternative provides competition and helps keep shipping rates down. It also reduces the number of trucks that would otherwise be on Kansas roads and highways. This in turn avoids increased maintenance and rehabilitation costs for those roads.
The Rail Service Improvement Fund is administered by KDOT’s freight and rail unit. The fund makes loans available to short line railroads, port authorities operating in Kansas and shippers and local units of government. The low-interest, long-term (10-year) loans and grants are used primarily for track rehabilitation, capacity improvement and economic development projects. Funds may also be used for financing and acquisition activities and the purchase of rolling stock. Beginning July 1, 2013, the fund will receive $5 million annually.
A-7
Kansas Airport Improvement ProgramWhen time is of the essence, no other means of travel can fulfill
time-sensitive requirements the way that air transportation does. Airports serve an important role in the state transportation system. The foremost role is the economic activity generated by companies that rely on airports in their daily business. According to the 2010 Kansas Aviation Economic Impact Study, aviation contributes over $20 billion to the Kansas economy each year (the highest per capita economic impact of any state).
Also important are medical services, both fly-in by professionals as well as emergency evacuations. In addition, agricultural applications, charters, a link to the national air transportation system, private air travel, and many other services are available.
The goals of the Kansas Airport Improvement Program (KAIP) include:smaintain the system’s runway condition rating of “very good;”sminimize surface travel time to air ambulance pick-up
locations;simprove safety, and;senhance airport and community economic development
appeal.The program is open to public-use airports in Kansas as defined
in K.S.A. 75-5061. Projects under this program are solicited annually to preserve or modernize facilities, to design or plan continued development and to improve or add equipment. A key element of the program is a matching requirement of between 5 and 50 percent, which is determined by community population, category of project and type of ownership. The program’s $3 million per year in state funds, combined with local matching funds, results in $4 to $4.5 million in improvements per year.
To date, the program has supported 380 projects at 110 public-use airports.
Federal Fund Exchange ProgramThe federal fund exchange program is a voluntary program
that allows a local public agency (LPA) to trade all or a portion of its federal funding allocation in a specific federal fiscal year with KDOT in exchange for state transportation dollars or with another LPA in exchange for their local funds.
Under this program the LPA may develop projects following local procedures, criteria, and standards. All work performed shall be consistent with the Kansas Statutes, applicable regulations, and normal engineering practices for the work being done. Any work performed on the state highway or city connecting link will require coordination with the local KDOT Area Office.
Only LPAs that are eligible to receive a federal funding allocation may participate in the federal fund exchange program. Eligible LPAs include all counties in the state and cities with populations greater than 5,000 that are not located in a Transportation Management Area (TMA). Currently the only TMAs in Kansas are the Mid America Regional Council (MARC – Kansas City Region) and the Wichita Area Metropolitan Planning Organization (WAMPO).
Participation in the program is optional. An eligible LPA may choose to exchange its federal funds or it may use the funds to develop a federal aid project following the established procedures.
In general, KDOT will determine the amount of state funds available for exchange annually at the time the federal funding is confirmed for a federal fiscal year (FFY). KDOT may conduct more frequent reviews of available funding when necessary as a result of funding or budgetary considerations. Around the beginning of each new FFY, KDOT’s Bureau of Local Projects will notify the LPAs in writing the amount they are eligible to receive for that FFY.
For more details on this program, see KDOT’s website at www.ksdot.org/burlocalproj/.
B-1
Project Listings
The projects scheduled for improvement during FY 2013-2020, projects completed in FY 2012, and projects under construction as of November 2012 are organized in alphabetical order by county. Each one includes a project description, length, construction cost or estimated construction cost, and work type.
K.S.A. Supp. 68-2315, as amended, requires information concerning construction work completed, construction work in progress, and planned projects for future years. A detailed explanation of the methods or criteria employed in the selection of projects is also required and can be found in this Appendix.
In addition to state highway construction project lists are aviation, rail, and public transit project listings.
NOTE: This section, as well as previous Annual Reports, is available on KDOT’s Internet site at www.ksdot.org/publications.asp, in the Report and Studies listing.
The project lists are:
Projects scheduled for improvement during FY 2013-2020, pages 3 to 21.
Projects completed in FY 2012, pages 22 to 45.
Projects under construction as of November 2012, pages 46 to 66.
Aviation projects, pages 68 to 69.
Rail projects, page 70.
Public transit projects, pages 71 to 73.
Section B
Thissectioncontainstheseparateprojectlists.
B-2
LC-LocalConstruction HAZ - Safety Projects (HSIP, off system) HES - Safety Projects (HSIP, on system) K1R - KLINK Resurfacing K3R - Geometric Improvements for KLINKs LOC - Local Construction (Local Administered & Let) RES - Local Construction (KDOT Administered & Let) RRX - Railroad Crossing Protection (HSIP, on system) RXR - Railroad Crossing Protection (HSIP, off system) SRT - Safe Routes To Schools (Federal) TEX - Transportation Enhancement Program
MM-Modernization-Safety&ShoulderImprovements 1RS - Resurfacing w/Improvements (Practical Design) COR - Corridor Management GFU - Guard Fence Upgrades (No Longer Used) IRI - Interstate Roadway Geometric Improvements KCC - KCC Railroad Crossing Projects LTG - Highway Lighting MPR - Miscellaneous (No Longer Used) OVC - Oil Overcharge (No Longer Used) RIM - Non Interstate Geometric Improvements SAF - Safety Projects (State) SBW - Scenic Byway
SE-Expansion/Enhancement-AddingSomethingNew EDP - Economic Development IRC - Interstate Capacity Impr (old IRI split to Exp/Enh) ITS - Intelligent Transportation Systems (ITS)
ProgrAM cAtegories
SE-Expansion/Enhancement-AddingSomethingNew RIC - Non Interstate Capacity Impr (old RIM split to Exp/Enh) RSL - Local Partnership Railroad Grade Separations RSP - New Railroad Grade Separations (State) SEB - System Enh. Bypasses SEC - System Enh. Corridors SEI - System Enh. Interchanges/Separations SEW - Systen Enh. Wichita Railroad Crossings
The following projects are scheduled for improvement during FY 2013 - 2020. The projects are listed in route/county order. The project listing includes (SM) Preservation, (MM) Modernization, (SE) Expansion and (LC) Local Construction. Not all of the Preservation Program has been identified at this time.
(FY 2013-2020 TWORKS)
FiscalYear
@ Note: Program Categories and Subcategories 12/01/2012 * Blanks indicate project does not have the construction work phase. See page B-2 for breakdown of categories and subcategories.
BRIDGE REPLACEMENT IN ALLEN COUNTYUPRR & NORTH DAKOTA ROAD NORTH OF MORANK-224 IN ALLEN COUNTY (FY 2013 1R PROJECT)MILL AND OVERLAY ON US-54 IN ALLEN COUNTYREPLACE BRIDGE ON US-59 IN ALLEN COUNTYDEEP MILL AND OVERLAY ON US-169 IN ALLEN COUNTYUS-169 IN ALLEN COUNTY (FY 2013 1R PROJECT)
BRIDGE REPLACEMENT IN ANDERSON COUNTYUPRR & 900 ROAD 1.5 MILES NORTHEAST OF SELMAUPRR & MARYLAND ROAD SOUTHWEST OF GARNETTREPLACE BRIDGE ON K-31 IN ANDERSON COUNTYREPLACE BRIDGE ON K-31 IN ANDERSON COUNTYCONSTRUCT TURN LANES AT US-59REPLACE BRIDGE ON US-59 IN ANDERSON COUNTYDEEP MILL AND INLAY ON US-169 IN ANDERSON COUNTYGRADING
UNION PACIFIC & 334TH ROAD NORTHWEST OF HURONBRIDGE REPLACEMENT IN ATCHISON COUNTYK-7 IMPROVEMENTS IN ATCHISON COUNTYK-7 IN ATCHISON COUNTY (FY 2013 1R PROJECT)K-9 IN ATCHISON COUNTY (FY 2013 1R PROJECT)CULVERT REPLACEMENT ON K-74 IN ATCHISON COUNTYK-116 IN ATCHISON COUNTY (FY 2013 1R PROJECT)US-59 IMPROVEMENTS IN ATCHISON COUNTYSLOPE PROTECTION IN ATCHISON COUNTY ON US-73BRIDGE REPLACEMENT IN ATCHISON COUNTY
REPLACE BRIDGE ON LOCAL ROAD 88 IN BARBER COUNTY.REPLACE BRIDGE ON US-160 IN BARBER COUNTY
CULVERT IMPROVEMENTS IN BARTON COUNTYKANSAS WETLANDSBRIDGE REPLACEMENT IN BARTON COUNTYBRIDGE REPLACEMENT IN BARTON COUNTYREPLACE BRIDGE ON K-4 IN BARTON COUNTYBRIDGE IMPROVEMENTS & ROAD RECONSTRUCTION
0.20.01.04.40.02.014.4
0.10.00.00.00.00.50.09.38.7
0.00.33.15.14.90.07.02.30.00.0
0.20.0
33.00.00.20.00.01.7
Bridge ReplacementFlashing Light Signal1.5 OverlayMilling And OverlayBridge ReplacementMilling And OverlayPavement Patching
ROAD IMPROVEMENTS IN GREAT BEND ON US-56CITY OF GREAT BEND: US-281 (MAIN ST.) AND 24TH ST.GEOMETRIC IMPROVEMENT IN GREAT BEND, KANSASREPLACE BRIDGE ON US-281 IN BARTON COUNTYROAD IMPROVEMENTS IN HOISINGTON ON US-281
FORT SCOTT PARK LOOP ROAD AND PARKINGSTREET IMPROVEMENTS IN FORT SCOTTGRADING, SURFACINGREPLACE BRIDGE ON K-3 IN BOURBON COUNTYREPLACE BRIDGE ON K-31 IN BOURBON COUNTYREPLACE BRIDGE ON K-39 IN BOURBON COUNTYBRIDGE #070 & #071 ON US-69 IN BOURBON COUNTYCONSTRUCT UPGRADABLE EXPRESSWAY IN BOURBON COUNTYFT SCOTT US69 IMPROVEMENTSSIGNAL IMPROVEMENTS IN BOURBON COUNTY
HIAWATHA FITNESS AND SCHOOL TRAILKICKAPOO TRIBE COMMUNITY BUILDING PARKING AREA PROJECTUNION PACIFIC & 120TH STREET NORTH OF EVERESTUNION PACIFIC & FALCON ROAD EAST OF MORRILLUPRR & 260TH ROAD 2 MILES NORTH OF HIAWATHAREPLACE BRIDGE ON K-20 IN BROWN COUNTYGEOMETRIC IMPROVEMENT PROJECT IN HORTON KANSASROAD IMPROVEMENT IN HORTON ON US-73PERMANENT SEEDING ALONG US-75 IN BROWN COUNTY
159TH STREET EAST IMPROVEMENTS IN ANDOVERBNSF RAILWAY & 60TH STREET NORTHEAST OF EL DORADOBNSF RAILWAY & PURITY SPRINGS ROAD NE OF AUGUSTABRIDGE ON ANDOVER RD OVER FOURMILE CREEKCITY OF AUGUSTA SOLAR POWERED SPEED MONITORINTERSECTION IMPROVEMENTS, ANDOVER: ANDOVER & 13THROAD IMPROVEMENTS IN BUTLER COUNTYSIDEWALK AND BIKE PATH IN THE CITY OF ROSE HILLUPGRADE SIGNAL AT KELLY AND OHIO IN BUTLER COUNTYGRADING, SURFACING & SIGNALS ON OHIO ST IN AUGUSTAK-177 IN BUTLER COUNTY (FY 2013 1R PROJECT)BRIDGE REPLACEMENTS IN BUTLER COUNTYGEOMETRIC IMPROVEMENT IN AUGUSTA, KANSASROAD IMPROVEMENTS IN AUGUSTA ON US-54ROAD IMPROVEMENTS IN EL DORADO ON US-77 AND US-54ROADWORK ON US-54 AND DIKE ROAD IN BUTLER COUNTYROADWORK ON US-54 IN BUTLER COUNTY WEST OF AUGUSTAUS 54 ANDOVER PARCELS ALONG CORRIDORUS-77 IN BUTLER COUNTY (FY 2013 1R PROJECT)PASSING LANES ON US-400 IN SOUTHEAST KANSAS
BRIDGE REPLACEMENT IN CHASE COUNTYRAIL/HIGHWAY IMPROVEMENT IN CHASE COUNTY
RESTORE TRAIN DEPOT IN STRONG CITYBRIDGE REPLACEMENT IN CHASE COUNTYPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSAS
BNSF & BELLEVIEW ROAD 3 MILES SOUTH OF SCAMMONGRADING AND SURFACING OF K-7 IN CHEROKEE COUNTYUS-69 IN CHEROKEE COUNTY (FY 2013 1R PROJECT)GEOMETRIC IMPROVEMENT IN BAXTER SPRINGS, KANSASUS-160 IN CHEROKEE COUNTY (FY 2013 1R PROJECT)BUILD INTERCHANGE AND 4-LANE ON US-166 CHEROKEE COUNTYREPLACE BRIDGE ON US-166 IN CHEROKEE COUNTYPASSING LANES ON US-400 IN SOUTHEAST KANSASUS-400 IMPROVEMENTS IN CHEROKEE COUNTY
BRIDGE REPLACEMENT IN CHEYENNE COUNTYGRADING IN CHEYENNE COUNTY
CITY OF MINNEOLA (SAFE ROUTES TO SCHOOL)DOWNTOWN STREETSCAPE IN THE CITY OF MINNEOLABRIDGE REPLACEMENT IN CLARK COUNTY
BRIDGE REPLACEMENT IN CLAY COUNTYK-15 IN CLAY COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN CLAY CENTER ON K15ROAD IMPROVEMENTS IN CLAY CENTER ON K-15K-197 IN CLAY COUNTY (SY 2013 1R PROJECT)
BNSF & INDUSTRIAL STREET IN CONCORDIABNSF & OLIVE STREET IN CONCORDIAREPLACE BRIDGE ON K-9 (COAL CREEK) IN CLOUD COUNTYREPLACE BRIDGE ON K-9 (COAL CREEK) IN CLOUD COUNTYROAD IMPROVEMENTS IN CONCORDIA ON K-9ROAD IMPROVEMENTS IN CONCORIDA ON K-9
BNSF & KANSAS STREET IN LEBOUPRR & 11TH STREET IN LE ROYSURFACING WORK ON I-35 IN COFFEY COUNTYREPLACE BRIDGE ON K-58 IN COFFEY COUNTY
GRADING & BRIDGE (OVER C ST CANAL) IN COWLEY COUNTYROAD IMPROVEMENMTS IN COWLEY COUNTYSKOL RAILROAD & 3RD AVENUE IN WINFIELDREPLACE BRIDGE ON K-15 IN COWLEY COUNTYGEOMETRIC IMPROVEMENT PROJECT IN WINFIELD KANSASMILL AND OVERLAY ON US-77 IN COWELY COUNTYREPLACE BRIDGE #010 ON US-77 IN COWLEY COUNTYUS-77 IN COWLEY COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN WINFIELD ON US 160BRIDGE REPLACEMENT IN COWLEY COUNTY
BNSF & 630 AVENUE 1 MILE NORTH OF GIRARDBNSF & 650 AVENUE 3 MILES NORTH OF GIRARDKCS RAILWAY & 250TH ROAD 3 MILES SOUTHEAST OF PITTSBURGCRAWFORD COUNTYK-7 IMPROVEMENTS IN CRAWFORD COUNTYBRIDGE REPLACEMENT IN CRAWFORD COUNTYBRIDGE REPLACEMENTS IN CRAWFORD COUNTYBRIDGE REPLACEMENTS IN CRAWFORD COUNTYCONSTRUCT UPGRADABLE EXPRESSWAY IN CRAWFORD COUNTYENVIRONMENTAL ASSESSMENT: US-69 IN CRAWFORD COUNTYROAD IMPROVEMENT IN CRAWFORD COUNTYROAD IMPROVEMENTS IN CRAWFORD COUNTYROAD IMPROVEMENTS ON US-69 IN CRAWFORD COUNTYGEOMETRIC IMPROVEMENT IN PITTSBURG, KANSASINTERSECTION UPGRADE IN PITTSBURGMILL AND OVERLAY ON US-69B IN PITTSBURGUS-69 IMPROVEMENTS IN CRAWFORD COUNTY
BRIDGE REPLACEMENTS ON US-36 IN DECATUR COUNTYBRIDGE REPLACEMENT IN DECATUR COUNTY
BNSF & 1ST STREET IN ENTERPRISEBRIDGE REPLACEMENT IN THE CITY OF HERINGTONROAD IMPROVEMENTS IN DICKENSON COUNTYUPRR & 300 AVENUE SOUTH OF HERINGTONUPRR & RAIN ROAD NORTHEAST OF RAMONAJUNCTION K-43, EAST TO DK-GE COUNTY LINEROADWAY REHAB ON I-70 IN ABILENE (DICKINSON COUNTY)GEOMETRIC IMPROVEMENT IN ABILENE, KANSASK-15 IN DICKINSON COUNTY (FY 2013 1R PROJECT)K-18 IN DICKINSON COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-43 IN DICKINSON COUNTYK-197 IN DICKINSON COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON US-77 IN DICKINSON COUNTY
K-7 IN DONIPHAN COUNTY (FY 2013 1R PROJECT)K-7 IN DONIPHAN COUNTY (FY 2013 PROJECT)BRIDGE #023 ON US-36 IN DONIPHAN COUNTY
CITY OF LAWRENCECITY OF LAWRENCE TRAFFIC SIGNAL COORDINATIONCITY OF LAWRENCE: 9TH AND KENTUCKY STREETSCITY OF LAWRENCE: 9TH STREET FROM EMERY TO MICHIGANK-10 CONNECTION: SOUTH LAWRENCE TRAFFICWAYSIGNAL UPGRADE AT 9TH AND TENNESSEECONSOLIDATION OF ACCESS POINTS: K-10 IN DOUGLAS COUNTYCONSTRUCT K-10 CONNECTION: SOUTH LAWRENCE TRAFFICWAYINTERCHANGE IMPROVEMENTS IN LAWRENCEK-10 IMPROVEMENTS FOR VITAMIN COTTAGE
STUDY: K-10 CONNECTION FROM US-59/K-10 TO K-10BRIDGE REPAIR ON BRIDGES #081 & #082 IN DOUGLAS COUNTYSAFETY PROJECT IN LAWRENCE AT US-40/K-10 INTERCHANGECONSTRUCT CENTER TURN LANE ON US-56 IN DOUGLAS COUNTYREPLACE BRIDGE ON US-56 IN DOUGLAS COUNTYREPLACE BRIDGES ON US-56 IN DOUGLAS COUNTYUS-56 IMPROVEMENTS IN DOUGLAS COUNTYGEOMETRIC IMPROVEMENT IN LAWRENCERECONSTRUCTION ON US-59 IN LAWRENCE (DOUGLAS COUNTY)REPLACE BRIDGE ON US-59 IN DOUGLAS COUNTYREPLACE BRIDGE ON US-59 IN DOUGLAS COUNTYUS-59 IMPROVEMENTS IN DOUGLAS COUNTYUS-59 IMPROVEMENTS IN LAWRENCE
REPLACE BRIDGE ON K-99 IN ELK COUNTY
ELLIS COUNTY SOLAR POWERED RADAR SPEED TRAILERIMPROVEMENTS ON RS-1977 IN ELLIS COUNTYROAD IMPROVEMENTS IN ELLIS COUNTYPAVEMENT RECONSTRUCT ON US-183 IN HAYS (ELLIS COUNTY)
BRIDGE REPLACEMENT IN ELLSWORTH COUNTYELLSWORTH COUNTYBRIDGE REPLACEMENT IN ELLSWORTH COUNTYBRIDGE REPLACEMENTS IN ELLSWORTH COUNTYTRAFFIC IMPACT STUDY IN ELLSWORTH
PRESERVATION OF HISTORIC WINDSOR HOTEL IN GARDEN CITYSIDEWALK AND BIKE PATH IN GARDEN CITYREPLACE BRIDGE ON K-23 IN FINNEY COUNTYGEOMETRIC IMPROVEMENT IN GARDEN CITY, KANSASK-156 IMPROVEMENTS IN GARDEN CITYDURANGO / SCHULMAN CROSSING SHOPPING CENTERROAD IMPROVEMENTS IN GARDEN CITY ON US-50/US-832-LANE PAVEMENT RECONSTRUCT ON US-83 IN FINNEY COUNTY
GRADING, BRIDGE & SURF ON CAMANCHE ST IN DODGE CITYREPLACE BRIDGE ON K-94 IN FORD COUNTYCONSTRUCT 4-LANE EXPRESSWAY ON US-50 IN FORD COUNTYROAD IMPROVEMENTS IN DODGE CITY ON US-50
BRIDGE REPLACEMENT IN FRANKLIN COUNTYCANTILEVER SIGN STRUCTURE ON I-35 IN FRANKLIN COUNTYIMPROVE INTERSECTION (K-68PAVEMENT RECONSTRUCT ON K-69 IN FRANKLIN COUNTYREPLACE BRIDGE ON K-68 IN FRANKLIN COUNTYPERMANENT SEEDING ON US-169 IN FRANKLIN COUNTYROAD IMPROVEMENTS IN FRANKLIN COUNTY
BRISGE REPLACEMENT IN GEARY COUNTYGRADING AND SURFACING ON K-177 IN GEARY COUNTYKLINK IMPROVEMENTS IN JUNCTION CITYBRIDGE #044 ON US-77 IN GEARY COUNTYCONSTRUCT 4-LANE/IMPROVEMENTS IN GEARY COUNTYROAD IMPROVEMENTS IN GEARY COUNTYROAD IMPROVEMENTS IN GEARY COUNTYSIGNAL AND TURN LANES AT US-77 AND K-57 IN GEARY CO.US-77 AND K-18 IMPROVEMENTS IN GEARY COUNTYUS-77 IMPROVEMENTS IN GEARY COUNTY
UPRR & GOVE 48 ROAD EAST EDGE OF GRAINFIELDI-70 IMPROVEMENTS IN GOVE COUNTYI-70 IMPROVEMENTS IN GOVE COUNTYBRIDGE REPLACEMENT IN GOVE COUNTY
BRIDGE REPLACEMENT IN GRAHAM COUNTYUS-24 PROJECT IN GRAHAM COUNTY (PRESERVATION)BRIDGE #045 ON US-283 IN GRAHAM COUNTY
ROAD IMPROVEMENTS ON K-25 IN ULLYSSESROAD IMPROVEMENTS ON K-25 IN ULYSSES
CONSTRUCT 4-LANE EXPRESSWAY ON US-50 IN GRAY COUNTYUS-50 IN GRAY COUNTY AT INGALLSPAVEMENT REPLACEMENT ON US-56 IN GRAY COPAVEMENT REPLACEMENT ON US-56 IN GRAY COUNTYPAVEMENT REPLACEMENT ON US-56 IN GRAY COUNTY
BRIDGE REPLACEMENT IN GREENWOOD COUNTYPASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSAS
REPLACE BRIDGE ON US-50 IN HAMILTON COUNTY
BNSF RAILWAY & NW 30 ROAD SOUTHWEST OF ATTICAREPLACE BRIDGE ON K-2 IN HARPER COUNTYROAD IMPROVEMENTS IN ANTHONY ON K-179REPLACE BRIDGES ON US-160 IN HARPER COUNTYROAD IMPROVEMENTS IN THE CITY OF HARPER ON US-160
BNSF RAILWAY & SW 48TH STREET SOUTH OF NEWTONBNSF RAILWAY & SW 72ND STREET NORTHEAST OF SEDGWICKK & O RAILROAD & 24TH STREET IN NEWTONK & O RAILROAD & N. ANDERSON STREET IN NEWTONK & O RAILROAD & RANDELL STREET IN HESSTONK & O RAILROAD & RIDGE ROAD IN HESSTONKANSAS & OKLAHOMA RR & LINCOLN BOULEVARD IN HESSTONKANSAS & OKLAHOMA RR & MAIN STREET IN HESSTON
KANSAS & OKLAHOMA RR & SPENCER STREET IN NEWTONBRIDGE REPLACEMENT IN HARVEY COUNTYHIGH MAST WEATHERING STEEL POLES IN HARVEY COUNTYINTERCHANGE IMPROVEMENT, I-135/36TH ST IN HARVEY COUNTYBRIDGE #071 ON US-50 IN HARVEY COUNTYGEOMETRIC IMPROVEMENT IN NEWTON, KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPERMANENT SEEDING ALONG US-50 IN HARVEY COUNTY
2-LANE PAVEMENT RECONSTRUCT ON US-83 IN HASKELL COUNTY2-LANE PAVEMENT RECONSTRUCT ON US-83 IN HASKELL COUNTY2-LANE PAVEMENT RECONSTRUCT ON US-83 IN HASKELL COUNTY
REPLACE BRIDGE ON K-156 IN HODGEMAN COUNTYSURVEY ON K-156 IN HODGEMAN COUNTY EAST OF HANSTONGEOMETRIC IMPROVEMENT IN JETMORE, KANSAS
K-116 IN JACKSON COUNTY (FY 2013 1R PROJECT)
REPLACE WINGS ON CULVERT ON K-4 IN JEFFERSON COUNTYREPLACE BRIDGE ON K-192 IN JEFFERSON COUNTYUS-24 IN JEFFERSON COUNTY (FY 2013 1R PROJECT)PERMANENT SEEDING ON US-24 IN JEFFERSON COUNTYREPLACE BRIDGE ON US-24 IN JEFFERSON COUNTYUS-24 IMPROVEMENTS IN PERRYUS-24 IN JEFFERSON COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE #016 ON US-59 IN JEFFERSON COUNTY
BNSF & 250 ROAD 3 MILES NORTH OF WEBBERBNSF & DIAMOND ROAD 3.5 MILES NORTH OF WEBBERBNSF & Z ROAD .5 MILE SOUTH OF WEBBERGEOMETRIC IMPROVEMENT IN JEWELL, KANSASGEOMETRIC IMPROVEMENT IN JEWELL, KANSASCULVERT REPLACEMENT ON K-28 IN JEWELL COUNTYREPLACE BRIDGE ON K-28 IN JEWELL COUNTYREPLACE BRIDGE ON K-28 IN JEWELL COUNTYBRIDGE REPLACEMENT IN JEWELL COUNTYBRIDGE #012 ON US-36 IN JEWELL COUNTYMILLPAVEMENT REPLACEMENT ON US-36 IN JEWELL COUNTY
159TH STREET IMPROVEMENTS IN JOHNSON COUNTYADDITIONAL WESTBOUND LEFT TURN LANE ON COLLEGE BLVDBNSF & LAKECREST DRIVE IN SHAWNEEBRIDGE REPLACEMENT IN DE SOTO IN JOHNSON COUNTYCITY OF OLATHE: CLAIRBORNE ROAD AND COLLEGE WAY
CITY OF OVERLAND PARK: 151ST AND ENGLANDGRADING, SURF & SEEDING ON MONTICELLO RD IN SHAWNEEHOMESTEAD LANE IMPROVEMENTS IN JOHNSON COUNTYINTERSECTION IMPROVEMENT LENEXA: 95TH STREET AND I-35INTERSECTION IMPROVEMENT LENEXA: COLLEGE & LACKMANINTERSECTION IMPROVEMENT, LENEXA: 95TH STJOHNSON COUNTY GATEWAY INTERCHANGE PROJECTJOHNSON COUNTY TRANSIT VEHICLE PURCHASEJOHNSON COUNTY: ELIMINATION OF AN AT-GRADE RR CROSSINGLENEXA TRAFFIC CAMERASOVERLAND PARK:TURKEY CREEK BICYCLE AND PEDESTRIAN TRAILRESURFACING ON 143RD ST IN LEAWOOD (JOHNSON COUNTY)ROAD IMPROVEMENT IN PRAIRIE VILLAGE IN JOHNSON COUNTYROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN MERRIAMROAD IMPROVEMENTS IN MISSIONROAD IMPROVEMENTS IN THE CITY OF OLATHESAFETY PROJECT IN JOHNSON COUNTYSW JOHNSON COUNTY SUSTAINABLE FREIGHT DISTRICT PLANTRAFFIC INFORMATION IMPROVEMENTS FOR KANSAS CITYTRAFFIC SIGNALS IMPROVEMENT IN LEAWOODVIDEO DETECTION DATA INTEGRATIONBRIDGE REPLACEMENT IN JOHNSON COUNTYBRIDGES #002 THRU #005 ON I-35 IN JOHNSON COUNTYPERMANENT SEEDING ALONG I-35 IN JOHNSON COUNTYSEEDING ON I-35 IN JOHNSON COUNTYBRIDGE #222 AND #223 ON I-435 IN JOHNSON COUNTYJOHNSON COUNTY GATEWAY INTERCHANGE PROJECTJOHNSON COUNTY GATEWAY INTERCHANGE PROJECT AREARECONSTRUCT ROE BLVD INTERCHANGE IN JOHNSON COUNTYSURFACING WORK ON I-435 IN JOHNSON COUNTY (FY 2013)K-7 IN JOHNSON COUNTY (FY 2013 1R PROJECT)K-7 IN JOHNSON COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN JOHNSON COUNTYROAD IMPROVEMENTS IN OLATHE ON K-7INTERCHANGE IMPROVEMENTS FOR JOCO GATEWAY PROJECTMINE REMEDIATIONROAD IMPROVEMENTS IN JOHNSON COUNTYBRIDGE #270 ON US-56 IN JOHNSON COUNTYCONSTRUCT TURN LANES AT US-56/CENTER ST IN JOHNSON COUS-56 IN JOHNSON COUNTY (2013 1R PROJECT)US-56 IN JOHNSON COUNTY (FY 2013 1R PROJECT)BRIDGE #256 ON US-69 IN JOHNSON COUNTYHIGH MAST WEATHERING STEEL POLES IN JOHNSON CO.US-69 & 159TH ST. IN JOHNSON COUNTYUS-69 IN JOHNSON COUNTY (FY 2013 1R PROJECT)INTERSECTION IMPROVEMENT IN OLATHE AT US-169
K-25 IN THE CITY OF LAKINREPLACE BRIDGE ON K-25 IN KEARNY COUNTY
REPAIR BRIDGE ON K-14 IN KINGMAN COUNTYPERMANENT SEEDING ALONG US-54 IN KINGMAN COUNTYPERMANENT SEEDING ALONG US-54 IN KINGMAN COUNTYPERMANENT SEEDING ALONG US-54 IN KINGMAN COUNTY
BRIDGE REPLACEMENT IN KIOWA COUNTYUPRR & 19 AVENUE 4 MILES NORTHEAST OF MULLINVILLECONSTRUCT INTERCHANGE ON US-54 IN KIOWA COUNTYPRESERVATION ON US-54 IN KIOWA COUNTYCULVERT REPLACEMENT ON US-400 IN KIOWA COUNTY
SIDEWALK AND BIKE PATH IN PARSONSSKOL RAILROAD & 6TH STREET IN OSWEGOSKOL RAILROAD & ROOKS ROAD 4 MILES EAST OF ALTAMONTSOUTH KANSAS & OKLAHOMA & HICKORY ST. IN MOUND VALLEYUPRR & 19500 ROAD SOUTHEAST OF PARSONSCRACK REPAIR AND PATCHING ON US-59 IN PARSONSREPAIR CULVERT #521 ON US-59 IN LABETTE COUNTYROAD IMPROVEMENTS IN PARSONS ON US-59ROAD IMPROVEMENTS ON US 59 IN PARSONSUS-59 IN LABETTE COUNTY (2013 1R PROJECT)PASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSASUS-400 IMPROVEMENTS IN LABETTE COUNTY
GEOMETRIC IMPROVEMENT PROJECT IN DIGHTON, KANSAS
BRIDGE IMPROVEMENT IN LEAVENWORTH COUNTYBRIDGE REPLACEMENT IN LEAVENWORTH COUNTYGRADINGGRADING, SURFACING ON LIMIT STREET IN LEAVENWORTHPED/BIKE PATH IN THE CITY OF TONGANOXIERESTORATION OF UNION PACIFIC DEPOT IN LEAVENWORTHROAD/BRIDGE IMPROVEMENT IN LEAVENWORTH COUNTYBRIDGE REPLACEMENT IN LEAVENWORTH COUNTYKLINK IMPROVEMENTS IN THE CITY OF LEAVENWORTHCONSTRUCT TURN LANES IN BASEHOR LEAVENWORTH COUNTYCONSTRUCT WOLF CREEK PARKWAY IN LEAVENWORTH COUNTYTURN LANES IN BASEHOR LEAVENWORTH COUNTYGEOMETRIC IMPROVEMENT PROJECT IN LEAVENWORTH KANSASROAD IMPROVEMENTS IN LEAVENWORTH ON U-73 AND K-92
REPLACE BRIDGE ON K-18 IN LINCOLN COUNTY
BNSF & 400 ROAD 1 MILE NORTH OF PRESCOTTRAIL IMPROVEMENTS FOR LA CYGNE INDUSTRIAL PARKUPRR & W 1250 ROAD SOUTHWEST OF CENTERVILLE
REPLACE BRIDGE #012 ON K-7 IN LINN COUNTYCULVERT REPLACEMENT ON K-52 IN LINN COUNTY
BRIDGE REPLACEMENT IN LOGAN COUNTY HISTORIC BYWAY KIOSK ON US-83 IN LOGAN COUNTY
SURFACING WORK ON I-35 IN LYON COUNTYK-130 IN LYON COUNTY (FY 2013 1R PROJECT)CONSTRUCT 4-LANE EXPRESSWAY ON US-50 IN LYON COUNTYUS-50 IMPROVEMENTS IN EMPORIAUS-50 IN LYON COUNTY (FY 2013 1R PROJECT)BRIDGE #148 ON US-56 IN LYON COUNTYUS-56 IN LYON COUNTY (FY 2013 PROJECT)
BNSF RAILWAY & LIMESTONE ROAD SOUTHWEST OF PEABODYBNSF RAILWAY & OLD MILL ROAD EAST EDGE OF PEABODYSIDEWALK AND BIKE PATH IN CITY OF HILLSBOROUPRR & 370TH STREET NORTHEAST OF RAMONAUPRR & F STREET IN RAMONAROAD IMPROVEMENTS IN MARION ON K-256GEOMETRIC IMPROVEMENT IN HILLSBORO KANSASSAFETY PROJECT ON US-56 IN MARION COUNTYUS-77 IN MARION COUNTY (FY 2013 1R PROJECT)
BRIDGE REPLACEMENT IN MARSHALL COUNTYREPLACE BRIDGE #021 ON K-9 IN MARSHALL COUNTYREPLACE BRIDGE #032 ON K-87 IN MARSHALL COUNTYREPLACE BRIDGE #042 ON K-99 IN MARSHALL COUNTYREPLACE BRIDGE ON K-99 IN MARSHALL COUNTYCULVERT REPLACEMENT ON US-36 IN MARSHALL COUNTYUS-36 BRIDGE REPLACEMENT IN MARSHALL COUNTYREPLACE BRIDGE #009 ON US-77 IN MARSHALL COUNTY
KANSAS & OKLAHOMA RR & CHRISTIAN AVENUE IN MOUNDRIDGEUNION PACIFIC & A AVENUE IN MCPHERSONUPRR & 29TH AVENUE NORTHEAST OF CANTONCONSTRUCT INTERCHANGE ON I-135 IN MCPHERSON COUNTYROAD IMPROVEMENTS IN LINDSBORG ON K-4K-61 IN MCPHERSON COUNTY (FY 2013 1R PROJECT)TURNBACK WORK IN MCPHERSON COUNTYK-153 IN MCPHERSON COUNTY (FY 2013 1R PROJECT)K-153 SPUR IN MCPHERSON COUNTY (FY 2013 1 R PROJECT)REPLACE BRIDGE #107 ON K-260 IN MCPHERSON COUNTYROAD IMPROVEMENTS IN MOUNDRIDGE ON K-2604-LANE PAVEMENT REPLACEMENT ON US-56 IN MCPHERSON COROAD IMPROVEMENTS IN MCPHERSON ON US-56ROAD IMPROVEMENTS IN MCPHERSON ON US 81US-81B IN MCPHERSON COUNTY (FY 2013 1R PROJECT)TURNBACK WORK IN MCPHERSON COUNTY
0.00.0
0.80.0
10.37.81.11.30.60.022.1
0.00.00.00.00.00.40.30.419.7
0.20.00.00.00.00.00.00.0
0.00.00.01.00.50.36.12.91.10.00.01.70.51.03.90.0
Bridge ReplacementCulvert
Bridge ReplacementScenic Or Historic Hwy Progs
2in OverlayMilling And OverlayGrade, Bridge & SurfacingMilling And OverlayMilling And OverlayBridge OverlayConv Seal
Flashing Light SignalFlashing Light SignalPedestrian & Bicycle PathsFlashing Light SignalFlashing Light SignalMilling And OverlayIntersection ImprovementRoundaboutMilling And Overlay
Flashing Light SignalFlashing Light SignalFlashing Light SignalGrade, Bridge & SurfacingSurfacingMilling And OverlaySurfacingMilling And OverlayMilling And OverlayBridge ReplacementConcrete PavementPavement ReconstructionMilling And OverlaySurfacingMilling And OverlayRight Of Way On
BRIDGE REPLACEMENT IN MIAMI COUNTYLOWER ROADWAY ELEVATION IN MIAMI COUNTYUNION PACIFIC & MULBERRY STREET IN PAOLAUPRR & 311TH STREET SOUTHWEST OF PAOLA (EAST XING)UPRR & 311TH STREET SOUTHWEST OF PAOLA (WEST XING)FRONTAGE ROAD SOUTH OF K-68 IN LOUISBURG.INTERIM IMPROVEMENTS ON K-68 IN MIAMI COUNTYK-68 INTERSECTION IMPROVMENTS IN LOUISBURGBRIDGE REPAIR ON BRIDGE #054 IN MIAMI COUNTYPERMANENT SEEDING ON US-169 IN MIAMI COUNTYROAD IMPROVEMENTS ON US-169 IN MIAMI COUNTY
CITY OF BELOIT (SAFE ROUTES TO SCHOOL)GEOMETRIC IMPROVEMENT IN BELOIT, KANSASROAD IMPROVEMENTS IN BELOIT ON K-14BRIDGE REPLACEMENT IN MITCHELL COUNTY
CULVERT IMPROVEMENTS IN MONTGOMERY COUNTYGRADINGSKOL RAILROAD & 7TH STREET IN COFFEYVILLEUPRR & 2225 ROAD NORTHWEST OF DEARINGCONSTRUCT 4-LANE ON US-75 IN MONTGOMERY COUNTYGEOMETRIC IMPROVEMENT IN INDEPENDENCE, KANSASROAD IMPROVEMENTS IN INDEPENDENCE ON US-75US-75 ACCESS MANAGEMENT PLANREPLACE BRIDGE ON US-160 IN MONTGOMERY COUNTYBRIDGE #038 ON US-166 IN MONTGOMERY COUNTYCULVERT REPLACEMENT ON US-166 IN MONTGOMERY COUNTYGEOMETRIC IMPROVEMENT IN COFFEYVILLE, KANSASGEOMETRIC IMPROVEMENT IN COFFEYVILLE, KANSASROAD IMPROVEMENTS IN COFFEYVILLE ON US-166US-169 IMPROVEMENTS IN MONTGOMERY COUNTY
REMOVAL OF CONCRETE HEADWALLS IN MORRIS COUNTYCULVERT REPLACEMENT ON K-149 IN MORRIS COUNTYGRADING AND SURFACING ON K-177 IN MORRIS COUNTYBRIDGE REPLACEMENTIN MORRIS COUNTY
REPLACE CULVERTS ON K-51 IN MORTON COUNTY
REPLACE BRIDGE ON K-63(WILD CAT CREEK) IN NEMAHA COUNTYENGINEERING ASSISTANCE FOR US-36 IN SENECAGEOMETRIC IMPROVEMENT PROJECT IN SENECA KANSASROAD IMPROVEMENTS IN NEMAHA COUNTYPERMANENT SEEDING ALONG US-75 IN NEMAHA COUNTY
BRIDGE REPLACEMENT IN NEOSHO COUNTYCITY OF ERIE (SAFE ROUTES TO SCHOOL)
REPLACE BRIDGE ON RS 1942 IN NEOSHO COUNTYSIDEWALK AND BIKE PATH IN CITY OF CHANUTEREPLACE BRIDGE ON K-39 IN NEOSHO COUNTYREPLACE BRIDGE ON K-39 IN NEOSHO COUNTYREPLACE BRIDGES #025 AND #026 IN NEOSHO COUNTYK-47 IN NEOSHO COUNTY (FY 2013 1R PROJECT)
K-96 IN NESS COUNTY (FY 2013 1R PROJECT)K-96 IN NESS COUNTY (FY 2013 1R PROJECT)ROAD IMPROVEMENTS IN NESS CITY ON K-96ROAD IMPROVEMENTS IN NESS ON K-96GEOMETRIC IMPROVEMENT PROJECT IN NESS CITY, KANSAS
BRIDGE REPLACEMENT IN NORTON COUNTYBRIDGE REPLACEMENT IN NORTON COUNTYGRADING AND SURFACING ON K-383 IN NORTON COUNTYGEOMETRIC IMPROVEMENT IN NORTON KANSASGEOMETRIC IMPROVEMENT IN NORTON, KANSASPERMANET SEEDING ON US-36 IN NORTON COUNTY
BIKE/PED PATH IN OSAGE COUNTYCITY OF LYNDON (SAFE ROUTES TO SCHOOL)BRIDGE REPLACEMENT IN OSAGE COUNTYBRIDGE REPLACEMENT IN OSAGE COUNTYK-31 IMPROVEMENTS IN OSAGERECONSTRUCT & ADD SHOULDERS ON K-31 IN OSAGE COUNTYBRIDGE REPLACEMENTS ON K-170 IN OSAGE COUNTYBRIDGE REPLACEMENT IN OSAGE COUNTYUS-56 IN OSAGE COUNTY (FY 2013 1R PROJECT)MILLROAD IMPROVEMENTS ON US-75 IN OSAGE COUNTYROUNDABOUT AT U75 AND K31/K268, NORTH OF LYNDONVARIOUS BRIDGES ON US-75 IN OSAGE COUNTY
BRIDGE REPLACEMENT IN OSBORNE COUNTYBRIDGE REPLACEMENT IN OSBORNE COUNTYGEOMETRIC IMPROVEMENT IN DOWNS, KANSASBRIDGE REPAIR ON BRIDGE #006 IN OSBORNE COUNTYCULVERT REPAIR ON US-24 IN OSBORNE COUNTY
K-41 IN OTTAWA COUNTY (FY 2013 1R PROJECT)K-106 IN OTTAWA COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-106 IN OTTAWA COUNTYUS-81 IN OTTAWA COUNTY (2013 1R PROJECT)
ROAD IMPROVEMENTS IN LARNED ON K-156 AND U-56
BRIDGE REPLACEMENT IN PHILLIPS COUNTYBRIDGE REPLACEMENT IN PHILLIPS COUNTYGRADING AND SURFACING ON K-383 IN PHILLIPS COUNTY
Prsrv And Railway For TrailsPreliminary EngineeringBridgeBridge ReplacementMilling And OverlayGrade, Bridge & SurfacingBridge ReplacementBridge ReplacementConv SealMilling And OverlayMilling And OverlayRoundaboutBridge Repair
BRIDGE REPLACEMENT IN POTTAWATOMIE COUNTYBRIDGE REPLACEMENT ON K-63 IN POTTAWATOMIE COUNTYBRIDGE REPLACEMENT ON K-63 IN POTTAWATOMIE COUNTYREPLACE BRIDGE ON K-63 IN POTTAWATOMIE COUNTYCONSTRUCT TURN LANE ON US-24 IN POTTAWATOMIE COINTERSECTION IMPROVEMENTS @ FLUSH RD IN POTTAWATOMIE COPATHS NEAR WWTPREPLACE BRIDGE ON US-24 IN POTTAWATOMIE COUNTYREPLACE BRIDGE ON US-24 IN POTTAWATOMIE COUNTYROAD IMPROVEMENTS IN POTTAWATAMIE COUNTYROAD IMPROVEMENTS IN POTTAWATAMIE COUNTYUS-24 IMPROVEMENTS IN POTTAWATOMIE COUNTYUS-24 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)US-24 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)
UPRR & NE 40TH AVENUE AT NATRONAUPRR & SW 110TH AVENUE WEST OF CULLISONUPRR & SW 40TH AVENUE WEST OF PRATTREPLACE BRIDGE ON K-42 IN PRATT COUNTY4-LANE EXPRESSWAY ON US-54 IN PRATT COUNTYCONSTRUCT 4-LANE EXPRESSWAY ON US-54 IN PRATT COUNTYROAD IMPROVEMENTS IN PRATT ON US-281
CITY OF HUTCHINSON (SAFE ROUTES TO SCHOOL)K-14(K-96) TURNBACK WORK FOR RENO COUNTYK-14 (K-96) IMPROVEMENTS IN RENO COUNTYBRIDGES #078 AND #079 ON K-61 IN RENO COUNTYMILLREPLACE BRIDGE ON K-61 IN RENO COUNTYROAD IMPROVEMENTS IN HUTCHINSON ON K-61TURNBACK WORK IN RENO COUNTYPASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPERMANENT SEEDING FOR US-50 IN RENO COUNTY.SEEDING PROJECT IN RENO COUNTY: US-50
BRIDGE REPLACEMENT IN REPUBLIC COUNTYBRIDGE REPLACEMENTS ON K-148 IN REPUBLIC COUNTYCULVERT REPLACEMENT ON K-148 IN REPUBLIC COUNTYREPLACE BRIDGE ON K-266 IN REPUBLIC COUNTYPAVEMENT RECONSTRUCT ON US-36 IN REPUBLIC COUNTYREPLACE BRIDGE #001 ON US-36 IN REPUBLIC COUNTYREPLACE BRIDGE ON US-36 IN REPUBLIC COUNTYUS-36 IMPROVEMENTS IN REPUBLIC COUNTY
K-14(K-96) TURNBACK WORK FOR RICE COUNTYBRIDGE REPLACEMENT IN RICE COUNTYK-14 (K-96) IMPROVEMENTS IN RICE COUNTYROAD IMPROVEMENTS IN STERLING ON K-14/K-96
CITY OF MANHATTAN TRAFFIC SIGNAL COORDINATIONDRAINAGE DITCH ON US-24 IN RILEY COUNTYMEDIAN FOR BLUEMONT AVENUE IN MANHATTANREPLACE BRIDGE ON WEST 40TH AVENUE IN RILEY COUNTYREPLACE GUARD FENCES AND BRIDGE RAILS IN RILEY COUNTYWEST ANDERSON / WEST CLAFLIN SIGNAL COORDINATIONBRIDGE REPLACEMENTS IN RILEY COUNTYCITY OF MANHATTAN: K-18 AND POLISKA LANEGEOMETRIC IMPROVEMENT IN MANHATTAN KANSASREPLACE BRIDGE #034 ON K-18 IN RILEY COUNTYROAD IMPROVEMENTS IN MANHATTAN ON K-18SEEDING PROJECT ON K-18 IN RILEY COUNTYCITY OF MANHATTAN: K-113 AND KIMBALLGEOMETRIC IMPROVEMENT IN MANHATTAN KANSASMILL AND INLAY ON US-24 IN RILEY COUNTYUS-24 IMPROVEMENTS IN RILEY COUNTYUS-24 IN RILEY COUNTY (FY 2013 1R PROJECT)
BRIDGE REPLACEMENT IN ROOKS COUNTYCITY OF STOCKTON (SAFE ROUTES TO SCHOOL)REMOVE CONCRETE HANDRAILS AND TREES IN ROOKS COUNTYBRIDGES #034 AND #035 ON K-18 IN ROOKS COUNTYREMOVE BRIDGE #006 ON K-258 IN ROOKS COUNTYMILL AND OVERLAY ON US-24 IN ROOKS COUNTYREPLACE BRIDGE ON US-24 IN ROOKS COUNTYREPLACE BRIDGE ON US-24 IN ROOKS COUNTYROADWAY IMPROVEMENT IN STOCKTON, KANSAS
UPRR & HOMER ROAD 2 MILES SOUTHEAST OF RUSSELLUPRR & MAIN STREET IN DORRANCEBRIDGE REPLACEMENT IN RUSSELL COUNTYREPLACE LIGHTS ON I-70 IN RUSSELL COUNTYROAD IMPROVEMENTS IN RUSSELL ON US 40GRADING AND SURFACING ON US-281 IN RUSSELL COUNTY
IMPROVEMENTS TO SALINE COUNTY ROADS AND GUARDRAILINTERSECTION IMPROVEMENT, SALINA: CLOUD ST AND 9TH STK & O RAILROAD & OLD 40 HIGHWAY NW EDGE OF SALINASALINA SIGNAL COORDINATIONHIGH PERFOMANCE SHEETING SIGN PROJECTSURFACING WORK ON I-135 IN SALINE COUNTYBRIDGE REPLACEMENT IN SALINE COUNTYK-143 IN SALINE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-143 IN SALINE COUNTYUS-81 IN SALINE COUNTY (FY 2013 1R PROJECT)
BRIDGE REPLACEMENT IN SEDGWICK COUNTYBRIDGE REPLACEMENT IN SEDGWICK COUNTYBRIDGE REPLACEMENT ON 23RD ST. SOUTH IN SEDGWICK COUNTYBRIDGE, GRADING, SEEDING ON CENTRAL AVE IN WICHITABROADWAY BRIDGE IMPROVEMENTS IN WICHITACITY OF WICHITA: 13 STREETGRADING & SURFACING IN VARIOUS LOCATIONS IN SEDGWICK COINTERSECTION IMPROVEMENT, WICHITA: MT VERNON & OLIVERPED/BIKE PATH IN THE CITY OF WICHITARECONSTRUCTION ON EAST GRAND AVENUE IN HAYSVILLEREPLACE BRIDGE ON 87TH STREET SOUTH IN SEDGWICK CO.ROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN WICHITASIDEWALK AND BIKE PATH IN MULVANESURFACING ON MADISON AVE IN DERBY (SEDGWICK COUNTY)TRAFFIC INFORMATION IMPROVEMENTS IN WICHITAUPRR & E 85TH STREET N. NORTHEAST OF KECHIUPRR & E. 69TH STREET N. NORTHEAST OF KECHIWICHITA REGIONAL AIR QUALITYWICHITA TRAFFIC MGT. CENTER PHASE IIBBRIDGE REPAIR ON BRIDGES #043 & #044 IN SEDGWICK COUNTYBRIDGES #339, #341 & #349 ON I-135 IN SEDGWICK COUNTYHIGH MAST WEATHERING STEEL POLES IN SEDGWICK COUNTYPAVEMENT MARKING ON I-135 IN SEDGWICK COUNTYROADWAY REHAB ON I-135 IN SEDGWICK COUNTYSURFACING WORK ON I-135 IN SEDGWICK COUNTYBRIDGE REPAIR ON BRIDGE # 098 IN SEDGWICK COUNTYBRIDGE REPLACEMENTS IN SEDGWICK COUNTYBRIDGE REPLACEMENTS IN SEDGWICK COUNTYDEFINE PROJECT SCOPE AT I-235/I-135 IN SEDGWICK COUNTYI-235 AND THE INTERCHANGES AT I-235/US-54(KELLOGG)INTERCHANGE IMPROVEMENTS I-235/US-54 IN SEDGWICK COUNTYPERMANENT SEEDING PROJECT IN SEDGWICK COUNTYCITY OF DERBY: K-15K-96 IN SEDGWICK COUNTY (FY 2013 1R PROJECT)KA-96 IN SEDGWICK COUNTY (FY 2013 1R PROJECT)RIGHT OF WAY ACQUISITION FOR NORTHWEST WICHITA BYPASSRIGHT OF WAY ACQUISITION FOR NORTHWEST WICHITA BYPASSCONTRACT MAINTENANCE PROJ ON US-54 IN SEDGWICK COUNTYRECONSTRUCT 4-LANE ON US-54 IN SEDGWICK COUNTYRECONSTRUCT 4-LANE ON US-54 IN SEDGWICK COUNTYRIGHT OF WAY ACQUISITION FOR NORTHWEST WICHITA BYPASSROAD IMPROVEMENTS IN SEDGWICK COUNTYROAD IMPROVEMENTS IN WICHITA ON US 54ROAD IMPROVEMENTS IN WICHITA ON US-54 AND K-42US-54 CENTRAL BUSINESS DISTRICT (CBD) VIADUCT (WICHITA)US-54 IN SEDGWICK COUNTY (FY 2013 1R PROJECT)SEDGWICK CO.: US-81 AND 79TH STREET
CONSTRUCT 4-LANE ON US-54 IN SEWARD COUNTYGEOMETRIC IMPROVEMENT PROJECT IN LIBERAL, KANSASINTERSECTION IMPROVEMENT IN LIBERALINTERSECTION OF US-54/NEW COUNTY ROAD IN SEWARD COUNTYPLAN DEVELOPMENT ON US-54 IN SEWARD COUNTYPRESERVATION AND REVIEW ON US-83 IN SEWARD COUNTY
CITY OF TOPEKA TRAFFIC SIGNAL CORDINATIONIMPROVE BIKE/PED PATH ON SHUNGA TRAIL IN SHAWNEE COUNTYTOPEKA SIGN AND CAMERA INSTALLATIONUPRR & NW ARN ROAD NORTHWEST OF ROSSVILLEUPRR & NW DAVIS ROAD 2 MILES SOUTHEAST OF ROSSVILLEUPRR & NW HALL ROAD 1 MILE NORTHWEST OF ROSSVILLEI-70 POLK/QUINCY VIADUCT AND APPROACH ROADWAYREHABILITATE BRIDGE ON I-70 IN SHAWNEE COUNTYBRIDGES #056;057;171;172 ON I-470 IN SHAWNEE COUNTYK-4 IN SHAWNEE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON K-4 IN SHAWNEE COUNTYROAD AND BRIDGE REHAB ON US-24 IN SHAWNEE COUNTYROAD AND BRIDGE REHAB ON US-24 IN SHAWNEE COUNTYROAD IMPROVEMENTS IN SHAWNEE COUNTYROAD IMPROCVEMENTS ON US-75 IN SHAWNEE COUNTY
K-23 PROJECT IN SHERIDAN COUNTYMILL, INLAY & OVERLAY ON K-383 IN SHERIDAN COUNTYREPLACE BRIDGE ON US-24 IN SHERIDAN COUNTYREPLACE BRIDGE ON US-24 IN SHERIDAN COUNTYUS-83 IMPROVEMENTS IN SHERIDAN COUNTY
PERMANENT SEEDING PROJECT IN SHERMAN COUNTY
BRIDGE REPLACEMENT IN SMITH COUNTYSMITH COUNTY BRIDGE GIS SYSTEMBRIDGE REPLACEMENT IN SMITH COUNTY
SIDEWALK AND BIKE PATH IN CITY OF HUGOTONHUGOTON DAIRY TRAFFIC IMPACT STUDYPAVEMENT REPLACEMENT ON K-51 IN STEVENS COUNTY(HUGOTON)
REPLACE BRIDGE OVER HARGIS CREEK IN WELLINGTONROAD IMPROVEMENTS IN SUMNER COUNTYSIDEWALK AND BIKE PATH IN WELLINGTONUNION PACIFIC & 130TH STREET 2 MILES SOUTH OF PECKUPRR & N. WEST ROAD SOUTH OF PECKSUMNER COUNTYROAD IMPROVEMENTS IN MULVANE ON K-53SUMNER COUNTY: ROAD IMPROVEMENTS IN MULVANEBRIDGE REPLACEMENT IN SUMNER COUNTY
BRIDGE REPLACEMENT IN SUMNER COUNTYCITY OF WELLINGTON; S JCT US-81 AND US-160 (8TH AND G)REPLACE BRIDGE ON US-81 IN SUMNER COUNTYROAD IMPROVEMENTS IN WELLINGTON ON US 160/81ROAD IMPROVEMENTS IN WELLINGTON ON US-81US-81 IN SUMNER COUNTY (FY 2013 1R PROJECT)GEOMETRIC IMPROVEMENT IN WELLINGTONWELLINGTON: US-160 (16TH ST) & WOODLAWN ST
SIDEWALK AND BIKE PATH IN CITY OF COLBYPERMANENT SEEDING PROJECT ON I-70 IN THOMAS COUNTYPERMANENT SEEDING PROJECT ON I-70 IN THOMAS COUNTYREPLACE BRIDGE ON I-70 IN THOMAS COUNTYROADWAY REHAB ON I-70 IN COLBY (THOMAS COUNTY)ROADWAY REHAB ON I-70 IN THOMAS COUNTYAREA TRANSPORTATION PLAN: I-70 IN COLBYMILLBRIDGE REPLACEMENT IN THOMAS COUNTYREPLACE BRIDGE #036 ON US-83 IN THOMAS COUNTYREPLACE BRIDGE #037 ON US-83 IN THOMAS COUNTYREPLACE BRIDGE #039 ON US-83 IN THOMAS COUNTYUS-83 PROJECT IN THOMAS AND LOGAN COUNTIES
UPRR & 390 AVENUE IN TREGO COUNTY
EMERGENCY REPAIR ON BRIDGE #097 (I-70 IN WABAUNSEE CO)REPLACE HIGH MAST TOWER IN WABUNSEE COUNTYCULVERT REPLACEMENTS ON K-4 IN WABAUNSEE COUNTYK-99 IN WABAUNSEE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE #056 ON K-99 IN WABAUNSEE COUNTYROAD IMPROVEMENTS IN THE CITY OF ALMA
GEOMETRIC IMPROVEMENT IN SHARON SPRINGS, KANSASK-27 FROM WA/GL COUNTY LINE NORTH TO WA/SH COUNTY LINEREPLACE BRIDGE ON K-27 IN WALLACE COUNTYROAD IMPROVEMENTS IN WALLACE COUNTY
BRIDGE REPLACEMENT IN WASHINGTON COUNTYBRIDGES #039 AND #042 ON K-9 IN WASHINGTON COUNTYBRIDGE #024 ON K-15 IN WASHINGTON COUNTYBRIDGE PAINTING OF #018 ON K-148 IN WASHINGTON COUNTY
UPRR & 800 ROAD SOUTH OF ALTOONAUPRR & PRATT ROAD NORTHWEST OF ALTOONAPASSING LANES ON US-400 IN SOUTHEAST KANSASPASSING LANES ON US-400 IN SOUTHEAST KANSAS
BRIDGE REPLACEMENT IN WOODSON COUNTYREMOVAL OF CONCRETE HEADWALLS IN WOODSON COUNTYREPLACE BRIDGE ON RS-291 IN WOODSON COUNTY
0.00.40.00.20.918.90.30.2
0.00.011.50.09.811.50.62.10.00.00.00.019.0
0.0
0.00.00.912.80.00.4
0.130.80.95.5
0.20.00.00.0
0.00.02.02.5
0.20.00.2
Bridge ReplacementTraffic SignalsBridge ReplacementSurfacingMilling And OverlayMilling And OverlayMilling And OverlayIntersection Improvement
Pedestrian & Bicycle PathsSeeding, SoddingSeeding, SoddingBridge ReplacementMilling And OverlayMilling And OverlayPreliminary EngineeringMilling And OverlayBridge ReplacementBridge ReplacementBridge ReplacementBridge ReplacementMilling And Overlay
Flashing Light Signal
Bridge RepairLightingCulvertMilling And OverlayBridge ReplacementMilling And Overlay
UPRR & 90TH ROAD SOUTHEAST OF YATES CENTERREPLACE BRIDGE #005 ON US-54 IN WOODSON COUNTY
IMPROVE INTERSECTION IN WYANDOTTE COUNTYROAD IMPROVEMENTS IN WYANDOTTE COUNTYSIDEWALK/BIKE PATH IN WYANDOTTE COUNTYVILLAGE WEST SIGN AND CAMERA INSTALLATIONWYANDOTTE COUNTY BRIDGE REPLACEMENTSBUS OPERATION ON SHOULDERSEMERGENCY REPAIR FOR BRIDGE ON I-35 IN WYANDOTTE COUNTYEMERGENCY REPAIR FOR BRIDGE ON I-35 IN WYANDOTTE COUNTY118TH ST OVERPASS AT I-70/K-7 INTERCH IN WYANDOTTE COBRIDGE #096 ON I-70 IN WYANDOTTE COUNTYBRIDGES FOR THE LEWIS & CLARK VIADUCT, KANSAS CITY, KSCONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COCONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COCONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTYCONSTRUCT WEST K-7/I-70 INTERCHANGE IN WYANDOTTE COUNTYI-70 & 38TH STREET (MATOON RD), WYANDOTTE CO.I-70 AND K-7 INTERCHANGEI-70 AND K-7 INTERCHANGE IMPROVEMENTSI-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTYI-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTYPERMANENT SEEDING AT I-70 AND K-7 IN WYANDOTTE COUNTYPERMANENT SEEDING AT I-70/K-7 IN WYANDOTTE CO.RIVERVIEW AVE REALIGNMENT ON I-70/K-7 IN WYANDOTTE COROAD IMPROVEMENTS AT I-70/K-7 IN WYANDOTTE COUNTYUPGRADE WEATHERING STEEL POLES IN WYANDOTTE COUNTYBRIDGE REPAIR ON #235 & #240 (MISSOURI RIVER) I-435HIGH MAST WEATHERING STEEL POLES IN WYANDOTTE CO.I-435REDECK BRIDGES ON I-635 IN WYANDOTTE COUNTYREPLACE BRIDGE OVER I-635 IN WYANDOTTE COUNTYMILLI-70 AND K-7 INTERCHANGE IMPROVEMENTSBRIDGE REPLACEMENT IN WYANDOTTE COUNTYROAD IMPROVEMENTS IN KANSAS CITY ON K-32CONSTRUCT I-70 AND K-7 INTERCHANGE IN WYANDOTTE COUNTY:BRIDGE IMPROVEMENTS IN WYANDOTTE COUNTYROAD IMPROVEMENTS IN KANSAS CITY ON US-69US-69 IN WYANDOTTE COUNTY (FY 2013 1R PROJECT)REPLACE BRIDGE ON US-73 (SB LANES) IN WYANDOTTE COUNTY
2013 KANSAS SCENIC BYWAY CONFERENCEDIST MAINT CONTRACT FOR R/W EASEMENTS, STATEWIDEDIST MAINT CONTRACT FOR REST AREA SERVICS STATEWIDEDIST MAINTENANCE CONTRACT FOR MAINTENANCE STATEWIDEDISTRICT WIDE, DISTRICT 1DISTRICT WIDE, DISTRICT 2DISTRICT WIDE, DISTRICT 3
DISTRICT WIDE, DISTRICT 4DISTRICT WIDE, DISTRICT 5DISTRICT WIDE, DISTRICT 6ECONOMIC RESEARCHFROM 47TH ST. TO EISENHOWER RD.HIGHWAY LIGHTING PROJECTSHIGHWAY LIGHTING PROJECTSHIGHWAY USE TAX EVASION PROJECTI-435 REAL TIME TRAVELER INFORMATIONINSTALLATION OF COMPRESSED NATURAL GAS FUELING STATIONINTERPRETIVE MANAGEMENT PLAN FOR KANSAS SCENIC BYWAYSKANSAS CITY LIVABLE COMMUNITIES PILOT PROGRAMKANSAS CITY METRO REGIONAL AIR QUALITY PUBLIC EDUCATIONKANSAS CITY METRO REGIONAL RIDESHARE PROGRAMKANSAS CITY METRO REGIONAL RIDESHARE PROGRAMKANSAS CITY METROREGIONAL ACTIVE TRANS PROGRAMKC METRO OZONE ALERT DAY REDUCED FARE PROGRAMKC OPERATION GREEN LIGHT COORDINATED TRAFFIC SIGNALSKDOT PROVIDED EQUIPMENT FOR FY14 CONSTRUCTION PROJECTSKS BYWAYS STATEWIDE BICYCLE/PEDESTRIAN STRATEGIC PLANMOTORIST ASSISTANCE PROGRAM FISCAL YEAR 2013NATIVE STONE SCENIC BYWAY INTERPRETIVE KIOSKSOPERATION GREEN LIGHT IMPROVEMENTPAVEMENT MARKING MASTER PROJECTSAFE ROUTES TO SCHOOLSAFE ROUTES TO SCHOOLSIGN INVENTORY FOR THE STATE HIGHWAY SYSTEM.SIGNING PROJECTSSIGNING PROJECTSSKILLED LABOR TRAINING PROGRAM (2013)STATEWIDE BRIDGE INSPECTIONSTATEWIDE PE FOR RR INSPECTIONSSTATEWIDE PE FOR RR INSPECTIONSSTATEWIDE PE FOR RR INSPECTIONSSTATEWIDE PLAN REVIEW OF ROUNDABOUTSSTATEWIDE SIGN AND LIGHT TOWER INSPECTIONSTATEWIDE:UPDATE KDOT ROUNDABOUT GUIDETAX EVASION PROJECTTAX EVASION PROJECTTRAFFIC INFORMATION IMPROVEMENTS FOR RURAL KANSASHIGH MAST WEATHERING STEEL POLES: JOHNSON/WYANDOTTE COSKTA SIGNS, CAMERAS BETWEEN TOPEKA AND KANSAS CITYINSTALL CONDUITK-99 IMPROVEMENTS IN CITY OF WAMEGOSIGN IMPROVEMENTS IN NORTH-CENTRAL KANSASSIGN IMPROVMENT PROJECT FOR NORTHWEST KANSASPASSING LANES EVALUATION ON US-50PASSING LANES ON US-50 IN SOUTHCENTRAL KANSASPASSING LANE EVALUATION ON US-400 IN SOUTHEAST KANSAS
HUMBOLDT: BRIDGE AND CENTRAL STIOLA: COTTONWOOD FROM MADISON TO GARFIELD4.2 MI W & 1.0 MI S OF ELSMOREUS-54 IN ALLEN COUNTY (CRACK REPAIR) PART PROJECTUS169 & HUMBOLT/CHANUTE IC,K-224,MINNESOTA RD INTERCHGS
UPRR & NE 2000 ROAD NORTHEAST OF GARNETTBRIDGE 31-02 (20);5.14 MILES WEST OF NORTH JCT US-59SOUTH JCT US-59, ANDERSON-LINN COUNTY LINEN JCT US-59/US-169, 1.25 MILES S OF GARNETTUS-59 IN ANDERSON COUNTY (2011 1R PROJECT)BRIDGE #011 ON US-169 IN ANDERSON COUNTYEXISTING BR ON SW OLD COLONY WELDA ROAD; DISTRICT 4
0.5 MI W OF CUMMINGSATCHISON: 4TH STREET, KANSAS TO DIVISIONUPRR & GREELEY ROAD NW OF LANCASTERUPRR & HAMILTON ROAD NW OF LANCASTER4.0 MILES N & 4.4 MILES E OF SHANNON1.3 MI S OF ARRINGTONBRIDGE 59-3-16.363(013); 0.31 MILES EAST 4TH STREETCORRIDOR: AMELIA EARHART BRIDGE (013) OVER MO RIVERK-116(CUMMINGS), NORTHEAST TO WEST JUNCTION US-59/US-73ATCHISON: US-73 IN ATCHISON COUNTY - KLINK PROJECT
BNSF & BLUESTEM ROAD BARBER COUNTYBNSF & D AVENUE IN HAZELTONBNSF & LONE TREE ROAD IN BARBER COUNTYBNSF & MINCO ROAD NORTHEAST OF HAZELTONBNSF & T-101,STATELINE ROAD SOUTH OF KIOWABNSF CORRIDOR BARBER COUNTY2.0 E OF HAZELTON ON RS-1381K-2 IN BARBER COUNTY (2011 1R PROJECT)K-8 IN BARBER COUNTY (2011 1R PROJECT)2L TO 4L (WEST OF JCT US-281/US-169) E TO BA/HP CO LNBR 010, ELM CREEK, 0.78 MILE EAST OF EAST JCT US-281
GREAT BEND: MULTIPLE LOCATIONS ON US-56/US-281/K-96GREAT BEND:FEDERAL FUND EXCHANGEMCKINLEY ST RECONSTRUCTIONPAWNEE ROCK HISTORIC SITE RESTORATIONSCENIC BYWAY AT CHEYENNE BOTTOMS AND QUIVIRA WL REBOYD ROAD (WEST) 2.5 MILES S & 4 MILES W OF HOISINGTONRS-462 FROM GREAT BEND W. CITY LIMTS W. TO NW 60TH AVEBOYD RR CROSSING SEC 2&3, T18S, R14W3.0 MI E & 1.0 MI S OF HEIZERK-96 IN BT CO RH/BT COUNTY LN EAST TO NCL GREAT BEND
CHEYENNE BOTTOMS WILDLIFE AREA VISITOR CENTERFROM W OF HARRISON ST, E TO WASHINGTON ST IN GREAT BENDGREAT BEND: INTERSECTION OF FREY ST AND 10TH ST (US-56)US-281 FROM 3RD ST TO 6TH ST
BNSF & 225TH STREET SOUTH OF HAMMONDBNSF & HACKBERRY ROAD SOUTH OF FT. SCOTTCITY OF FORT SCOTTBOURBON/CRAWFORD COUNTY LINE NORTH TO EAST JCT K-39BOURBON/LINN COUNTY LINE TO EAST JUNCTION K-7/K-31JUNCTION K-3 EAST TO JUNCTION K-31 (MAPLETON)AL/BB COUNTY LINE TO 0.7 MILES W OF N JCT US-69 (PCCP)FORT SCOTT:JCT US-69/K-7 TO BROWN ST ON WALL ST (US-54)
2.5 MI SOUTH & 0.8 MI WEST OF HIAWATHAUPRR & BITTERSWEET ROAD EAST OF SABETHA2.5 MI S & 1.8 MI W OF HIAWATHABRIDGE 36-7(045); 1.08 MILES EAST OF US-73BR#8(.42 MI E OF E JCT US-159) #9(4 MI N OF W JCT K-20)EMERGENCY REPAIR ON US-73 CULVERT IN BROWN COUNTYNCL HORTON, N TO SCL HIAWATHAHORTON: SOUTH CITY LIMITS, NORTH TO K-20
1.5 MILES W OF BENTON & 1.7 MILES N OVER WHITEWATER CKANDOVER: ANDOVER RD FROM HARRY ST TO 1100 FT S OF US-54AUGUSTA:WBL OF 7TH ST BT BNSF RR TO 250 FT W OF BLUFFBNSF & DIAMOND ROAD SOUTHWEST OF AUGUSTABNSF & ELLIS ROAD, NORTHEAST OF EL DORADOBNSF & NE 80TH STREET, 7 MILES SW OF CASSODAYBNSF & SW 120TH STREET, SOUTHWEST OF AUGUSTAEL DORADO: NINTH AVENUE OVER W BRANCH OF WALNUT RIVEREL DORADO:FEDERAL FUND EXCHANGEELDORADO: 6TH AVE & BOYER AVE FROM K-254 TO METCALF RDK196/K254; US-54/HAVERHILL ROAD; AND US54/US400/US77UNION PACIFIC & 2ND STREET IN WHITEWATERUNION PACIFIC & NW BUTLER RD NORTH OF WHITEWATERUPRR & 160TH STREET NORTH EDGE OF ELBING3.0 MILES E & 0.7 MILES N OF EL DORADOBRIDGE #126 LOCATED 8.17 MILES NORTH OF US-54BU/HV COUNTY LINE EAST TO CONC PAVEMENT (18.598 MILES)BUTLER/SEDGWICK COUNTY LINE EAST TO PCCP WEST OF K-196K-254 FROM SCHOOL RD TO HAVERHILL RDAUGUSTA: E EWS OF BNSF RR BR TO ECL ON 7TH ST (US-54)BR # 127 & 128; 1.21 MILE EAST OF WEST JUNCTION US-77BRIDGE #25; 0.55 MILES EAST OF US-77 NORTH JUNCTIONBRIDGE 54-08 (119); 0.40 MILES EAST OF US-77 WEST JCTN OF US-400 INTERCHANGE, N TO WHERE 4-LANES ENDSUS-54 IN BUTLER CO; SG/BU CO LINE EAST TO AUGUSTA CLCL/BU CO LINE N TO 1 MILE S OF S CITY LIMITS OF AUGUSTACL-BU COUNTY LINE, N TO SOUTH CITY LIMITS OF AUGUSTA
Landscaping And BeautificationGrade & SurfacingGrade & SurfacingGrade & Surfacing
EL DORADO: 4TH TO 12TH AVENUE ON MAIN STREET (US-77)NCL EL DORADO, N TO RS 862
CHASE:FEDERAL FUND EXCHANGEBRIDGE 033,OVER ROCK CREEK, 14.1 MI N BU/CS COUNTY LINECULVERTS(521&522);12.35 & 13.21 MI N OF CS/BU COUN LINESCENIC BYWAYTHE FLINT HILLS SCENIC NATIONAL BYWAY (K-177)
2.0 MI N & 3.5 MI E OF SEDAN2.0 MI NORTH & 2.0 MI EAST OF PERUSEDAN: INDEPENDENCE RD RS 97 E 3.5 MILES
RS 107 FROM HWY 66 AT RIVERTON SOUTH TO LOWELL KSBNSF & BEASLEY ROAD NE OF BAXTER SPRINGSBNSF & MAIN STREET IN GALENABNSF & MESSER ROAD SOUTH OF COLUMBUSBNSF & N 10TH ROAD NORTHWEST OF BAXTER SPRINGSBNSF & QUAKER ROAD NE OF BAXTER SPRINGSKCS & 110TH STREET SOUTH OF PITTSBURGKCS & WEIR ROAD SOUTH OF PITTSBURG1.5 MI W & 3.25 MI S OF HALLOWELL3.0 MI E & 1.5 MI S OF SCAMMONRS 1791 FROM US-400 E. TO 100TH STREETK-26 IN CHEROKEE COUNTY (2011 1R PROJECT)BNSF & K-66 IN GALENABRIDGE 66-11 (005);1.00 MILES EAST OF US-400/K-66 JCTSKO & K-102 AT CARONACOLUMBUS: N SIDE OF RR XING TO MAPLE ST ON US-69JCT K-7/US-69 EAST TO SOUTH JCT US-400/US-69OKLAHOMA/KANSAS STATE LINE; NORTH TO COLUMBUSSPRING RIVER DRAINAGE BR 034, 5.3 MILES E OF JCT US-69US-166 IN CHEROKEE CO LB/CK CO LINE EAST TO BAXTER SPRBRIDGES 74 AND 76, 2.5 MILE E OF JUNCTION K-126US-400/K-66/BEASLEY INTERSECTION W OF RIVERTON; CK CO
13 MILES W & 11 MILES S OF ST FRANCIS
BRIDGE #006 IN CLARK CO (3.58 MI E OF S JCT US-283)BR 18, CIMARRON RV & 19 CIM RV OVFL, 4.39 & 4.87 M N OKUS-283 IN CLARK COUNTY (2011 1R PROJECT)
5.2 MI S OF CLIFTONCLAY CENTER: BLUNT STREET, NORTH TO NORTH CITY LIMITSK-15 FROM NORTH CITY LIMITS OF CLAY CENTER N 11.936 MIUS-24 IN CLAY COUNTY (2011 1R PROJECT)US-24 IN CLAY COUNTY (2011 1R PROJECT)
CONCORDIA:FEDERAL FUND EXCHANGE2.0 MI S & 4.5 MI W OF CONCORDIA
3.0 MI S & 1.75 MI W OF AMESK-9; CITY OF CLYDE IN CLOUD COUNTY KLINK PROJECTK-189 IN CLOUD COUNTY (2011 1R PROJECT)BR 011, WEST PIPE CREEK DRAINAGE, 0.2 MI EAST OF US-81BRIDGES #002&012; EAST OF MC COUNTY LN & EAST OF US-81US-24 IN CLOUD COUNTY (2011 1R PROJECT)0.494 MILES NORTH OF OT/CD COUNTY LINE NORTH 1.45 MILES2.424 MILES SOUTH OF K-9 JCT;NORTH TO 1.769 MILES SOUTH5.085 MILES NORTH OF OT/CD CO LINE NORTH 7.595 MILESBRIDGE 053, 1.28 MILES NORTH OF JUNCTION K-9OTTAWA/CLOUD COUNTY LINE NORTH 8.92 MILES ON US-81
BURLINGTON: 3RD STREET OVER ROCK CREEKUPRR & 9TH STREET IN LEROY7.0 MI N & 0.5 MI W OF LEROY6.2 MI N OF LEROYAPPROX 1.1 KM(0.7 MI) W OF US-75, NE TO CF-OS CO LWAVERLY: PIERSON STREET(K-31), 6TH TO 1STK-58 IN COFFEY COUNTY (2011 1R PROJECT)0.2KM S OF OLD US-50(RS 2066), NO TO 1.6KM N OLD US-50BR 021, NEOSHO RIV, 13.7 KM N K-57 N JCTBURLINGTON: FROM POTOMAC ST N TO SOUTH OF NEOSHO ST
ALONG LEVEE:PARIS PRK TO S SUMMIT & ACPC PRK - ARK CITYSKORR & 132ND ROAD NORTH OF WINFIELDSKORR & 151ST ROAD EAST OF NEW SALEMSKORR & ANDREWS STREET IN WINFIELDSKORR & HARTER STREET IN WINFIELDSKORR & MANNING STREET IN WINFIELD5.0 MI S & 2.3 MI E OF WINFIELDWEST US-166/K-15 JUNCTION WEST TO EAST US-160/K-15 JCTARKANSAS CITY(GI):INTERSECTION OF US-77B AND KANSAS AVEWINFIELD: NORTH OF 15TH ST, NORTH TO NORTH OF 6TH AVESKORR & US-160 WEST OF BURDENUS-160 IN COWLEY COUNTY; OXFORD EAST TO WINFIELD
BNSF & GOODING ROAD SOUTH OF GIRARDBNSF & MAGNOLIA STREET IN CHEROKEEBNSF & PINE STREET IN CHEROKEEPITTSBURG: BROADWAY ST CENTENNIAL TO WILLIAMSSOUTH KANSAS & OKLAHOMA RR & ELM STREET IN PITTSBURGJUNCTION K-47 NORTH TO BOURBON/CRAWFORD COUNTY LINEEAST CITY LIMITS OF GIRARD EAST TO JUNCTION US-69NEOSHO/CRAWFORD CO LINE E TO W CITY LIMITS OFGIRARDBRIDGE 058, LITTLE COW CREEK DR. 1.2 MI W KS/MO ST LINEBRIDGE 146-19 (52) EAST OF WALNUT ON K-146BR NO 160-19-12.025(078), 2.53 MI WEST OF KS/MO ST LINE
3.4 MI S & 9.1 MI W OF DRESDEN4.7 MI S & 4.4 MI W OF OBERLIN
Grade & BridgeMilling And OverlayMilling And OverlayGrade, Bridge & SurfacingBridge RepairMilling And OverlaySlurry SealSlurry SealSlurry SealBridge RepairSpecial
8.5 MI N & 4.4 MI W OF NORCATURPART PROJECT OF HOST PROJECT KA-1450-01PART PROJECT OF HOST PROJECT KA-1450-01SD/DC COUNTY LINE NORTH TO JUNCTION K-383ASPHALT SEAL ON K-383 IN DECATUR COUNTY (7.313 MILES)US-83 IN DECATUR COUNTY (2011 1R PROJECT)
BR #15:2.55 MI E OF K-15 & BR #61:2.3 MI N E JCT K-18BRIDGE #091; CURTIS CREEK TRIBUTARY AT MILFORD ST PARK1.5 MI W OF CHAPMAN (RS 1816)BR 026, OVER LOCAL RD, 5.4 KM E K-43PATCH & SEAL ON I-70 IN DICKINSON COUNTYSALINE-DICKINSON COUNTY LINE, EAST 14.1 KILOMETERSK-4 IN DICKINSON COUNTY (2011 1R PROJECT)ABILENE: S 5TH ST, N TO N 8TH ST (EXCEPT UP RR TRACKS)BRIDGE #057 IN DICKINSON CO (3.53 MILES SOUTH OF I-70)CRACK REPAIR ON K-15 IN DICKINSON COUNTYN OF I-70 RAMPS TO 130M N OF ROLLER COASTER RDCRACK ROUT & SEAL ON K-18 IN DICKINSON COUNTYK-18 IN DICKINSON COUNTY: COUNTY LINE EAST TO K-15/K-18BRIDGE #85;3.76 MILES SOUTH OF I-70K-43 IN DICKINSON COUNTY: K-4 JCT NORTH TO I-70 JCTK-218 IN DICKINSON COUNTY (2011 1R PROJECT)US-56 IN DICKINSON COUNTY (2011 1R PROJECT)2011 1R PROJECT ON US-56B IN DICKINSON COUNTYUS-77 IN DICKINSON COUNTY (2011 1R PROJECT)
HIGHLAND: OLD US-36 (RS-2128) JUST WEST OF ELM STTROY: RS-2163(LOCUST) FROM LAST CHANCE TO N. CITY LIMTSJCT K-20, N ON NEW ALIGNMENT TO EXIST K-7 N OF U-36US-36 & E JCT K-7; W JCT K-7; K-120 IN DONIPHAN COUNTY
BNSF & 11TH STREET IN LAWRENCEBNSF & E 1850 ROAD EAST OF LAWRENCECITY OF BALDWIN CITYBRIDGE #070; 7.04 MILES EAST OF US-59BRIDGES 10-23 (073,074,075,078); W OF JOHNSON CO LNLAWRENCE ED: K-10 FROM US-59(IOWA ST) EAST TO LOUISIANALAWRENCE ED:K-10 FROM US-59(IOWA ST) E. TO LOUISIANALAWRENCE: HASKELL AVENUE, EAST TO EAST CITY LIMITSLAWRENCE: K-10 (23RD ST), FROM OUSDAHL TO BARKERSLIDE REPAIR ON K-10 IN DOUGLAS COUNTYBR 001, MUD CR, 2.32 MILES E OF S JCT US-59US-24 IN DOUGLAS COUNTY (2011 1R PROJECT)BOWERSOCK DAM IN LAWRENCE KANSASBR #081 & 082;1.45 MILES EAST OF S JCT US-59LAWRENCE:INTERSECTION OF N 2ND STREET AND LOCUST STREETUS-40 IN DOUGLAS COUNTY (2011 1R PROJECT)US-56 SURFACE RECYCLE IN DOUGLAS COUNTYBRIDGE #066 LOCATED 8.97 MILES NORTH OF US-56
Grade & BridgeMilling And OverlayMilling And OverlayConv SealConv SealMilling And Overlay
Bridge RepairGrade, Bridge & SurfacingGrade, Bridge & SurfacingBridge ReplacementPavement PatchingGrade, Bridge & SurfacingMilling And OverlayOverlayBridge RepairCrack RepairGrade & SurfacingCrack RepairCrack RepairBridge RepairCrack RepairMilling And OverlayConv SealConv SealConv Seal
US-59; CITY OF LAWRENCE IN DOUGLAS COUNTY KLINK PROJECT
EDWARDS:FEDERAL FUND EXCHANGEUS-50 IN EDWARDS COUNTY (2011 1R PROJECT)BRIDGE 183-24(008); 1.84 MILES SOUTH OF US-50(KINSLEY)
CITY LIMIT OF ELLIS EAST 7.2 MILES TO YOCEMENTOHAYS: 22ND ST FROM CANTERBURY DR TO COMMERCE PARKWAYUNION PACIFIC & 130TH AVENUE EAST OF ELLISUNION PACIFIC & YOCEMENTO ROAD WEST OF HAYS5.6 MI S & 0.8 MI W OF WALKERBR # 038 & 039; AROUND 3.6 MILES EAST OF JCT K-255/I-70TR-EL COUNTY LINE, EAST TO JUNCTION US-183HAYS: 22ND ST TO 27TH ST ON N VINE ST(US-183)JCT 55TH ST, N OF HAYS, N TO EL-RO CO LINE
BRIDGES #10(I-70) #11(K-14) #56(K-232) ELLSWORTH COUNTYLOW RD FROM ELLSWORTH TO KANOPOLISRS1002 FROM 1.8 MILES E OF ECL KANOPOLIS TO K1403.0 MILE SOUTH WILSON AT SMOKEY HILL RIVERBRIDGE #2; LOCATED EXIT 209 RS 236 OVERRUSSELL-ELLSWORTH CO L, EAST TO ELLSWORTH-LINCOLN CO LBRIDGE #031; 0.18 MILES EAST OF K-141RICE COUNTY LINE EAST TO MCPHERSON COUNTY LINENORTH CITY LIMITS OF KANOPOLIS NORTH EAST TO K-156BRIDGE NUMBER 59; 0.4 MILES EAST OF K-156K-4/K-141 JUNCTION NORTH TO K-141/K-140 JUNCTIONBARTON CO LINE NORTH EAST TO N CITY LIMITS OF HOLYROODCRACK SEAL ON K-156 IN ELLSWORTH COUNTYK-140 NORTH EAST TO I-70MAIN STREET IN HOLYROOD, NORTHEAST TO JCT K-140OLD HIGHWAY 40 NORTH TO LINCOLN COUNTY LINE
JENNY BARKER ROAD,US-50/400 N TO 140 M N OF SCHULMAN RDINTRSECT K-156, MARY ST & JENNIE BARKER RD-GARDEN CITYUS-50/US-83 AND MARY STREET AT GARDEN CITYGARDEN CITY: US-50B/83B, FROM CAMPBELL ST TO JENNY AVEUS-83 IN FINNEY COUNTY (2011 1R PROJECT)
14TH AVE. OVER ARKANSAS RIVERPED/BIKE PATH:US-50-6TH TO 14TH & 2 SPURS IN DODGE CITYBRIDGE 052, W FORK RATTLESNAKE CR, 0.4 MI S OF BUCKLINNORTH OF JCT UA-54/K-34 NORTH TO JCT US-400/K-34GRAY/FORD CO LINE EAST TO US-50/US400 JCT AT DODGE CITYUS-50 FROM US-400 TO WEST CITY LIMITS OF DODGE CITYBRIDGE #60;0.30 MILES NORTH OF JUNCTION US-56/US-400US-283 IN FORD COUNTY (2011 1R PROJECT)BRIDGE #57; 1 MI NORTH OF FORD (ARKANSAS RIVER BRIDGE)NORTH CITY LIMITS OF FORD SOUTHEAST TO FORD/KIOWA CO LNUS-400, FROM US56/283 JCT EAST TO EAST CITY LIMITS
US50 1.5 M W US50/50B S TO US-56(DODGE CITY SW BYPASS)US50 1.5M W US50/50B S TO US-56(BYPASS)SW OF DODGE CITYUS50/50B, S & E TO JCT US56/283(BYPASS)- W OF DODGECITY
MIDLAND RAILWAY: MONTANA RD TO PAWNEE RD IN FRANKLIN COMONTANA RD FROM SAND CR RD N. TO FUTURE US-59 INTCHG.OTTAWA:FEDERAL FUND EXCHANGEPRAIRIE SPIRIT RT BETWEEN 5TH AND 23RD STS IN OTTAWA1.8 MI N OF RANTOUL0.4 KM W OF W JUNCTION U50B, NE AND N TO 0.5 KM N K680.4 KM W OF W JUNCTION U50B, NE AND N TO 0.5 KM N K680.5 KM NORTH K-68, NORTHEAST 11.7 KM12.2 KM NE K-68, NE TO FR-MI COUNTY LINEBRIDGE 35-30 (12);8.33 MILES EAST OF OSAGE COUNTY LINEBRIDGE #72;11.86 MILES EAST OF OSAGE COUNTY LINEBRIDGES #073 (K-68) & #028 (I-35) IN FRANKLIN COUNTYK-68 & BNSF WEST OF OTTAWAOTTAWA: K-68 FROM POPLAR TO JUNCTION I-35 CONC PAVEMENTI-35 NE OF OTTAWA, N TO FRANKLIN-DOUGLAS COUNTY LINEMISSOURI ROAD, STAFFORD ROAD NORTH TO STAFFORD TERRACEUS-59 IN FRANKLIN COUNTY (2011 1R PROJECT)
GEARY:FEDERAL FUND EXCHANGEJUNCTION CITY:E CHESTNUT STREET,E OF US-40B,W OF I-70BRIDGE #15;2.04 MILES EAST OF WEST JUNCTION US-40INTERCHANGE: EXIT 298, N RAMP TERM, I-70/EAST/CHESTNUTPATCH & SEAL ON I-70 IN GEARY COUNTYCRACK ROUT & SEAL ON K-18 IN GEARY COUNTYK-244/K-7 4 LN SOUTH EAST TO K-57 4 LN DIV/4 LNK-57 IN GEARY COUNTY (2011 1R PROJECT)K-57 IN GEARY COUNTY (2011 1R PROJECT)K-57 IN GEARY COUNTY US-77 JCT SOUTHEAST TO K-244 JCTK-57 IN MORRIS COUNTY (2011 1R PROJECT)K-157 IN GEARY COUNTY (2011 1R PROJECT)CRACK SEAL ON K-177 IN GEARY COUNTYEMERGENCY REPAIR ON K-177 IN GEARY COUNTYK-244 SPUR JUNCTION NORTH TO K-57/K-244 SPUR JUNCTIONK-244/RS 270 JUNCTION EAST TO K-57/K-244 JUNCTIONUS-77 IN GEARY COUNTY (2011 1R PROJECT)
3.5 MI S AND 1.3 MI W OF GRAINFIELDLG/GO CO LN; EAST TO 19.254 MILES (0.985 MI E OF K-23)8 MILES NORTH OF LANE/GOVE CO LN THEN 9.5 MILES NORTHGOVE (GI): K-23 FROM 6TH STREET TO 3RD STREETLANE/GOVE COUNTY LINE, NORTH 8 MILES
JCT US-24 & RS-718, THENCE N 14.25 MI(FA)K-18 IN GRAHAM COUNTY (2011 1R PROJECT)K-85 IN GRAHAM COUNTY (2012 1R PROJECT)STOCKPILE PROJECT ON US-24 IN GRAHAM COUNTY
US-24 IN GRAHAM COUNTY (2011 1R PROJECT)BR #21(.59 MI N OF TREGO CO LN) SALINE RIVER DRAINAGEUS-283 IN GRAHAM COUNTY (2012 1R PROJECT)
GRANT CO: RD K FROM US-160 N. 3.1 MI & W. 1 MI TO K-25SV/GT COUNTY LINE NORTH TO SOUTH CITY LIMITS OF ULYSSESK-190 (GRANT CO) FROM JCT US-160 EAST TO GT/HS CO LINEEAST CITY LIMITS OF ULYSSES EAST TO GT/HS COUNTY LINEULYSSES: US160, FROM W. OF MAIN ST, EAST TO MISSOURI ST
9.0 MI N OF INGALLS, THENCE N 3.0 MIBITUMINOUS SEAL ON K-144 IN GRAY COUNTYK-144 & CIMARRON VALLEY RAILROAD N.E. OF COPELANDAPPROX 252M E OF 7TH ST, E 0.36 KM- CIMARRONCIMARRON:2ND ST. TO 5TH ST. ON US-50 (AVENUE A)EAST CITY LIMITS OF CIMARRON EAST TO GRAY/FORD CO LINEHWY 50 IN CIMARRON KANSAS
K-27 FROM NEWTON ST TO HARPER STNCL TRIBUNE, N TO GL-WA CO LJUNCTION K-96/K-27 AT TRIBUNE EAST TO GL/WH COUNTY LINE
GREENWOOD HOTEL BUS DEPOT @ 300 N MAIN IN EUREKANCL OF EUREKA, THENCE N 4.5 MIK-58 IN GREENWOOD COUNTY (2011 1R PROJECT)BR #10(1.2 MI S OF LY CO LN) #11(1.63 MI S OF LY CO LN)HOMER CREEK BR (035), 5 MILES NORTH OF US-54EUREKA: US-54 & JEFFERSON ST.US-54 IN GREENWOOD COUNTY (CRACK REPAIR) PART PROJECT
RS308 FROM 1.93 MILES S OF US-50 N TO US-50BRIDGE #39;15.77 MILES NORTH OF SOUTH COUNTY LINEWEST CITY LIMITS OF SYRACUSE, E TO HM-KE COUNTY LINE
K-2 IN HARPER COUNTY (2011 1R PROJECT)ANTHONY(GI):K-44 FR K-2 TO LAWRENCE AND PENNSYL TO KSK-44 IN HARPER COUNTY (2012 1R PROJECT)K-179; CITY OF ANTHONY IN HARPER COUNTY KLINK PROJECTBRIDGE #019; 7.62 MILES EAST OF NORTH JUNCTION K-2US-160 IN HARPER COUNTY (2011 1R PROJECT)
BNSF & 8TH ST/N. HIGH ST. IN NEWTONBNSF & HARVEST HILL ROAD NE OF WALTONBR #076(0.380 MI E OF I-135);#079(3.92 MI E OF K-89)FROM SAND CR & KS AVE TO 36TH ST & K-15 IN N NEWTONHALSTEAD: MAIN STREET BRIDGES OF I-135, W OF K-15, N OF 36TH ST IN HARVEY CO5.25 MI S OF HESSTON7.0 MI S OF HESSTON0.48 KM S S JCT K-15, N AND NW TO 0.48 KM N N JCT K-15
5.00.00.7
4.013.45.814.20.3
3.04.80.00.20.06.60.2
0.215.910.2
0.04.512.50.50.00.05.5
3.00.00.0
23.40.111.80.30.02.8
0.00.00.00.00.20.00.10.10.0
Conv SealBridge RepairMilling And Overlay
Grade & SurfacingMilling And OverlaySealing3/4 OverlayMilling And Overlay
BRIDGE #024; 0.04 MILES SOUTH OF JUNCTION US-50/I-135I-135/36TH ST, 2 MILES SOUTH OF SO. JUNCT I-135/US-50I-135: EMERGENCY REPAIRS ON BR. #044 IN HARVEY COUNTYPAVEMENT REPAIR ON I-135 IN HARVEY COUNTYSOUTH JCT US-50 TO THE HARVEY/MCPHERSON COUNTY LINEN JCT I-135 TO 0.5 MILES W OF CITY LIMITS OF WALTONUS-50 IN HARVEY CO; RN/HV CO LINE EAST TO NEWTON
VARIOUS LOCATIONS IN THE CITY OF SATANTA8.0 MI N & 6.0 MI W OF SUBLETTE, N 6.0 MIBITUMINOUS SEAL ON K-144 IN HASKELL COUNTYJCT US-56/K-190; SOUTH TO HASKELL/SEWARD COUNTY LINEK-190 (HASKELL CO) FROM GT/HS CO LINE TO W JCT US-56CIMARRON VALLEY RR & US-83 WEST OF SUBLETTEGT/HS COUNTY LINEEAST TO JCT US-83/US-160/K-144
RS 255 FROM THE FORD/HG CO LINE, N. TO 1 MI S OF K-156JCT RS-314/K-156 THENCE EAST TO HODGEMAN/PAWNEE CO LNJETMORE: US-283 FROM BUCKNER CR BR. NORTH TO TUCKER STUS-283 IN HODGEMAN COUNTY (2011 1R PROJECT)
2.0 MI W & 0.2 MI S OF NETAWAKA3.0 MI S & 2.2 MI E OF HOLTON4.3 MI E & 0.5 MI N OF HOYTRS324 WEST EDGE OF CIRCLEVILLECULV 523, NORTH CEDAR CR DRG, 5.4 MI SE OF JCT K-116MICHIGAN STREET IN HOLTON EAST TO JA/JF COUNTY LINEPART PROJECT OF HOST PROJECT KA-1352-01INTERCHANGE: US-75 AND CO RD 150 (1 M S OF MAYETTA)US-75 AT PRAIRIE BAND NATION, SIGNS AND CAMERA
2.0 MI E & 3.2 MI S OF NORTONVILLE2.0 MILES N & 1.3 MILES W OF OSKALOOSABRIDGE 16-44 (22);5.76 MI SOUTH EAST OF JA/JF CO LNJACKSON/JEFFERSON COUNTY LN EAST TO SOUTH JCT K-16/K-4NORTH JUNCTION K-4 EAST TO NORTH JUNCTION US-59N JCT US-59, SE TO JF-DG CO LUS-24 FROM MP 372.0 TO MP 386.5WEST COUNTY LINE EAST TO MUDDY CREEK - JEFFERSON COUNTYMILL & INLAY ON US-59 IN JEFFERSON COUNTY
BR 18,LOVEWELL RESERVOIR 7 MI S KS/NE STATE LINE ON K14BRIDGE #039; 3.41 MILES EAST OF SOUTH JUNCTION K-14BRS:LIMESTONE CR DR (030) & LIMESTONE CR (031)MITCHELL/JEWELL COUNTY LINE NORTH TO KS/NB BORDERCRACK ROUT & SEAL ON US-36 IN JEWELL COUNTYCULVERT 516, LIMESTONE CR DRG, 2.89 MILES EAST OF K-112E END OF CURB & GUTTER @ MANKATO, E TO 1.0 KM E RS 1446E END OF CURB & GUTTER @ MANKATO, E TO 1.0 KM E RS 1446JEWELL/SMITH COUNTY LINE; EAST TO JUNCTION US-36/K-128
MANKATO: US-36 FROM LINCOLN ST TO LEBOW STW JCT K-128, E TO BEGINNING OF 4-LANE SECT W OF MANKATO
107TH & LACKMAN RD, CITY OF LENEXABNSF & 215TH ST. SOUTH OF EDGERTONBNSF & OLATHE CORRIDOR 8 CROSSINGSCITY OF OLATHE: VARIOUS LOCATIONSCITY OF OLATHE: VARIOUS LOCATIONSCITY OF OVERLAND PARKCITY OF OVERLAND PARK: VARIOUS LOCATIONSCITY OF SHAWNEE: CITYWIDECLEAR CR PATH:MONTICELLO RD TO WOODSTOCK RD IN SHAWNEEDENNIS AVE & FERREL ST TO HEDGE LN & 131ST ST IN OLATHEFAIRWAY: MISSION RD 0.125 MI S OF US-56 OVER ROCK CREEKGAMBLIN PARK TO K-7 IN SHAWNEE- CLEAR CREEK TRAILGARDNER: INTERSECTION OF US 56 & OLD 56 HWYHERITAGE TRAIL: 151ST ST S TO S OF 159TH ST IN OLATHEINDIAN CR TR EXT FROM SOUTHDOWNS TO HAMPTON PRKS:OLATHEJOHNSON CO SECTIONS OF I-435, I-35, K-10 AND US-69JOHNSON COUNTYKANSAS CITY METRO AREALEAWOOD: 103RD ST STATE LINE RD TO MISSION RDLENEXA:87TH STREET FROM PFLUMM RD TO RENNER RD(CA)MERRIAM: 55TH ST FROM MERRIAM DR TO SWITZER RDMERRIAM: MERRIAM DR FROM 57TH ST TO ANTIOCH RDMERRIAM: MERRIAM DR FROM JOHNSON DR TO SHAWNEE MIS PKWYMISSION: ROE AVE W 63RD ST N TO SHAWNEE MISSION PKWYOLATHE: 119TH & STRANG LINEOLATHE: BR OVER LITTLE CEDAR CR/LAKESHORE DR & ROBINSONOLATHE: CITYWIDEOVERLAND PARK: 119TH ST FROM US-69 TO RILEY ST(CA)OVERLAND PARK: 132ND STREET OVER US-69(CA)OVERLAND PARK: 135TH ST FROM ANTIOCH TO METCALF(CA)OVERLAND PARK: 151ST FROM SWITZER RD TO ANTIOCH RD(CA)OVERLAND PARK: CITYWIDEOVERLAND PARK: COLLEGE BLVD FROM BENSON ST TO NALL AVEOVERLAND PARK: COLLEGE BLVD FROM PFLUMM RD TO US-69(CA)OVERLAND PARK:VARIOUS LOCATIONSOVERLAND PARK:VARIOUS LOCATIONSSHAWNEE: 83RD ST FROM HEDGE LANE TERR TO MONTICELLO TERSHAWNEE: NIEMAN RD FROM 59TH ST TO SN MISSION PKWYSHAWNEE: QUIVIRA RD FROM 64TH ST TO 77TH STSHAWNEE:47TH STREET FROM MUND ROAD TO WOODLAND RD(CA)US-169 IN JOHNSON CO (215TH STREET NORTH TO 175TH ST)DESOTO: KILL CREEK ROAD(RS-346) FROM 83RD TO K-10199TH STREET FROM US-169 TO RIDGEVIEW100 FT RIGHT OF I-35; JO/WY CO LN (NEAR LAMAR AVE EXIT)BRIDGE 35-46 (009);5.75 MI NORTH EAST MIAMI COUNTY LNI-35 IN JOHNSON COUNTY CONCRETE PAVEMENT REPLACEMENTI-35 NB AT K-150 (SANTA FE) EMERGENCY REPAIR
JOHNSON/MIAMI COUNTY LINE NE TO I-35/I635 JUNCTIONSPRAY PATCH & OVERLAY ON I-35 IN JOHNSON COUNTYBIRDGES #054, 055 & 274 1.76 MILES WEST OF STATE LINEBRIDGE #216; I-135 AND JOHNSON DRIVE IN SHAWNEE KSBRIDGE #221, RAMP K-10 EASTBOUND TO I-435 NORTHBOUNDBRIDGE 435-46 (227);JCT 79TH ST/I-435I-435 IN JOHNSON COUNTY 87TH STREET TO MIDLAND DRIVEI-435 JOHNSON COUNTY 87TH STREET TO ANTIOCHINTERCHANGE IN THE CITY OF LENEXA.INTERCHANGE: I-435 AND ANTIOCH ROAD IN OVERLAND PARKJOHNSON COUNTY: I-435 & SHAWNEE MISSION/67TH ST.RAMP METERING I-435 @ METCALF TO KANSAS/MO STATE LINE67TH ST, CITY OF SHAWNEE; & 83RD STREET, CITY OF LENEXABRIDGE REPAIR ON BRIDGE #299 IN JOHNSON COUNTYK-7 & JOHNSON DRIVE/55TH STREET IN SHAWNEEOLATHE: K-7 FROM OLD 56 HIGHWAY TO DENNIS AVEBRIDGE #180; 5.96 MILES NORTH EAST OF DOUGLAS COUNTY LNBRIDGE 10-46 (237);2.46 MI EAST OF K-7BRIDGES 10-46 (183,185,197); EAST OF DOUGLAS CO LNEMERGENCY REPAIR ON BRIDGE #0236EMERGENCY REPAIR ON K-10 IN JOHNSON COUNTY BRIDGE #237EMERGENCY REPAIRS ON K-10 IN JOHNSON COUNTYJOHNSON COUNTY; CITY OF DESOTO; K-10 & LEXINGTON ROADK-10 ELECTRONIC SIGNS, CAMERAS, AND RADAR DETECTIONLENEXA: ALONG K-10 FROM WOODLAWN TO LONE ELMWESTBOUND EXIT RAMP AT THE K-10/WOODLAND ROAD INTERCHUS-56 IN JOHNSON COUNTY (2011 1R PROJECT)167TH ST, 179TH ST, & 199TH ST - CITY OF OVERLAND PARKBLUE VALLEY PARKWAY TO COLLEGE BLVD-OVERLAND PARK, KAUS-69 ELECTRONIC SIGNS, CAMERAS, AND RADAR DETECTIONUS-69/159TH STREET NORTH TO 135TH STREET/US-6999TH ST TO 86TH ST & 75TH TO SH MISSION PKWY ON US-169US-169(METCALF) FROM 86TH ST TO 75TH ST
BRIDGES: RED CREEK (049) AND ROSE BUD CREEK (050)JUNCTION K-14/K-42 EAST TO KM/SU COUNTY LINE5.77 MI E OF PR/KM CO LN EAST TO W KINGMAN CITY LIMITSPRATT/KINGMAN COUNTY LINE, EAST FOR 5.82 MILES
FO/KW CO LINE EAST TO WEST CITY LIMITS OF GREENSBURGWEST CITY LIMITS MULLINVILLE EAST TO EAST CITY LIMITS
31ST & BELMONT E TO 10TH & ALONG NEOSHO RV DIKE:PARSONSPARSONS:JOTHI AVE, US-59 W TO 32NDSKORR & NESS ROAD AT ALTAMONTCULVERT 1.34 MILES NORTH OF BRIDGE (050)PARSONS: S OF CORNING TO N OF MAIN ON 16TH ST (US-59)PARSONS: US 59 & FLYNN DRIVEBRIDGE #048; 1.03 MILES EAST OF EAST JUNCTION US-59US-59/US-160 THENCE EAST TO EWS OF BR.#160-11-092
US-166 IN LABETTE COUNTY FROM BR 085 TO LB/CK CO LINE5.0 MI W OF LB/CK CO LN (END PCCP) E TO LB/CK CO LNPARSONS(GI): INTERSECTION OF US-400 AND 32ND ST
FI/LE CO LINE NORTH TO LE/GO CO LINE (EXCLUDES K-4)KANSAS & OKLAHOMA RR & K-23, MAIN STREET IN DIGHTON316FT W OF JCT K-96/K-23 IN DIGHTON E TO LE/NS CO LINE
150TH ST, CRAIG ST NORTH TO PARALLEL RAOD, IN BASEHORCITY OF LEAVENWORTHTONGANOXIE: US HWY 24 AT NORTHSTAR DRON PLEASANT ST BETWEEN 5TH & 6TH ST: CITY OF TONGANOXIEINTERSECTION OF COUNTY ROAD 1 AND K-32FROM 1.5 MI W & 2.0 MI N OF TONGANOXIE, N 2.5 MI1.5 MI S & 4.2 MI W OF LANSING1.2 MI W & 1.5 MI N OF EASTONWYANDOTTE/LEAVENWORTH COUNTY LINE NORTH 7.56 MILESK-192 FROM JF/LV COUNTY LINE EAST TO JUNCTION US-73K-16 JUNCTION EAST TO WY/LV COUNTY LINEUS-24 IN LEAVENWORTH COUNTY (2011 1R PROJECT)BRIDGE #10;1.78 MILES NORTH OF WY/LV COUNTY LINEK-92 NORTH JUNCTION NORTH EAST TO LOWEMONTLEAVENWORTH: INTERCHANGE US-73/K-7 AND 20TH STPENNSYVANIA AVE TO LINN ST ON 4TH STREET (US-73/K-7)WY/LV COUNTY LINE NORTH TO GILMAN ROAD
4.5 MI W & 1.0 MI N OF WESTFALL5.0 MI W & 1.0 MI N OF WESTFALLBRIDGE 181-53-7.925(031) 8.06 MILES NORTH OF K-232LINCOLN COUNTY LINE NORTH TO RUSSELL COUNTY LINE
BNSF & 1650 ROAD AT BOICOURTBNSF & 2ND STREET IN PLEASANTONBNSF & 500 ROAD NORTH OF PRESCOTTBNSF & 700 ROAD SOUTH OF PLEASANTONBNSF & 800 ROAD SOUTH OF PLEASANTONBNSF & INDUSTRIAL STREET IN LA CYGNEBNSF & SWAN STREET IN LA CYGNEUNION PACIFIC & W. 1600 ROAD 5 MILE SOUTH OF PARKERUNION PACIFIC & W. 2000 ROAD 1 MILE SOUTHWEST OF PARKERUPRR & W 2400 ROAD NORTH OF PARKERCULVERT #514, 2.4 KM N OF NCL MOUND CITYANDERSON-LINN COUNTY LINE EAST TO JCT K-52JUNCTION K-52 TO LINN/BOURBON COUNTY LINECULVERT #521, 2.09 KM E OF RS 4030.3 M S OF RS 1204 INTERCHANGE, N TO 0.7 M N OF RS 12030.5KM S OF RS 1204 INTERCHANGE, TO 1.2 KM N OF RS 12030.7 MILE NORTH OF RS 1203, NORTH TO LN-MI COUNTY LINE1.7KM S OF NEW K-52 INTERCH, N TO 0.5KM S OF RS1204LINN COUNTY SAFETY REST AREA AT THE N JCT K-52
LINN COUNTY SAFETY REST AREA. KS-04(001)N OF K-239 INTERCH, N TO 1.7 KM S OF NEW K-52 INTERCHNORTH JUNCTION K-52, NORTH TO LN-MI COUNTY LINE
UNION PACIFIC & A STREET AT WINONAUNION PACIFIC & COUNTY ROAD 450 EAST OF OAKLEYTHOMAS/LOGAN CO LINE;EAST TO LOGAN/GOVE COUNTY LINELOGAN/SCOTT COUNTY LINE NORTH TO EAST JUNCTION US-40US-83 IN LOGAN COUNTY; ASPHALT SEAL ON MAINLINE
CITY OF EMPORIA2.5 MILES S & 2.0 MILES E OF BUSHONGEMPORIA: 18TH AVENUE BRIDGE OVER KTA6.4 MI N & 4.5 MI E OF OLPEASPHALT SURFACING ON I-35 IN LYON COUNTYI-35 IN LYON CO FROM STATION 361+25 NORTH BR OVER US-50EMPORIA: KANSAS AVE TO 3RD AVE & 12TH AVE TO I-35K-99; CITY OF EMPORIA KLINK PROJECTBR 057, NEOSHO RIV, 7.6 MI (12.23 KM) S I-35LYON CO: JCT US-50 AND ROAD FUS-50 IN LYON CO PAVEMENT MARKING (VARIOUS)
CITY OF MARIONHILLSBORO: ASH STREET 1ST ST TO 3RD STUNION PACIFIC & 6TH STREET IN LINCOLNVILLEUNION PACIFIC & 8TH STREET IN PEABODYUNION PACIFIC & SUNRISE ROAD NORTH OF MARIONUP & 360 ROAD 2 MILES NORTH OF LOST SPRINGS3.5 MI W OF RAMONAMARION: LOCUST TO W OF CEDAR ST & TO E OF COBLE ST
UPRR & 18TH ROAD NORTHEAST OF HOME CITYUPRR & 23RD ROAD SOUTHEAST OF FRANKFORTUPRR & 3 CROSSINGS IN AXTELLUPRR & 5TH ROAD WEST OF HERKIMER1.5 MI W OF FRANKFORTFROM 2.0 MI E OF MARYSVILLE THENCE N 8.0 MIEAST JCT US-77/K-9 EAST TO W CITY LIMITS OF FRANKFORT4TH TO 20TH ON US-36/77 & OAK TO CENTER ON 10TH US-77EAST CITY LIMITS OF MARYSVILLE EAST TO JUNCTION K-87
CITY OF LINDSBORGMCPHERSON:FEDERAL FUND EXCHANGEUNION PACIFIC & ARAPAHO ROADUNION PACIFIC & BUCKSKIN ROAD S. OF INMANUNION PACIFIC & EISENHOWER ROAD SW OF MCPHERSON4.0 MI N OF MOUNDRIDGE2.0 MI E & 0.1 MI N OF ELYRIABR #043,044,048&049; NORTH OF US-56ELLSWORTH CO LINE EAST TO WEST CITY LIMTS OF LINDSBORG
0.03.20.0
0.00.00.829.11.0
0.00.10.20.110.55.11.30.70.00.66.4
0.00.20.00.00.00.00.10.4
0.00.00.00.00.38.011.91.316.0
0.00.00.00.00.00.10.10.013.0
Scenic Or Historic Hwy ProgsSeeding, SoddingSafety Rest Area
Flashing Light SignalFlashing Light SignalMilling And OverlaySlurry SealConv Seal
CORRIDOR: RENO/MCPHERSON CO LN NE TO 4 LANECORRIDOR: RENO/MCPHERSON CO LN NE TO 4 LANEMCPHERSON: US-56/81B FROM MAPLE EAST TO WEST OF CHERRYUS-81B FROM K-4 TO SWENSSON STREETBRIDGE #116; 0.23 MILES NORTH ACADEMY (LINDSBORG)
FROM 8.0 MI N OF PLAINS, N 4.0 MIFOWLER GI: K-98 FROM 6TH ST NORTH TO 10TH STSW-ME CO LINE, E TO W JCT US-54
223RD STREET FROM WOODLAND ROAD TO METCALF ROADBNSF & LONE ELM RD. S. OF FONTANABNSF CROSSING AT 223RD STREET IN MIAMI COUNTYFROM WEST OF 6TH & MAIN ST TO E OF 5TH ST IN OSAWATOMIEPAOLA:FEDERAL FUND EXCHANGEUPRR & W 335TH ROAD AT RINGER0.9 MI N & 3.5 MI W OF NEW LANCASTER2.4 MI N & 1.0 MI E OF BEAGLEJOHN BROWN HWY & PRESSONVILLE RD (INT) 4 MI W OF OSWTMFR-MI COUNTY LINE, NE TO MI-JO COUNTY LINELOUISBURG: INT OF K-68 AND EAST CRESTVIEW CIRCLEBRIDGE 69-61 (78);4.09 MILES NORTH OF K-68LINN-MIAMI CO L, N 7.48KM(4.65 MILES)BR NUMBERS 087; 089; 092; 093; 095 IN MIAMI COUNTY
KYLE RAILROAD & ASHERVILLE ROAD IN BELOITFROM 6.0 MI E OF HUNTER, THENCE E 7.0 MIS OF GLEN ELDER RS 466 & RS 1029 THENCE N 3 MILESBELOIT GI:K-14 FROM SOUTH OF 9TH ST, NORTH .2 MIBELOIT: SOUTH CITY LIMITS, NORTH TO SOLOMON RIVER BRUS-24 JUNCTION NORTH TO MITCHELL/JEWELL COUNTY LINEBRIDGE #037 LOCATED 3.67 MILES SOUTH EAST OF K-9CULVERT, 24.08 MILES EAST OF OSBORNE-MITCHELL CO LINE
5.0 MILES S & 2.0 MILES E OF COFFEYVILLE AIRPORTPAVEMENT MARKING AT VARIOUS LOCATIONS IN DISTRICT 4SKO & 5100 ROAD (SUNFLOWER ROAD) NORTH OF COFFEYVILLEUPRR & 3900 ROAD NORTH OF SYCAMORE1.0 MI N & 1.0 MI W OF CANEY6.0 MI S & 1.6 MI E OF INDEPENDENCEINDEPENDENCE: WEST MAIN FROM 21ST TO 27THINDEPENDENCE:LOCUST TO OAK ON PENNSYLVANIA (US-75)BRIDGE REPAIR ON BRIDGE #023 IN MONTGOMERY COUNTYSOUTH KANSAS & OKLAHOMA RR & US-160 SOUTH OF CHERRYVALEBR 40-NL OVER UP RR, 14.2 MILES EAST S JCT US-75COFFEYVILLE: 8TH ST, NE TO THE VERDIGRIS RIVER BRIDGECOR: US-169, INCLUDING JCT US-166, N TO APPR CO RD 3000BR #80,81,83 EAST OF US-75/US-400;#84 JCT US-169/US-400US-400 PCCP PATCH IN MONTGOMERY COUNTY
2.0 MILES SOUTH & 1.8 MILES EAST OF DWIGHT3.0 MI E & 3.4 MI S OF WILSEY3.5 MILES N & 2.2 E OF COUNCIL GROVECITY OF COUNCIL GROVE-SCENIC BYWAY PROGRAMCULVERT REPLACEMENT 0.73 MILES W OF W JCT US-56/K-177US-77 IN MORRIS COUNTY (2011 1R PROJECT)US-77 IN MORRIS COUNTY (2011 1R PROJECT)
NORTH ST FROM BACA AVE EAST TO BORDER AVE IN ELKHART0.972 MILES NORTH OF CO ROAD F;THENCE NORTH 2.579 MILESPERMANENT SEEDING FOR K-27 HEAVY REHAB PROJ K-5753-01
UPRR & 5 CROSSINGS IN SABETHAUPRR & 7 CROSSINGS IN SENECAUPRR & E ROAD EAST OF BAILEYVILLEUPRR & N ROAD EAST OF SENECA3.5 MILES SOUTH AND 3.0 MILES WEST OF BERN1.0 MI N & 0.5 MI E OF SENECABRIDGE NUMBER 30; 3.11 MILES NORTH OF US-36JUNCTION K-63/US-36 EAST TO NEMAHA/BROWN COUNTY LINE
CHANUTE: PLUMMER STREET FROM MAIN STREET N TO K-39UP & SOUTH STREET IN ERIERS 168 E OF SHAW RD FOR 3.5 MILESBR 015, OVER SKO RR IN CHANUTE(2.6 KM E JCT US-169)AREA OF BR 47-67 17.17(079), 2.3 MI E OF US-59/K-37 JCTBRIDGE NO. 47-67 (043), 3 MILES E OF SO JCT US-59/K-47FRONT STREET IN ST. PAUL EAST TO NEOSHO/CRAWFORD CO LNERIE(GI): FROM MAIN ST TO N JCT OF US-59/K-108 ON K-108EAST SIDE OF US-59 EMBANK. N OF THE S JCT K-47/US-59JUNCTION K-146, NORTH TO WEST JUNCTION K-39
JCT US-283/K-4 EAST TO NESS/RUSH COUNTY LINEN FK WALNUT CR BRS 032 & 033, 1.2 & 0.5 KM W OF US-283JUNCTION K-4/K-147 NORTH TO NESS/TREGO COUNTY LINEHODGEMAN/NESS CO LINE NORTH TO BRICK PAVE IN NESS CITY
NT/DC COUNTY LINEEAST TO WEST JUNCTION K-9/US-283AG VALLEY COOP FACILITY TRAFFIC IMPACT STUDY
BURLINGAME:US56 S CTY LIM TO SANTA FE AVE W ON K31CF-OS CO L, E TO APPROX 0.6 KM(0.4 MI) E E JCT K-31BRIDGE 31-70 (101);3.05 MI E OF W OS CO LN;DRAGOON CRKK-68 IN OSAGE CO; JCT K-68/US-75 EAST TO JCT K-68/K-268K-170 IN OSAGE CO; LYON/OSAGE CO LINE EAST 13.72 MILESABANDONNED MOPAC RR BRIDGE (035), 0.28 MI N US-75/K268OSAGE COUNTY: US-75 & US-56
0.5 MI S & 4.0 MI E OF ALTONK-18 IN OSBORNE COUNTY (2011 1R PROJECT)
0.40.30.20.00.06.85.3
0.22.60.0
0.00.00.00.00.20.30.114.3
0.50.03.50.00.00.05.00.50.05.5
17.20.03.913.2
16.22.5
1.06.50.011.413.70.01.0
0.27.8
Grade, Bridge & SurfacingGrade, Bridge & SurfacingGrade, Bridge & SurfacingScenic Or Historic Hwy ProgsCulvertConv SealConv Seal
Milling And OverlayLandscaping And BeautificationSeeding, Sodding
BR #45; 0.5 MI N OF JCT US-24; NORTH FORK SOLOMON RIVERBRIDGE #12; 3.98 MILES WEST OF SOUTH JUNCTION US-281DOWNS: US-24 FROM 2ND ST. EAST TO CLARK ST.US-24 IN OSBORNE COUNTY
MINNEAPOLIS: ROCK ST INTER K-106 TO NCL OF MINNEAPOLIS2.5 MI S OF BENNINGTONEAST CITY LIMITS OF DELPHOS EAST TO US-81EAST CITY LIMITS OF MINNEAPOLIS EAST TO US-816 MILES SOUTH OF OT/CD CO LINE NORTH 6 MILES (CO LN)US-81 & K-18 IN OTTAWA COUNTY
NE TRAIL ST JCT WITH US-56 HWY E TO 11TH STREET2 MI N & 3.75 MI W OF ROZEL5 MI N & 1 MI E OF GARFIELD(RS-976)LARNED: N EWS OF PAWNEE RV BR TO NORTH OF 5TH ST (K-19S
KYLE RR & N 1600 RD EAST OF PHILLIPSBURGPHILLIPSBURG: INTERSECTION STATE STREET & 2ND STREET15.0 MILES NORTH & 10.0 MILES EAST OF PHILLIPSBURGNT/PL CO LINE EAST TO WEST CITY LIMITS OF PHILLIPSBURG
EAST RILEY/POTTAWATOMIE CO LN NORTH TO JCT K-16/K-13PART PROJECT OF HOST PROJECT KA-1352-010.693 MI W OF W CL OF WAMEGO;E TO1 MI E OF E CL WAMEGOMANHATTAN: INTERSECTION US 24 & MCCALL ROADWCL TO ECL ON BERTRAND(US-24)/US-24 TO ELM ON 6TH(K-63)
UP & NE 120TH AVENUE NORTHEAST OF PRESTONUP & NE 140TH AVENUE NORTHEAST OF PRESTON7.0 MI E & 1.0 MI N OF PRATTJUNCTION US-281/K-42 EAST TO PR/BA COUNTY LINEJUNCTION US-54/K-61; NORTH 1.3 MILESK-61 IN PRATT COUNTY (2011 1R PROJECT)NEAR PROPOSED INTERCHANGE E OF PRATT, E TO PR-KM CO LPERMANENT SEEDING PROJECT IN PRATT COUNTY (US-54)PRATT GI:US-281 FROM 4TH ST, N TO US-54/400 (1ST ST)PRATT: MAIN ST (US-281), FROM 6TH TO 4TH ST.US-281 IN PRATT COUNTY (2011 1R PROJECT)
3.5 MI S AND 4.0 MI W OF ATWOODRAWLINS COUNTY USD 105
E OF WALNUT ST, N TO AVENUE B IN HUTCHINSONHUTCHINSON:FEDERAL FUND EXCHANGEK&O & AVENUE G IN HUTCHINSONK&O & RED ROCK ROAD AT YODERKANSAS & OKLAHOMA RR & KANSAS AVENUE IN HAVENKANSAS & OKLAHOMA RR & MAPLE STREET IN HUTCHINSONRENO COUNTY MUSEUM, 100 S WALNUT IN HUTCHINSON
0.00.00.23.9
0.70.15.01.46.00.0
0.20.10.10.5
0.00.10.217.1
13.33.22.50.01.9
0.00.00.39.01.316.910.74.00.20.15.5
0.20.0
0.00.00.00.00.00.00.0
Bridge RepairBridge RepairGrade & SurfacingMilling And Overlay
5.0 MI E & 2.2 MI S OF NICKERSONK-17 IN RENO CO; KM/RN COUNTY LN NORTH TO JCT K-96AVE G TO LORRAINE ON KEN KENNEDY FRWY (K-61)K-61 IN RENO COUNTY (2011 1R PROJECT)K&O RR & K-96 @ NICKERSONRENO COUNTY;CITY OF YODER;K-96 AND YODER ROAD0.5 MI W OF US-50/K-96 INTERCHANGE TO K-61/US-50 E JUNC1:W JT K96, E TO E JT K96;2:E OF E JT K96,E TO W OF K61BRIDGE #023; 10.33 MILES EAST OF EAST JUNCTION K-61INTERCHANGE: EAST JCT K-96/US-50 IN SOUTH HUTCHINSONK-61 JUNCTION EAST TO VALLEY PRIDE ROADUS-50 IN RENO CO; E JCT K-61 EAST TO RH/HV CO LINE
BNSF & RS-563 SOUTH OF COURTLAND3.0 MILES SOUTH AND 3.0 MILES EAST MUNDENBR 027, SOUTH FORK MILL CREEK, 0.9 KM SOUTH OF US-36CULVERT 148-79 (523); 7.52 MILES EAST OF US-81JCT US-81/K-148 EAST TO REPUBLIC/WASHINGTON COUNTY LINE
NORTH AND SOUTH ENDS AND DOWNTOWN AREA OF STERLINGK-4 IN RICE COUNTY; BT/RC CO LN EAST TO RC/EW CO LINELYONS: K-14/96 FROM AMERICAN RD TO US-56/K-96 (MAIN ST)LYONS:K-14, US56, N. TO NCL; US-56, DOUGLAS AVE TO ECL
CLAFLIN AND SUNSET/JARVIS (MANHATTAN, KS)GOODNOW HOUSE HSTRCL SITE @ 2309 CLAFLIN RD:MANHATTANJULIETTE & BLUEMONT MANHATTANMANHATTAN: KIMBALL & CANDLEWOODRILEY CO: WILDCAT CR. RD, FROM EUREKA DR SOUTH .8 KMEUREKA DRIVE FROM SCENIC DRIVE WEST 2.0 MILES1.6 MI EAST OF KEATSSCENIC DR 1/8 MI W OF ANDERSON AVEBRIDGES #001 & 002 ON I-70 IN RILEY COUNTYNORTH JCT US/24 NORTH TO EAST RILEY/POTTAWATOMIE CO LNE EWS OF WILDCAT CR BR TO WESTWOOD ON FT RL BLVD (K-18)K-18:FROM WALNUT ST. (OGDEN) NE TO 0.3MI W K-113/SETH C(MAN) CLAFLIN, K-113 TO APPROX 300’ E OF BEECHWOD TERRJUNCTION K-113/K-18 NORTH TO JUNCTION K-113/US-24CRACK SEAL ON K-177 IN RILEY COUNTYMANHATTAN: US-24 AND MARLATT AVENUEBRIDGE #13; 1.31 MI W OF W JCT US-24/US-77 AT RILEY, KSEAST JCT US-24/US-77 NORTH TO WEST JCT K-16
END OF CONCRETE IN STOCKTON NORTH TO PL/RO COUNTY LINE
0.25 MILES NORTH & 1.3 MILES WEST OF ALEXANDERNESS/RUSH COUNTY LINE EAST TO BARTON/RUSH COUNTY LINEBRIDGE NUMBER 1; 3.74 MILES NORTH OF PN/RH COUNTY LINE
RUSSELL: US 281 HWY FOSSIL STREET FROM E 9TH TO UPRR
UPRR & 177 ST 1 MI E OF GORHAMI-70 IN RUSSELL COUNTY UBAS & ASPHALT SEAL SHOULDERSK-18 IN RUSSELL COUNTY (2011 1R PROJECT)WEST FORK WOLF CREEK BR (044), 0.2 MI W OF WALDO
N 9TH:I-70-CRAWFORD & W CRAWFORD:I-135 TO ECL OF SALINAROAD SAFETY AUDIT/ASSESSMENT ON NON-STATE HWY SYSTMSALINA: N OHIO ST OVER THE UP RR & CK RW TRACKSSALINA: N OHIO ST OVER THE UP RR & CK RW TRACKSSALINE:FEDERAL FUND EXCHANGE0.1 MILES N & 0.5 MILES E OF KIPPLINCOLN/SALINE CO LN E TO 0.373 MI WEST OF I-135 INTERC
295TH ST W. FROM 21ST ST N. TO 61ST ST N.53RD ST W AND .25 MI W OF 151ST ST N IN COLWICHBNSF & 95TH STREET NORTH IN SEDGWICK COUNTYBUCKNER & 71ST/MEADOWLARK (DERBY, KS)CITY OF ANDALECITY OF GARDEN PLAINCOLWICH: 167TH ST FROM WICHITA AVE TO 57THST NDERBY: MADISON AVE BETWEEN K15 & ROCK ROADHAYSVILLE: 71ST ST S FROM US-81 TO KTA RAMPHAYSVILLE: W GRAND AVE MERIDIAN AVE TO NORTH MAIN STK&O & 119TH STREET NORTHWEST OF MAIZEK&O & 45TH STREET SOUTH EDGE OF MAIZEKANSAS & OKLAHOMA & 151ST STREET 1 MILE EAST OF COLWICHKANSAS & OKLAHOMA RR & 61ST STREET WEST EDGE OF ANDALEMADISON AVE:PANTHER STADIUM W TO WOODLAWN BLVD NORTHWEST BELTWAY AROUND WICHITAPARK CITY: BROADWAY BRIDGE OVER CHISHOLM CREEKUNION PACIFIC & WOODLAWN RD NE OF KECHIUPRR & 87TH STREET SOUTH OF HAYSVILLEUPRR & HILLSIDE AVE. IN WICHITAWICHITA METRO AUTOMATED VEHICLE LOCATIONWICHITA: 21ST ST N BRIDGE OVER ARKANSAS RIVER(CA)WICHITA: 29TH ST N FROM MAIZE RD TO 119TH ST W(CA)WICHITA: 37TH STREET N FROM TYLER RD TO RIDGE RD(CA)WICHITA: CENTRAL AND TYLERWICHITA: CENTRAL FROM WOODLAWN TO ROCK ROAD(CA)WICHITA: CENTRAL, OLIVER TO WOODLAWN (CA)WICHITA: HILLSIDE BRIDGE AT RANGE ROAD(CA)WICHITA:21ST ST N BRIDGE AT LITTLE ARKANSAS RIVER(CA)WICHITA:25TH ST N BRIDGE OVER LITTLE ARKANSAS RIVER(CA)WICHITA:MACARTHUR RD - MERIDIAN AVE TO SENECA ST(CA)RIDGE ROAD FROM K-96 TO 53RD STREET NROCK ROAD FROM OAK KNOLL .5 MILES N OF 63RD ST SBROADWAY OVER BNSF RR AT 45TH STREET NBRIDGE ON 143 ST E OVR KS TRNPKE BETWEEN US54 & CENTRAL135TH STREET W FROM 0.5 MI N OF US-54, S TO K-42BRIDGE #006, 007, 015 AND 016 ON I-135 IN SEDGWICK CO
I-135/US-54 INTERCHANGE & SB I-135(LINCOLN TO HARRIS)WICHITA TMC DEPLOYMENT PHASE IBRIDGES 32 AND 33 WICHITA (INTERCHANGE)I-235/K-96 & MERIDIAN AVE., SEDGWICK CO.I-235/K-96 INTERCHANGEBR #316(0.57 MILES E OF W ST)#329(0.65 MILES E OF W ST)BRIDGE #280; JUNCTION K-96/TYLER ROADMIDDLE FORK CHISHOLM CREEK EAST TO SG/BU COUNTY LINENW BYPSS:NEAR US-54/151ST W,N & E TO K96 NEAR 45TH ST NNW BYPSS:NEAR US-54/151ST W,N & E TO K96 NEAR 45TH ST NOVERLAY ON K-254 IN SEDGWICK COUNTY.25 MILE WEST OF WEBB TO ECL ON KELLOGG(US-54/400)BRIDGE #149 & 150; JUNCTION US-54/I-35BRIDGE #317 LOCATED 0.25 MILES EAST OF TOPEKA AVENUEBRIDGE #336;13.97 MILES EAST OF JUNCT US-54/K-163BRIDGE #380&384;APPROX 2 MILES EAST OF JCT US-54/I-235INTERCHANGE: MISSION RD TO HEATHER ST-E SIDE OF WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST -E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST -E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: MISSION ROAD TO HEATHER ST-E SIDE WICHITAINTERCHANGE: SYLVAN LANE TO MISSION RD-E SIDE WICHITAKINGMAN/SEDGWICK COUNTY LINE EAST TO 0.5 MI E OF K-163US-54 & WASHINGTON, SEDGWICK CO.US-54 FROM EAST CITY LIMITS OF WICHITA TO BUTLER CO LNUS-54/US-400 (KELLOGG AVE), ELLISON TO ZELTAWICHITA: 119TH STREET, EAST TO 111TH STREETCOWSKIN CR BR (157) 3.08 MI (5.0 KM) N SU-SG CO LUS-81 WIDEN & OVERLAY PROJECT IN SEDGWICK COUNTY
HWY 83 1 MI N OF LIBERAL THEN EAST 5 MI TO HWY 54LIBERAL: 8TH STREET FROM US-83 W TO CALVERTLIBERAL:15TH ST W-CTTNWD;CTTNWD-SCCC;NEW YORK ST-11TH7.5 MI E OF LIBERAL, THENCE E 5.0 MI & S 2.71 MIFROM JCT US-160 & US-83 THENCE W & S 4.5 MIRS-1987 FROM US-54, WEST 0.75 MILES & NORTH 3.0 MILESHASKELL/SEWARD COUNTY LINE; EAST TO JCT US-83/K-190OKLAHOMA/KANSAS STATE LN; NE TO WESTERN AVE IN LIBERALKANSAS/OKLAHOMA STATE LINE; NORTH TO END OF PCCPKANSAS/OKLAHOMA STATE LINE; NORTH TO SOUTH END PCCPUS-83 IN SEWARD COUNTY (2011 1R PROJECT)JCT US-83/US-160; EAST TO THE SEWARD/MEADE COUNTY LINE
I-470 OFF RAMP @ HUNTOON/ARVONIA; TOPEKA (SHAWNEE CO)LANDON TRAIL EXT: 25TH TO 45TH STS IN TOPEKASHUNGA TRAIL EXTENSION: 10TH ST TO GOLDEN IN TOPEKA
TOPEKA: GAGE BTW 12TH & 10THTOPEKA: HUNTOON & WANAMAKERTOPEKA: SW 29TH STREET & FAIRLAWN ROADUP & VALENCIA ROAD WEST OF SILVER LAKEUPRR & HUMPHREY ROAD 2 MI E OF SILVER LAKESE CROCO ROAD & SE 45TH STREET INTERSECTIONSOUTH EAST CROCO ROAD FROM 39TH TO 31TH STREETSNW 46TH STREET BETWEEN US HWY 75 AND NW FIELDING ROADINTERSECTION OF SW 53RD STREET & SW WANAMAKER ROADSW 41ST & WANAMAKER ROAD INTERSECTIONSW WANAMAKER ROAD FROM SW 39TH TO SW 41ST.8 KM WEST WB-SN COUNTY LINE, E TO 0.5 KM W VALENCIA RDEMERGENCY REPAIR AT BRIDGE #219 ON I-70 IN SHAWNEE COI-70 DOWNTOWN BEAUTIFICATION PROJECT IN TOPEKAINTERCHANGE IN THE CITY OF TOPEKAPAVEMENT MARKING PROJECTPAVEMENT REPAIR ON I-70 IN SHAWNEE COUNTYBRIDGE #047; JUNCTION 10TH STREET/I-470BRIDGES 470-89 (54&151);1.01 MI SE W JCT US-75(21ST ST)FROM 21ST STREET EAST TO GAGE BOULEVARD; CITY OF TOPEKABRIDGE #082; 1.56 MILES EAST OF JCT US-24/TOPEKA BLVDEAST OF KANSAS AVE EAST TO THE EAST COUNTY LINE-SHAWNEEEMERGENCY REPAIR; BRIDGE #073 ON US-24 IN SN COUNTYUS-24 IN SHAWNEE COUNTY 1R PROJECT FY 2011US-40 IN SHAWNEE COUNTY (2011 1R PROJECT)EMERGENCY REPAIR FOR PAVEMENT MUDJACKING ON US-75EMERGENCY REPAIR ON US-75 IN SHAWNEE COUNTYJOINT SEAL ON US-75 IN SHAWNEE COUNTYPAVEMENT MARKING IMPROVEMENT ON US-75 IN SN COUNTY
14.2 MILES N AND 7.0 MILES E OF HOXIEPART PROJECT OF HOST PROJECT KA-1450-01JUNCTION US-24/K-23 NORTH TO JUNCTION US-83/K-383PART PROJECT OF HOST PROJECT KA-1450-01K-23 JUNCTION NORTH TO SD/DC COUNTY LINE
GOODLAND: K27 N OF I70 FROM 800 FT N TO US24 INTERGOODLAND: K27/US24 BUS NORTH OF I70SH CO. RS1668 FROM N OF I-70 EXIT 12 N TO SH CO RD 6515.0 MILES N AND 5.4 MILES W OF GOODLANDBRIDGE #031; 5.01 MILES TO EAST JUNCTIONK-27I-70 IN SHERMAN COUNTY FROM STATE LINE EAST 12 MILESREPLACE ROW FENCE ON I-70 IN SHERMAN COUNTY (2 MILES)REPLACE ROW FENCE ON K-27 IN SHERMAN COUNTYGOODLAND GI: US-24B/K-27 FROM I-70 NORTH .15 MI
0.6 M SOUTH AND 1.2 M WEST OF KENSINGTONPL/SM COUNTY LINE E TO E CITY LIMITS OF SMITH CENTERUS-281 IN SMITH COUNTY (2011 1R PROJECT)WHITE ROCK CREEK NORTH BRANCH (029), 12 MI N US-36
CITY OF STAFFORDUS-50 IN STAFFORD CO; ED/SF CO LN EAST TO US-281 JCT
RS 1664STANTON:FEDERAL FUND EXCHANGECVRR & US-160 AT SAUNDERS
9.0 MI NORTH & 7.5 MI WEST OF HUGOTONEAST JUCNTION K-25/US-56 NORTH TO STEVENS/GRANT CO LINEEAST JUNCTION K-25/US-56 EAST 5.099 MILESINTERSECTION OF US-56 AND 6TH STREET IN HUGOTON
CITY OF OXFORDVARIOUS LOCATIONS IN SUMNER COUNTYWELLINGTON; HILLSIDE ST. BRIDGE OVER ROCK ISLAND SLOUGH1.0 MILES N AND 2.1 MILES E OF MILTON5 MI W & 1 M S OF CALDWELL OVER BLUFF CREEKKM/SU COUNTY LINE EAST TO JUNCTION K-42/K-2K-44 IN SUMNER COUNTY (2012 1R PROJECT)BEGINNING OF K-53 EAST TO WEST CITY LIMITS OF MULVANEOK/KS STATE LINE EAST TO .25 MILES NORTH OF US-166 JCTWELLINGTON: VANDENBURGH TO 15TH & WASHNGTN ON US-81/160US-160 IN SUMNER COUNTY; AK RIVER EAST TO COUNTY LINEOK/KS STATE LINE NORTH TO END OF US-177
COLBY: 1090 FT N OF COLLEGE DR TO 4TH ST ON K-25 HWYBRIDGES NO 22,23 & 26 LOCATED SE OF COLBY ON I-70I-70 EXIT NO.54 (COUNTRY CLUB ROAD) CITY OF COLBYI-70 IN THOMAS CO; SHERMAN/THOMAS CO LINE E 10.623 MII-70 IN THOMAS COUNTY; EXIT 54 RAMPS (MILL AND OVERLAY)REPLACE ROW FENCE ON I-70 IN THOMAS COUNTY (7 MILES)COLBY:K-25, FROM I-70 ROW, NORTH TO COLLEGE DRIVECOLBY EAST CITY LIMITS EAST TO JUNCTION US-24/US-83JCT US-24/I-70 EAST TO START CONCRETE PAVEMENT COLBYJCT US-24/US-83 NORTH TO SHERIDAM/THOMAS COUNTY LINEUS-83 IN THOMAS COUNTY; ASPHALT SEAL (8.018 MILES)US-83 IN THOMAS COUNTY; ASPHALT SEAL ON MAINLINE
12.0 MILES S & 8.6 MILES W OF WAKEENEY4.0 MI S & 3.6 MI E OF WAKEENEYGOVE COUNTY LINE EAST TO WEST JUNCTION US-283/I-70JCT US-283/I-70;EAST 16.581 MILES TO TR/EL COUNTY LINEBR #41(3.09 MI S OF GH CO LN) TREGO CREEK
0.62 KM E OF JCT K-30, E TO 0.8 KM W WB-SN CO LINEBRIDGE #003 IN WABAUNSEE CO (2 MI E OF RILEY CO LINE)
SHARON SPRINGS:HWY K-27 FROM NORTH FRONT ST TO THIRD STBR #5(6.54 MI E OF E JCT K-27) POND CREEK
0.015.0
0.20.00.0
0.113.15.10.0
0.00.00.10.10.11.011.64.712.10.20.63.5
1.00.00.010.60.07.01.18.68.411.58.010.0
0.00.214.016.60.0
4.10.0
0.20.0
Pedestrian & Bicycle PathsSealing
Grade & SurfacingFunds OnlySurfacing
Bridge OverlayMilling And OverlayMilling And OverlayLandscaping/Beautification
EAST CITY LIMITS OF SHARON SPRINGS EAST TO WA/LG CO LN
0.8 MI S & 1.5 W MI OF HADDAM3.5 MI N & 2.2 MI E OF GREENLEAFCLAY/WASHINGTON COUNTY LINE NORTH TO JUNCTION K-148K-9 FROM JCT K-9/K-15/K-148 EAST TO WS/MS COUNTY LINEBRIDGE 025, MELVIN CREEK, 0.68 MILE N OF WEST JCT US-36JUNCTION K-148/K-9/K-15 NORTH TO JUNCTION US-36/K-15K-15 FROM APPROX 1 MI S US-36 N .5 MI TO MILL CRK BRCRACK ROUT & SEAL ON K-22 IN WASHINGTON COUNTYREPUBLIC/WASHINGTON CO LINE EAST TO K-9/K-15/K-148JCTCRACK ROUT & SEAL ON US-36 IN WASHINGTON COUNTYUS-36 IN WASHINGTON COUNTY (2011 1R PROJECT)US-36 IN WASHINGTON COUNTY 2/4 LANE TO WS/MS CO LNWASHINGTON: US-36 FROM W OF D ST. EAST TO JCT US36/K15
SOUTH KANSAS & OKLAHOMA RR & 11TH STREET IN NEODESHAUPRR & QUEEN ROAD NW OF ALTOONA1.5 MILES SOUTH & 4.5 MILES EAST OF NEODESHABRIDGE #21; 7.12 MILES EAST OF JUNCTION US-400/K-39WEST JUNCTION K-39 TO WILSON/WOODSON COUNTY LINEUS-400 & K-47 EAST OF FREDONIA, WILSON COUNTY.
YATES CENTER: SOUTH CITY LIMITS 700 FT NORTH ON US75JUNCTION US-54/K-105 TO WEST SIDE OF TORONTO DAMUS-54 IN WOODSON COUNTY (CRACK REPAIR) PART PROJECTSEAL BITUMINOUS CRACKS ON US-75 IN WOODSON COUNTYWILSON/WOODSON CO LINE N TO S CITY LIMITS YATES CENTER
BONNER SPRINGS: K-32(KUMP), NETTLETON TO S PARK AVENUEEDWARDSVILLE: 110TH FROM RIVERVIEW N TO I-70I-435 FROM I-70 NORTH TO K-5/LEAVENWORTH RD, INCL I-70KANSAS SPEEDWAY CAMERA AND FIBER UPGRADEQUINDARO ELEMENTARY, UNFD GOV WY CO/KANSAS CITY, KSUNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITYUNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITYUPRR & 49TH DRIVE IN WYANDOTTE COUNTYUS 73 & DONAHOO RD INTERSECTIONUS 73 (K7) AND POLFER RD INTERSECTIONVICTORY DR RAMP @ 46TH & PARALLEL PRKWY KCK142ND STREET BRIDGE OVER I-70BONNER SPRINGS:WOODEND ROAD OVER WOLF CREEK142ND STREET OVER KAW CREEKPAVEMENT MARKING PROJECT19.399 KM E LV-WY CL E 2.113 KMBRIDGE #031 IN WYANDOTTE CO (0.34 MI W OF MO ST LINE)BRIDGE #24;US-69 & 7TH ST (I-70 & I-670 INTERCHANGE)BRIDGE #70-105-418.99(0152); I-70/I-635 INTERCHANGEBRIDGE 70-105 (238);WEST BOUND I-70 OVER 18TH STREETBRIDGES #301 & 303; INTRCHANGE I-70/I-635
I-70 & OHIO STREET (LEWIS & CLARK VIADUCT)I-70 AND K-7 INTERCHANGEI-70 EXIT 417 (57TH ST.); KANSAS CITY, WYANDOTTE COI-70 FROM 78TH STREET TO MISSOURI STATE LINEBRIDGE #195; KANSAS RIVER-1-435BRIDGE #234;0.37 MILES NORTH OF EAST JUNCTION K-5BRIDGE 435-105 (220) OVER PARALLEL PARKWAYCRACK SEAL ON I-435 FROM KS RIVER BR TO 98TH STREET BRI-435 AND DONAHOO ROADI-435 BETWEEN STATE AVENUE AND LEAVENWORTH RDI-435 OVERLAY IN WYANDOTTE COUNTYPAVEMENT MARKING ON I-435 IN WYANDOTTE COUNTYWOODEND AVE/I-435, SB RAMP TO NB RAMP-EDWARDSVILLEGEORGIA AVE (WYANDOTTE CO) NORTH TO KS/MO STATE LINEJCT K-32, N TO 0.5 KM N US-24(43RD ST BR)(EL & WL)I-670 FROM I-70 JCT TO WEST EWS OF BRIDGES OVER I-70APPROX JCT HUTTON/K-5; NORTH 1.79 MI TO WY/LV CO LINEI-435 NORTH WEST TO WOLCOTT ROADKANSAS CITY: FROM I-435 TO 77TH ON LEAVENWORTH RD(K-5)BRIDGE #077; 0.03 MILES NORTH OF JOHNSON COUNTY LINEBONNER SPRINGS: K-32 FROM S PARK AVENUE TO 138THBRIDGE #277 IN WYANDOTTE CO (1.25 MILES EAST OF I-635)ELM ST TO THE SB OFF RAMP OF K-7 ON FRONT ST (K-32)JUNCTION K-7/K-32 EAST TO TURNER DIAGONALK-32/(FRONT ST):SB K-7 OFF-RAMP TO ELM ST:BONNER SPRNGSCORR:(STATE AVE)-142ND E TO 118TH ST,INCLDE K-7 INTCHNGI-35 NORTH TO STEELE ROADSIMPSON AVENUE TO SUNSHINE ROAD ON 7TH STREET (US-69)3000 FEET NORTH OF US-24-40 NORTH TO WY/LV COUNTY LINE
2011 1R PROGRAM IN DISTRICT 2 (MILLING SAMPLES)2011 1R PROGRAM IN DISTRICT 5 (MILLING SAMPLES)AMBER ALERT FUNDED ITS FIELD DEVICESAQUIRE RAP SAMPLES FOR 2011 1R PROGRAM IN DISTRICT IIIBNSF KS/OK LINE TO AUGUSTA AND WINFIELD TO NEWTONBNSF LOST SPRINGS NORTH TO KS/NE STATE LINEDIST 1 JA,PT,RL,LY,WB,MS,NEMAHA COUNTIESDIST 6 FI,HS,SW,GT,SV,MT,LE,NS,GRAY COUNTIESDIST MAINT CONTRACT FOR R/W EASEMENTS, STATEWIDEDIST MAINT CONTRACT FOR REST AREA SERVICS STATEWIDEDIST MAINTENANCE CONTRACT FOR MAINTENANCE STATEWIDEDIST2: WASHINGTON, REPUBLIC, MCPHERSON, GEARY,ELLSWORTHDISTRICT 4 CR, FR, NO, WL, WO COUNTIESDISTRICT 5 COUNTIES BU, KW, PN, PR, RH, SUDISTRICT WIDE, DISTRICT 1DISTRICT WIDE, DISTRICT 2DISTRICT WIDE, DISTRICT 3DISTRICT WIDE, DISTRICT 4DISTRICT WIDE, DISTRICT 5DISTRICT WIDE, DISTRICT 6
FLINT HILLS OF KS-BUTLER,CHASE,MORRIS COUNTIESKANSAS CITY OPERATION GREEN LIGHTKANSAS CITY OPERATION GREEN LIGHTKC OPERATION GREEN LIGHTKDOT WORK ZONE SAFTY PUBLIC AWARENESS CAMPKIOSKS FOR NATIVE STONE & PRAIRIE TRAIL SCENIC BYWAYSMILLING FOR RAP SAMPLES AT MULTIPLE LOCATIONS IN DIST 4MILLING IN DISTRICT ONE FOR EACH NINE UPCOMING PROJECTSMILLING SAMPLES (DIST 6) 2011 1R PROGRAMSCENIC BYWAYSTATEWIDESTATEWIDESTATEWIDESTATEWIDE INTERSTATES AND FREEWAYS (LOGO SG)STATEWIDE MOTORIST ASSISTANCE PROGRAMSTATEWIDE SCENIC BYWAY PROGRAMVAR LOC (JA, SH, WB, LY, DG, OS, RL, LV, WY COUNTIESVARIOUS LOCALS, OK ST LINE, N TO LEAVENWORTHVARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 4WETLANDS & WILDLIFE SCENIC BYWAY (SB-2009-KS-55545)GOVE CO: EXIT 85(K-216),RUSSELL CO: EXIT 180(BALTA RD)I-70, I-135 AND US-81 IN DISTRICT TWOK-10 FROM THE ECL OF LAWRENCE, EAST TO I-435PAVEMENT MARKING CITY PROJECTSMILLED RUMBLE STRIPS IN DISTRICT SIXRUMBLE STRIPS IN VARIOUS LOCATIONS IN DISTRICT SIXUS-56 HWY COR FROM US-59(DG COUN) EAST TO I-35(JO COUN)MILLING PROJECT AT VARIOUS LOCATIONS IN DISTRICT 4FROM JCT K-103, NO. TO NORTH OF ARMA (CK/ CR CO LINE)MUDJACKING FOR VARIOUS LOCATIONS IN DISTRICT 2RUMBLE STRIP PROJECT FOR VARIOUS ROUTES IN DISTRICT 5GRIND RUMBLE STRIPS AT VARIOUS LOCATIONS IN DISTRICT 5
PED/BIKE PATH IN THE CITY OF IOLAUNION PACIFIC & SOUTH DAKOTA ROAD SOUTH OF MILDREDCRACK ROUT AND SEAL ON US-54 IN ALLEN COUNTY
CF-AN CO LINE, EAST TO NORTH JCT US-59US-169: NO JCT US-169/US-59, NO TO AN/FR COUNTY LINE
ATCHISON: 4TH ST FROM KANSAS AVE TO MAIN STUPRR & CONGRESS AVENUE IN LANCASTERK-74 IN ATCHISON COUNTY (2012 1R PROJECT)CORRIDOR: AMELIA EARHART BRIDGE (013) OVER MO RIVERPREVENTIVE MAINTENANCE ON US-59 IN ATCHISON COUNTY6.4 KM N OF AT-LV CO L, N TO SCL ATCHISONUS-73 IN ATCHISON COUNTY (2012 1R PROJECT)
BNSF & KOCHIA ROAD 4 MILES NORTHEAST OF HAZELTONBR 31, MEDICINE RIVER, 2.11 MILES NORTHEAST OF JCT K-8CULV 522, MULE CR DRG, CULV XXX & NEW BRIDGEDRAINAGE STRUCTURES IN BARBER COUNTY ON K-2JUNCTION US-281/US-160 NORTH TO BA/PR COUNTY LINE
CITY OF HOISINGTONGREAT BEND: KANSAS AVENUE AND BROADWAY AVENUEK-4 IN BARTON COUNTY (FY 2013 1R PROJECT)CONTRACT MAINTENANCE PROJECT ON US-56 IN BARTON COUNTYCULVS 504 & 505, 6.2 & 1 KM W OF BT-RC COLELLINWOOD 2L/4L EAST TO BT/RC COUNTY LINEUS-56 & K&O RAILROAD AT PAWNEE ROCKUS-56 IN BARTON COUNTY (2012 1R PROJECTS)US-56 IN BARTON COUNTY (FY 2013 1R PROJECT)BRIDGE REPAIR IN BARTON COUNTY ON US-281PRESERVATION PROJECT ON US-281 IN BARTON COUNTYUS-281 IN BARTON COUNTY (FY 2013 1R PROJECT)
BNSF & OSAGE ROAD NORTH OF FT. SCOTTBNSF & YELLOWSTONE ROAD 1.5 MILES NORTH OF FULTONDOWNTOWN FORT SCOTT1.6 KM N & 5.8 KM E OF FORT SCOTTCONVENTIONAL SEAL ON K-3 IN BOURBON COUNTYCONVENTIONAL SEAL ON K-7 IN BOURBON COUNTYCR-BB CO L, N & E TO S JCT US-69K-7 IN BOURBON COUNTY (2012 1R PROJECT)CONVENTIONAL SEAL ON K-39 IN BOURBON COUNTYCONVENTIONAL SEAL ON K-39 IN BOURBON COUNTYNO-BB CO L, E TO JCT K-7PAVEMENT MARKING PROJECT
1.10.05.8
20.612.7
0.10.03.43.712.55.85.2
0.00.00.00.016.2
0.00.826.14.70.04.70.00.711.50.015.54.6
0.00.00.00.20.511.111.113.96.08.314.71.5
Prsrv And Railway For TrailsFlashing Light SignalCrack Repair
US-54 & US-69 NORTH JUNCTION, BOURBON COPAVEMENT MARKING PROJECT
STREETSCAPE IN THE CITY OF HIAWATHAK-20 IN BROWN COUNTY (FY 2013 1R PROJECT)K-246 IN BROWN COUNTY (FY 2013 1R PROJECT)CULVERT REPAIR IN BROWN COUNTY ON US-36US-36 IN BROWN COUNTY (FY 2013 1R PROJECT)BR 73-7-6.05 (007); OTTER CREEK, 2.8 MI E US-73/US-159US-73 IN BROWN COUNTY (2012 1R PROJECT)0.5 MILES NORTH OF NCL SABETHA, NO TO BR/NM COUNTY LINEUS-75 IN BROWN COUNTY (2012 1R PROJECT)
4.5 MI S OF WHITEWATER21ST STREET N FROM 159TH ST TO 1000 FT E OF ANDOVER RD2 MILES S OF ROSE HILL5 MILES N OF HWY 254 AT NW 30TH5 MILES E OF ANDOVERFROM 6.5 MI WEST OF DOUGLASS, THENCE EAST 4.5 MIBRIDGE REPAIR ON BRIDGE #124 IN BUTLER COUNTYEL DORADO: K-254 FROM HAVERHILL RD, EAST TO JONES ST.US-54 IN BUTLER COUNTY (2012 1R PROJECT)BRIDGE #030 ON US-77 IN BUTLER COUNTYEL DORADO GI: INT OF US-77 & 6TH AVEJCT RS 862, N TO BU-MN CO LINEUS-77; CITY OF AUGUSTA IN BUTLER COUNTY KLINK PROJECT0.8 MILES E OF LEON CL TO BUTLER/GREENWOOD COUNTY LINE
BNSF & C-28 3MI WEST OF STRONG CITYBNSF & C-36 2MI SE OF STRONG CITYBNSF & CAMPWOOD ROAD 1.5 MILES EAST OF CLEMENTSPRESERVATION PROJECT ON K-150 IN CHASE COUNTYBR 031, NICKEL CREEK, 10.52 M N OF CHASE/BUTLER CO LINEBRIDGE (036), FOX CREEK, 0.2 MILES WEST OF STRONG CITYK-177 & UNION; CITY OF COTTONWOOD FALLS IN CHASE COUNTYPRESERVATION PROJECT ON US-50 IN CHASE COUNTYUS-50 IN CHASE COUNTY (2011 1R PROJECT)US-50 IN CHASE COUNTY (2012 1R PROJECT)
K-99 IN CHAUTAUQUA COUNTY (FY 2013 1R PROJECT)K-99 IN CHAUTAUQUA COUNTY (FY 2013 1R PROJECT)US-166B IN CHAUTAUQUA COUNTY (FY 2013 1R PROJECT)
BAXTER SPRINGS USD 508BNSF & 30TH STREET SOUTHEAST OF BAXTER SPRINGSBNSF & 7TH STREET IN GALENABNSF & LAWTON ROAD 3 MILES NORTH OF COLUMBUS2.0 MI N & 3.0 MI W OF HALLOWELL1.1KM E OF JCT US-400, E TO WCL GALENAJCT K-7, E TO JCT US-400
21.613.0
0.010.44.70.013.70.023.23.013.0
0.31.10.30.50.34.50.00.517.20.00.27.30.513.8
0.00.00.08.60.00.00.01.08.85.6
5.913.92.7
0.00.00.00.00.23.07.0
LightingPavement Marking
Landscaping And BeautificationAsphalt PavementConv SealBridge Repair1.5 OverlayFlood Damage1.5 OverlayMilling And OverlayO-lay & Shoulder
OKLAHOMA/KANSAS STATE LINE; NORTH TO COLUMBUSUS-400: BRIDGE NO. 104 IN CHEROKEE COUNTY
K-27 IN CHEYENNE COUNTY (FY 2013 1R PROJECT)K-217 IN CHEYENNE COUNTY (FY 2013 1R PROJECT)US-36 IN CHEYENNE COUNTY (FY 2013 1R PROJECT)
CITY OF MINNEOLA (SAFE ROUTES TO SCHOOL)UPRR & 7 ROAD 1 MILE NORTHEAST OF MINNEOLAK-34 IN CLARK COUNTY (2013 1R PROJECT)US-54 IN CLARK COUNTY (2012 1R PROJECT)ASHLAND WEST CITY LIMITS WEST THEN NORTH TO JCT US-283US-183 IN CLARK COUNTY (FY 2013 1R PROJECT)CRACK ROUT AND SEAL ON US-283 IN CLARK COUNTYOK/KS STATE LINE NORTH TO SOUTH JUNCTION US-160
2.0 MI S & 1.5 MI E OF MORGANVILLECRACK ROUT AND SEAL ON K-82 IN CLAY COUNTYBR (004), ABANDONED RR & HUNTRESS CREEK IN CLAY CENTERCRACK ROUT AND SEAL ON US-24 IN CLAY COUNTYUS-24; CITY OF CLAY CENTER IN CLAY COUNTY KLINK PROJECT
BNSF & WEST 4TH STREET IN MILTONVALEK-9 IN CLOUD COUNTY (FY 2013 1R PROJECT)PREVENTIVE MAINTENANCE ON K-9 IN CLOUD COUNTYCRACK ROUT AND SEAL ON K-189 IN CLOUD COUNTYCRACK ROUT AND SEAL ON US-24 IN CLOUD COUNTYUS-24 IN CLOUD COUNTY (FY 2013 1R PROJECT)US-81 IN CLOUD COUNTY (2011 1R PROJECT)US-81 IN CLOUD COUNTY (2012 1R PROJECT)
7.0 MI N & 0.4 MI E OF LEROY0.31 MILE EAST OF JCT K-131, EAST TO 0.31 MILE W US-75LYON-COFFEY CO L, EAST TO 0.31 MILE EAST OF JCT K-131OS-CF CO LINE, EAST TO CF-AN CO LINENCL BURLINGTON, TO 1.0KM S OF I-35WO-CF CO L, N TO SCL BURLINGTON
1.0 MI W OF COLDWATERK-1 IN COMANCHE COUNTY (FY 2013 1R PROJECT)US-160 IN COMANCHE COUNTY (FY 2013 1R PROJECT)
BNSF & 202 ROAD 2 MILES SOUTH OF WINFIELDBNSF & 232 ROAD SOUTH OF HACKNEYBNSF & 71ST STREET 3.5 MILES SOUTH OF WINFIELDBNSF CROSSING AT KANSAS AVENUE IN ARKANSAS CITYRUBBERMAID RAIL IMPROVEMENTSK-15 IN COWLEY COUNTY (2012 1R PROJECT)RIGHT & LEFT TURN LANES ON US-77 AT 242ND ROADSE ARK CITY:US-77 & SUMMIT, E & N TO JCT US-166
SE ARK CITY:US-77 & SUMMIT, E & N TO JCT US-166US-77 BY-PASS & US-166/KS AVE - ARKANSAS CITYUS-77; CITY OF WINFIELD IN COWLEY COUNTY KLINK PROJECTBRIDGE REPAIR ON BRIDGE #032 IN COWLEY COUNTYRT TURN LANE AT NEW INDUSTRAL PARK ENT AND INTERNAL RDBRIDGE REPAIR ON BRIDGE #089 IN COWLEY COUNTYE EWS ARKANSAS RVR BR TO SUMMIT ON MADISON AVE (US-166)EAST US-77/US-166 JCT EAST TO CL/CQ COUNTY LINE
BNSF & 680 AVENUE 1 MILE SOUTH OF FARLINGTONCITY OF GIRARDCONVENTIONAL SEAL ON K-7 IN CRAWFORD COUNTYJUNCTION K-126, NORTH TO SOUTH OF SCL OF GIRARDNCL GIRARD, N TO CR-BB CO LBRS 022,023 & 028; 1.75, 1.93 & 6.56 MILES EAST OF K-7BRIDGE REPAIR IN CRAWFORD COUNTY ON K-126JCT K-7, E TO WEST LAKE ROADUS-69 & SOUTH KANSAS & OKLAHOMA AT PITTSBURG
1.0 MILES N & 7.1 MILES W OF DRESDENRAWLINS/DECATUR COUNTY LINE EAST TO JCT US-36/US-83US-36 IN DECATUR COUNTY (2012 1R PROJECT)BRIDGE REPAIR ON BRIDGE #031 IN DECATUR COUNTYSHERIDAN/DECATUR COUNTY LINE NORTH 9 MILESUS-83 IN DECATUR COUNTY 2011 1R PROJECT
RS 191: 8.0 MILES S. OF SOLOMON AT 138 1400 AVE.UP & 400 AVENUE SOUTH OF HERINGTONPAVEMENT MARKING PROJECT ON I-70ABILENE: KLINK ON K-15MN/DK CO LN NORTH TO K-15/K-18 JCT(EXCEPT ABILENE)BNSF & K-18 NORTHWEST OF TALMAGECONVENTIONAL SEAL ON K-18 IN DICKINSON COUNTYPRESERVATION PROJECT ON K-43 IN DICKINSON COUNTYREPLACE PIPEUS-56 IN DICKINSON COUNTY (2012 1R PROJECT)
PRESERVATION PROJECT ON US-36 IN DONIPHAN COUNTY
5.5 MI E OF CO. LINE AND 11.5 MI N OF CO. LINEBNSF & E 950TH ROAD 3.5 MILES EAST OF LECOMPTONDOUGLAS COUNTY CHIPKASOLD DR FROM CLINTON PRKY 23RD ST TO 31ST STRS-1374, APPROXIMATELY 1/2 MI S OF K-10 HIGHWAYTURNING LANES (DOUGLAS CO., BERRY PLASTICS EXPANSION)BRIDGE (023) OVER BNSF RR IN LAWRENCE NEAR HASKELL UNIVK-10 IN DOUGLAS COUNTY (2012 1R PROJECT)K-10 IN DOUGLAS COUNTY FROM E LAWRENCE TO COUNTY LINELAWRENCE ED:K-10 FROM US-59(IOWA ST) E. TO LOUISIANACULVERT #502, 1.5 KM N OF FR-DG CO LINE
0.00.50.70.00.00.01.00.0
0.00.011.06.011.00.00.00.90.0
0.211.011.40.09.09.0
0.10.014.71.026.70.09.09.00.00.1
14.6
0.40.00.00.90.00.00.08.48.70.10.0
Grade & SurfacingGrade & SurfacingMilling And OverlayBridge RepairGrade & SurfacingBridge RepairMilling And Overlay1.5 Overlay
Flashing Light SignalPedestrian & Bicycle PathsConv SealGrade, Bridge & Surfacing40 Mm Overlay (1-1/2 Inches)Bridge ReplacementBridge Repair40 Mm Overlay (1-1/2 Inches)Surfacing
Grade & BridgeOverlayConv SealBridge RepairOverlayMilling And Overlay
LAWRENCE: KLINK ON US-40CONST LT/RT TURN LANES ON6TH ST(RTE 1055) AT US-56BR 017, WAKARUSA RIVER DRG, 6.1 MI. NO. OF JUNCT US-56FRANKLIN-DOUGLAS COUNTY LINE, NORTH TO 2L/4L DIVIDEDFRANKLIN-DOUGLAS COUNTY LINE, NORTH TO 2L/4L DIVIDEDFRANKLIN-DOUGLAS COUNTY LINE, NORTH TO 2L/4L DIVIDED
ARKANSAS RIVER BRIDGE (004), 1 MILE EAST OF KINSLEYKINSLEY, KS; NORTHEAST OF SOUTH JUNCTION US-56/US-183
K-99 IN ELK COUNTY (FY 2013 1R PROJECT)0.8 MILES WEST OF EK/MG COUNTY LINE TO EK/ME COUNTY LNCULVS 501 & 502 12.2 & 14.8 KM E OF CL-EK COLE JCT K-99, E TO 1.6 KM W OF EK-MG CO LUS-160 IN ELK COUNTY (FY 2013 1R PROJECT)
ASPHALT SEAL ON I-70 IN ELLIS COUNTYBR NOS. 004, 005, 040, 041 AND 044 IN ELLIS COUNTY1.8 KM N OF JCT I-70, N TO EL-RO CO LUS-183 IN ELLIS COUNTY (FY 2013 1R PROJECT)US-183B IN ELLIS COUNTY (FY 2013 1R PROJECT)
0.745 MI WEST OF K-14(E JCT) EAST TO EW/LC COUNTY LINEEMERGENCY REPAIR ON I-70, ELLSWORTH COUNTY BRIDGE #013EW CO: EXIT 206(K-232), 219(W JCT K-14), 225(K-156)I-70 IN ELLSWORTH CO 8.3 MI E OF RS/EW CO LN E 7.9 MIPERMANENT SEEDING FOR PROJECT KA-0729-01 (I-70)PERMANENT SEEDING IN ELLSWORTH COUNTY ALONG I-70RUSSELL-ELLSWORTH COUNTY LINE EAST 8.3 MILESSEEDING PROJECT FOR KA-0730-01ELLSWORTH: K-14 SMOKY HILL RIVER BRIDGE N. TO K-140
CAMPUS DRIVE IN GARDEN CITY EAST TO TOWNS ROADCORRIDOR: FROM KE/FI CO LINE, E TO NO JCT US-50/US-83GRAY/FINNEY CO LINE NORTH TO EAST JUNCTION K-23/US-156CRACK ROUT AND SEAL ON K-156 IN FINNEY COUNTYK-156 IN FINNEY COUNTY (FY 2013 1R PROJECT)PRESERVATION PROJECT ON K-156 IN FINNEY COUNTYBR 023 AT K-156, EAST OF GARDEN CITYCORRIDOR:FROM KE-FI COL, EAST TO NORTH JUNCTION US-83KE-FI CO L, E TO CONC PVMTUS-50 IN FINNEY COUNTY (FY 2013 1R PROJECT)US-50 IN FINNEY COUNTY (FY 2013 1R PROJECT)US-50B IN FINNEY COUNTY (FY 2013 1R PROJECT)JCT US-50/US-83 NORTH TO FINNEY/SCOTT COUNTY LINEUS-83 IN FINNEY COUNTY (FY 2013 1R PROJECT)US-83B IN FINNEY COUNTY (FY 2013 1R PROJECT)US-83B; CITY OF GARDEN CITY KLINK PROJECT
DODGE CITY: WYATT EARP BLVD FROM 14TH AVE WEST TO WCLK-34 IN FORD COUNTY (2012 1R PROJECT)CRACK ROUT AND SEAL ON US-50 IN FORD COUNTYSTOCKPILE IN FORD COUNTY ALONG US-50US-50 IN FORD COUNTY (2012 1R PROJECT)US-54 IN FORD COUNTY (2012 1R PROJECT)END PCCP E OF N JCT US400 NE TO .5 MI E OF US-50/US-283E CITY LIMITS OF DODGE CITY SE TO N CITY LIMITS OF FORDUS50 1.5M W US50/50B S TO US-56(BYPASS)SW OF DODGE CITYUS50/50B, S & E TO JCT US56/283(BYPASS)- W OF DODGECITY
CITY OF OTTAWABRIDGE #028 & #029 ON I-35 IN FRANKLIN COUNTYBRIDGE 35-30 (28);2.93 MILES NORTH EAST OF US-59SURFACING WORK ON I-35 IN FRANKLIN COUNTY (FY 2013)JUNCTION K-33, EAST TO FRANKLIN-MIAMI COUNTY LINEK-68 IN FRANKLIN COUNTY (2012 1R PROJECT)K-68 IN FRANKLIN COUNTY (2013 1R PROJECT)OTTAWA: W CITY LIMITS, E TO MARAIS DES CYNES RIVER BRI-35 NE OF OTTAWA, N TO FRANKLIN-DOUGLAS COUNTY LINE
CITY OF JUNCTION CITYGEARY CO: HENRY DR FROM I70 IC TO FT RILEY GATEHENRY DRIVE, NOR I-70 RAMP TERMINAL, NO INTO FORT RILEYBRS US-77 (40), I-70 (14 & 15), US-40B (37)CRACK FILLING ON I-70 IN GEARY COUNTYPAVEMENT MARKING PROJECTCONVENTIONAL SEAL ON K-18 IN GEARY COUNTYBRS 055 & 065 DRY CR DRGCRACK ROUT AND SEAL ON K-57 IN GEARY COUNTY
0.985 MILES E OF JCT K-23, EAST TO GO-TR COUNTY LINEK-23 IN GOVE COUNTY (FY 2013 1R PROJECT
BRIDGE (032), SOUTH FORK SOLOMON RIVER, NO. OF PENOKEEUS-24: SD/GH CO LINE,E TO EAST CITY LIMITS OF HILL CITYUS-283 IN GRAHAM COUNTY (FY 2013 1R PROJECT)
CULVERT #512, 7.22 MILES NORTH OF GT/SV COUNTY LINESTANTON/GRANT COUNTY LINE E TO W CL OF ULYSSESUS-160 FROM RAILROAD TRACKS EAST OF K-25 650FT EAST.
CITY OF CIMARRON: K-23 IN GRAY COUNTYNORTH CITY LIMITS OF CIMARRON N TO GRAY/FINNEY CO LINEHASKELL/GRAY COUNTY LINE EAST TO JUNCTION US-56/K144CIMARRON: KLINK ON US 50CRACK ROUT AND SEAL ON US-50 IN GRAY COUNTYUS-50 IN GRAY COUNTY (FY 2013 1R PROJECT)US-56 IN GRAY COUNTY (2012 1R PROJECT)US-56 IN GRAY COUNTY (2012 1R PROJECT)
CRACK ROUT AND SEAL ON K-96 IN GREELEY COUNTYK-96 IN GREELEY COUNTY (FY 2013 1R PROJECT)
BR 036, BERNARD CR, 8.08 KM N OF JCT US-54BRIDGE #011 ON K-99 IN GREENWOOD COUNTYUS-54 IN GREENWOOD COUNTY (2012 1R PROJECT)US-400 IN GREENWOOD COUNTY (2013 1R PROJECT)
BRIDGE # 039 ON K-27 IN HAMILTON COUNTYPRESERVATION PROJECT ON US-50 IN HAMILTON COUNTY
BNSF & WEST STREET SOUTHWEST OF NEWTONCITY OF NEWTONNEWTON: ASH ST OVER SAND CREEKBRIDGE 050, CAMP CREEK, 0.2 MI WEST OF ATTICABRIDGE #023 ON I-135 IN HARVEY COUNTYRR TRACKS IN N NEWTON, N TO HV-MN CO LINE (EXCEPTION)CONTRACT MAINTENANCE PROJECT ON US-50 IN HARVEY COUNTYCOR:US-50, 1 MI W OF ANDERSON AVE, EAST TO OLD MAIN ST.
JUNCTION US-83/US-160 EAST TO HASKELL/GRAY COUNTY LINEBRIDGE REPAIR ON BRIDGE #001 IN HASKELL COUNTYUS-56 IN HASKELL COUNTY (FY 2013 1R PROJECT)US-83 IN HASKELL COUNTY (2013 1R PROJECT)US-83 IN HASKELL COUNTY (FY 2013 1R PROJECT)
JUNCTION K-156 & RS-283/255PRESERVATION PROJECT ON K-156 IN HODGEMAN COUNTYUS-283 IN HODGEMAN COUNTY (FY 2013 1R PROJECT)
K-62 IN JACKSON COUNTY (2012 1R PROJECT)INTERCHANGE: US-75 AND COUNTY RD 150(1 MI S OF MAYETTA)SHAWNEE/JACKSON COUNTY LINE NORTH TO JCT K-16/US-75US-75 & COLUMBINE DRIVE, NORTH OF HOLTON, JA COUS-75 IN JACKSON COUNTY (2012 1R PROJECT)US-75 IN JACKSON COUNTY (2012 1R PROJECT)
BRIDGE REPAIR ON #017 & #018 IN JEFFERSON COUNTYK-4 IN JEFFERSON COUNTY (2012 1R PROJECT)K-245 IN JEFFERSON COUNTY (2012 1R PROJECT)US-24: 1.8 MI E OF SN/JF CO LN, E TO 4-L/2-L TRANSITIONUS-59 IN JEFFERSON COUNTY (2012 1R PROJECT)
K-14 IN JEWELL COUNTY (2012 1R PROJECT)K-14 IN JEWELL COUNTY (FY 2013 1R PROJECT)CULVERT XXX, 5 MILES EAST OF JCT K-14CRACK ROUT AND SEAL ON K-148 IN JEWELL COUNTYCRACK ROUT & SEAL ON US-36 IN JEWELL COUNTYW JCT K-128, E TO BEGINNING OF 4-LANE SECT W OF MANKATO
191ST ST, JOHNSON CO.;NEAR GARDNER,BNSF INTERMODAL FAC.ANTIOCH RD FROM I-435 TO 119TH STREET(CA)GARDNER: MOONLIGHT ROAD FROM WARREN ST TO MADISON STHOMESTEAD LANE FROM 199TH ST. NORTH TO 191ST ST.LENEXA: 79TH AND LACKMANLENEXA: 87TH ST PARKWAY, PFLUMM RD TO RENNER BLVDLENEXA: I-435 AND 95TH ST MIXED USE TRAILLENEXA: LACKMAN AND COLLEGE BLVD.LENEXA: MONTICELLO ROAD FROM 83RD TO 91ST STREETS(CA)LENEXA:87TH PKWY,PFLUMM TO QUIVIRA;QUIVIRA,85TH TO 87THLENEXA:PRAIRIE STAR PKWY,FALCON VALLEY TO RIDGEVIEW(CA)MARTWAY/LAMAR TO N SIDE OF SHAWNEE MISS PKWY IN MISSIONMOONLIGHT RD, FROM MADISON ST. N TO PRAIRIE VILLAGE DROLATHE: MAHAFFIE AT 151ST STREETOLATHE: 127TH STREET MUR-LEN TO BLACK BOBOLATHE: COLLEGE BLVD OVER BN & SFR W OF RIDGEVIEW RDOLATHE: DENNIS AVENUE OVER CEDAR CREEK(CA)OLATHE: MULTIPLE LOCATIONSOLATHE-RIDGEVIEW, SANTA FE, PARK & LOULA-BNSF TRACKSOVERLAND PARK: 159TH ST ANTIOCH TO METCALFOVERLAND PARK: 2070 SIGNAL CONTROLLERSOVERLAND PARK: PEDESTRIAN WALKABILITY ENHANCEMENTSOVERLAND PARK: QUIVIRA RD FROM I-435 TO 99TH STOVERLAND PARK: QUIVIRA RD., COLLEGE BLVD TO 119TH ST.PED/BIKE PATH IN THE CITY OF SHAWNEESHAWNEE: SHAWNEE MIS PKWY & LACKMANLENEXA: 87TH ST FROM RENNER BLVD TO RIDGEVIEW RDI-35 & 159TH ST & LONE ELM RD IN OLATHEI-35 & 75TH ST., JOHNSON CO.I-35 SW JOHNSON COUNTY INTERCHANGE PROJECTI-35 SW JOHNSON COUNTY INTERCHANGE PROJECT STUDY AREAI-435 FROM 95TH STREET E TO QUIVIRA ROAD, I-35 & K-10INTERCHANGE: I-35 AND US-69 WITH 87TH STREET.KC SCOUT EXTENSION ON I-35 FROM OLATHE TO EDGERTONOVERLAY ON I-35 IN JOHNSON COUNTYPAVEMNET PATCHING ON I-35 IN JOHNSON COUNTYSW JOHNSON COUNTY INTCH PROJECT AT I-35/HOMESTEAD LANEBRIDGE REPAIR IN JOHNSON COUNTY ON I-435PAVEMENT MARKING PROJECTSURFACING WORK ON I-435 IN JOHNSON COUNTYPAVEMENT RECONSTRUCTION ON I-635 IN JOHNSON COUNTYK-7 FROM 0.5 MI S OF 183RD ST, N TO 0.5 M N OF 119TH STK-7 FROM 0.5 MI S OF 183RD ST, N TO 0.5 M N OF 119TH STBRIDGE #236 & #237 ON K-10 IN JOHNSON COUNTYBRIDGE REPAIR ON BRIDGE #177 IN JOHNSON COUNTYUS-56 IN JOHNSON COUNTY (2012 1R PROJECT)CORRIDOR: FROM 119TH ST, N TO I-35 & K-35, N TO 75THCORRIDOR: FROM 119TH STREET, N TO I-35 & I-35 N TO 75THCORRIDOR:FROM 119TH ST, N TO I-35 & I-35 N TO 75TH ST
CORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH STCORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH STCORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH STCORRIDOR:FROM 119TH ST, NO TO I-35 & I-35 NO TO 75TH ST
PRESERVATION PROJECT ON US-50 IN KEARNY COUNTY
K-14 IN KINGMAN COUNTY (FY 2013 1R PROJECT)BRIDGES: RED CREEK (049) AND ROSE BUD CREEK (050)3.2 M W OF K-14 W JCT, EAST TO 1 M W OF K-14 W JCT5.82 MILES E OF PR/KM CO LN, E TO 7 M E OF PR/KM CO LNBYRON WALKER WILDLIFE AREACORRIDOR: PR-KM CO LINE, E 5.82 MILESFROM THE 2L/4L DIVISION EAST TO 0.16KM EAST OF JCT K-17PRESERVATION PROJECT ON US-54 IN KINGMAN COUNTY
2.0 MI N & 1.7 MI E OF ANGOLASOUTH KANSAS & OKLAHOMA RR & 4TH STREET IN OSWEGOSOUTH KANSAS & OKLAHOMA RR & OHIO STREET IN OSWEGOUNION PACIFIC & 20000 ROAD 3 MILES SOUTHEAST OF PARSONSPARSONS: US-59, FROM SOUTHERN AVE NORTH TO THORNTON ST.BRIDGE #071 ON US-400 IN LABETTE COUNTYECL PARSONS, E TO LB-CK CO L
K-4 IN LANE COUNTY (FY 2013 1R PROJECT)
2.5 MI S AND 1.0 MI W OF LANSINGCITY OF LANSINGCITY OF LEAVENWORTHBRIDGE #92-52-18.480(026); MISSOURI RIVERLEAVENWORTH: KLINK ON K-92 AND K-7BASHOR: U24 & 158THUS-24;WOLFCREEK PKWY FR 153RD ST TO 150TH ST IN BASEHORLV: 3 LOCATIONS ON US-73 & K-92PAVEMENT MARKING PROJECTUS-73 IN LEAVENWORTH COUNTY (2013 1R PROJECT)
4.0 MILES S & 1.5 MILES E OF WESTFALLELLSWORTH/LINCOLN CO LN EAST TO LINCOLN/SALINE CO LNPERMANENT SEEDING SPLIT OUT OF PROJECT KA-0731-01CULVERT #530; 2.572 MILES NORTH OF JCT K-18/K-181
CRACK ROUT AND SEAL ON K-7 IN LINN COUNTYREPAIR ON BRIDGE #014 ON K-7 IN LINN COUNTYJCT K31,E TO S JCT US69(EXCLD K-7) & 3RD TO 6TH-MOUND C0.5KM S OF RS 1204 INTERCHANGE, TO 1.2 KM N OF RS 12031.7KM S OF NEW K-52 INTERCH, N TO 0.5KM S OF RS1204N OF K-239 INTERCH, N TO 1.7 KM S OF NEW K-52 INTERCHNORTH JUNCTION K-52, NORTH TO LN-MI COUNTY LINEPAVEMENT MARKING PROJECT
VISITOR INFORMATION CENTER IN OAKLEY (LOGAN COUNTY)K-25 IN LOGAN COUNTY (FY 2013 1R PROJECT)K-25: NCL OF RUSSELL SPRINGS, N TO WEST JCT US-40/K-25WA-LG CO L, E TO 0.2 KM W OF W JCT US-83
CITY OF EMPORIA0.1 MILES N OF ALLENBRIDGE REPAIR IN LYON COUNTY ON I-35EMERGENCY REPAIR ON BRIDGE #119 IN LYON COUNTYI-35/KTA/US-50 INTERCHANGESURFACING WORK ON I-35 IN LYON COUNTYBRIDGE 99-56 (051); K-99 & KTA NORTH JUNCTIONEMPORIA: KLINK PROJECT ON US-50US-50/I-35 ROUNDABOUTS AND CONNECTOR ROAD IN EMPORIA
CITY OF HILLSBOROBRIDGE #034 ON K-15 IN MARION COUNTYPRESERVATION PROJECT ON K-150 IN MARION COUNTYK-168 IN MARION COUNTY (2011 1R PROJECT)US-50 IN MARION COUNTY (2011 1R PROJECT)US-50 IN MARION COUNTY (2011 1R PROJECT)MARION CO: JUNCTION US-56, US-77 AND K-150US-56 IN MARION COUNTY (2011 1R PROJECT)
K-9 IN MARSHALL COUNTY (FY 2013 1R PROJECT)K-87 IN MARSHALL COUNTY (FY 2013 1R PROJECT)K-99 IN MARSHALL COUNTY (FY 2013 1R PROJECT)BR REPLACE; NF BLACK VERMILLION RIVER DRAINAGE BR (043)K-233 IN MARSHALL COUNTY (FY 2013 1R PROJECT)US-36 IN MARSHALL COUNTY (2012 1R PROJECT)US-36 IN MARSHALL COUNTY (2012 1R PROJECT)BIG BLUE RIVER BR (013), 0.5 MILES EAST OF BLUE RAPIDSUS-77 IN MARSHALL COUNTY (FY 2013 1R PROJECT)
INTER. OF FAS1065/FAS1064, THEN EAST 6 MILES TO FAS1961INTERSECTION OF IRON HORSE ROAD AND FAS 307UP & 19TH AVENUE 2 MILES WEST OF GALVA1.61 KM S OF JCT K-61, N 14.84 KMCORRIDOR: RN-MP COL NE TO BEGIN OF 4-LANE S OF MCPHERSNCORRIDOR: RN-MP COL NE TO BEGIN OF 4-LANE S OF MCPHERSNUS-56 & KANSAS AVE(S OF CANTON), MCPHERSON COUNTYUS-56 IN MCPHERSON COUNTY (2011 1R PROJECT)US-56 IN MCPHERSON COUNTY (2011 1R PROJECT)I-135/US-81B INTERHCANGE NORTH TO SALINE COUNTY LINE
CIMARRON RIVER BRIDGE #015 ON K-23OK/KS STATE LINE NORTH TO NORTH CITY LIMITS OF MEADEUS-54 IN MEADE COUNTY (2011 1R PROJECT)US-54 IN MEADE COUNTY (2011 1R PROJECT)
0.02.311.335.7
0.00.20.00.00.210.30.00.60.3
0.00.08.00.513.05.70.28.4
12.38.69.60.03.56.75.00.011.2
6.01.00.09.27.47.00.213.213.16.3
0.025.613.714.4
Landscaping And Beautification3in OverlayPavement Reconstruction40 Mm Overlay (1-1/2 Inches)
CITY OF LOUISBURGLAMBETH SALVAGE YARDLAMBETH SALVAGE YARD, NORTH OF I-35 IN MIAMI COUNTYRS 1604 AT 287TH ST., 1.1 MILES SOUTH OF K-68CRACK ROUT AND SEAL ON K-7 IN MIAMI COUNTYFRANKLIN-MIAMI COUNTY LINE, EAST TO JUNCTION US-169JCT US-169, EAST TO KANSAS-MISSOURI STATE LINEK-68;JUST EAST OF US-69/K-68 INTERCHANGE, IN LOUISBURG7.6 KM N LN-MI CO LINE, N TO 2L/4L DIVCRACK ROUT AND SEAL ON US-169 IN MIAMI COUNTYUS-169 IN MIAMI COUNTY (2013 1R PROJECT)
BRIDGE (005): 1.95 MILES EAST OF K-128, LIMESTONE CREEKCITY OF BELOIT (SAFE ROUTES TO SCHOOL)K-9 IN MITCHELL COUNTY (FY 2013 1R PROJECT)K-14 IN MITCHELL COUNTY (2012 1R PROJECT)K-14 IN MITCHELL COUNTY (2012 1R PROJECT)CULVERT #523; 4.19 MILES NORTHWEST OF LINCOLN COUNTY LNCULVERT 522, BACON CR DRG, 0.94 MI N LC-MC CO LBRIDGE (005; 1.95 MILES EAST OF K-128 (LIMESTONE CREEK)
2.0 MILES S & 1.2 MILES W OF COFFEYVILLE AIRPORTUNION PACIFIC & 5000 ROAD EAST OF LE HUNT6.5 MI N & 2.3 MI E OF ELK CITYOK/KS STATE LINE TO WEST JUNCTION US-160/US-75OK-KS ST L, N TO W JCT US-160ELK/MONTGOMERY COUNTY LINE TO WEST JUNCTION US-75INDEPENDENCE: 10TH ST TO PARK BLVD. ON MAIN ST (US-160)BRIDGE 031, BEE CREEK, 0.2 MILES EAST OF CQ/MG CO. LINE.2 KM S OF N JCT US-160, NE TO 0.3KM S OF JCT US-400COR: US-169, INCLDNG JCT US-166, N TO APPROX CO RD 3000E JCT US-166, N TO 0.4 KM S OF S JCT US-160US-169 IN MONTGOMERY COUNTY (2012 1R PROJECT)US-169 IN MONTGOMERY COUNTY (2012 1R PROJECT)US-169; CITY OF COFFEYVILLE KLINK PROJECT
UP & 2800 ROAD SW OF LATIMERBRIDGE #033 ON K-4 IN MORRIS COUNTYCRACK ROUT AND SEAL ON K-57 IN MORRIS COUNTYCOUNCIL GROVE: KLINK PROJECT ON US-56US-56 IN MORRIS COUNTY (2012 1R PROJECT)
NCL OF ELKHART, N TO S JCT K-51 AND NE BYPASSCHIP SEAL ON K-51 IN MORTON COUNTY7.9 KM NE RS1488, E TO MT-SV CO L
RESTORATION OF HISTORIC BRICK STREET IN SENECAK-9 IN NEMAHA COUNTY (FY 2013 1R PROJECT)CULVERT 502, SOLDIER CR DRG, 3.8 MI N OF JA-NM CO LINE
K-62 IN NEMAHA COUNTY (2012 1R PROJECT)K-63 IN NEMAHA COUNTY (FY 2013 1R PROJECT)K-178 IN NEMAHA COUNTY (FY 2013 1R PROJECT)K-236 IN NEMAHA COUNTY (FY 2012 1R PROJECT)SLOPE PROTECTION IN NEMAHA COUNTYUS-36 IN NEMAHA COUNTY (2012 1R PROJECT)BROWN/NEMAHA COUNTY LINE NORTH TO NEBRASKA STATE LINE
CITY OF CHANUTECITY OF ERIE (SAFE ROUTES TO SCHOOL)SOUTH KANSAS & OKLAHOMA RR & ASH STREET IN CHANUTEUNION PACIFIC & 130TH ROAD SOUTH OF ERIEUNION PACIFIC & 20TH ROAD SOUTHEAST OF SOUTH MOUND0.25 MILES WEST OF SHAWCONVENTIONAL SEAL ON K-39 IN NEOSHO COUNTYW OF US-169, EAST TO PLUMMER AVE - CHANUTEBRIDGE (043), NEOSHO RIVER, 3 MILES EAST OF US-59WILSON-NEOSHO CO LINE E TO .05 MI W OF JCT K-47/US-169WILSON-NEOSHO CO LINE E TO .05 MI W OF JCT K-47/US-169
3.8 MI N OF K-96 AN 1.0 MI E OF COUNTY LINE5.9 MI S OF K-4 & 1.0 MI E OF COUNTY LINEK-4 IN NESS COUNTY (FY 2013 1R PROJECT)CRACK ROUT AND SEAL ON US-283 IN NESS COUNTYK&O & US-283 IN NESS CITYUS-283 IN NESS COUNTY (FY 2013 1R PROJECT)
K-60 IN NORTON COUNTY (2012 1R PROJECT)K-383 IN NORTON COUNTY (2012 1R PROJECT)0.528KM E OF WCL NORTON, E TO NT-PL CO L (EXCPT 1.2KM)US-36 IN NORTON COUNTY (2012 1R PROJECT)US-36 IN NORTON COUNTY(EAST NORTON LIMITS TO K-383 JCT)
BNSF & 217TH STREET 2 MILES NORTH OF OSAGE CITYBNSF & E 293RD ROAD BETWEEN QUENEMO AND MELVERNBNSF & LEWELLING ROAD 1 MILE EAST OF OLIVETCITY OF LYNDON (SAFE ROUTES TO SCHOOL)CITY OF OVERBROOKEAST JCT I-35, EAST TO OS-CF CO LINEOSAGE CITY: E OF MARTIN ST(K-31/170), E TO E OF 4TH STK-68 IN OSAGE COUNTY (2012 1R PROJECT)BRIDGE #025 ON US-56; 110 MILE CREEK IN OSAGE COUNTYABANDONNED MOPAC RR BRIDGE (035) 0.28 MI N US-75/K268
0.3 MILES S AND 5.2 MILES E OF ALTONBRIDGE #043 ON K-181 IN OSBORNE COUNTYCARR CREEK DRAINAGE BR (041), 1 MI W OF OB-MC CO LINEK-181 IN OSBORNE COUNTY (FY 2013 1R PROJECT)US-24 IN OSBORNE COUNTY (FY 2013 1R PROJECT)CITY OF OSBORNE: KLINK ON US 281
K-18 IN OTTAWA COUNTY (2012 1R PROJECT)6 MI S OF OTTAWA/CLOUD CO LN; N TO OTTAWA/CLOUD CO LNMINNEAPOLIS (RS 518); NORTH 6 MILESUS-81 IN OTTAWA COUNTYUS-81 IN OTTAWA COUNTY (2011 1R PROJECT)
US-56 IN PAWNEE COUNTY (2012 1R PROJECTS)
K-121 IN PHILLIPS COUNTY (2012 1R PROJECT)PHILLIPSBURG: FROM 220 FT E. OF US-36/183 JCT TO 5TH STUS-36 IN PHILLIPS COUNTY (2012 1R PROJECT)STOCKPILE ON US-183 IN PHILLIPS COUNTYUS-183 IN PHILLIPS COUNTY (2012 1R PROJECT)US-183 IN PHILLIPS COUNTY (2012 1R PROJECT)
2.0 MI N & 1.0 MI E OF DULUTH5.0 MI S & 1.0 MI E OF ONAGAK-16 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)COMMERCIAL ST FROM SCL TO NCL - HAVENSVILLENCL ST MARYS, N TO PT-NM CO LBRIDGE REPLACEMENT; BRUSH CREEK BRIDGE (036)K-99 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)K-99 IN POTTAWATOMIE COUNTY (FY 2013 1R PROJECT)(MAN)REALIGN THE WWTP ACCESS RD TO ALIGN WITH LEVEE DR.BRIDGE REPAIR ON BRIDGE #001 IN POTTAWATOMIE COUNTYPREVENTIVE MAINTENANCE ON US-24 IN POTTAWATOMIE CO
CONTRACT MAINTENANCE PROJECT ON K-42 IN PRATT COUNTYK-61: FROM K-61/US-54 JUNCTION, NORTH 1.3 MILEBRIDGE #024; 2.74 MILES NORTH EAST OF US-281K-64 IN PRATT COUNTY (FY 2013 1R PROJECT)1.0 MI E OF CAIRO INTERSECTION, E TO PR-KM CO LUS-54 IN PRATT COUNTY (FY 2013 1R PROJECT)US-54: FROM PR/KW CO LINE, EAST TO WEST CL OF PRATTUS-281 IN PRATT COUNTY (2012 1R PROJECT)
K-25 IN RAWLINS COUNTY (FY 2013 1R PROJECT)
BNSF & MAIN STREET IN PARTRIDGECITY OF HUTCHINSON (SAFE ROUTES TO SCHOOL)CORRIDOR: 4L/2L, N OF 17TH IN HUTCH, NE TO RN-MP COLCORRIDOR: 4L/2L, N OF 17TH IN HUTCH., NE TO RN/MP CO LNECL NICKERSON, EAST 3.96 MILES TO CONCRETE PAVEMENTK-96 IN RENO COUNTY (2012 1R PROJECT)SCL HUTCHINSON, EAST TO .8 MILE E OF HAVEN/BUHLER RDSTAFFORD/RENO COUNTY LINE EAST TO RS-360(PLEVNA)US-50 AND AIRPORT RD(YODER RD), SOUTH OF HUTCHINSONUS-50: RS-360 (PLEVNA) EAST TO JUNCTION US-50/K-14
4.0
14.66.06.011.50.2
7.4
0.50.213.60.013.217.7
0.10.118.60.426.80.04.621.60.00.010.7
9.01.30.03.64.04.514.26.7
13.2
0.00.08.08.64.04.914.18.80.08.0
2in Overlay
O-lay & Shoulder1.5 Overlay1.5 OverlayMilling And OverlayOverlay
O-lay & Shoulder
Conv SealOverlay4in OverlayStockpile Bituminous Material4in OverlayConv Seal
Grade, Bridge & SurfacingGrade, Bridge & SurfacingMilling And OverlayMilling And Overlay25 Mm Overlay (1 Inch)Bridge ReplacementAsphalt Pavement1.0 OverlayIntersection ImprovementBridge RepairConv Seal
Crack RepairPavement ReconstructionBridge RepairMilling And OverlayGrade & Surfacing1.5 OverlayOverlay1.5 Overlay
1.5 Overlay
Flashing Light SignalPreliminary EngineeringGrade, Bridge & SurfacingSeeding, SoddingOverlay1.5 OverlayConv SealMilling And OverlayTraffic SignalsMilling And Overlay
629
2,043386288
9,672795
812
11381
3,395138
3,302531
619436
2,193565
1,4171,0121,1161,581775155388
452,381
90288
29,661847
7,606838
1,331
5400
54,287161259489317
7,90861
12,244
SM-1RR
MM-1RSSM-1RRSM-1RRSM-RIPSM-1RR
SM-1RR
SM-1RRLC-K1RSM-1RRSM-CMNSM-1RRSM-1RR
LC-RESLC-RESSM-1RRLC-K3RSM-1RRSM-PBRSM-1RRSM-1RR
MM-CORSM-BSRSM-CMN
SM-CMNSM-RIPSM-BSRSM-1RRSE-SECSM-1RRSM-RIPSM-1RR
SM-1RR
LC-RXRLC-SRTSE-SECSE-SECSM-1RRSM-1RRSM-CMNSM-RIP
MM-SAFSM-RIP
2013
20122008200820112011
2012
201220122012201220122012
20122012201320042003201220132013201220132012
20122012201120132009201320122012
2013
2012201320092013200520122005201220052012
Route Location Description Length(Miles)
Type of WorkCounty
B-59 (Projects Under Construction as of November 2012)
WEST OF JUNCTION K-61, EAST TO EAST OF YODER/AIRPORT RD
CRACK ROUT & SEAL ON K-139 IN REPUBLIC COUNTY4 CULVERTS PLUS ELK CREEK DRAINAGE CULVERTS 519 AND 521BRIDGE #043 IN REPUBLIC COUNTY ON K-148CRACK ROUT AND SEAL ON K-148 IN REPUBLIC COUNTYK-266 AT MILEPOST 4.53 IN REPUBLIC COUNTYBRIDGE REPAIR IN REPUBLIC COUNTY ON US-36CRACK ROUT & SEAL ON US-36 IN REPUBLIC COUNTYUS-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)US-81 IN REPUBLIC COUNTY (2012 1R PROJECT)
CITY OF LYONSJCT K-14, E TO RC-EW CO LK-4 IN RICE COUNTY (2013 1R PROJECT)CLEVELAND AVE TO FOREST AVE ON BROADWAY AVE (K-14/K-96)COW CR BR (033):LITTLE COW CR BR (034)1.5&2.2 M S LYONSK-46 IN RICE COUNTY (2012 1R LIST)BT/RC COUNTY LINE EAST TO WEST CITY LIMITS OF LYONSCONTRACT MAINTENANCE PROJECT ON US-56 IN RICE COUNTYUS-56 IN RICE COUNTY (2012 1R PROJECT)
4TH & BLUEMONT; RILEY COUNTY; CITY OF MANHATTANMANHATTAN:ANDERSON AVE,SETH CHILD RD TO CONNECTICUT AVESTABILIZE BANK OF LITTLE DEEP CREEK (I-70) RLCOUNTYK-16 IN RILEY COUNTY (FY 2013 1R PROJECT)GE-RL CO L, NORTHEAST TO SOUTH OF WALNUT ST @ OGDENK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHK-18 FROM WALNUT ST.(OGDEN) NE TO 0.3MI W K-113/SETH CHCRACK ROUT AND SEAL ON K-82 IN RILEY COUNTYK-82 IN RILEY COUNTY (FY 2013 1R PROJECT)BRIDGE REPAIR ON BRIDGES #040 & #051 IN RILEY COUNTYJCT K-18, N TO JCT US-24OGDEN E CITY LIMITS, E 0.256 KMPRESERVATION PROJECT ON US-24 IN RILEY COUNTYBR 015, FANCY CR, 3.4 KM N K-16US-77 IN RILEY COUNTY (FY 2013 1R PROJECT)
CITY OF STOCKTON (SAFE ROUTES TO SCHOOL)K-18 IN ROOKS COUNTY FY 2013 1R PROJECT)1.5KM S OF JCT US24, N TO RO-PL CO L(EXCPT PCCP)US-183 IN ROOKS COUNTY (2012 1R PROJECT)US-183 IN ROOKS COUNTY (FY 2013 1R PROJECT)
CONTRACT MAINTENANCE PROJECT ON K-4 IN RUSH COUNTYJCT US-183, E TO RH-BT CO LBRIDGE REPAIR ON BRIDGE #049 IN RUSH COUNTYSOUTH CITY LIMITS OF LACROSSE NORTH TO RH/EL COUNT LINEUS-183 IN RUSH COUNTY (FY 2013 1R PROJECT)
EL-CO L, EAST 13.28 MILESEL-RS CO L, EAST 21.365 KMFAS48 FROM OLD US40, S 7.2KM (EXEPT 0.2KM BALTA INTCH)JUNCTION US-281, EAST TO RS-EW CO LINEPRESERVATION PROJECT ON K-18 IN RUSSELL COUNTYPRESERVATION PROJECT ON K-232 IN RUSSELL COUNTYSTOCKPILE ALONG K-232 IN RUSSELL COUNTYUS-281 IN RUSSELL COUNTY (2012 1R PROJECT)US-281 IN RUSSELL COUNTY (2012 1R PROJECT)
.6KM W OF I-135/US-81, E TO .5KM W RS 10500.5 MILE WEST OF RS 1050, EAST TO SA/DK COUNTY LINE0.5 MILE WEST OF RS 1050, EAST TO SA/DK COUNTY LINE2 MILES WEST OF I-135, EAST TO NEW CONCRETE PAVEMENTBRIDGE REPAIR IN SALINE COUNTY ON I-70BRIDGE REPAIR ON BRIDGE #065 IN SALINE COUNTYBRIDGE REPAIR ON BRS #076 & #077(I-70 IN SALINE COUNTY)HEDVILLE RD (EXIT 244) & HALSTEAD RD (EXIT 249), SALINELC-SA CO LINE, E TO JUNCTION I-135PAVEMENT MARKING PROJECT ON I-70SURFACING ON I-70 IN SALINE COUNTYWATERWELL RD. (EXIT 88) INTERCHANGE, SALINE COUNTYBRIDGE REPAIR IN SALINE COUNTY ON K-4K-104 JUNCTION EAST TO SOUTH CITY LIMITS OF GYPSUMMP/SA COUNTY LINE NORTH EAST TO I-135/US-81 JUNCTION
K-96 IN SCOTT COUNTY (2012 1R LIST)FINNEY/SCOTT COUNTY LINE NORTH TO BEGING PCCP @ 12THRR TRACKS IN SCOTT CITY NORTH TO SC/LG COUNTY LINEUS-83 IN SCOTT COUNTY (FY 2013 1R PROJECT)
ARKANSAS RV/GYPSUM CR PATH CONNECTION IN WICHITABYPASS: W OF GODDARD E & N TO K-96 NEAR 45TH ST NCITY OF CHENEYCITY OF COLWICH PEDESTRIAN ACTIV SCHOOL CROSSING SIGNALHAYSVILLE: GRAND AVE/UNION PACIFIC RR GRADE SEPARATIONK&O & ATHENIAN STREET IN WICHITAK&O & MAIZE ROAD IN MAIZEK&O & ST. PAUL STREET IN WICHITAKANSAS & OKLAHOMA RR & DODGE AVENUE IN WICHITAKANSAS & OKLAHOMA RR AND 2ND AVENUE IN ANDALEMAIZE: MAIZE RD N. OF 45TH ST TO N. OF 53RD STPED/BIKE PATH IN THE CITY OF DERBYVALLEY CENTER: 5TH ST. WICHITA-VALLEY CENTER FLOODWAY
VALLEY CENTER: FORD STREET BRIDGEWICHITA METRO AUTOMATED VEHICLE LOCATION FOR TRANSITWICHITA TMC DEPLOYMENT PHASE IIAWICHITA: 119TH STREET W FROM KELLOGG TO MAPLE(CA)WICHITA: 13TH ST, MAIZE RD TO TYLER RDWICHITA: 13TH STREET N & MOSLEY(CA)WICHITA: 17TH ST N & HILLSIDE INTERSECTIONWICHITA: 21ST ST N FROM K-96 E TO 159TH ST E(CA)WICHITA: 2ND & WESTWICHITA: 47TH ST., LULU ST. TO HYDRAULIC AVE.WICHITA: 47TH STREET S FROM MERIDIAN TO SENECA(CA)WICHITA: CENTRAL CORRIDORWICHITA: GREENWICH ROAD FROM HARRY ST TO KELLOGG(CA)WICHITA: HARRY & BROADWAY, INTERSECTION IMPROVEMENTWICHITA: HARRY & WOODLAWN, INTERSECTION IMPROVEMENTWICHITA: HARRY STREET FROM KTA TO E OF ROCK ROAD(CA)WICHITA: HARRY, GREENWICH RD TO 127TH ST E.WICHITA: HYDRAULIC AVE HARRY ST TO KELLOGGWICHITA: LINCOLN BRIDGE OVER ARKANSAS RIVER(CA)WICHITA: OLIVER ST FROM HARRY TO KELLOGG(CA)WICHITA: PAWNEE AND BROADWAY.WICHITA: SENECA, I-235 TO 31ST S(CA)WICHITA: WOODLAWN, HARRY ST TO LINCOLN STWICHITA:CITYWIDE63RD STREET S FROM ROCK ROAD TO BUTLER COUNTY LINE37TH STREET TO 85TH STREETBRIDGE #010 ON I-135 IN SEDGWICK COUNTYBRIDGE #330 ON I-135 IN SEDGWICK COUNTYEND VIADUCT, NORTH TO 0.1 KM NORTH OF 37TH STREETI-135/KTA/47TH ST INTERCHANGEPAVEMENT MARKING PROJECTBRIDGE #106 ON I-235 IN SEDGWICK COUNTYBRIDGE REPAIR ON BRIDGE # 105 IN SEDGWICK COUNTYI-235 & 13TH STREET CONNECTION ON WEST SIDE OF WICHITAI-235, K-254 & I-135, SEDGWICK CO.PATCHING ON I-235 IN SEDGWICK COUNTYSOUTH END I-235, NORTH, 14.5 MILES TO BROADWAY BRIDGEK-15; CITY OF WICHITA IN SEDGWICK COUNTY KLINK PROJECTPAVEMENT MARKING PROJECTWICHITA: SCL TO JCT WITH I-135/US-81 ON K-15JCT WITH K-49, NORTHEAST TO RIDGE ROAD ON K-42PRESERVATION PROJECT ON K-42 IN SEDGWICK COUNTYK-96: BR NOS. 421, 422, 427 AND 428 IN SEDGWICK COUNTYSLIDE REPAIR ON K-96 IN SEDGWICK COUNTYBRIDGE #354 ON US-54 IN SEDGWICK COUNTYE BOUND US-54 IN WICHITA AT RP 218.6 NEAR HILLSIDE EXITINSTALL SIGNAL AT U54 & 159TH AT SEDGWICK/BUTLER COUNTYS ACCESS RD FROM CINDY ST TO 183 RD ST WEST IN GODDARDUS-54 CENTRAL BUSINESS DISTRICT (CBD) VIADUCT (WICHITA)
LIBERAL: 8TH STREET FROM US-54 TO US 83UP & COUNTY ROAD 2 SOUTHWEST OF LIBERALUPRR & R ROAD 7 MILES SOUTHWEST OF KISMETUPRR & X ROAD 3 MILES NORTHEAST OF KISMET0.1 MI E US-83, EAST TO WEST EWS CIMARRON RIVER BRIDGEBRIDGE REPAIR ON BRIDGE #006 IN SEWARD COUNTYUS-56 IN SEWARD COUNTY (FY 2013 1R PROJECT)BRIDGE # 005 ON US-83 IN SEWARD COUNTYNCL OF LIBERAL, PT 3, N TO 0.9 MILE NORTHOF JCT K-51OK-KS STATE LINE, N TO 1.52 KM N OF JCT K-51
CITY OF TOPEKA CCTV CAMERASDEER CR TRAIL; 6TH ST TO 10TH ST IN TOPEKAINNOVATION PKWY FROM GARY ORMSBY DR TO S. TOPEKA BLVDKANZA FIRE COMMERCE PARK, RAIL PORTIONTOPEKA: KANSAS AVE EXTENSION FROM 37TH TO TOPEKA BLVDFROM URISH TO DANBERRY & CARNAHAN TO KS TURNPIKE BOOTHGAGE BLVD E 2.37 MI TO JCT I-470/KTA (EXCEPT BRIDGES)I-70 FROM DANBURY LANE TO ADAMS TRAFFICWAYI-70: FROM SN/WB COUNTY LINE, EAST TO VALENCIA ROADI-70; BEG. @ ML POST 362.952 TO 364.852 E & W BOUND LNSMULTIPLE BRIDGE REPAIRS IN SHAWNEE COUNTY ON I-70REPAIR A SIGN TRUSS ON I-70 IN SHAWNEE COUNTYI-470 FROM I-70 JUNCTION EAST TO 21ST STREET IN TOPEKAI-470: BR NOS. 200, 201, 183, 055 AND 195 IN SN COUNTYPATCHING ON I-470 IN SHAWNEE COUNTYK-4 IN SHAWNEE COUNTY (2012 1R PROJECT)K-4: BRIDGE NO. 233 IN SHAWNEE COUNTYWB-SN COUNTY LINE, NORTHEAST TO RS 514 (AUBURN ROAD)BOURBONAIS CR BR (069), 3 MILES NORTHWEST OF ROSSVILLEENSIGN CREEK BR (071), 2 MILES WEST OF SILVER LAKEPRESERVATION PROJECT ON US-24 IN SHAWNEE COUNTYUS-24 IN SHAWNEE COUNTY (2012 1R PROJECT)US-24 IN SHAWNEE COUNTY (2012 1R PROJECT)US-24, CROSS CR BR TO ECL, AND ORANGE ST INT.US-24, FROM COUNTRYSIDE ROAD, EAST TO EXISTING 4-LANEUS-24/MAIN & US-24/ORANGE IN ROSSVILLENORTHBOUND US-40 & K-4 OFFRAMP3690 FT S OF JCT 62ND ST/US-75 N TO SN/JA COUNTY LINE46TH STREET, NORTH TO SN-JA COUNTY LINE ON US-75PAVEMENT MARKING PROJECTPRESERVATION PROJECT ON US-75 IN SHAWNEE COUNTYUS-75 IN SHAWNEE COUNTY (2013 1R PROJECT)
GOVE/SHRIDAN COUNTY LINE N TO S CITY LIMITS HOXIEK-186 IN SHERIDAN COUNTY (2012 1R PROJECT)K-188 IN SHERIDAN COUNTY (2012 1R PROJECT)US-24 IN SHERIDAN COUNTY (2012 1R PROJECT)JCT K-383/US-83 NORTH TO DECATUR/SHERIDAN COUNTY LINEUS-83 IN SHERIDAN COUNTY 2011 1R PROJECT
REPLACEMENT OF HISTORIC BRICK STREET IN GOODLANDBEGIN AT GOODLAND EXIT 17;THENCE E 10.2004 MI TO EDSONCO-KS ST L, E TO JCT K-27COLORADO STATE LINE EAST TO 0.5 MI E OF RS-1668(CARUSO)K-253 (EDSON) E TO 0.5 MI E OF SHERMAN/THOMAS COUN LINEK-253 (EDSON) E TO 0.5 MI E OF SHERMAN-THOMAS COUN LINE
K-8 IN SMITH COUNTY (FY 2013 1R PROJECT)K-181 IN SMITH COUNTY (FY 2013 1R PROJECT)K-248 IN SMITH COUNTY (2012 1R PROJECT)
US-50 IN STAFFORD COUNTY (2012 1R PROJECT)US-281 IN STAFFORD COUNTY (2012 1R PROJECT)US-281 IN STAFFORD COUNTY (2012 1R PROJECT)
CIMARRON VALLEY RR & K-27 AT JOHNSON CITYS JCT US-160, N TO ST-HM CO LNORTH JCT K-27/US-160 EAST TO STANTON/GRANT COUNTY LINE
US-56 IN STEVENS COUNTY (FY 2013 1R PROJECT)
BNSF & BLUFF ROAD 1 MILE WEST OF MILANBNSF & DRURY ROAD 4MI WEST OF WELLINGTONBNSF & SUMNER ROAD 1 MILE WEST OF MAYFIELDBNSF & TYLER ROAD 2MI WEST OF WELLINGTONK-15 IN SUMNER COUNTY (2012 1R PROJECT)PRESERVATION PROJECT ON K-42 IN SUMNER COUNTYBR 052, NINNESCAH RIVER DR, 3.5 MI SO. OF SG-SU CO LINES MAIN (JCT US-81/K49) TO ECL ON E CENTRAL AVE (US-81)US-160 IN THE CITY OF WELLINGTONUS-166 IN SUMNER COUNTY (2012 1R PROJECT)
.55 KM W OF JCT US-24, E TO .55 KM E OF JCT K-250.337 MI W OF I-70/US-24; 0.355 E OF I-70/K-25 @ COLBY0.34 MILES E OF JCT K-25, SE 9.042 MILES TO MINGO INTERSH-TH CO LINE, EAST 10.623 MILESUBAS ON I-70 IN THOMAS COUNTYK-25 IN THOMAS COUNTY (FY 2013 1R PROJECTK-25 IN THOMAS COUNTY (FY 2013 1R PROJECT)NORTH FORK SOLOMON RIVER BR (042), 3 MI SOUTH OF COLBYUS-24 IN THOMAS COUNTY (2012 1R PROJECT)
3.0 MILES N & 6.9 MILES E OF TREGO CENTERBRIDGE REPAIR ON BRIDGES #008 - #011 IN TREGO COUNTYJCT US-283, EAST TO TR-EL COUNTY LINEUS-40B IN TREGO COUNTY (FY 2013 1R PROJECT)US-283 IN TREGO COUNTY (FY 2013 1R PROJECT)WAKEENEY: US-283/40B FROM FIRST ST EAST TO 13TH ST
0.010.217.112.88.48.4
16.015.21.0
15.07.19.1
0.012.012.9
15.2
0.00.00.00.05.56.60.00.30.69.1
8.78.79.110.68.211.515.50.08.3
0.20.016.80.79.11.0
Historic Preservation3/4 OverlayOverlayGrade, Bridge & SurfacingSeeding, SoddingMilling And Overlay
Milling And OverlayAsphalt PavementConv Seal
O-lay & Shoulder2in Overlay1.5 Overlay
Surfacing40 Mm Overlay (1-1/2 Inches)3/4 Overlay
Milling And Overlay
Flashing Light SignalFlashing Light SignalFlashing Light SignalFlashing Light SignalUltra Thin Bonded Asphalt Surf.Milling And OverlayBridge ReplacementMilling And OverlayOverlayPavement Patching
DOWNTOWN STREETSCAPE IN THE CITY OF ALMABRIDGE REPAIR ON BRIDGE #020 IN WABAUNSEE COUNTYI-70 @ WEIGH STATION WEST OF MCFARLAND RD.I-70 PAXICO REST AREAI-70: EAST OF I-70/K-30 JCT., E TO WB/SN COUNTY LINECULVERT 534, MISSION CR DRG, 2.88 MILES W WB-SN CO LINEJUNCTION K-177, NE TO WB-SN COUNTY LINESOUTH BRANCH MISSION CREEK BR (041), 3 MI N OF ESKRIDGEBR & CUL REPL;DEEP CR BR(049) ANTELOPE BR(050), CUL 512BRIDGE #075; 4.18 MILES EAST OF JUNCTION K-99/K-31CULVERT 545, SOUTH BRANCH MILL CR DRG, 1.73 MI N OF K-4TRIBUTARY TO SOUTH FORK MILL CR BRIDGE (063), W JCT K-4W JCT K-4, N TO SCL ALMA
K-27 IN WALLACE COUNTY (FY 2013 1R PROJECT)CO-KS ST L, E TO 0.538 KM W OF W JCT K-27
PREVENTIVE MAINTENANCE ON K-9 IN WASHINGTON & CLAY COPREVENTIVE MAINTENANCE ON K-15 IN WASHINGTON COUNTYUS-36 JUNCTION NORTH TILL ROUTE ENDSEAST JCT K-148/K-9, N TO KANSAS-NEBRASKA STATE LINEK-148 IN WASHINGTON COUNTY (2012 1R PROJECT)ECL HANOVER, EAST TO JUNCTION K-148K-234 IN WASHINGTON COUNTY (2012 1R PROJECT)JUNCTION K-148, EAST TO PONY EXPRESS STATIONK-243 IN WASHINGTON COUNTY (2012 1R PROJECT)EAST CITY LIMITS WASHINGTON, EAST TO THE 2 LANE/4 LANERP/WS COUNTY LINE EAST TO WASHINGTON EAST CITY LIMITSUS-36 IN WASHINGTON COUNTY (2012 1R PROJECT)
LEOTI GI: K-25 FROM SOUTH ST NORTH TO A STLEOTI: K-96 FROM INDIAN ST TO WATERS STK&O & K-167 AT MARIENTHAL
CONVENTIONAL SEAL ON K-39 IN WILSON COUNTYJUNCTION US-400/K-39 WEST TO JUNCTION K-39/US-750.18 MI E OF JCT K-47/US-75 E TO WILSON-NEOSHO CO LINE0.18 MI E OF JCT K-47/US-75 E TO WILSON-NEOSHO CO LINEUS-75, APPROX 1.5 MI S OF S JCT OF K-39, WILSON COUNTY
BR 002, MOPAC RR OVER US-54BRIDGE REPAIR IN WOODSON COUNTY ON US-54CRACK ROUT AND SEAL ON US-54 IN WOODSON COUNTYUS-54 IN WOODSON COUNTY (2012 1R PROJECT)NCL YATES CENTER, N TO WO-CF CO L
BONNER SPRINGS: WALKING TRAIL SHADYSIDE TO W.MORSE AVE.KANSAS CITY: MERRIAM LANE BICYCLE LANESKC: 5TH ST FROM RIVERFRONT HERITAGE TR TO JERSEY CR TRPAVEMENT MARKING PROJECT
0.00.00.10.04.50.039.50.00.00.00.00.08.5
29.616.1
25.27.03.120.420.40.30.30.90.99.217.69.4
1.20.90.0
8.014.47.07.00.4
0.80.011.812.710.5
0.90.90.510.5
Landscaping And BeautificationBridge RepairLightingUltra Thin Bonded Asphalt Surf.OverlayCulvert1.5 OverlayBridge ReplacementBridge ReplacementCulvertCulvertBridge Replacement25 Mm Overlay (1 Inch)
STATE AVENUE FROM 94TH ST TO 82ND STBRIDGES #007 AND #008 ON I-35 IN WYANDOTTE COUNTYE OF SW BLVD, NE TO KS-MO ST L (NL & SL)MISSION RD, 7TH ST. TRFWY, & EATON ST., WYANDOTTE CO SURFACING WORK ON I-70 IN WYANDOTTE COUNTY94TH ST, EAST TO LEWIS AND CLARK VIADUCT(EXCPT I-635)BR REPAIR ON BRS #269, #128 & #096 IN WYANDOTTE COUNTYBRIDGE REPAIR IN WYANDOTTE COUNTY ON I-70BRIDGE REPAIR IN WYANDOTTE COUNTY ON I-70EMERGENCY REPAIR ON I-70, 18TH ST. EXPRESSWAY INTERCHI-70 @ 3RD/FAIRFAX TRFWY, WYANDOTTE CO.I-70 REAL TIME TRAVELER INFORMATION KC METROI-70 STUDY FOR THE LEWIS & CLARK VIADUCTI-70, STAGING AREA WEST OF 72ND STREET, WYANDOTTE CO.I-70: BRIDGE NOS. 029, 031 IN WYANDOTTE COUNTYBRIDGE REPAIR ON BRIDGE #204 IN WYANDOTTE COUNTYBRIDGE REPAIR ON BRIDGES #198&199 IN WYANDOTTE COUNTYI-435 & K-32, WYANDOTTE CO.I-435 & WOODEND RD.I-435: BRIDGE NO. 195 IN WYANDOTTE COUNTYPAVEMENT MARKING PROJECTI-635 & K-5, WYANDOTTE CO.I-635 MISSOURI RIVER BRIDGE, BR NO 635-105-8.91(166)BRIDGE REPAIR ON BRIDGE #258 IN WYANDOTTE COUNTYPRESERVATION PROJECT ON K-7 IN WYANDOTTE COUNTYBONNER SPRINGS: KLINK- TWO LOCATIONS ON K-32PAVEMENT MARKING PROJECTBR NO 69-105-156.66(136) 18TH ST OVER KANSAS RIVERBR. NO.(136), 18TH ST. EXPRESSWAY OVER THE KANSAS RIVERBR #181 & #070 ON US-169 IN WYANDOTTE COUNTY
DISTRICT ONE, AREA FOURDISTRICTS 3, 2 & 6KANSAS & OKLAHOMA RAILROAD IN KM, SG, AND SU COUNTIESKANSAS CITY LIVABLE COMMUNITIES PILOT PROGRAMKANSAS STATE HISTORICAL HIGHWAY MARKERSKDOT WORK ZONE SAFETY PUBLIC AWARENESS CAMPAIGNMILLING AT MULTIPLE LOCATIONS IN DISTRICT FOURMILLING AT MULTIPLE LOCATIONS IN DISTRICT ONEMILLING AT MULTIPLE LOCATIONS IN DISTRICT TWOMILLING AT MULTIPLE LOCATIONS IN DISTRICT TWOMOTORIST ASSISTANCE PROGRAM FISCAL YEAR 2013MUDJACKING AT VARIOUS LOCATIONS IN DISTRICT ONEOPERATION GREEN LIGHT SYSTEM IN KANSAS CITY METRO AREASAFE KIDS OF KANSASSCHOOL ZONE SIGNING AND PAVEMENT MARKINGSTATEWIDESTATEWIDESTATEWIDESTATEWIDE
STATEWIDESTATEWIDE - STANDING FUND FOR ITS RESEARCHSTATEWIDE INTERSTATES AND FREEWAYS LOGO SIGNING & TODSSTATEWIDE KCA (KANSAS CONTRACTORS ASSOCIATION)STATEWIDE-PAVEMENT MARKING RESEARCHUNION PACIFIC LED LENS UPGRADEVARIOUS LOCATIONS IN DISTRICT 1VARIOUS LOCATIONS IN DISTRICT 1VARIOUS LOCATIONS IN DISTRICT 1VARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 2VARIOUS LOCATIONS IN DISTRICT 3VARIOUS LOCATIONS IN DISTRICT 4VARIOUS LOCATIONS IN DISTRICT 4VARIOUS LOCATIONS IN DISTRICT 4HIGH PERFOMANCE SHEETING PROJECT I-70 - DISTRICT 3I-70 @ US-281 EXIT 184 (RS CO) & K-247 EXIT 145 (EL CO)I-70 IN SHERMAN COUNTY (2013 1R PROJECT)TR CO EXIT 135(K-147); EL CO 161(RS 2166), 163(RS 1877)I635 FROM MERRIAM LN TO GEORGIA IN JO/WYFRONTIER MILITARY SCENIC BYWAY SIGNINGVARIOUS LOCATIONS IN DISTRICT 3K-10: DOUGLAS CO. NEAR EUDORA & JOHNSON CO. AT K-7VARIOUS LOCATIONS IN DISTRICT 6VARIOUS LOCATIONS ON K-25 IN DISTRICT 3VARIOUS LOCATIONS IN DISTRICT 5K-96 FROM SE OF NICKERSON, N & W TO NORTH OF STERLINGDISTRICT 5 HIGH PERFORMANCE PROJECT - FY 2012DISTRICT 6 HIGH PERFORMACE PROJECT - FY 2012DISTRICT 1 HIGH PERFORMANCE PROGRAM PROJECT.WESTERN VISTAS HISTORIC BYWAY SIGNINGPRESERVATION ON US-400 IN BU, GW, WL, MG & LB COUNTIES
Airport Development Plan at BeaumontWiden & O-Lay Runway 17-35 at BentonRelocate Fuel System at Benton
Remark Runway at Abilene
Airport Development Plan Ph. II at Quinter
Seal Cracks Rwy 13-31 and Twys at SyracuseEmergency Fuel Syst Repair at Syracuse
Install PAPIs at HarperReplace Fueling Syst at Harper
Self-Service Fueling Syst at SatantaReplace Airfield Lighting Syst at Satanta
Repair Airfield Pavements at Jetmore
Bury Overhead Power Lines at Greensburg
Install Fueling Syst at Oswego
Airport Development Plan Ph II at DightonLand Acquisition; Remove Tower at Dighton
Replace Restrooms at Lincoln
Repair and Remark Runway at Norton
Self-Service Fueling Syst at Phillipsburg
Self-Service Fueling Syst at Rooks Co
Tree Removal at Rose HillAirport Development Plan at Rose HillRemove Bldg; Reroute Road at Rose Hill
Repair Airfield Pavements at Hoxie
Reconst Barrel Hangar Apron at GoodlandReconst T-Hangar Apron at Goodland
Self-Service Fueling Syst at Smith Center
$38,000$449,955$28,319
$15,000
$38,000
$7,920$40,500
$166,500$99,000
$92,250$186,300
$257,940
$270,000
$90,000
$28,500$609,516
$26,100
$89,226
$45,000
$82,800
$7,025$38,000$8,550
$67,500
$112,500$315,000
$16,612
$2,000$49,995$3,147
$5,000
$2,000
$880$4,500
$18,500$11,000
$10,250$20,700
$28,660
$30,000
$10,000
$1,500$67,724
$3,046
$11,101
$5,000
$17,325
$781$2,000$950
$7,500
$37,500$105,000
$1,845
201320132013
2013
2013
20132013
20132013
20132013
2013
2013
2013
20132013
2013
2013
2013
2013
201320132013
2013
20132013
2013
$40,000$499,950$31,467
$20,000
$40,000
$8,800$45,000
$185,000$110,000
$102,500$207,000
$286,600
$300,000
$100,000
$30,000$677,240
$29,146
$100,327
$50,000
$100,125
$7,806$40,000$9,500
$75,000
$150,000$420,000
$18,457
County Project Total Cost State Funds Local Funds FY
B-69 (Aviation)
Stafford
Sumner
Thomas
Airport Development Feasibility Study at Stafford
Fuel Tank Leak Detection at Wellington
Repair Joints & Pvmt, Taxiways & Ramp at Colby
TOTALS:
$38,000
$11,438
$54,000
$3,317,332
$2,000
$3,812
$18,000
$480,369
2013
2013
2013
$40,000
$15,250
$72,000
$3,797,701
B-70
RailServiceImprovementFund Many areas of the state no longer have service from Class I railroads. Short line railroads provide rail service to such areas, provide an alternative to trucks for freight (primarily grain) shippers, and keep rural areas of the state connected to the national rail network as well as national and international markets for Kansas grains and products. This alternative provides competition and helps keep shipping rates down. It also reduces the number of trucks that would otherwise be on Kansas roads and highways. This in turn avoids increased maintenance and rehabilitation costs for those roads.
The Rail Service Improvement Fund component of the CTP is administered by KDOT’s freight and rail unit. The fund makes available to short line railroads and port authorities operating in Kansas, and shippers and local units of government in coordination with the serving railroad, low-interest, long-term (ten-year) loans and grants to be used primarily for track rehabilitation, capacity improvementand economic development projects. Funds may also be used for financing and acquisition activities and the purchase of rolling stock.
(Rail)
ARRARailProjects
ProjectNumber RailLineSegment
GrantAmount ProjectDescription
LoanAmount
106 RF 0001-01
106 KA 2637-01
Cimarron Valley Railroad
Kyle Railroad Tiger III project
$3,000,000
$8,210,119
Total project included $15,000,000 for 100,000 ties, 560 carloads of ballast, 150 miles of tamping and 10 miles of rail replacement. KDOT, CVR and Port Authority of the Southwest contributed $5,000,000 each to the total project. All tie work and instal-lation of ballast and tamping will be done by year end 2012. Rail installation will continue to proceed over the next two years.
The project goes from Solomon to Downs (84 miles) and includes 50,000 ties, 50,000 tons of ballast and upgrades of 24 crossings and 14 bridges. The work will be done by third quarter calendar year 2013.
$2,000,000
($408,283 state,
$1,233,741 Kyle railroad,
$6,568,095 in Federal
funds)
CountiesServed LocalShare
TotalVehicleCosts
CoordinatedTransitDistrict(CTD)Operating
FederalShare
StateShare
FederalShare
StateShare
LocalShare
TotalOperatingCosts
State/FederalPublicTransitPrograms-ARRAContracts
FY2013CoordinatedTransitDistrict(CTD)Operating
B-71(Public Transit)
Four-County Paratransit Council, Inc. (CTD 1)
Topeka/SN Co. Paratransit Council, Inc. (CTD 2)
North East Kansas Transit Council, Inc. (CTD 3)
Two Lakes Coordinated Transit Alliance, Inc. (CTD 4)
Flint Hills Transit Council (CTD 5)
Marion/McPherson CTD (CTD 6)
North Central Kansas Transit Council, Inc. (CTD 7)
Northwest Kansas Area Transit Coordinating Council, Inc. (CTD 8)
Kansas Area Transit District, Inc. (CTD 9)
Southeast Kansas Area Transit Coordinating Council, Inc. (CTD 10)
South Central KSTransit Council, Inc. (CTD 11)
Central Plains Coordinated Transit District, Inc. (CTD 12)
Mid-Kansas Transit District, Inc. (CTD 13)
West Central Kansas Regional Transportation Council, Inc. (CTD 14)
Southwest Kansas Regional Transportation Council, Inc. (CTD 15)