APPENDIX D Pipeline Facility Tables Table D-1. Areas Where the Pipeline is Co-Located with Existing Rights-of-Way and Corridors Table D-2. Access Roads and Road Crossing Methods Table D-3. Potential Hydrostatic Dewatering (Test Header) Locations within the Construction Right-of-Way Table D-4. Areas Where Topsoil Will Be Salvaged along the Proposed Route Table D-5 Temporary Extra Work Areas Necessary for Construction of the Pipeline Table D-6. Uncleared Storage Areas Necessary for Construction of the Pipeline Table D-7 Rock Source and Permanent Disposal Sites Identified for Construction of the Pipeline Table D-8 Landownership/Jurisdiction by Milepost Table D-9 Contractor and Pipe Storage Yards that May Be Used during Construction of the Pipeline