Top Banner
CROSS YARRA PARTNERSHIP Building Brilliance TAS-CYP-CBN-ZWD-PLA-XLP-TNC-X0001 Rev D D Appendix D: CBD North Public Realm Plans Public Realm Legend TAS-CYP-CN-00-DRG-AUD-CNB-730001-DP Hardscape Plan Sheet 1 of 8 TAS-CYP-CN-00-DRG-AUD-CNB-732102-DP Hardscape Plan Sheet 2 of 4 TAS-CYP-CN-00-DRG-AUD-CNB-732103-DP Hardscape Plan Sheet 3 of 4 TAS-CYP-CN-00-DRG-AUD-CNB-732104-DP Hardscape Plan Sheet 4 of 4 TAS-CYP-CN-00-DRG-AUD-CNB-732105-DP
6

Appendix D: CBD North Public Realm Plans

Dec 18, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Appendix D: CBD North Public Realm Plans

CROSS YARRA PARTNERSHIP Building Brilliance TAS-CYP-CBN-ZWD-PLA-XLP-TNC-X0001 Rev D D

Appendix D: CBD North Public Realm Plans

Public Realm Legend TAS-CYP-CN-00-DRG-AUD-CNB-730001-DP

Hardscape Plan – Sheet 1 of 8 TAS-CYP-CN-00-DRG-AUD-CNB-732102-DP

Hardscape Plan – Sheet 2 of 4 TAS-CYP-CN-00-DRG-AUD-CNB-732103-DP

Hardscape Plan – Sheet 3 of 4 TAS-CYP-CN-00-DRG-AUD-CNB-732104-DP

Hardscape Plan – Sheet 4 of 4 TAS-CYP-CN-00-DRG-AUD-CNB-732105-DP

Page 2: Appendix D: CBD North Public Realm Plans

Outdoor dining area

B ike Stand Area

Bike Stand Area

Bike Stand Area

CONSTRUCTION ZONE

CONSTRUCTION ZONE

GRATED PIT

GRATED PIT

GRATED PIT

GRATED PIT

GRATED PIT

GRATED PIT

VALVE

VALVE

VALVE

VALVE

VALVE

HYDRANT

VALVE

HYDRANT

HYDRANT

TELSTRA

VALVE

VALVEVALVE VALVE

VALVE

VALVE VALVE

GRATED PIT

GRATED PIT

Com

ms

Com

ms

OPTUS

UP

UPUP

UP

UP

EXTENT OF PUBLIC REALM AND ARCHITECTURAL DESIGN RESPONSE

PROPOSED TREE IN GARDEN BED / GRASS

EXISTING TREE

NOTES:

EXISTING TREES TO BE REMOVED AND RETAINED ARE CURRENT AS AT 27.11.2017 AND SUBJECT TO FURTHER DETAILED DESIGN THAT MAY RESULT IN FURTHER CHANGE. CROSS YARRA PARTNERSHIP IS COMITTED TO PROTECTING AS MANY TREES AS POSSIBLE. THIS WILL REMAIN A PRIORITY THROUGHOUT DETAILED DESIGN

LOCATION OF STREET FURNITURE SUBJECT TO DETAILED DESIGN

BICYCLE PARKING LOCATIONS UNDER REVIEW IN CONSULTATION WITH STAKEHOLDERS

LIGHTING - INDICATIVE LOCATION AND TYPES SHOWN, SUBJECT TO DETAIL DESIGN

REFER TO MATERIALS PALETTE IN DEVELOPMENT PLAN REPORT

STONE EDGE (FLUSH IN GROUND)

OVER SITE DEVELOPMENT

EXISTING STONE PAVING

STONE PAVING

STONE PAVING (VEHICULAR)

GARDEN BED

WSUD PLANTING(WATER SENSITIVE URBAN DESIGN)EXTENT AND LOCATION SUBJECT TO DETAILED DESIGN

PROPOSED TREE - IN PAVED SURFACE

STONE STAIR

STONE SEATING TERRACE (HEAVY LINE INDICATES STEP)

BIKE HOOPS

RUBBISH AND RECYCLE BINS

BOLLARDS

DRINKING FOUNTAIN

BENCHES / SEATS

STONE SEAT WALL

BIKE SHARE STAND

DECKING

OUTDOOR WORKING BENCHGREEN ROOF

NEW TREE SURROUND TO EXISTING TREE (PASSIVELY IRRIGATED)

SPORTS COURT

ASPHALT FOOTPATH

CLIMBING PLANTS TO FACADE

STREET LIGHT

PEDESTRIAN LANTERN

POLE LIGHT

BICYCLE LANE SURFACING

GENERAL DIRECTION OF FALL (PASSIVE IRRIGATION)

TREE PIT AND SOIL VOLUME (DASHED)

STATION ENTRANCE

POSSIBLE INDICATIVE CAFE ZONE (FURNITURE BY TENNANTS)

ENTRY

WALL MOUNTED LUMINARY

RECESSED LOW LEVEL FEATURE LIGHT

NOTE: LIGHT TYPES AND LOCATION ARE SHOWN INDICATIVELY ONLY -AND ARE SUBJECT TO DETAILED DESIGN

INDICATIVE DRAINAGE OR PASSIVE IRRIGATION ELEMENT. TYPE AND EXTENT SUBJECT TO DETAIL DESIGN.

FREE STANDING RETAIL KIOSK

TREE TO BE REMOVED; AS PER THE CYP MELBOURNE METRO GIS

PRECINCT SIGNAGE

STATION TOTEM SIGN

EVENT LIGHT

UP

UP

PROJECT LAND BOUNDARY

732102

732103

732104

732105

730200

L A T R O B E S T R E E T

V I C T O R I A S T R E E T

S W A N S T O N S T R E E T

732202

732203

732204

732205

DEVELOPMENT PLAN SUBMISSION

Certif

ied B

y:(B

LOCK

LETT

ERS)

(SIG

NATU

RE)

(DAT

E)

Revised By In Serv Rev. Date Description Designed Checked Ind. Rev. Approv.

Up LocationEast.North.ID#

Down LocationEast.North.ID#

Datum

A1

Project Drawing Number

File Name

Sheet No.

Scale Sheet Size

Drawn By Designed By

Checked By Ind. Review

Approval DateApproved

Drawing Number Revision

ARCHITECTURAL

NOT FOR CONSTRUCTION

Revision

CYP H+WW

H+WW H+WW

hrlv/GB

hrlv/GB

As indicated

G.3

24/1

1/20

17 4

:02:

31 P

M

PUBLIC REALM LEGEND

METRO TUNNELCBD NORTH STATION

TAS-CYP-CN-00-DRG-AUD-CBN-730001-DP

L E G E N D K E Y P L A N

N

G.3 24.11.17 ISSUED FOR DEVELOPMENT PLAN

Page 3: Appendix D: CBD North Public Realm Plans

F R A N K L I N S T R E E T

M E L B O U R N E C I T Y B A T H S

S W A

N S T

O N

S T

R E E

T

V I C T O R I A S T R E E T

R M I T

RL21.100 +RL21.430 +

ex RL21.106 +

ex RL22.813 +

ex RL23.020 +

RL21.670 +

RL18.120 +

RL18.000 +

RL24.200 +

RL25.600 +

RETAIN EXISTING TREES, TURF, RETAINING WALL AND PAVED AREA

1734202-DP

DASHED EXTENT OF STATION CANOPY OVER, SHOWN INDICATIVELY

EXISTING HERITAGE TRAM BUILDING

FOOTPATH WIDENING TO NEW KERB LINE

3 RAIL STAFF PARKING DDA PARKING

B O

W E

N S

T.

ENTR

Y

HYDRANT BOOSTERCABINET, LIFT AND EMERGENCY ACCESS STAIR WITH GREEN ROOF ABOVE

42 B

IKES

4 BIKES

6 BIKES

16 BIK

ES

REINSTATE EXISTING BICYCLE PARKING FOR BATHS

PARK

ING/LO

ADING

ZONE

S T E

W A R

T S

T.

ROAD LAYOUT SUBJECT TO FURTHER CONSULTATION WITH KEY STAKEHOLDERS

ENTRY

18 BIKES

RMIT BUILDING OVERHANG

12 BI

KES

4 BIKES 4 BIKES

REINSTATE EXISTING BICYCLE PARKING FOR BATHS

REINSTATE EXISTING BICYCLE PARKING FOR BATHS (12 BIKES)

RL22.005 +

RL22.011 +

MANUAL FLOOD BARRIER

PARKING/LOADING ZONE

CLIMBING PLANT SCREEN TO ANCILLARY BUILDINGS

DEVELOPMENT PLAN SUBMISSION

0 5 10 20m

1:250

Certif

ied B

y:(B

LOCK

LETT

ERS)

(SIG

NATU

RE)

(DAT

E)

Revised By In Serv Rev. Date Description Designed Checked Ind. Rev. Approv.

Up LocationEast.North.ID#

Down LocationEast.North.ID#

Datum

A1

Project Drawing Number

File Name

Sheet No.

Scale Sheet Size

Drawn By Designed By

Checked By Ind. Review

Approval DateApproved

Drawing Number Revision

ARCHITECTURAL

NOT FOR CONSTRUCTION

Revision

CYP H+WW

H+WW H+WW

hrlv/GB

hrlv/GBPROJECT LAND BOUNDARYEXTENT OF PUBLIC REALM / DESIGN RESPONSE

LEGEND

1 : 250

G.4

8/03

/201

8 6:

06:2

8 PM

HARDSCAPE PLAN - SHEET 01 OF 04

METRO TUNNELCBD NORTH STATION

TAS-CYP-CN-00-DRG-AUD-CBN-732102-DP

N

G.4 08.03.18 ISSUED FOR DEVELOPMENT PLAN

Page 4: Appendix D: CBD North Public Realm Plans

F R A N K L I N S T R E E T

V I C T O R I A S T R E E T

R M I TB O

W E

N

S T

.

EXISTING SCULPTURE AND GARDEN BED RETAINED

RL29.566 +

RL28.276 +

RL28.750 +

RL27.360 +

STUDY DESKS AND STOOLS

C A

R D

I G

A N

S

T R

E E

T

DDA PARKING DDA PARKING

REPLACEMENT BUS BAY

DEVELOPMENT PLAN SUBMISSION

0 5 10 20m

1:250

Certified By

:

(BLO

CK LE

TTER

S)

(SIGNAT

URE)

(DAT

E)

Revised By In Serv Rev. Date Description Designed Checked Ind. Rev. Approv.

Up Location

East.

North.

ID#

Down Location

East.

North.ID#

Datum

A1

Project Drawing Number

File Name

Sheet No.

Scale Sheet Size

Drawn By Designed By

Checked By Ind. Review

Approval DateApproved

Drawing Number Revision

ARCHITECTURAL

NOT FOR CONSTRUCTION

Revision

CYP H+WW

H+WW H+WW

hrlv/GB

hrlv/GBPROJECT LAND BOUNDARY

EXTENT OF PUBLIC REALM / DESIGN RESPONSE

LEGEND

1 : 250

G.3

24/11/2017 11:08:50 AM

HARDSCAPE PLAN - SHEET 02 OF 04

METRO TUNNELCBD NORTH STATION

TAS-CYP-CN-00-DRG-AUD-CBN-732103-DP

N

G.3 24.11.17 ISSUED FOR DEVELOPMENT PLAN

Page 5: Appendix D: CBD North Public Realm Plans

Com

ms

Com

ms

S W

A N

S T

O N

S T

R E

E T

A ' B E C K E T T S T.

S T E

W A

R T

S T

R E

E T

B O

W E

N S

T R

E E

T

N E

W A

C A

D E

M I

C S

T R

E E

T

R M I T

R M I T

EXISTING SUPER TRAM STOP

EXISTING FOOTPATH TO BE RETAINED

O X F O R D S C H O L A RH O T E L

R M I T A R T S C H O O L

EXISTING FOOTPATH AND STREET FURNITURE TO BE RETAINED

10 X

EXI

STIN

G BI

KE S

HARE

EXIS

TING

BIKE

LANE

EXIS

TING

BIKE

LANE

POSSIBLE SOCIAL ENTERPRISE

EMERGENCY EXIT STAIRS AND FIRE CONTROL CENTRE WITH GREEN ROOF ABOVE

RL 21.800 +

RL 20.900 +

RL 20.400 +RL 20.500 +

RL 20.900 +

RL 21.700 +

RL 19.400 +

RL 18.700 +

RL 21.680 +RL 21.860 +

VENT SHAFT

STONE BLEACHER SEATS VERTICAL PLANTING TO WALL

NEW STREET FURNITURE TO MATCH WITH EXISTING CURVED BENCHES

SHARED ROAD FOR VEHICLE ACCESS TO RESIDENTIAL CARPARK

EXISTING PEDESTRIAN LEVEL CROSSING

1734203-DP

REINSTATE EXISTING BIKE SHARE TO AVOID PASSENGER CONFLICT

MULTIPURPOSE SPORTS AND EVENTS COURT

VENT SHAFT

EVENT LIGHTING

NOTE: ANCILLARY STRUCTURES FLOOD PROTECTION IN ABEYANCE

EXISTING SHARED BIKE AND TRAFFIC LANE TO BE CONVERTED TO BIKE LAN E ONLY

DEVELOPMENT PLAN SUBMISSION

0 5 10 20m

1:250

Certif

ied B

y:(B

LOCK

LETT

ERS)

(SIG

NATU

RE)

(DAT

E)

Revised By In Serv Rev. Date Description Designed Checked Ind. Rev. Approv.

Up LocationEast.North.ID#

Down LocationEast.North.ID#

Datum

A1

Project Drawing Number

File Name

Sheet No.

Scale Sheet Size

Drawn By Designed By

Checked By Ind. Review

Approval DateApproved

Drawing Number Revision

ARCHITECTURAL

NOT FOR CONSTRUCTION

Revision

CYP H+WW

H+WW H+WW

hrlv/GB

hrlv/GBPROJECT LAND BOUNDARYEXTENT OF PUBLIC REALM / DESIGN RESPONSE

LEGEND

1 : 250

G.3

24/1

1/20

17 5

:08:

47 P

M

HARDSCAPE PLAN - SHEET 03 OF 04

METRO TUNNELCBD NORTH STATION

TAS-CYP-CN-00-DRG-AUD-CBN-732104-DP

N

G.3 08.03.18 ISSUED FOR DEVELOPMENT PLAN

Page 6: Appendix D: CBD North Public Realm Plans

Outdoor dining area

Bike Stand Area

UP

UP

UP

UP

UP

L I T T L E L A T R O B E S T R E E T

L A T R O B E S T R E E T

ENTR Y

O S D

R M I T A R T S C H O O L

RETAIN EXISTING TRAM STOP

S W

A N

S T

O N

S T

R E

E T

B O

W E

N S

T R

E E

T

N E W A C A D E M I C

S T.

OSD SITE OUTLINE

EXISTING TRAM STOP

LOADING BAY

EXISTING BIKE LANEEXISTING BIKE LANE

EXISTING BIKE LANE EXISTING BIKE LANE

LOAD

ING

BAY

RL 22.200 +

RL 22.170+

RL 20.040 +

RL 20.150 +

RL 22.180 +

RL 22.750 +

RL 22.560+

RL 21.960+

EXISTING STREET FURNITURE TO BE RETAINED

DDA

LOADING BAYLOADING BAY

O S D

SECURE PERIMETER OF BOLLARDS TO STATION ENTRY

ENTRY

STATION TOTEM SIGNAGE

PRECINCT SIGNAGE

STATION LOADING BAY DRIVEWAY ENTRANCE

REMOVEABLE BOLLARDS

REMOVEABLE BOLLARDS

RL 22.910 +

EXISTING SHARED BIKE AND TRAFFIC LANE TO BE CONVERTED TO BIKE LANE ONLY

L I T

E R

A T

U R

E L

A N

E

RL 22.610 +

DEVELOPMENT PLAN SUBMISSION

0 5 10 20m

1:250

Certif

ied B

y:(B

LOCK

LETT

ERS)

(SIG

NATU

RE)

(DAT

E)

Revised By In Serv Rev. Date Description Designed Checked Ind. Rev. Approv.

Up LocationEast.North.ID#

Down LocationEast.North.ID#

Datum

A1

Project Drawing Number

File Name

Sheet No.

Scale Sheet Size

Drawn By Designed By

Checked By Ind. Review

Approval DateApproved

Drawing Number Revision

ARCHITECTURAL

NOT FOR CONSTRUCTION

Revision

CYP H+WW

H+WW H+WW

hrlv/GB

hrlv/GBPROJECT LAND BOUNDARYEXTENT OF PUBLIC REALM / DESIGN RESPONSE

LEGEND

1 : 250

G.5

8/03

/201

8 6:

26:4

0 PM

HARDSCAPE PLAN - SHEET 04 OF 04

METRO TUNNELCBD NORTH STATION

TAS-CYP-CN-00-DRG-AUD-CBN-732105-DP

N

G.5 08.03.18 ISSUED FOR DEVELOPMENT PLAN