November 16, 2016 45 APPENDIX G: Meeting Materials Presentation Boards
November 16, 2016 45
APPENDIX G:Meeting Materials
Presentation Boards
November 16, 2016 46
Welcome!
AGENDA6 - 6:30 p.m. Visit information stations and speak one-on-one with
project representatives
6:30 - 7:30 p.m. Formal presentation followed by brief Q& A
7:30 - 8 p.m. Visit information stations and speak one-on-one with project representatives
PURPOSE OF TODAY�S MEETINGTo obtain public input on preliminary design plans for the Loop 202(South Mountain Freeway) Project
Not to debate project alignment and “build or no build” options
YOUR INPUT IS IMPORTANT TO US!Submit your comments at today’s meeting
Speak to project representatives in personWrite your comments on the forms provided and hand them to aproject team member
Send us your commentsEmail: southmountainfreewayinfo@ c202p.comProject website: southmountainfreeway.com
Mail your comments to us at the following addressSouth Mountain Freeway Project Team; 411 N. Roosevelt Ave.Chandler, AZ 85226
Call us at the project hotline:1.855.SMF.L202 (1.855.SMF.L202) / Para españ ol: 623.239.4558
November 16, 2016 47
2016 2017 2018 2019WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL
Design Phase and Preconstruction Activities
Utility Relocation
Construction Phase*
Public Meetings to Obtain Input on Preliminary Design Plans
Public Meetings to Share Final Plans, Present
Construction Information and Introduce Construction Managers
Construction Segments and Schedule
DowntownPhoenix
Gila River Indian Community
Phoenix
10
10
10
10
17
17
60
202LOOP
51SR
75th
Ave.
59th
Ave.
51st A
ve.
43rd
Ave.
67th
Ave.
Roosevelt
Van Buren
UPRRBuckeye Rd.
Broadway Rd.
Southern Ave.
Baseline Rd.
Dobbins Rd.
Elliot Rd.
Estrella Dr.
LACC
Lower Buckeye Rd.
Elwood
RID Canal
51st Ave.
Ivanhoe St.
17th
Ave.
Dese
rt Fo
othills
Pk
wy.
24th
St.
32nd
St.
40th
St.
Salt River
I-10 PapagoSegment
Salt River Segment
Center Segment
Pecos Segment
South Mountain Park
SR 202L AlignmentSouth Mountain Freeway Interchange LocationsGila River Indian Community
LEGEND
* Notes:1. Preliminary Schedule � Subject to Change.2. Due to the nature of the design-build project delivery method being used for the South Mountain Freeway Project and the fact that it is a 22-mile project, construction activities will occur in multiple locations
within each construction segment during the construction phase.
PUBLIC INVOLVEMENT OPPORTUNITIES*
PROJECT SCHEDULE OVERVIEW
Pecos, Salt River and I-10 Segments
CenterSegment
CenterSegment
Pecos, Salt River and I-10 Segments
November 16, 2016 48
Five Different Character Areas for Landscape Architectural Design
Five Unique Aesthetic Areas
Landscaping and Aesthetic Design Concepts
November 16, 2016 49
Landscape and Aesthetics
Noise
Right-of-Way
Diverging Diamond Interchange
ADOT Title VI Notice
November 16, 2016 50
APPENDIX H:Preliminary Design
Public Input Meetings Presentation