November 16, 2016 45 APPENDIX G: Meeting Materials Presentation Boards
6

APPENDIX G: Meeting Materials Presentation Boards...Presentation Boards. November 16, 2016 46 Welcome! AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with ...

Jul 25, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: APPENDIX G: Meeting Materials Presentation Boards...Presentation Boards. November 16, 2016 46 Welcome! AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with ...

November 16, 2016 45

APPENDIX G:Meeting Materials

Presentation Boards

Page 2: APPENDIX G: Meeting Materials Presentation Boards...Presentation Boards. November 16, 2016 46 Welcome! AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with ...

November 16, 2016 46

Welcome!

AGENDA6 - 6:30 p.m. Visit information stations and speak one-on-one with

project representatives

6:30 - 7:30 p.m. Formal presentation followed by brief Q& A

7:30 - 8 p.m. Visit information stations and speak one-on-one with project representatives

PURPOSE OF TODAY�S MEETINGTo obtain public input on preliminary design plans for the Loop 202(South Mountain Freeway) Project

Not to debate project alignment and “build or no build” options

YOUR INPUT IS IMPORTANT TO US!Submit your comments at today’s meeting

Speak to project representatives in personWrite your comments on the forms provided and hand them to aproject team member

Send us your commentsEmail: southmountainfreewayinfo@ c202p.comProject website: southmountainfreeway.com

Mail your comments to us at the following addressSouth Mountain Freeway Project Team; 411 N. Roosevelt Ave.Chandler, AZ 85226

Call us at the project hotline:1.855.SMF.L202 (1.855.SMF.L202) / Para españ ol: 623.239.4558

Page 3: APPENDIX G: Meeting Materials Presentation Boards...Presentation Boards. November 16, 2016 46 Welcome! AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with ...

November 16, 2016 47

2016 2017 2018 2019WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL WINTER SPRING SUMMER FALL

Design Phase and Preconstruction Activities

Utility Relocation

Construction Phase*

Public Meetings to Obtain Input on Preliminary Design Plans

Public Meetings to Share Final Plans, Present

Construction Information and Introduce Construction Managers

Construction Segments and Schedule

DowntownPhoenix

Gila River Indian Community

Phoenix

10

10

10

10

17

17

60

202LOOP

51SR

75th

Ave.

59th

Ave.

51st A

ve.

43rd

Ave.

67th

Ave.

Roosevelt

Van Buren

UPRRBuckeye Rd.

Broadway Rd.

Southern Ave.

Baseline Rd.

Dobbins Rd.

Elliot Rd.

Estrella Dr.

LACC

Lower Buckeye Rd.

Elwood

RID Canal

51st Ave.

Ivanhoe St.

17th

Ave.

Dese

rt Fo

othills

Pk

wy.

24th

St.

32nd

St.

40th

St.

Salt River

I-10 PapagoSegment

Salt River Segment

Center Segment

Pecos Segment

South Mountain Park

SR 202L AlignmentSouth Mountain Freeway Interchange LocationsGila River Indian Community

LEGEND

* Notes:1. Preliminary Schedule � Subject to Change.2. Due to the nature of the design-build project delivery method being used for the South Mountain Freeway Project and the fact that it is a 22-mile project, construction activities will occur in multiple locations

within each construction segment during the construction phase.

PUBLIC INVOLVEMENT OPPORTUNITIES*

PROJECT SCHEDULE OVERVIEW

Pecos, Salt River and I-10 Segments

CenterSegment

CenterSegment

Pecos, Salt River and I-10 Segments

Page 4: APPENDIX G: Meeting Materials Presentation Boards...Presentation Boards. November 16, 2016 46 Welcome! AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with ...

November 16, 2016 48

Five Different Character Areas for Landscape Architectural Design

Five Unique Aesthetic Areas

Landscaping and Aesthetic Design Concepts

Page 5: APPENDIX G: Meeting Materials Presentation Boards...Presentation Boards. November 16, 2016 46 Welcome! AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with ...

November 16, 2016 49

Landscape and Aesthetics

Noise

Right-of-Way

Diverging Diamond Interchange

ADOT Title VI Notice

Page 6: APPENDIX G: Meeting Materials Presentation Boards...Presentation Boards. November 16, 2016 46 Welcome! AGENDA 6 - 6:30 p.m. Visit information stations and speak one-on-one with ...

November 16, 2016 50

APPENDIX H:Preliminary Design

Public Input Meetings Presentation