Top Banner
Appendix C2 Alternative 2 – Conceptual Plans
4

Appendix C Alternative 2 Conceptual Plans - New York · Figure C2-3 NC C Capital Project ANRE Conceptual Graphic of Alternative 2 (Project Area One - Reaches I and J) NOTE: Preliminary

Jun 27, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Appendix C Alternative 2 Conceptual Plans - New York · Figure C2-3 NC C Capital Project ANRE Conceptual Graphic of Alternative 2 (Project Area One - Reaches I and J) NOTE: Preliminary

Appendix C2Alternative 2 – Conceptual Plans

Page 2: Appendix C Alternative 2 Conceptual Plans - New York · Figure C2-3 NC C Capital Project ANRE Conceptual Graphic of Alternative 2 (Project Area One - Reaches I and J) NOTE: Preliminary

Figure C2-1Conceptual Graphic of Alternative 2 (Project Area One - Reaches A through D)

EAST SIDE COASTAL RESILIENCY PROJECTNYC DDC Capital Project: SANDRESM1

NOTE: Preliminary Design Concept

FIELD 2 SHIFTED EAST

Page 3: Appendix C Alternative 2 Conceptual Plans - New York · Figure C2-3 NC C Capital Project ANRE Conceptual Graphic of Alternative 2 (Project Area One - Reaches I and J) NOTE: Preliminary

Figure C2-2EAST SIDE COASTAL RESILIENCY PROJECTNYC DDC Capital Project: SANDRESM1 Conceptual Graphic of Alternative 2 (Project Area One - Reaches E through H)

NOTE: Preliminary Design Concept

NEW BRIDGE RAMP

FIELD 3 SHIFTED EAST

Page 4: Appendix C Alternative 2 Conceptual Plans - New York · Figure C2-3 NC C Capital Project ANRE Conceptual Graphic of Alternative 2 (Project Area One - Reaches I and J) NOTE: Preliminary

Figure C2-3EAST SIDE COASTAL RESILIENCY PROJECTNYC DDC Capital Project: SANDRESM1 Conceptual Graphic of Alternative 2 (Project Area One - Reaches I and J)

NOTE: Preliminary Design Concept

kmui
Text Box
The flood protection alignment in Project Area Two would be similar to the alignment for the Preferred Alternative except for Murphy Brothers Playground and Asser Levy Playground, where they would be replaced in kind under this alternative. Please refer to Appendix C1 for conceptual design drawings for Project Area Two.