1 APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information S. No. Item Details 1. Name of the Project M/s. Prasananthee Laboratories Pvt. Ltd Active Pharmaceutical Ingredients (APIs) and intermediates manufacturing Unit. 2. S.No. in the Schedule 5 (f) 3. Proposed capacity / area / length / tonnage to be handled / command area / lease area / number of wells to be drilled Existing unit Application for Extension of Validity of Environmental Clearance (EC). 4. New/ Expansion / Modernization Existing unit, Application for Extension of Validity of Environmental Clearance (EC) only. 5. Existing Capacity / Area etc. Permitted capacity : 180 TPA (Any 3 products out of 12 products will be manufactured at a time); Existing total area: 2.6 Ha. 6. Category of Project i.e., ‘A’ or ‘B’ Category ‘A’ 7. Does it attract the general Condition? If Yes, Please specify No 8. Does it attract the specific condition? If Yes, Please specify No 9. Location Plot/Survey/Khasra No. Sy. No. 93 Village Rahimkhanpet Tehsil Atmakur District Yadadri District (Formerly Nalgonda District) State Telangana 10. Nearest railway station / airport along with distance in km. Wangapally Railway station – 25 Km (NW) Valigonda Railway station – 21 km (SW) Rajiv Gandhi International Airport, Shamshabad – 84 km (SW) 11. Nearest Town, City, District Headquarters along with distance in km. Rahimkhanpet village – 1.8 km (NNE) Atmakur Mandal Headquarters– 5.2 km (W) Mothkur – 7.3 km (E) Hyderabad (ORR) - 55 Km (W) 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Village Panchayat address (local body): Gram Panchayat Office, Rahimkhanpet Village, Atmakur Mandal - 508111 Yadadri District (formerly Nalgonda District), Telangana State 13. Name of the applicant Authorized signatory: J.Parvathi Devi, Director
34
Embed
APPENDIX I FORM 1 (I) Basic Information Detailsenvironmentclearance.nic.in/writereaddata/modification/PreviousTOR/... · Hyderabad 500038 . Pin Code : ... Telephone No. 040-48502223
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
1
APPENDIX I (See paragraph – 6)
FORM 1
(I) Basic Information
S. No. Item Details 1. Name of the Project M/s. Prasananthee Laboratories Pvt. Ltd
Active Pharmaceutical Ingredients (APIs) and intermediates manufacturing Unit.
2. S.No. in the Schedule 5 (f) 3. Proposed capacity / area / length /
tonnage to be handled / command area / lease area / number of wells to be drilled
Existing unit Application for Extension of Validity of Environmental Clearance (EC).
4. New/ Expansion / Modernization Existing unit, Application for Extension of Validity of Environmental Clearance (EC) only.
5. Existing Capacity / Area etc. Permitted capacity : 180 TPA (Any 3 products out of 12 products will be manufactured at a time); Existing total area: 2.6 Ha.
6. Category of Project i.e., ‘A’ or ‘B’ Category ‘A’ 7. Does it attract the general Condition? If
Yes, Please specify No
8. Does it attract the specific condition? If Yes, Please specify
No
9. Location Plot/Survey/Khasra No. Sy. No. 93 Village Rahimkhanpet Tehsil Atmakur District Yadadri District
(Formerly Nalgonda District) State Telangana
10. Nearest railway station / airport along with distance in km.
Wangapally Railway station – 25 Km (NW) Valigonda Railway station – 21 km (SW) Rajiv Gandhi International Airport, Shamshabad – 84 km (SW)
11. Nearest Town, City, District Headquarters along with distance in km.
Rahimkhanpet village – 1.8 km (NNE) Atmakur Mandal Headquarters– 5.2 km (W) Mothkur – 7.3 km (E) Hyderabad (ORR) - 55 Km (W)
12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given)
Village Panchayat address (local body): Gram Panchayat Office, Rahimkhanpet Village, Atmakur Mandal - 508111 Yadadri District (formerly Nalgonda District), Telangana State
13. Name of the applicant Authorized signatory: J.Parvathi Devi, Director
15. Address for correspondence: Name A. Mohan Krishna Designation (Owner/Partner/ CEO) Managing Director Address M/s. Prassanthee Laboratories Pvt. Ltd.
Plot No.23/A, 6B, 6thFloor, Nandanavanam Complex Vengal Rao Nagar, Near S.R.Nagar X Roads Hyderabad 500038
16. Details of Alternative Sites examined, if any, Location of these sites should be shown on a topo sheet.
Not Applicable as this application for extension of EC validity.
17. Interlinked projects Nil 18. Whether separate application of
interlined project has been submitted Not Applicable
19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable as this application for
extension of EC validity. 21. Whether the proposal involves
approval/clearance under: if yes, details of the same and their status to be given (a) The Forest (Conservation)Act, 1980 (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z Notification, Act, 1991
Nil
22. Whether there is any Government Order/Policy relevant/relating to the site
Nil
23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending
against the project and / or land in which the project is propose to be set up
(a) Name of the Court (b) Case No. (c) Orders / directions of the Court, if
any and its relevance with the proposed project.
Nil
*Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,)
3
(II) Activity
1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
1.20 New or diverted transmission lines or pipelines?
No Not envisaged
1.21 Impoundment, damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers?
No Not envisaged
1.22 Stream crossings? No Not envisaged 1.23 Abstraction or transfers of water
from ground or surface waters? No This application is for extension of EC
validity. 1.24 Changes in water bodies or the
land surface affecting drainage or run-off?
No Not envisaged.
1.25 Transport of personnel or materials for construction, operation or decommissioning?
No This application is for extension of EC validity.
1.26 Long-term dismantling or decommissioning or restoration works?
No Not envisaged
1.27 Ongoing activity during decommissioning which could have an impact on the environment?
No Not envisaged.
1.28 Influx of people to an area in either temporarily or permanently?
No This application is for extension of EC validity.
1.29 Introduction of alien species? No Nil. 1.30 Loss of native species or genetic
diversity? No Nil.
1.31 Any other actions? No -
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
2.1 Land especially undeveloped or agricultural land (ha)
No This application is for extension of EC validity.
2.2 Water (expected source & competing users) unit: KLD
No This application is for extension of EC validity.
2.3 Minerals (MT) No Not envisaged 2.4 Construction material – stone,
aggregates, sand / soil (expected source – MT)
No Not envisaged
2.5 Forests and timber (source – MT) No Not applicable. 2.6 Energy including electricity and
fuels (source, competing users) Unit: fuel (MT), energy (MW)
No Not envisaged
2.7 Any other natural resources (use appropriate standard units)
No This application is for extension of EC validity.
5
3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.
with source of information data 5.1 Emissions from combustion of
fossil fuels from stationary or mobile sources
No This application is for extension of EC validity.
5.2 Emissions from production processes
No This application is for extension of EC validity.
5.3 Emissions from materials handling including storage or transport
No Existing APIs & intermediates manufacturing unit and submitting for extension of EC validity
5.4 Emissions from construction activities including plant and equipment
No Not applicable.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste
No Not envisaged.
5.6 Emissions from incineration of waste
No Not applicable
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)
No Not envisaged.
5.8 Emissions from any other sources No Not envisaged. 6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist
confirmation Yes/No
Details thereof (with Approximate quantities/rates, wherever possible) with source of information data with
source of information data 6.1 From operation of equipment e.g.
engines, ventilation plant, crushers
No Existing APIs & intermediates manufacturing unit and submitting for extension of EC validity
6.2 From industrial or similar processes
No Existing APIs & intermediates manufacturing unit and submitting for extension of EC validity
6.3 From construction or demolition.
No Existing APIs & intermediates manufacturing unit and submitting for extension of EC validity
6.4 From blasting or piling No Not envisaged. 6.5 From construction or operational
traffic No This application is for extension of EC
validity. 6.6 From lighting or cooling systems No Nil 6.7 From any other sources No Nil
7
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:
with source of information data 7.1 From handling, storage, use or
spillage of hazardous materials
Yes Complying as per EC / CFE. Existing APIs & intermediates manufacturing unit and submitting for extension of EC validity.
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge)
No Complying as per EC/ CFE. Existing APIs & intermediates manufacturing unit and submitting for extension of EC validity. Process effluents will be pumped to the above ground level R.C.C lined tanks for storage and neutralization then sent to ETP – ZLD. Treated effluent will be reuse in Cooling towers
7.3 By deposition of pollutants emitted to air into the land or into water
No This application is for extension of EC validity.
7.4 From any other sources No Nil 7.5 Is there a risk of long term build up
of pollutants in the environment from these sources?
No Not envisaged.
8. Risk of accidents during construction or operation of the Project, which could
affect human health or the environment S.No.
Information/Checklist confirmation
Yes/No
Details thereof (with Approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc. from storage, handling, use or production of hazardous substances
Yes This application is for extension of EC validity. All safety precautions will be taken by the industry to avoid such accidents.
8.2 From any other causes Yes - 8.3 Could the project be affected by
9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality
with source of information data 9.1 Lead to development of supporting
facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads,
power supply, waste or waste water treatment, etc.)
• housing development • extractive industries • supply industries • other
No
No
No No No
• This application is for extension of EC
validity.
• All employees are coming from nearby villages.
• Not envisaged. • Not envisaged. • Not envisaged.
9.2 Lead to after-use of the site, which could have an impact on the environment
No This application is for extension of EC validity.
9.3 Set a precedent for later developments
No This application is for extension of EC validity.
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects
No Existing APIs & intermediates manufacturing unit and submitting for extension of EC validity.
(III) Environmental Sensitivity
S. No.
Areas
Name/ Identity
Aerial distance (within 15 km) Proposed project location boundary
1. Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value
No -
2. Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests
No Not envisaged
3. Areas used by protected, important or sensitive Species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
No Not envisaged.
4. Inland, coastal, marine or underground waters
Yes Bukleru river – 2.6 km (N) Aleru river – 6.5 Km (NE) Kurella cheruvu – 3 km (SSE)
9
S. No.
Areas
Name/ Identity
Aerial distance (within 15 km) Proposed project location boundary
Pond near Pallerla – 4.4 km (S) & 5.6 km (SW) Pond near Siddapur- 6.8 km (SW) Pond near Paladugu – 5.5 km (SE) Virla cheruvu near Atmakur – 5.7 km (W) Mothkur cheruvu – 7.8 km (ENE)
5. State, National boundaries No Nil 6. Routes or facilities used by the
public for access to recreation or other tourist, pilgrim areas
No Industry is located near to the village road connecting to NH 163 (previously NH-202) : 29 Km (W) (Hyderabad -Warangal).
7. Defence installations No Nil 8. Densely populated or built-up
area Yes Atmakur Mandal Headquarters– 5.2 km (W)
Mothkur – 7.3 km (E) 9. Areas occupied by sensitive man-
made land uses (hospitals, schools, places of worship, community facilities)
Yes Hospitals, schools, temples and other general community facilities exist in the settlements of the study area.
10. Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)
No Not applicable
11. Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)
No Not applicable.
12. Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)
No The project area falls under seismic zone II as per IS: 1893 (Part1):2002.
(IV). Proposed Terms of Reference for EIA studies: Not applicable as this is Existing industry and submitting Form 1 application for extension of EC validity.
11
Annexures
S.No. Contents Page No.
1 Environmental Clearance vide order No. F. No. J-11011/523/2007-IA II (I) dated 26-12-2007
12-19
2 CFE issued by SPCB vide order no. 258/PCB/CFE/RO-NLG/HO/2011-2270 dated by 24-10-2011 20-27
Other Annexures
3
Industry Letter (dated 11-6-2012) to MoEF for EC Validity Extension MoEF vide File No. J-11011/242/2012-IA.II(I) dated 19-06-2012 with Proposal No. IA/AP/IND/3648/2012 dated 19-6-2012
28
4 Minutes for the 3rd Reconstituted EAC Meeting held on 3rd – 5th December, 2012 for EC Validity Extension (Agenda No. 3.7.30)
29-30
5 Letter submitted to MoEF&CC for follow up regarding EC Validity Extension dated 5-5-2016 31
6 Letter submitted to MoEF&CC for follow up regarding EC Validity Extension vide Lr. No. PLPL/MoEF&CC/Oct.2016 dated 27-10-2016